CN205933004U - Device for connecting construction elevator adheres to and tower crane - Google Patents

Device for connecting construction elevator adheres to and tower crane Download PDF

Info

Publication number
CN205933004U
CN205933004U CN201620939038.XU CN201620939038U CN205933004U CN 205933004 U CN205933004 U CN 205933004U CN 201620939038 U CN201620939038 U CN 201620939038U CN 205933004 U CN205933004 U CN 205933004U
Authority
CN
China
Prior art keywords
tower crane
anchor ear
elevator
standard section
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620939038.XU
Other languages
Chinese (zh)
Inventor
黄万龙
曾作良
徐彬
张海彬
丰素香
宫敬海
王镜策
杨英青
包福满
张方元
黄宇
许勇贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
China Railway Group Guizhou Tourism and Culture Development Co Ltd
Original Assignee
Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
China Railway Group Guizhou Tourism and Culture Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd, China Railway Group Guizhou Tourism and Culture Development Co Ltd filed Critical Road and Bridge Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201620939038.XU priority Critical patent/CN205933004U/en
Application granted granted Critical
Publication of CN205933004U publication Critical patent/CN205933004U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a device for connecting construction elevator adheres to and tower crane, square steel staple bolt (1) was connected through M20 high strength bolt (2) and tower crane standard festival (14), and the tower crane standard festival (14) is connected with the elevator standard festival (15) respectively through adhere to pole (10) in the upper and lower in situ outside, connect on square steel staple bolt (1) and attend lower floor's staple bolt connection lug arm -tie (5), attend lower floor's staple bolt connection lug arm -tie (5) and be connected with posting (11) and elevator standard festival (15) through adhere to pole (10) and M15 high strength bolt (13) in the outside, connect on square steel staple bolt (1) and attend the lower floor staple bolt and connect lug bottom plate (7), attend lower floor's staple bolt and connect lug bottom plate (7) and be connected through the adhering to of inboard pole (10) and activity fastener (12) and elevator standard save (15), elevator cage (16) left -hand thread is on elevator standard festival (15) track.

Description

A kind of construction elevator attachment and the attachment means of tower crane
Technical field
This utility model is related to the attachment means of a kind of construction elevator attachment and tower crane.
Background technology
In Bridge High-pier construction, traditional elevator design typically independently separates design with standard section of tower crane, and elevator is general Design to box beam bottom and punch at box beam bottom, set up stair to bridge floor through case in box beam.Traditional elevator design scheme have impact on Box beam, in the box beam rigidity of construction stage, is unfavorable for the safety in bridge construction stage, wider and do not permit in order to solve bridge box and beam Permitted to open under the operating mode of construction elevator mouth in box beam base plate, spy devises the attachment means of a kind of construction elevator attachment and tower crane.
Utility model content
The technical problems to be solved in the utility model is:The attachment means of a kind of construction elevator attachment and tower crane are provided, with Overcome punching at box beam bottom of prior art presence, impact, in the box beam rigidity of construction stage, is unfavorable for the bridge construction stage The deficiencies such as safety.
The technical solution of the utility model is:It includes standard section of tower crane square steel anchor ear, standard section of tower crane, elevator standard Section, square steel anchor ear is connected with standard section of tower crane by M20 high-strength bolt, and standard section of tower crane passes through the Anchored Bar in outside in levels It is connected with elevator standard section respectively;Levels anchor ear is connected on square steel anchor ear and connects hanger arm-tie, the connection of levels anchor ear is hung Ear arm-tie passes through the Anchored Bar in outside and M15 high-strength bolt is connected with elevator standard section with posting;Square steel anchor ear connects Levels anchor ear connects hanger base plate, and levels anchor ear connects Anchored Bar and moving fastening and the elevator that hanger base plate passes through inner side Standard knot connects;Cage left-hand thread is on elevator standard section track.
Levels are connected on square steel anchor ear and connects hanger motherboard and levels anchor ear connection hanger side panel, levels are embraced Hoop is connected hanger side panel and is connected the connection of hanger arm-tie with levels anchor ear.
The Anchored Bar of inner side is passed through connection moving fastening and is connected with the column of elevator standard section, and the Anchored Bar in outside passes through to determine Position frame is connected with the cross bar of elevator standard section.
Square steel anchor ear connects locking on standard section of tower crane by M20 high-strength bolt, and on anchor ear, welding boatswain chair adopts bearing pin It is connected with Anchored Bar, upper strata Anchored Bar is connected by moving fastening with elevator standard section vertical rod respectively, lower floor's Anchored Bar passes through M15 High-strength bolt and posting are connected on standard knot cross bar, are connected with elevator standard by four Anchored Bars of two planes.
Pier shaft welding overlength attachment constraint construction elevator is leaned against outside box beam wing plate using traditional elevator, due to elevator attachment Slenderness ratio exceedes design specification requirement, thus design anchor ear is locked on standard section of tower crane, designs four bars on two planar hinged On elevator standard section and tower crane anchor ear, therefore solve in Bridge High-pier construction, wider and not in case in bridge box and beam Beam base plate is opened under the operating mode of construction elevator mouth, and independent separately traditional elevator design overlength attachment leads to attachment and elevator standard section Slenderness ratio is far beyond the non-serviceable difficult problem of specification.
This utility model provides the attachment means of a kind of construction elevator attachment and tower crane, by construction elevator and standard section of tower crane Anchor ear is integrally connected, and realizes tower crane integrated elevator and runs.Elevator Anchored Bar realizes spatially two faces with elevator standard section, puts down On face, four hinges fix elevator standard section, and elevator operationally compares that traditional elevator attachment standard rotary angle is little, and elevator is transported More steady during row.
The beneficial effects of the utility model:
1st, elevator is attached by square steel anchor ear and is connected with standard section of tower crane and elevator standard section, realizes tower crane integrated elevator Run.
2nd, in span bridge construction, ascending for elevator can directly run to bridge floor, and it is convenient to pass through up and down.
3rd, avoid traditional elevator and tower crane separately designs, evaded in box beam base plate opening impact bridge structure safe simultaneously Escapable cost.
4th, two sides four bar connection is realized in the attachment of contrast traditional elevator, and when elevator runs, left-right rotation is less, and elevator runs more Safety and comfort.
Brief description
Fig. 1 is tower crane of the present utility model, elevator adheres to and elevator integral planar schematic diagram;
Fig. 2 is Fig. 1 profile I-I of the present utility model;
Fig. 3 is that elevator of the present utility model adheres to floor map;
Fig. 4 is Fig. 3 profile II-II of the present utility model.
In figure, 1- square steel anchor ear, 2- M20 high-strength bolt, 3- levels connect hanger motherboard, and 4- levels anchor ear connects Hanger side panel, 5- levels anchor ear connects hanger arm-tie, 6- bearing pin, and 7- levels anchor ear connects hanger base plate, 8- levels Anchored Bar otic placode side panel, 9- levels Anchored Bar otic placode motherboard, 10- Anchored Bar, 11- posting, 12- moving fastening, 13- M15 high-strength bolt, 14- standard section of tower crane, 15- elevator standard section, 16- cage.
Specific embodiment
Embodiment of the present utility model:It includes standard section of tower crane square steel anchor ear 1, standard section of tower crane 14, elevator standard section 15, square steel anchor ear 1 is connected with standard section of tower crane 14 by M20 high-strength bolt 2, and standard section of tower crane 14 passes through outside in levels Anchored Bar 10 is connected with elevator standard section 15 respectively(Explanation:For interior outside refers to the plane graph schematic diagram referring to the drawings 1,3, The inner side that appears below, outside, same);Levels anchor ear is connected on square steel anchor ear 1 and connects hanger arm-tie 5, levels Anchor ear is connected hanger arm-tie 5 and is connected with elevator standard section 15 with posting 11 by the Anchored Bar 10 in outside and M15 high-strength bolt 13 Connect;Levels anchor ear is connected on square steel anchor ear 1 and connects hanger base plate 7, levels anchor ear connects hanger base plate 7 and passes through inner side Anchored Bar 10 and moving fastening 12 are connected with elevator standard section 15;Cage 16 left-hand thread is on elevator standard section 15 track.
Levels are connected on square steel anchor ear 1 and connects hanger motherboard 3 and levels anchor ear connection hanger side panel 4, up and down Layer anchor ear connection hanger side panel 4 is connected hanger arm-tie 5 with levels anchor ear and connects.
The Anchored Bar 10 of inner side is passed through connection moving fastening 12 and is connected with the column of elevator standard section 15, the Anchored Bar in outside 10 are connected with the cross bar of elevator standard section 15 by posting 11.
Bearing pin 6 adopts the 40cr screw mandrel of a diameter of 25mm.
Square steel anchor ear 1 is 100mm × 100mm × 5mmq235 steel plate processing.
Anchored Bar 10 is the q235 pipe processing of diameter 80mm × 5mm.
Posting 11 is the q235 angle steel of 60mm × 60mm.
It is connected by moving fastening 12 and M15 high-strength bolt 13 and posting between Anchored Bar 10 and elevator standard section 15 11 connect formation entirety.
During use, first square steel anchor ear 1 and standard section of tower crane 14 are installed, then Anchored Bar 10 and posting 11 are installed.Elevator is attached The erection sequence is installed from the bottom up, should remove from top to bottom during dismounting.

Claims (7)

1. a kind of attachment of construction elevator and tower crane attachment means it is characterised in that:It includes standard section of tower crane square steel anchor ear (1), standard section of tower crane(14), elevator standard section(15), square steel anchor ear(1)By M20 high-strength bolt(2)Connect and hold tower crane tightly Standard knot(14), standard section of tower crane(14)Anchored Bar by outside in levels(10)Respectively with elevator standard section(15)Even Connect;In square steel anchor ear(1)Upper connection levels anchor ear connects hanger arm-tie(5), levels anchor ear connection hanger arm-tie(5)Pass through The Anchored Bar in outside(10)And M15 high-strength bolt(13)With posting(11)With elevator standard section(15)Connect;In square steel anchor ear (1)Upper connection levels anchor ear connects hanger base plate(7), levels anchor ear connection hanger base plate(7)By the Anchored Bar of inner side (10)And moving fastening(12)With elevator standard section(15)Connect;Cage(16)Left-hand thread is in elevator standard section(15)On track.
2. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:In square steel anchor ear (1)Upper connection levels connect hanger motherboard(3)And levels anchor ear connects hanger side panel(4), levels anchor ear connect hang Ear side panel(4)It is connected hanger arm-tie with levels anchor ear(5)Connect.
3. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:The Anchored Bar of inner side (10)By connecting moving fastening(12)With elevator standard section(15)Column connect, the Anchored Bar in outside(10)By posting (11)With elevator standard section(15)Cross bar connect.
4. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Bearing pin(6)Using The 40cr screw mandrel of a diameter of 25mm.
5. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Square steel anchor ear(1) For 100mm × 100mm × 5mmq235 steel plate processing.
6. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Anchored Bar(10)For The q235 pipe processing of diameter 80mm × 5mm.
7. construction elevator according to claim 1 attachment and tower crane attachment means it is characterised in that:Posting(11)For The q235 angle steel of 60mm × 60mm.
CN201620939038.XU 2016-08-25 2016-08-25 Device for connecting construction elevator adheres to and tower crane Withdrawn - After Issue CN205933004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620939038.XU CN205933004U (en) 2016-08-25 2016-08-25 Device for connecting construction elevator adheres to and tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620939038.XU CN205933004U (en) 2016-08-25 2016-08-25 Device for connecting construction elevator adheres to and tower crane

Publications (1)

Publication Number Publication Date
CN205933004U true CN205933004U (en) 2017-02-08

Family

ID=57952047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620939038.XU Withdrawn - After Issue CN205933004U (en) 2016-08-25 2016-08-25 Device for connecting construction elevator adheres to and tower crane

Country Status (1)

Country Link
CN (1) CN205933004U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115511A (en) * 2016-08-25 2016-11-16 中铁五局集团路桥工程有限责任公司 The attachment of a kind of construction elevator and the attachment means of tower crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115511A (en) * 2016-08-25 2016-11-16 中铁五局集团路桥工程有限责任公司 The attachment of a kind of construction elevator and the attachment means of tower crane
CN106115511B (en) * 2016-08-25 2018-05-11 中铁五局集团有限公司 A kind of construction elevator attachment and the attachment device of tower crane

Similar Documents

Publication Publication Date Title
CN106115511B (en) A kind of construction elevator attachment and the attachment device of tower crane
CN206016225U (en) One kind is without counterweight fixture type gondola-hanging mechanism
CN105781100B (en) Template component for subway station side wall
CN205933004U (en) Device for connecting construction elevator adheres to and tower crane
CN205804939U (en) template assembly for subway station side wall
CN206753009U (en) One kind building fabricated scaffold
CN205663188U (en) All steel seals convenient hydraulic pressure from creeping formwork board
CN208578346U (en) A kind of curtain wall unit body hanging apparatus
CN206512614U (en) Bridge maintenance system supporting device with steel structure
CN206667741U (en) A kind of construction template
CN206220248U (en) A kind of Column Joint structure
CN205873724U (en) A girder steel subassembly for large -span steel structure frame building tower crane attachment
CN204236571U (en) A kind of framework beam T word grooved jointing
CN204309890U (en) A kind of framework beam Phillips-type jointing
CN208618867U (en) A kind of hanging steel platform mounting structure based on tubular truss chord member
CN202324586U (en) Integral attached device attached with lifting scaffold
CN209556323U (en) A kind of wellbore operations platform and template integrated construction system
CN206376364U (en) A kind of moveable house assembling type terrace
CN205637570U (en) Regularization wall post template
CN206529707U (en) A kind of Hanging Basket for building
CN206888811U (en) A kind of distribution cabinet door mounting structure of fast demountable
CN205975344U (en) Assembled closure section locks strength nature skeleton outward
CN205532603U (en) Shaft three -layer platform sling stand connecting device
CN205804596U (en) A kind of a few formed steel construction assemblies
CN215368572U (en) Scaffold for building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20180511

AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20180511