CN107100357A - A kind of construction is with holding hanger - Google Patents

A kind of construction is with holding hanger Download PDF

Info

Publication number
CN107100357A
CN107100357A CN201710395006.7A CN201710395006A CN107100357A CN 107100357 A CN107100357 A CN 107100357A CN 201710395006 A CN201710395006 A CN 201710395006A CN 107100357 A CN107100357 A CN 107100357A
Authority
CN
China
Prior art keywords
tie
open slot
arm
bolt
fixed block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710395006.7A
Other languages
Chinese (zh)
Other versions
CN107100357B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qing Fengshou
Shang Jingzhan
Zuo Shibo
Original Assignee
Lin Zaiyi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lin Zaiyi filed Critical Lin Zaiyi
Priority to CN201710395006.7A priority Critical patent/CN107100357B/en
Publication of CN107100357A publication Critical patent/CN107100357A/en
Application granted granted Critical
Publication of CN107100357B publication Critical patent/CN107100357B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to construction hanging frame technical field, more particularly to a kind of construction constitutes a triangular structure with hanger is held between vertical beam, crossbeam and cant beam three;Pre-embedded bolt is passed through after through hole to be fixed in the inner chamber of counterbore with nut check;Contiguous block is made up of arm-tie and tie-beam;Arm-tie is arranged on the inside of open slot;Arm-tie end face is mutually fixedly connected with tie-beam one end;The tie-beam other end is mutually fixedly connected after reaching the outside of open slot with crossbeam close to one end of vertical beam;Fast locking device is provided with the left and right sides wall of fixed block;Arm-tie is locked at the inner chamber of open slot by fast locking device.When using the present invention, head one end of pre-embedded bolt is pre-buried to be fixed in concrete structure;Fixed block is locked on the surface of concrete structure by nut and pre-embedded bolt, then contiguous block is locked in open slot by fast locking device, realizes the installation for holding hanger;The structure installation effectiveness is high, uses manpower and material resources sparingly, accelerating construction progress.

Description

A kind of construction is with holding hanger
Technical field
The present invention relates to construction hanging frame technical field, more particularly to a kind of construction is with holding hanger.
Background technology
In the industrial premises based on concrete shear force wall, floor construction, wall segment is higher due to height, and wall is not Completion can once be constructed, it is necessary to be divided into two layers or multilayer is poured.Construct different height when, material is had bad luck, human users space, The problems such as steel bar template is constructed is difficult to solve.Load-bearing hanger can be provided by being hung on construction layer for current layer construction One safe and simple, reliable job platform.Building sufficiently large space and construct needs multiple hangers that hold to be propped up Support;But construction now holds that hanger speed is slow, and the workload of multiple installations for holding hanger is quite big, expends a large amount of Manpower and materials;And delay construction speed.
The content of the invention
In view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of construction use easy to use Hold hanger.
To achieve the above object, the technical solution adopted by the present invention is:
A kind of construction of the present invention is with hanger is held, and it includes vertical beam, fixed block, pre-embedded bolt, nut, connection Block, crossbeam and cant beam;Described vertical beam one end is mutually fixedly connected with the bottom of crossbeam one end;Described cant beam one end and the crossbeam other end Bottom is mutually fixedly connected;The cant beam other end is mutually fixedly connected with the side of the vertical beam other end;The vertical beam, crossbeam and cant beam A triangular structure is constituted between three;The front end face of the fixed block is provided with open slot;The interior bottom of chamber of the open slot Portion is provided with several counterbores;The rear end face of the fixed block is provided with the through hole being connected with counterbore;The pre-embedded bolt is worn Cross after through hole and to be fixed in the inner chamber of counterbore with nut check;The cross section of the contiguous block is in " T " word shape;The contiguous block by Arm-tie and tie-beam composition;The arm-tie is arranged on the inside of open slot;The arm-tie end face is mutually fixed with tie-beam one end Connection;The tie-beam other end is mutually fixedly connected after reaching the outside of open slot with crossbeam close to one end of vertical beam;It is described Fast locking device is provided with the left and right sides wall of fixed block;The arm-tie is locked at the inner chamber of open slot by fast locking device.
Further, the fast locking device includes bearing pin, spring, pressing plate and bolt;The quantity of the bearing pin is extremely It is two less;The pilot hole matched with bearing pin is provided with the side wall of the fixed block;The pilot hole and open slot it is interior Chamber is connected;The quantity of the pilot hole is equal with the quantity of bearing pin;It is provided with the lateral wall of the fixed block and positioning spiral shell The screwed hole that bolt matches;Described bearing pin one end is mutually fixedly connected after passing through spring with pressing plate;The bearing pin other end is passed through and led The inside of open slot is extend into after to hole;The bearing pin is pressed on the preceding surface of arm-tie;The bolt is passed through after pressing plate Mutually it is threadedly coupled with screwed hole.
Further, the bottom of the vertical beam is provided with regulation screwed hole;Regulation spiral shell is provided with the regulation screwed hole Bolt;The regulating bolt is wanted to be threadedly coupled with regulation screwed hole.
After said structure, the present invention has the beneficial effect that:A kind of construction of the present invention is stood with hanger is held A triangular structure is constituted between beam, crossbeam and cant beam three;The front end face of fixed block is provided with open slot;Open slot it is interior Bottom of chamber portion is provided with several counterbores;The rear end face of fixed block is provided with the through hole being connected with counterbore;Pre-embedded bolt passes through logical Fixed behind hole in the inner chamber of counterbore with nut check;Contiguous block is made up of arm-tie and tie-beam;Arm-tie is arranged on the interior of open slot Portion;Arm-tie end face is mutually fixedly connected with tie-beam one end;The tie-beam other end is leaned on after reaching the outside of open slot with crossbeam One end of nearly vertical beam is mutually fixedly connected;Fast locking device is provided with the left and right sides wall of fixed block;Arm-tie passes through fast locking device It is locked at the inner chamber of open slot.When using the present invention, head one end of pre-embedded bolt is pre-buried to be fixed in concrete structure;It is logical Cross nut to be locked on the surface of concrete structure fixed block with pre-embedded bolt, then contiguous block is locked in by fast locking device In open slot, the installation for holding hanger is realized;The structure installation effectiveness is high, uses manpower and material resources sparingly, accelerating construction progress.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that contiguous block is locked at by fast locking device in fixed block;
Fig. 3 is B in Fig. 2 to profile;
Fig. 4 is the A portions zoomed-in view in Fig. 1;
Description of reference numerals:
1st, concrete structure;2nd, vertical beam;201st, screwed hole is adjusted;3rd, fixed block;301st, open slot;
301a, counterbore;302nd, pilot hole;303rd, screwed hole;304th, through hole;4th, pre-embedded bolt;
5th, nut;6th, contiguous block;601st, arm-tie;602nd, tie-beam;7th, crossbeam;8th, cant beam;
9th, regulating bolt;10th, bearing pin;11st, spring;12nd, pressing plate;13rd, bolt.
Embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.
As shown in Figures 1 to 4, a kind of construction of the present invention is with holding hanger, it include vertical beam 2, fixed block 3, Pre-embedded bolt 4, nut 5, contiguous block 6, crossbeam 7 and cant beam 8;The bottom of described one end of vertical beam 2 and the one end of crossbeam 7 is mutually fixed to be connected Connect;Described one end of cant beam 8 is mutually fixedly connected with the other end bottom of crossbeam 7;The side of the other end of cant beam 8 and the other end of vertical beam 2 Face is mutually fixedly connected;A triangular structure is constituted between the vertical beam 2, crossbeam 7 and the three of cant beam 8;Before the fixed block 3 End face is provided with open slot 301;The intracavity bottom of the open slot 301 is provided with several counterbores 301a;The fixed block 3 Rear end face is provided with the through hole 304 being connected with counterbore 301a;The pre-embedded bolt 4 is passed through after through hole 304 counterbore 301a's Inner chamber is locked with nut 5;The cross section of the contiguous block 6 is in " T " word shape;The contiguous block 6 is by arm-tie 601 and connection Beam 602 is constituted;The arm-tie 601 is arranged on the inside of open slot 301;The end face of arm-tie 601 and one end phase of tie-beam 602 It is fixedly connected;The other end of tie-beam 602 reaches mutually solid close to one end of vertical beam 2 with crossbeam 7 behind the outside of open slot 301 Fixed connection;Fast locking device is provided with the left and right sides wall of the fixed block 3;The arm-tie 601 is locked by fast locking device In the inner chamber of open slot 301;Head one end of pre-embedded bolt 4 is pre-buried to be fixed in concrete structure 1;By nut 5 with it is pre-buried Bolt 4 is locked at fixed block 3 on the surface of concrete structure 1, and then contiguous block 6 is locked in open slot by fast locking device In 301, the installation for holding hanger is realized;The structure installation effectiveness is high, uses manpower and material resources sparingly, accelerating construction progress.
As a kind of preferred embodiment of the present invention, the fast locking device includes bearing pin 10, spring 11, pressing plate 12 and positioning Bolt 13;The quantity at least two of the bearing pin 10;It is provided with the side wall of the fixed block 3 and leading that bearing pin 10 matches To hole 302;The inner chamber of the pilot hole 302 and open slot 301 is connected;The quantity of the pilot hole 302 and the number of bearing pin 10 Amount is equal;The screwed hole 303 matched with bolt 13 is provided with the lateral wall of the fixed block 3;The bearing pin 10 1 Hold and be mutually fixedly connected with pressing plate 12 through after spring 11;The other end of bearing pin 10 extend into open slot after passing through pilot hole 302 301 inside;The bearing pin 10 is pressed on the preceding surface of arm-tie 601;The bolt 13 pass through pressing plate 12 after with screw thread Hole 303 is mutually threadedly coupled;Rotational positioning bolt 13, makes whole pressing plate 12 be slided along the direction of pilot hole 302, and drive is fixed on pressing plate Each bearing pin 10 on 12 is moved, and contiguous block 6 is locked on fixed block 3 by bearing pin 10;When holding hanger dismounting, both sides are unclamped Bolt 13, all bearing pins 10 are retracted into pilot hole 302, and contiguous block 6 can just be removed from fixed block 3;And spring 11 effect is that the teeth for making bolt 13 are tightly pressed in the teeth of screwed hole 303 all the time, is served locking.
As a kind of preferred embodiment of the present invention, the bottom of the vertical beam 2 is provided with regulation screwed hole 201;The regulation Regulating bolt 9 is provided with screwed hole 201;The regulating bolt 9 is wanted to be threadedly coupled with regulation screwed hole 201;Regulating bolt 9 End is pressed on the surface of concrete structure 1;On the one hand a strong point is provided on concrete structure 1 for vertical beam 2, it is another Aspect is when contiguous block 6 is arranged on the inside of open slot 301, and being rotated by regulating bolt 9 makes the pivot angle of vertical beam 2, makes contiguous block 6 Rear surface fitted with the basal surface of open slot 301.
During using the present invention, head one end of pre-embedded bolt is pre-buried to be fixed in concrete structure;By nut with it is pre-buried Bolt is locked at fixed block on the surface of concrete structure, and being rotated by regulating bolt makes the pivot angle of vertical beam, makes contiguous block Surface is fitted with the basal surface of open slot afterwards;Rotational positioning bolt, makes whole pressing plate be slided along pilot hole direction, and drive is fixed on Each bearing pin motion on pressing plate, makes contiguous block be locked on fixed block by bearing pin;When holding hanger dismounting, determining for both sides is unclamped Position bolt, all bearing pins are retracted into pilot hole, and contiguous block can just be removed from fixed block;And the effect of spring is to make positioning The teeth of bolt are tightly pressed in the teeth of screwed hole all the time, are served locking;The structure installation effectiveness is high, saves manpower thing Power, accelerating construction progress.
Described above is only the better embodiment of the present invention, therefore all constructions according to described in present patent application scope, The equivalent change or modification that feature and principle are done, is included in the range of present patent application.

Claims (3)

1. a kind of construction is with hanger is held, it includes vertical beam(2), crossbeam(7)And cant beam(8);The vertical beam(2)One end with Crossbeam(7)The bottom of one end is mutually fixedly connected;The cant beam(8)One end and crossbeam(7)Other end bottom is mutually fixedly connected;It is described Cant beam(8)The other end and vertical beam(2)The side of the other end is mutually fixedly connected;The vertical beam(2), crossbeam(7)And cant beam(8)Three Between constitute a triangular structure;It is characterized in that:It also includes fixed block(3), pre-embedded bolt(4), nut(5)And even Connect block(6);The fixed block(3)Front end face be provided with open slot(301);The open slot(301)Intracavity bottom set There are several counterbores(301a);The fixed block(3)Rear end face be provided with and counterbore(301a)The through hole being connected(304); The pre-embedded bolt(4)Through through hole(304)Afterwards in counterbore(301a)Inner chamber and nut(5)It is locked;The contiguous block (6)Cross section be in " T " word shape;The contiguous block(6)By arm-tie(601)And tie-beam(602)Composition;The arm-tie (601)It is arranged on open slot(301)Inside;The arm-tie(601)End face and tie-beam(602)One end is mutually fixedly connected; The tie-beam(602)The other end reaches open slot(301)Outside after with crossbeam(7)Close to vertical beam(2)One end it is mutually solid Fixed connection;The fixed block(3)Left and right sides wall on be provided with fast locking device;The arm-tie(601)Pass through fast locking device It is locked at open slot(301)Inner chamber.
2. a kind of construction according to claim 1 is with holding hanger, it is characterised in that:The fast locking device includes pin Axle(10), spring(11), pressing plate(12)And bolt(13);The bearing pin(10)Quantity at least two;The fixation Block(3)Side wall on be provided with and bearing pin(10)The pilot hole matched(302);The pilot hole(302)With open slot(301) Inner chamber be connected;The pilot hole(302)Quantity and bearing pin(10)Quantity it is equal;The fixed block(3)Lateral wall On be provided with and bolt(13)The screwed hole matched(303);The bearing pin(10)One end passes through spring(11)Afterwards with pressure Plate(12)Mutually it is fixedly connected;The bearing pin(10)The other end passes through pilot hole(302)After extend into open slot(301)Inside; The bearing pin(10)It is pressed on arm-tie(601)Preceding surface on;The bolt(13)Through pressing plate(12)Afterwards with screwed hole (303)Mutually it is threadedly coupled.
3. a kind of construction according to claim 1 is with holding hanger, it is characterised in that:The vertical beam(2)Bottom set It is equipped with regulation screwed hole(201);The regulation screwed hole(201)On be provided with regulating bolt(9);The regulating bolt(9)With Adjust screwed hole(201)Think threaded connection.
CN201710395006.7A 2017-05-30 2017-05-30 A kind of construction is with holding hanger Expired - Fee Related CN107100357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710395006.7A CN107100357B (en) 2017-05-30 2017-05-30 A kind of construction is with holding hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710395006.7A CN107100357B (en) 2017-05-30 2017-05-30 A kind of construction is with holding hanger

Publications (2)

Publication Number Publication Date
CN107100357A true CN107100357A (en) 2017-08-29
CN107100357B CN107100357B (en) 2019-08-27

Family

ID=59660187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710395006.7A Expired - Fee Related CN107100357B (en) 2017-05-30 2017-05-30 A kind of construction is with holding hanger

Country Status (1)

Country Link
CN (1) CN107100357B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700559A (en) * 2019-11-02 2020-01-17 浙江宇之航科技工程有限公司 Wall-attached support for attached scaffold

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746862A (en) * 2015-04-13 2015-07-01 中冶天工集团有限公司 Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN204728676U (en) * 2015-05-07 2015-10-28 中国建筑第二工程局有限公司 A kind of support load-bearing hanger of variable cross-section body of wall
CN205189413U (en) * 2015-12-02 2016-04-27 唐山学院 Special bearing stores pylon of civil engineering

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746862A (en) * 2015-04-13 2015-07-01 中冶天工集团有限公司 Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN204728676U (en) * 2015-05-07 2015-10-28 中国建筑第二工程局有限公司 A kind of support load-bearing hanger of variable cross-section body of wall
CN205189413U (en) * 2015-12-02 2016-04-27 唐山学院 Special bearing stores pylon of civil engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700559A (en) * 2019-11-02 2020-01-17 浙江宇之航科技工程有限公司 Wall-attached support for attached scaffold

Also Published As

Publication number Publication date
CN107100357B (en) 2019-08-27

Similar Documents

Publication Publication Date Title
CN206053225U (en) A kind of dry-hanging installation structure for vertical faces of stone materials
EP2811052A3 (en) Process in an electrolytic cell
CN206752807U (en) A kind of three-dimensional adjustable furred ceiling basic unit shell system
CN103032438A (en) Pop-up single-side bolt fastener
CN208152459U (en) A kind of quick cladding installation infrastructure of decoration material
CN202401613U (en) Non-template and energy-dissipating steel plate shear wall structure
CN207177264U (en) A kind of pedal of scaffold
CN107100357A (en) A kind of construction is with holding hanger
CN204098294U (en) A kind of back of the body of rod-type altogether bolt mounts system
CN203022126U (en) Embedded groove and wave-shaped-thread anchor rods
CN203426020U (en) Spraying hanger for external aluminum profiles of door and window frames
CN208184209U (en) A kind of novel aluminum alloy pattern plate convenient for construction
CN206360167U (en) A kind of stone material dry suspending structure with function of seismic resistance
CN209556323U (en) A kind of wellbore operations platform and template integrated construction system
CN204940780U (en) Freely install and remove, the architectural decoration panel dried hanging hang structure of size independent assortment
CN209891396U (en) Intercolumnar bearing structure for steel construction
CN208918283U (en) A kind of taper can be used in turn wall bushing
CN208473897U (en) A kind of tunnel lining trolley splash guard supporting member with illumination functions
CN209635745U (en) A kind of construction single-rail crane brake gear
CN205134941U (en) Stereotype and hang mould in cast -in -place area of superimposed sheet
CN105544824A (en) Upper-wing rotating type combined hanger
CN205688819U (en) A kind of lifting special-purpose supporting frame of reserved cast-in-place band assembled integral superstructure precoated plate
CN205189239U (en) Bent panel mount carbon fiber plate ground tackle
CN205557926U (en) Upper limb rotation type combination pendant
CN206861167U (en) A kind of multi-functional instrument and meter hanging frame device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190731

Address after: 453100 No. 04 Beimashi Street, Weihui City, Xinxiang City, Henan Province

Applicant after: Wang Gang

Applicant after: Yang Zhongwei

Applicant after: Zuo Shibo

Applicant after: Dong Hong

Applicant after: Shang Jingzhan

Applicant after: Sun Libin

Applicant after: Yu Weidong

Applicant after: Qing Fengshou

Applicant after: Wei Yu

Applicant after: Huang Kai

Address before: 528429 No. 32 Zhongxing Road, Huangpu Town, Zhongshan City, Guangdong Province

Applicant before: Lin Zaiyi

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190827

Termination date: 20200530

CF01 Termination of patent right due to non-payment of annual fee