CN107100357B - A kind of construction is with holding hanger - Google Patents

A kind of construction is with holding hanger Download PDF

Info

Publication number
CN107100357B
CN107100357B CN201710395006.7A CN201710395006A CN107100357B CN 107100357 B CN107100357 B CN 107100357B CN 201710395006 A CN201710395006 A CN 201710395006A CN 107100357 B CN107100357 B CN 107100357B
Authority
CN
China
Prior art keywords
open slot
pin shaft
pulling plate
fixed block
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710395006.7A
Other languages
Chinese (zh)
Other versions
CN107100357A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qing Fengshou
Shang Jingzhan
Zuo Shibo
Original Assignee
Qing Feng Shou
Shang Jing Zhan
Sun Li Bin
Yang Zhong Wei
Zuo Shi Bo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qing Feng Shou, Shang Jing Zhan, Sun Li Bin, Yang Zhong Wei, Zuo Shi Bo filed Critical Qing Feng Shou
Priority to CN201710395006.7A priority Critical patent/CN107100357B/en
Publication of CN107100357A publication Critical patent/CN107100357A/en
Application granted granted Critical
Publication of CN107100357B publication Critical patent/CN107100357B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to construction hanging frame technical field, in particular to a kind of construction constitutes a triangular structure with hanger is held between vertical beam, crossbeam and cant beam three;Pre-embedded bolt is fixed in the inner cavity of counterbore with nut check after passing through through-hole;Link block is made of pulling plate and attachment beam;The inside of open slot is arranged in pulling plate;One end face of pulling plate is mutually fixedly connected with attachment beam one end;The attachment beam other end is mutually fixedly connected with crossbeam close to one end of vertical beam after reaching the outside of open slot;Fast locking device is provided on the left and right sides wall of fixed block;Pulling plate is locked at the inner cavity of open slot by fast locking device.In using the present invention, head one end of pre-embedded bolt is pre-buried is fixed in concrete structure;Fixed block is locked on the surface of concrete structure by nut and pre-embedded bolt, then link block is locked in open slot by fast locking device, realizes the installation for holding hanger;The structure installation effectiveness is high, uses manpower and material resources sparingly, accelerates construction progress.

Description

A kind of construction is with holding hanger
Technical field
The utility model relates to construction hanging frame technical field, in particular to a kind of construction is with holding hanger.
Background technique
In the industrial premises based on concrete shear force wall, floor construction, wall segment is due to highly higher, and wall is not It cannot be completed once, and need to be divided into two or more layers and pour.When constructing different height, materials dumping, personnel operating space, The problems such as steel bar template is constructed is difficult to solve.Load-bearing hanger can construct for current layer and provide by hanging on construction layer One safe, simple and reliable job platform.Building sufficiently large space and construct needs multiple hangers that hold to be propped up Support;But construction now holds that hanger speed is slow, the workload of multiple installations for holding hanger be it is quite big, expend a large amount of Manpower and material resources;And delay construction speed.
Utility model content
The purpose of this utility model is that it is in view of the drawbacks of the prior art and insufficient, one kind building easy to use is provided and is applied Work is with holding hanger.
In order to achieve the above purposes, the technical solution adopted by the utility model is:
With hanger is held, it includes vertical beam, fixed block, pre-embedded bolt, spiral shell for a kind of construction described in the utility model Mother, link block, crossbeam and cant beam;Described vertical beam one end is mutually fixedly connected with the bottom of one end of the beam;Described cant beam one end and cross Beam other end bottom is mutually fixedly connected;The cant beam other end is mutually fixedly connected with the side of the vertical beam other end;The vertical beam, cross A triangular structure is constituted between beam and cant beam three;The front end face of the fixed block is provided with open slot;The open slot Intracavity bottom be provided with several counterbores;The rear end face of the fixed block is provided with the through-hole being connected with counterbore;It is described pre- Bolt is buried to fix in the inner cavity of counterbore with nut check after through-hole;The cross section of the link block is in T-shaped shape;It is described Link block is made of pulling plate and attachment beam;The inside of open slot is arranged in the pulling plate;One end face of pulling plate and attachment beam one End is mutually fixedly connected;The attachment beam other end, which reaches, to be connected close to one end of vertical beam is mutually fixed with crossbeam behind the outside of open slot It connects;Fast locking device is provided on the left and right sides wall of the fixed block;The pulling plate is locked at open slot by fast locking device Inner cavity;The fast locking device includes pin shaft, spring, pressing plate and positioning bolt;The quantity at least two of the pin shaft;Institute State the pilot hole for being provided on the side wall of fixed block and matching with pin shaft;The inner cavity of the pilot hole and open slot is connected;Institute The quantity for stating pilot hole is equal with the quantity of pin shaft;The spiral shell to match with positioning bolt is provided on the lateral wall of the fixed block Pit;Described pin shaft one end is mutually fixedly connected after passing through spring with pressing plate;The pin shaft other end is extend into after passing through pilot hole The inside of open slot;The pin shaft is pressed in the front surface of pulling plate;The positioning bolt pass through pressing plate after with threaded hole phase spiral shell Line connection.
Further, the bottom of the vertical beam is provided with adjusting threaded hole;Adjusting spiral shell is provided on the adjusting threaded hole Bolt;The adjusting bolt is wanted to be threadedly coupled with threaded hole is adjusted.
After adopting the above structure, the utility model has the beneficial effect that a kind of construction described in the utility model with holding Hanger constitutes a triangular structure between vertical beam, crossbeam and cant beam three;The front end face of fixed block is provided with open slot;It opens The intracavity bottom of mouth slot is provided with several counterbores;The rear end face of fixed block is provided with the through-hole being connected with counterbore;Pre-buried spiral shell Bolt is fixed in the inner cavity of counterbore with nut check after passing through through-hole;Link block is made of pulling plate and attachment beam;Pulling plate setting is being opened The inside of mouth slot;One end face of pulling plate is mutually fixedly connected with attachment beam one end;After the attachment beam other end reaches the outside of open slot It is mutually fixedly connected with crossbeam close to one end of vertical beam;Fast locking device is provided on the left and right sides wall of fixed block;Pulling plate passes through Fast locking device is locked at the inner cavity of open slot.When the utility model is used, head one end of pre-embedded bolt it is pre-buried be fixed on it is mixed In Xtah Crude Clay structure;Fixed block is locked on the surface of concrete structure by nut and pre-embedded bolt, then link block passes through Fast locking device is locked in open slot, realizes the installation for holding hanger;The structure installation effectiveness is high, uses manpower and material resources sparingly, accelerates to apply Work progress.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram that link block is locked in fixed block by fast locking device;
Fig. 3 is B in Fig. 2 to sectional view;
Fig. 4 is the portion the A enlarged view in Fig. 1;
Description of symbols:
1, concrete structure;2, vertical beam;201, threaded hole is adjusted;3, fixed block;301, open slot;
301a, counterbore;302, pilot hole;303, threaded hole;304, through-hole;4, pre-embedded bolt;
5, nut;6, link block;601, pulling plate;602, attachment beam;7, crossbeam;8, cant beam;
9, bolt is adjusted;10, pin shaft;11, spring;12, pressing plate;13, positioning bolt.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings.
As shown in Figures 1 to 4, with hanger is held, it includes vertical beam 2, fixes for a kind of construction described in the utility model Block 3, pre-embedded bolt 4, nut 5, link block 6, crossbeam 7 and cant beam 8;The bottom of described 2 one end of vertical beam and 7 one end of crossbeam is mutually fixed Connection;Described 8 one end of cant beam is mutually fixedly connected with 7 other end bottom of crossbeam;8 other end of cant beam and 2 other end of vertical beam Side is mutually fixedly connected;A triangular structure is constituted between 8 three of the vertical beam 2, crossbeam 7 and cant beam;The fixed block 3 Front end face is provided with open slot 301;The intracavity bottom of the open slot 301 is provided with several counterbores 301a;The fixed block 3 Rear end face be provided with the through-hole 304 being connected with counterbore 301a;The pre-embedded bolt 4 is after through-hole 304 in counterbore 301a Inner cavity be locked with nut 5;The cross section of the link block 6 is in T-shaped shape;The link block 6 is by pulling plate 601 and even Connect the composition of beam 602;The inside of open slot 301 is arranged in the pulling plate 601;601 1 end face of pulling plate and 602 one end of attachment beam Mutually it is fixedly connected;602 other end of attachment beam reaches one end phase behind the outside of open slot 301 with crossbeam 7 close to vertical beam 2 It is fixedly connected;Fast locking device is provided on the left and right sides wall of the fixed block 3;The pulling plate 601 is locked by fast locking device Tightly in the inner cavity of open slot 301;Head one end of pre-embedded bolt 4 is pre-buried to be fixed in concrete structure 1;By nut 5 and in advance It buries bolt 4 to be locked at fixed block 3 on the surface of concrete structure 1, then link block 6 is locked in open slot by fast locking device In 301, the installation for holding hanger is realized;The structure installation effectiveness is high, uses manpower and material resources sparingly, accelerates construction progress;The fast lock dress Set includes pin shaft 10, spring 11, pressing plate 12 and positioning bolt 13;The quantity at least two of the pin shaft 10;The fixation The pilot hole 302 to match with pin shaft 10 is provided on the side wall of block 3;The pilot hole 302 connects with the inner cavity of open slot 301 It is logical;The quantity of the pilot hole 302 is equal with the quantity of pin shaft 10;It is provided on the lateral wall of the fixed block 3 and positioning spiral shell The threaded hole 303 that bolt 13 matches;Described 10 one end of pin shaft is fixedly connected after passing through spring 11 with 12 phase of pressing plate;The pin shaft 10 The other end extend into the inside of open slot 301 after pilot hole 302;The pin shaft 10 is pressed in the front surface of pulling plate 601; The positioning bolt 13 is threadedly coupled after passing through pressing plate 12 with 303 phase of threaded hole;Rotational positioning bolt 13 makes entire 12 edge of pressing plate The sliding of 302 direction of pilot hole, drives each pin shaft 10 being fixed on pressing plate 12 to move, and makes link block 6 solid by pin shaft 10 Determine to lock on block 3;When holding hanger dismounting, the positioning bolt 13 of two sides is unclamped, all pin shafts 10 are retracted into pilot hole 302, Link block 6 can be removed from fixed block 3;And the effect of spring 11 is that the teeth of positioning bolt 13 is made tightly to be pressed on screw thread always In the teeth in hole 303, anti-loose effect is played.
As a kind of preferred embodiment of the utility model, the bottom of the vertical beam 2, which is provided with, adjusts threaded hole 201;It is described It adjusts to be provided on threaded hole 201 and adjusts bolt 9;The adjusting bolt 9 is wanted to be threadedly coupled with threaded hole 201 is adjusted;Adjust spiral shell The end of bolt 9 is pressed on the surface of concrete structure 1;It on the one hand is that vertical beam 2 provides a support on concrete structure 1 Point makes the pivot angle of vertical beam 2 by adjusting the rotation of bolt 9, makes on the other hand when link block 6 is mounted on the inside of open slot 301 The rear surface of link block 6 is bonded with the bottom surface of open slot 301.
When using the utility model, head one end of pre-embedded bolt is pre-buried to be fixed in concrete structure;By nut with Pre-embedded bolt is locked at fixed block on the surface of concrete structure, makes the pivot angle of vertical beam by adjusting bolt rotation, makes to connect The rear surface of block is bonded with the bottom surface of open slot;Rotational positioning bolt slides entire pressing plate along pilot hole direction, drives solid The each pin shaft movement being scheduled on pressing plate, locks link block on fixed block by pin shaft;When holding hanger dismounting, two sides are unclamped Positioning bolt, all pin shafts are retracted into pilot hole, and link block can be removed from fixed block;And the effect of spring is to make The teeth of positioning bolt are tightly pressed on always in the teeth of threaded hole, play anti-loose effect;The structure installation effectiveness is high, saves manpower Material resources accelerate construction progress.
The above description is only a preferred embodiment of the present invention, therefore all according to described in the utility model patent application range The equivalent change or modification done of structure, feature and principle, be included in the scope of the utility model patent application.

Claims (2)

1. a kind of construction is with hanger is held, it includes vertical beam (2), crossbeam (7) and cant beam (8);Described vertical beam (2) one end with The bottom of crossbeam (7) one end is mutually fixedly connected;Described cant beam (8) one end is mutually fixedly connected with crossbeam (7) other end bottom;It is described Cant beam (8) other end is mutually fixedly connected with the side of vertical beam (2) other end;The vertical beam (2), crossbeam (7) and cant beam (8) three Between constitute a triangular structure;It is characterized by: it further includes having fixed block (3), pre-embedded bolt (4), nut (5) and connecting Connect block (6);The front end face of the fixed block (3) is provided with open slot (301);The intracavity bottom of the open slot (301) is arranged There are several counterbores (301a);The rear end face of the fixed block (3) is provided with the through-hole (304) being connected with counterbore (301a); The pre-embedded bolt (4) is locked in the inner cavity of counterbore (301a) with nut (5) after passing through through-hole (304);The link block (6) cross section is in T-shaped shape;The link block (6) is made of pulling plate (601) and attachment beam (602);The pulling plate (601) it is arranged in the inside of open slot (301);(601) one end face of pulling plate is mutually fixedly connected with attachment beam (602) one end; Attachment beam (602) other end reaches mutually solid close to the one end of vertical beam (2) with crossbeam (7) behind the outsides of open slot (301) Fixed connection;Fast locking device is provided on the left and right sides wall of the fixed block (3);The pulling plate (601) passes through fast locking device It is locked at the inner cavity of open slot (301);The fast locking device includes pin shaft (10), spring (11), pressing plate (12) and positioning spiral shell Bolt (13);The quantity at least two of the pin shaft (10);It is provided on the side wall of the fixed block (3) and pin shaft (10) phase The pilot hole (302) matched;The pilot hole (302) and the inner cavity of open slot (301) are connected;The number of the pilot hole (302) It measures equal with the quantity of pin shaft (10);The spiral shell to match with positioning bolt (13) is provided on the lateral wall of the fixed block (3) Pit (303);Described pin shaft (10) one end passes through spring (11) and is mutually fixedly connected with pressing plate (12) afterwards;The pin shaft (10) is another End extend into the inside of open slot (301) after pilot hole (302);The pin shaft (10) is pressed on the preceding table of pulling plate (601) On face;The positioning bolt (13) passes through pressing plate (12) and is mutually threadedly coupled with threaded hole (303) afterwards.
2. a kind of construction according to claim 1 is with holding hanger, it is characterised in that: the bottom of the vertical beam (2) is set It is equipped with and adjusts threaded hole (201);It is provided on the adjusting threaded hole (201) and adjusts bolt (9);The adjusting bolt (9) with Threaded hole (201) are adjusted to be threadedly coupled.
CN201710395006.7A 2017-05-30 2017-05-30 A kind of construction is with holding hanger Expired - Fee Related CN107100357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710395006.7A CN107100357B (en) 2017-05-30 2017-05-30 A kind of construction is with holding hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710395006.7A CN107100357B (en) 2017-05-30 2017-05-30 A kind of construction is with holding hanger

Publications (2)

Publication Number Publication Date
CN107100357A CN107100357A (en) 2017-08-29
CN107100357B true CN107100357B (en) 2019-08-27

Family

ID=59660187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710395006.7A Expired - Fee Related CN107100357B (en) 2017-05-30 2017-05-30 A kind of construction is with holding hanger

Country Status (1)

Country Link
CN (1) CN107100357B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700559B (en) * 2019-11-02 2022-01-18 浙江宇之航科技工程有限公司 Wall-attached support for attached scaffold

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746862A (en) * 2015-04-13 2015-07-01 中冶天工集团有限公司 Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN204728676U (en) * 2015-05-07 2015-10-28 中国建筑第二工程局有限公司 A kind of support load-bearing hanger of variable cross-section body of wall
CN205189413U (en) * 2015-12-02 2016-04-27 唐山学院 Special bearing stores pylon of civil engineering

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746862A (en) * 2015-04-13 2015-07-01 中冶天工集团有限公司 Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN204728676U (en) * 2015-05-07 2015-10-28 中国建筑第二工程局有限公司 A kind of support load-bearing hanger of variable cross-section body of wall
CN205189413U (en) * 2015-12-02 2016-04-27 唐山学院 Special bearing stores pylon of civil engineering

Also Published As

Publication number Publication date
CN107100357A (en) 2017-08-29

Similar Documents

Publication Publication Date Title
AU2014253429B2 (en) Holder for a guide shoe of a climbing system for concrete formwork
CN107100357B (en) A kind of construction is with holding hanger
EP2792804A1 (en) Anchoring device for a concrete ceiling, concrete ceiling and installation method
CN207177264U (en) A kind of pedal of scaffold
CN204754226U (en) Detachable construction platform of unloading
CN104005556A (en) Shaped and fabricated formwork construction process used for shear wall at expansion and contraction joint
CN204591309U (en) The fixed tunnel lining trolley of a kind of triangle
SE1350387A1 (en) Arrangement for attaching a frame with metal construction
EP2295663A3 (en) Connecting device between a ceiling and a partition wall structure
CN204418379U (en) A kind of prefabricated component syndeton
CN107313597A (en) Modularization ready-package discharging platform for assembled architecture
CN204983338U (en) Buckle formula conversion layer pendant
CN103938845A (en) Anchor device for cantilever beam of cantilever scaffold and construction method
CN204038825U (en) Protective door for elevator shaft
CN202560755U (en) Bolt
CN208899873U (en) A kind of K plate conversion equipment
CN105089195A (en) Buckle type conversion layer hanging part
CN205933004U (en) Device for connecting construction elevator adheres to and tower crane
CN207419994U (en) A kind of staircase construction and protective platform
CN209244290U (en) A kind of construction device for discharging
CN111636559B (en) Prefabricated member for prefabricated building and special equipment
CN212506841U (en) Sound insulation device for building engineering
BE1022348B1 (en) METHOD FOR ATTACHING AN INSULATION LAYER TO A WALL, AS IS AN INSULATION ANCHOR THAT CAN BE USED IN SUCH METHOD
DE102012003982A1 (en) Plastic dowel for anchoring scaffold in e.g. multi-layered brickwork in wall structure made of concrete, has collar, where dowel is extended by sleeve over distance of non-bearing layers after expanding zone for forming shaft extension
CN207988237U (en) One kind building stone curtain wall by laying bricks or stones

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190731

Address after: 453100 No. 04 Beimashi Street, Weihui City, Xinxiang City, Henan Province

Applicant after: Wang Gang

Applicant after: Yang Zhongwei

Applicant after: Zuo Shibo

Applicant after: Dong Hong

Applicant after: Shang Jingzhan

Applicant after: Sun Libin

Applicant after: Yu Weidong

Applicant after: Qing Fengshou

Applicant after: Wei Yu

Applicant after: Huang Kai

Address before: 528429 No. 32 Zhongxing Road, Huangpu Town, Zhongshan City, Guangdong Province

Applicant before: Lin Zaiyi

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190827

Termination date: 20200530

CF01 Termination of patent right due to non-payment of annual fee