CN107100295B - A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method - Google Patents

A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method Download PDF

Info

Publication number
CN107100295B
CN107100295B CN201710228111.1A CN201710228111A CN107100295B CN 107100295 B CN107100295 B CN 107100295B CN 201710228111 A CN201710228111 A CN 201710228111A CN 107100295 B CN107100295 B CN 107100295B
Authority
CN
China
Prior art keywords
keel
calcium silicate
built
fitting
silicate board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710228111.1A
Other languages
Chinese (zh)
Other versions
CN107100295A (en
Inventor
蒋红庆
吴生久
邓宏
郭长春
唐清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN201710228111.1A priority Critical patent/CN107100295B/en
Publication of CN107100295A publication Critical patent/CN107100295A/en
Application granted granted Critical
Publication of CN107100295B publication Critical patent/CN107100295B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/76Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal

Abstract

The invention belongs to fixed building fields, specifically disclose a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method, include the following steps: preparation of construction, it is pre-buried along ground joist and built-in fitting, snap the line and calibration, it is fixed along top keel and frame keel, installation vertical keel, installation sash, installation lateral direction penetrating keel, electrical pipe laying and installation attached wall equipment, installation calcium silicate board, seam and corner protector processing.This programme applies pre-buried theory in the construction of lightgage steel joist internal partition wall system, the mode being connect instead of conventional expanded bolt with main structure, so that without drilling again after main structure molding, to reduce construction site dust pollution, improve construction quality, and built-in fitting and fixing piece stable connection are reliable, and additional stress is not caused to influence panel piece.

Description

A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method
Technical field
The invention belongs to fixed building field more particularly to a kind of construction techniques.
Background technique
In recent years, with the adjustment of national policy, light fire-proof heat-insulating wall is China's wall reform and building energy conservation Development trend, lightgage steel joist internal partition wall system are one of.
Lightgage steel joist internal partition wall is using galvanized steel plain sheet as raw material, and the light-gauge steel section for using cold bending process to produce is skeleton, gypsum Equal light materials are panel, the packing materials such as filling fire prevention rock wool in panel and a kind of lightweight non-load bearing partition for being formed, and It is widely used in the high-grade fitting-out work such as hotel, high-end residential, office building, there is environmentally protective, energy-saving heat preserving, physical separation Can good, easy construction the advantages that.But in traditional light steel keel gypsum board internal partition wall system work progress, partition wall surrounding Expansion bolt is all made of between frame main joist and wall to be installed, and is not only needed to drill in the main structure to have completed, be made At dust pollution, it is also possible to drill main structure in drilling, influence other residents.In addition, expansion bolt uses centainly It is also easy to loosen after time.
Summary of the invention
The purpose of the present invention is to provide a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction methods, to solve background The problem of dust pollution and expansion bolt that conventional mounting arrangements will appear in technology easily loosen.
In order to achieve the above object, base case of the invention provides a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall and applies Work method, includes the following steps:
S1: preparation of construction: predetermined along ground joist, match along top keel, frame keel, built-in fitting and with built-in fitting Fixing piece material, it is described that the through-hole matched with built-in fitting is provided at link position along top keel and frame keel;
S2: pre-buried along ground joist and built-in fitting: first according to design working drawing, to mark the position along ground joist and built-in fitting Line;The reinforcing bar needed when then using BIM technology to along ground joist and built-in fitting binding carries out analysis selection, then in main body knot When structure concrete construction, binding and fixing will be directly carried out with floor top bars along ground joist, and in main structure and light steel dragon The edge top keel of bone internal partition wall, the corresponding position of frame keel are embedded to built-in fitting;
S3: snap the line and calibration;
S4: fixed along top keel and frame keel: when partition wall is constructed, to make to be provided with through-hole along top keel and frame keel first Position it is corresponding with built-in fitting, then will be consolidated again along top keel and frame keel using the fixing piece that is matched with built-in fitting It is fixed;
S5: installation vertical keel: carrying out stepping to vertical keel, using BIM technology to vertical keel stepping, additional keel And sash is analyzed in advance, then installs vertical keel by stepping position;
S6: installation sash;
S7: installation lateral direction penetrating keel;
S8: electrical pipe laying, installation attached wall equipment;
S9: installation calcium silicate board: the calcium silicate board of side is installed, calcium silicate board is screwed;It will prevent fires, sound insulation, prevent Damp material is packed into wall, carries out installation filling simultaneously with other side calcium silicate board;
S10: seam and corner protector processing.
The beneficial effect of this base case is:
1, built-in fitting is embedded in main structure by this programme in advance, does not need to drill again when carrying out keel installation, have Effect ground reduces construction site dust pollution, improves construction quality;And consolidated using the fixing piece matched with built-in fitting It is fixed, so that connection is more reliable and more stable, additional stress is not caused to influence panel piece;
2, this programme replaces traditional brickwork separating wall using lightgage steel joist calcium silicate board partition wall system, and light-weight environment-friendly effectively subtracts Small vapor barrier layer, and reduce environmental pollution and energy consumption;
3, this programme replaces plasterboard using calcium silicate board, and intensity hardness is higher, fire prevention, moisture-proof, sound insulation, thermal insulation property Good, durability is high, reliable and stable;And plate face flatness is more preferable, is not necessarily to two-sided plastering, can directly carry out putty, coating or wallpaper Etc. top grade decorations;
4, this programme uses BIM technology to be analyzed in advance in the construction process, reasonably selects assembling reinforcement, panel rule Lattice, vertical keel stepping and additional keel, on-site consolidation efficiently and accurately reduce waste of material, avoid doing over again, and promote green ring It protects;
5, this programme applies the pre-buried theory based on BIM technology in the construction of lightgage steel joist internal partition wall system, so that construction Process is more information-based, systematization.
Scheme two: this is the preferred of basic scheme, and the built-in fitting in the step S1 is internally threaded sleeve, the fixing piece Including fixing bolt and gasket.Internally threaded sleeve and fixing bolt are attached by screw thread, and connection is more stable securely, and pads Piece can disperse the pressure of fixing bolt internal threads casing, and internally threaded sleeve is prevented to be scratched or wear.
Scheme three: this is preferred for scheme two, and the size of the through-hole is twice of fixing bolt diameter.Internally threaded sleeve During installation it is possible that displacement, the through-hole of such size can guarantee after internally threaded sleeve is subjected to displacement still can be with Fixing bolt is cooperated.
Scheme four: this is preferred for scheme two, and the end face of the internally threaded sleeve is quadrangle or hexagon.Quadrangle Or hexagon has corner angle, is less likely to occur to trackslip during installation, to improve the accuracy rate of installation.
Scheme five: this is preferred for scheme two, and the periphery of the internally threaded sleeve is equipped with wing plate.Wing plate can prevent from leading In construction, by internally threaded sleeve compressive strain, internally threaded sleeve and main structure concrete also can be enhanced in body structural concrete Conjugation, so that internally threaded sleeve is more firmly pre-buried.
Scheme six: this is the preferred of basic scheme, is provided with several communication ports along ground joist bottom in the step S1. Communication port is bound when can be convenient construction to along ground joist, directly will be fixed on one with floor top bars along ground joist It rises.
Scheme seven: this is the preferred of basic scheme, after the step S4 will be fixed along top keel and frame keel, in fixation One layer of sealing material, such as stop-leak compound are smeared on part.Sealing substance can prevent fixing bolt, gasket and internally threaded sleeve and sky Gas contact is corroded, and fixed effect is enhanced.
Detailed description of the invention
Fig. 1 is a kind of construction process figure of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method embodiment of the present invention;
Fig. 2 is 3 dimensional drawing of the present invention along ground joist;
Fig. 3 is the 3 dimensional drawing of internally threaded sleeve;
Fig. 4 is the main view of internally threaded sleeve.
Specific embodiment
Below by specific embodiment, the present invention is described in further detail:
Embodiment is substantially as shown in Fig. 1:
A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method, includes the following steps:
S1: preparation of construction: predetermined along ground joist, match along top keel, frame keel, built-in fitting and with built-in fitting Fixing piece material.Wherein, as shown in Fig. 2, several communication ports are provided with along ground joist bottom;As shown in attached drawing 3 and attached drawing 4, Built-in fitting is internally threaded sleeve, and the end face of internally threaded sleeve is quadrangle or hexagon;The periphery of internally threaded sleeve is equipped with Wing plate;Fixing piece includes fixing bolt and gasket.Along top keel and frame keel are provided at link position and internally threaded sleeve The through-hole matched, the size of through-hole are twice of fixing bolt diameter.
S2: pre-buried along ground joist and built-in fitting: to mark the position line along ground joist and internally threaded sleeve;Then BIM is used The reinforcing bar needed when technology is to along ground joist and internally threaded sleeve binding carries out analysis selection, then applies in main structure concrete Working hour will directly carry out binding and fixing along ground joist with floor top bars, and in main structure and lightgage steel joist internal partition wall Internally threaded sleeve is embedded to along top keel, the corresponding position of frame keel.
S3: by the width snap the line along top keel and frame keel, the internal partition wall position line, door and window hole snap the line and calibration: are released Mouthful frame line and along top keel and the frame keel position line.
S4: fixed along top keel and frame keel: when partition wall is constructed, to make to be provided with through-hole along top keel and frame keel first Position it is corresponding with internally threaded sleeve, then again will be along top dragon using the fixing bolt that is matched with internally threaded sleeve and gasket Bone and frame keel are fixed.After fixing along top keel and frame keel, one layer of stop-leak compound is smeared on fixing bolt.
S5: installation vertical keel: carrying out stepping to vertical keel, using BIM technology to vertical keel stepping, additional keel And sash is analyzed in advance, then installs vertical keel by stepping position.
S6: installation sash.
S7: installation lateral direction penetrating keel: installation lateral direction penetrating keel penetrate through dragon using pumping heart rivet or bolt fixed lateral Bone.
S8: electrical pipe laying, installation attached wall equipment: it is laid with pipeline, attached wall equipment is installed.
S9: installation calcium silicate board: the calcium silicate board of side is installed, calcium silicate board is screwed;It will prevent fires, sound insulation, prevent The materials such as tide are packed into wall, carry out installation filling simultaneously with other side calcium silicate board.
S10: it seam and corner protector processing: scrapes before sealing paint filling first by removings of drifting along in seam, one of glue of brush, with small scraper Putty is embedded in plate stitch, tamps and strikes off with plate face;Two glass-fiber-fabrics are disposed in seam crossing.
After completing construction, by artificial observation, construction site is in the air without generating the dust floated;Every seeing again after a few days It examines, the dust of floating is also not observed in construction site.
Compared with traditional construction method, present embodiment does not need to drill at the construction field (site), and the dust of construction site is big It is big to reduce, construction quality is improved, and be fixed using the fixing bolt matched with internally threaded sleeve, so that connection is more It is reliable and stable, do not cause additional stress to influence panel piece, construction quality greatly improves.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these also should be considered as protection scope of the present invention, these all will not influence what the present invention was implemented Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as specific embodiment can be used for explaining the content of claim.

Claims (5)

1. a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method, which comprises the steps of:
S1: preparation of construction: predetermined along ground joist, edge top keel, frame keel, built-in fitting and the fixation matched with built-in fitting Part material, it is described that the through-hole matched with built-in fitting is provided at link position along top keel and frame keel;
S2: pre-buried along ground joist and built-in fitting: first according to design working drawing, to mark the position line along ground joist and built-in fitting; The reinforcing bar needed when then using BIM technology to along ground joist and built-in fitting binding carries out analysis selection, then in main structure When concrete construction, binding and fixing directly will be carried out with floor top bars along ground joist, and in main structure and lightgage steel joist The edge top keel of internal partition wall, the corresponding position of frame keel are embedded to built-in fitting, and built-in fitting is internally threaded sleeve, internally threaded sleeve End face be quadrangle or hexagon, the periphery of internally threaded sleeve is equipped with wing plate;
S3: snap the line and calibration;
S4: fixed along top keel and frame keel: when partition wall is constructed, to make the portion that through-hole is provided with along top keel and frame keel first Position is corresponding with built-in fitting, then will be fixed again along top keel and frame keel using the fixing piece matched with built-in fitting;
S5: installation vertical keel: carrying out stepping to vertical keel, using BIM technology to vertical keel stepping, additional keel and door Window frame is analyzed in advance, then installs vertical keel by stepping position;
S6: installation sash;
S7: installation lateral direction penetrating keel;
S8: electrical pipe laying, installation attached wall equipment;
S9: installation calcium silicate board: the calcium silicate board of side is installed, calcium silicate board is screwed;It will fire prevention, sound insulation, moisture-proof material Material is packed into wall, carries out installation filling simultaneously with other side calcium silicate board;
S10: seam and corner protector processing.
2. a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method according to claim 1, it is characterised in that: institute Stating fixing piece includes fixing bolt and gasket.
3. a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method according to claim 2, it is characterised in that: institute The size for stating through-hole is twice of fixing bolt diameter.
4. a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method according to claim 1, it is characterised in that: institute It states in step S1 and is provided with several communication ports along ground joist bottom.
5. a kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method according to claim 1, it is characterised in that: institute One layer of sealing material will be smeared after top keel and the fixation of frame keel on fixing piece by stating step S4.
CN201710228111.1A 2017-04-10 2017-04-10 A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method Active CN107100295B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710228111.1A CN107100295B (en) 2017-04-10 2017-04-10 A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710228111.1A CN107100295B (en) 2017-04-10 2017-04-10 A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method

Publications (2)

Publication Number Publication Date
CN107100295A CN107100295A (en) 2017-08-29
CN107100295B true CN107100295B (en) 2019-06-04

Family

ID=59674988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710228111.1A Active CN107100295B (en) 2017-04-10 2017-04-10 A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method

Country Status (1)

Country Link
CN (1) CN107100295B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424642A (en) * 2019-07-01 2019-11-08 中国十七冶集团有限公司 A kind of abnormal shape metal Roof bolts the construction method of keel with spigot-and-socket

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605883A (en) * 2012-04-12 2012-07-25 中建一局集团第二建筑有限公司 Light steel joist partition connecting structure and construction method thereof
CN202969677U (en) * 2012-12-30 2013-06-05 深圳瑞和建筑装饰股份有限公司 Keel assembly and main keel
CN106049714A (en) * 2016-07-28 2016-10-26 杭州江润科技有限公司 Plastic-steel net combined light partition wall and construction method
CN106168067A (en) * 2016-08-18 2016-11-30 上海闵轩钢结构工程有限公司 A kind of construction method of light steel keel partition

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8800227B2 (en) * 2008-09-08 2014-08-12 Dennis LeBlang Connectors for concrete structure and structural insulating core

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605883A (en) * 2012-04-12 2012-07-25 中建一局集团第二建筑有限公司 Light steel joist partition connecting structure and construction method thereof
CN202969677U (en) * 2012-12-30 2013-06-05 深圳瑞和建筑装饰股份有限公司 Keel assembly and main keel
CN106049714A (en) * 2016-07-28 2016-10-26 杭州江润科技有限公司 Plastic-steel net combined light partition wall and construction method
CN106168067A (en) * 2016-08-18 2016-11-30 上海闵轩钢结构工程有限公司 A kind of construction method of light steel keel partition

Also Published As

Publication number Publication date
CN107100295A (en) 2017-08-29

Similar Documents

Publication Publication Date Title
CN104746828B (en) Dovetail key suspension member and use its decorative panel dry hanging construction technique
CN106760348A (en) A kind of insulation and decoration acoustic wall board and its construction method of installation
CN204876080U (en) Outer wall and crossbeam installation connection structure in aluminum alloy house
CN204112532U (en) Integral light grouting heat-preserving wall
CN207878960U (en) A kind of construction material for installing high-strength durable fiber cloth or/and plastic film
WO2017036187A1 (en) Structure for connecting beam of aluminum alloy house to wallboard, door and window
CN104100013A (en) Space-saving type construction method for indoor efficient sound insulation system
CN204571010U (en) Assembling type partition wall
WO2017036186A1 (en) Structure for connecting pillar of aluminum alloy house to wallboard, door and window
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN102535688A (en) Outer wall with built-in single-surface composite rock wool insulation board and construction method for outer wall
CN104164956A (en) Flexible connecting system for polyurethane heat preservation decorative sheets
CN107100295B (en) A kind of pre-buried lightgage steel joist calcium silicate board internal partition wall construction method
CN105064551B (en) Removable board wall system
CN206957099U (en) A kind of insulation and decoration acoustic wall board
CN207277619U (en) The reinforced light steel keel partition of shaped steel
CN105155730A (en) Outer wall building module and application thereof
CN209397798U (en) A kind of compound water-proof thermal-insulation curtain wall
CN101319524A (en) Multifunctional combination large plate combined exterior wall and its construction method
CN104196192B (en) Grade-A fireproofing, insulation and decoration integrated combined hanging board of building exterior wall
CN204919880U (en) Crossbeam and wallboard and door and window connection structure in aluminum alloy house
CN210563122U (en) Thermal insulation decorative composite ALC peripheral wall panel
CN107476592A (en) A kind of construction material for installing high-strength durable fiber cloth or/and plastic sheeting
CN204059666U (en) Lightweight grouting wall
CN208267404U (en) A kind of construction wall or prefabricated panels for installing high-strength durable fiber cloth

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant