CN205933004U - Device for connecting construction elevator adheres to and tower crane - Google Patents
Device for connecting construction elevator adheres to and tower crane Download PDFInfo
- Publication number
- CN205933004U CN205933004U CN201620939038.XU CN201620939038U CN205933004U CN 205933004 U CN205933004 U CN 205933004U CN 201620939038 U CN201620939038 U CN 201620939038U CN 205933004 U CN205933004 U CN 205933004U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- anchor ear
- elevator
- standard section
- connect
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model discloses a device for connecting construction elevator adheres to and tower crane, square steel staple bolt (1) was connected through M20 high strength bolt (2) and tower crane standard festival (14), and the tower crane standard festival (14) is connected with the elevator standard festival (15) respectively through adhere to pole (10) in the upper and lower in situ outside, connect on square steel staple bolt (1) and attend lower floor's staple bolt connection lug arm -tie (5), attend lower floor's staple bolt connection lug arm -tie (5) and be connected with posting (11) and elevator standard festival (15) through adhere to pole (10) and M15 high strength bolt (13) in the outside, connect on square steel staple bolt (1) and attend the lower floor staple bolt and connect lug bottom plate (7), attend lower floor's staple bolt and connect lug bottom plate (7) and be connected through the adhering to of inboard pole (10) and activity fastener (12) and elevator standard save (15), elevator cage (16) left -hand thread is on elevator standard festival (15) track.
Description
Technical field
This utility model is related to the attachment means of a kind of construction elevator attachment and tower crane.
Background technology
In Bridge High-pier construction, traditional elevator design typically independently separates design with standard section of tower crane, and elevator is general
Design to box beam bottom and punch at box beam bottom, set up stair to bridge floor through case in box beam.Traditional elevator design scheme have impact on
Box beam, in the box beam rigidity of construction stage, is unfavorable for the safety in bridge construction stage, wider and do not permit in order to solve bridge box and beam
Permitted to open under the operating mode of construction elevator mouth in box beam base plate, spy devises the attachment means of a kind of construction elevator attachment and tower crane.
Utility model content
The technical problems to be solved in the utility model is:The attachment means of a kind of construction elevator attachment and tower crane are provided, with
Overcome punching at box beam bottom of prior art presence, impact, in the box beam rigidity of construction stage, is unfavorable for the bridge construction stage
The deficiencies such as safety.
The technical solution of the utility model is:It includes standard section of tower crane square steel anchor ear, standard section of tower crane, elevator standard
Section, square steel anchor ear is connected with standard section of tower crane by M20 high-strength bolt, and standard section of tower crane passes through the Anchored Bar in outside in levels
It is connected with elevator standard section respectively;Levels anchor ear is connected on square steel anchor ear and connects hanger arm-tie, the connection of levels anchor ear is hung
Ear arm-tie passes through the Anchored Bar in outside and M15 high-strength bolt is connected with elevator standard section with posting;Square steel anchor ear connects
Levels anchor ear connects hanger base plate, and levels anchor ear connects Anchored Bar and moving fastening and the elevator that hanger base plate passes through inner side
Standard knot connects;Cage left-hand thread is on elevator standard section track.
Levels are connected on square steel anchor ear and connects hanger motherboard and levels anchor ear connection hanger side panel, levels are embraced
Hoop is connected hanger side panel and is connected the connection of hanger arm-tie with levels anchor ear.
The Anchored Bar of inner side is passed through connection moving fastening and is connected with the column of elevator standard section, and the Anchored Bar in outside passes through to determine
Position frame is connected with the cross bar of elevator standard section.
Square steel anchor ear connects locking on standard section of tower crane by M20 high-strength bolt, and on anchor ear, welding boatswain chair adopts bearing pin
It is connected with Anchored Bar, upper strata Anchored Bar is connected by moving fastening with elevator standard section vertical rod respectively, lower floor's Anchored Bar passes through M15
High-strength bolt and posting are connected on standard knot cross bar, are connected with elevator standard by four Anchored Bars of two planes.
Pier shaft welding overlength attachment constraint construction elevator is leaned against outside box beam wing plate using traditional elevator, due to elevator attachment
Slenderness ratio exceedes design specification requirement, thus design anchor ear is locked on standard section of tower crane, designs four bars on two planar hinged
On elevator standard section and tower crane anchor ear, therefore solve in Bridge High-pier construction, wider and not in case in bridge box and beam
Beam base plate is opened under the operating mode of construction elevator mouth, and independent separately traditional elevator design overlength attachment leads to attachment and elevator standard section
Slenderness ratio is far beyond the non-serviceable difficult problem of specification.
This utility model provides the attachment means of a kind of construction elevator attachment and tower crane, by construction elevator and standard section of tower crane
Anchor ear is integrally connected, and realizes tower crane integrated elevator and runs.Elevator Anchored Bar realizes spatially two faces with elevator standard section, puts down
On face, four hinges fix elevator standard section, and elevator operationally compares that traditional elevator attachment standard rotary angle is little, and elevator is transported
More steady during row.
The beneficial effects of the utility model:
1st, elevator is attached by square steel anchor ear and is connected with standard section of tower crane and elevator standard section, realizes tower crane integrated elevator
Run.
2nd, in span bridge construction, ascending for elevator can directly run to bridge floor, and it is convenient to pass through up and down.
3rd, avoid traditional elevator and tower crane separately designs, evaded in box beam base plate opening impact bridge structure safe simultaneously
Escapable cost.
4th, two sides four bar connection is realized in the attachment of contrast traditional elevator, and when elevator runs, left-right rotation is less, and elevator runs more
Safety and comfort.
Brief description
Fig. 1 is tower crane of the present utility model, elevator adheres to and elevator integral planar schematic diagram;
Fig. 2 is Fig. 1 profile I-I of the present utility model;
Fig. 3 is that elevator of the present utility model adheres to floor map;
Fig. 4 is Fig. 3 profile II-II of the present utility model.
In figure, 1- square steel anchor ear, 2- M20 high-strength bolt, 3- levels connect hanger motherboard, and 4- levels anchor ear connects
Hanger side panel, 5- levels anchor ear connects hanger arm-tie, 6- bearing pin, and 7- levels anchor ear connects hanger base plate, 8- levels
Anchored Bar otic placode side panel, 9- levels Anchored Bar otic placode motherboard, 10- Anchored Bar, 11- posting, 12- moving fastening, 13-
M15 high-strength bolt, 14- standard section of tower crane, 15- elevator standard section, 16- cage.
Specific embodiment
Embodiment of the present utility model:It includes standard section of tower crane square steel anchor ear 1, standard section of tower crane 14, elevator standard section
15, square steel anchor ear 1 is connected with standard section of tower crane 14 by M20 high-strength bolt 2, and standard section of tower crane 14 passes through outside in levels
Anchored Bar 10 is connected with elevator standard section 15 respectively(Explanation:For interior outside refers to the plane graph schematic diagram referring to the drawings 1,3,
The inner side that appears below, outside, same);Levels anchor ear is connected on square steel anchor ear 1 and connects hanger arm-tie 5, levels
Anchor ear is connected hanger arm-tie 5 and is connected with elevator standard section 15 with posting 11 by the Anchored Bar 10 in outside and M15 high-strength bolt 13
Connect;Levels anchor ear is connected on square steel anchor ear 1 and connects hanger base plate 7, levels anchor ear connects hanger base plate 7 and passes through inner side
Anchored Bar 10 and moving fastening 12 are connected with elevator standard section 15;Cage 16 left-hand thread is on elevator standard section 15 track.
Levels are connected on square steel anchor ear 1 and connects hanger motherboard 3 and levels anchor ear connection hanger side panel 4, up and down
Layer anchor ear connection hanger side panel 4 is connected hanger arm-tie 5 with levels anchor ear and connects.
The Anchored Bar 10 of inner side is passed through connection moving fastening 12 and is connected with the column of elevator standard section 15, the Anchored Bar in outside
10 are connected with the cross bar of elevator standard section 15 by posting 11.
Bearing pin 6 adopts the 40cr screw mandrel of a diameter of 25mm.
Square steel anchor ear 1 is 100mm × 100mm × 5mmq235 steel plate processing.
Anchored Bar 10 is the q235 pipe processing of diameter 80mm × 5mm.
Posting 11 is the q235 angle steel of 60mm × 60mm.
It is connected by moving fastening 12 and M15 high-strength bolt 13 and posting between Anchored Bar 10 and elevator standard section 15
11 connect formation entirety.
During use, first square steel anchor ear 1 and standard section of tower crane 14 are installed, then Anchored Bar 10 and posting 11 are installed.Elevator is attached
The erection sequence is installed from the bottom up, should remove from top to bottom during dismounting.
Claims (7)
1. a kind of attachment of construction elevator and tower crane attachment means it is characterised in that:It includes standard section of tower crane square steel anchor ear
(1), standard section of tower crane(14), elevator standard section(15), square steel anchor ear(1)By M20 high-strength bolt(2)Connect and hold tower crane tightly
Standard knot(14), standard section of tower crane(14)Anchored Bar by outside in levels(10)Respectively with elevator standard section(15)Even
Connect;In square steel anchor ear(1)Upper connection levels anchor ear connects hanger arm-tie(5), levels anchor ear connection hanger arm-tie(5)Pass through
The Anchored Bar in outside(10)And M15 high-strength bolt(13)With posting(11)With elevator standard section(15)Connect;In square steel anchor ear
(1)Upper connection levels anchor ear connects hanger base plate(7), levels anchor ear connection hanger base plate(7)By the Anchored Bar of inner side
(10)And moving fastening(12)With elevator standard section(15)Connect;Cage(16)Left-hand thread is in elevator standard section(15)On track.
2. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:In square steel anchor ear
(1)Upper connection levels connect hanger motherboard(3)And levels anchor ear connects hanger side panel(4), levels anchor ear connect hang
Ear side panel(4)It is connected hanger arm-tie with levels anchor ear(5)Connect.
3. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:The Anchored Bar of inner side
(10)By connecting moving fastening(12)With elevator standard section(15)Column connect, the Anchored Bar in outside(10)By posting
(11)With elevator standard section(15)Cross bar connect.
4. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Bearing pin(6)Using
The 40cr screw mandrel of a diameter of 25mm.
5. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Square steel anchor ear(1)
For 100mm × 100mm × 5mmq235 steel plate processing.
6. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Anchored Bar(10)For
The q235 pipe processing of diameter 80mm × 5mm.
7. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Posting(11)For
The q235 angle steel of 60mm × 60mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620939038.XU CN205933004U (en) | 2016-08-25 | 2016-08-25 | Device for connecting construction elevator adheres to and tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620939038.XU CN205933004U (en) | 2016-08-25 | 2016-08-25 | Device for connecting construction elevator adheres to and tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205933004U true CN205933004U (en) | 2017-02-08 |
Family
ID=57952047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620939038.XU Withdrawn - After Issue CN205933004U (en) | 2016-08-25 | 2016-08-25 | Device for connecting construction elevator adheres to and tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205933004U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106115511A (en) * | 2016-08-25 | 2016-11-16 | 中铁五局集团路桥工程有限责任公司 | The attachment of a kind of construction elevator and the attachment means of tower crane |
-
2016
- 2016-08-25 CN CN201620939038.XU patent/CN205933004U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106115511A (en) * | 2016-08-25 | 2016-11-16 | 中铁五局集团路桥工程有限责任公司 | The attachment of a kind of construction elevator and the attachment means of tower crane |
CN106115511B (en) * | 2016-08-25 | 2018-05-11 | 中铁五局集团有限公司 | A kind of construction elevator attachment and the attachment device of tower crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106115511B (en) | A kind of construction elevator attachment and the attachment device of tower crane | |
CN206016225U (en) | One kind is without counterweight fixture type gondola-hanging mechanism | |
CN105781100B (en) | Template component for subway station side wall | |
CN205933004U (en) | Device for connecting construction elevator adheres to and tower crane | |
CN205804939U (en) | template assembly for subway station side wall | |
CN206753009U (en) | One kind building fabricated scaffold | |
CN205663188U (en) | All steel seals convenient hydraulic pressure from creeping formwork board | |
CN208578346U (en) | A kind of curtain wall unit body hanging apparatus | |
CN206512614U (en) | Bridge maintenance system supporting device with steel structure | |
CN206667741U (en) | A kind of construction template | |
CN206220248U (en) | A kind of Column Joint structure | |
CN205873724U (en) | A girder steel subassembly for large -span steel structure frame building tower crane attachment | |
CN204236571U (en) | A kind of framework beam T word grooved jointing | |
CN204309890U (en) | A kind of framework beam Phillips-type jointing | |
CN208618867U (en) | A kind of hanging steel platform mounting structure based on tubular truss chord member | |
CN202324586U (en) | Integral attached device attached with lifting scaffold | |
CN209556323U (en) | A kind of wellbore operations platform and template integrated construction system | |
CN206376364U (en) | A kind of moveable house assembling type terrace | |
CN205637570U (en) | Regularization wall post template | |
CN206529707U (en) | A kind of Hanging Basket for building | |
CN206888811U (en) | A kind of distribution cabinet door mounting structure of fast demountable | |
CN205975344U (en) | Assembled closure section locks strength nature skeleton outward | |
CN205532603U (en) | Shaft three -layer platform sling stand connecting device | |
CN205804596U (en) | A kind of a few formed steel construction assemblies | |
CN215368572U (en) | Scaffold for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170208 Effective date of abandoning: 20180511 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20170208 Effective date of abandoning: 20180511 |