CN107090778A - A kind of hydraulic foldable mould bases - Google Patents

A kind of hydraulic foldable mould bases Download PDF

Info

Publication number
CN107090778A
CN107090778A CN201710445380.3A CN201710445380A CN107090778A CN 107090778 A CN107090778 A CN 107090778A CN 201710445380 A CN201710445380 A CN 201710445380A CN 107090778 A CN107090778 A CN 107090778A
Authority
CN
China
Prior art keywords
girder
mould bases
slide
template
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710445380.3A
Other languages
Chinese (zh)
Inventor
江明坤
刘方杰
赵阳
胡元伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HENGHUN MACHINERY Co Ltd
Original Assignee
SHANDONG HENGHUN MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HENGHUN MACHINERY Co Ltd filed Critical SHANDONG HENGHUN MACHINERY Co Ltd
Priority to CN201710445380.3A priority Critical patent/CN107090778A/en
Publication of CN107090778A publication Critical patent/CN107090778A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of hydraulic foldable mould bases, including:Two hanging beams, two shuttering supporting frameworks, N number of slide, locking device, template, oil cylinder and vertical shift mechanism.When casting concrete, the equipment girder of hydraulic foldable mould bases is fixed on slide by the way that locking device is locked, and hydraulic oil cylinder driving template is swung up.The casting concrete bridge floor on steel box-girder afterwards, the edge of a wing position of casting concrete bridge floor in template, when pouring construction finishes die sinking, hydraulic oil cylinder driving template is rotated down, the edge of a wing of itself and concrete bridge deck is set to be separated, vertical shift mechanism urges whole equipment is slided with respect to slide afterwards, realizes reach, and rear matched moulds carries out new round construction in place.Whole work progress, only in bridge upper operating, with job parallelism under bridge, and need not be in setting support under bridge, work progress is easy, and required workmen, machinery are few, efficiency of construction is improved, construction period is shortened, the problem of intersecting of being constructed on bridge under bridge is solved.

Description

A kind of hydraulic foldable mould bases
Technical field
The present invention relates to bridge machine field, and in particular to a kind of hydraulic foldable mould bases.
Background technology
The casting method of traditional steel-concrete mixing bridge flange plate is that proping then lays template construction under bridge, The method is influenceed big and long construction period by landform, environment etc., and costly, efficiency is low.Especially constructed in city major trunk roads, bridge Under multiple project cross-operation when, this construction method performance difficulty has a strong impact on project progress.Accordingly, it would be desirable to which a kind of new applies Work method and apparatus, to solve the problem of bridge cross-operation is brought.
The content of the invention
The present invention can be achieved to pour box beam to overcome the shortcomings of that above technology need not set up support there is provided one kind The hydraulic foldable mould bases of edge of a wing board concrete.
The technical scheme that the present invention overcomes its technical problem to be used is:
A kind of hydraulic foldable mould bases, including:
Two hanging beams, are horizontally placed on above steel box-girder, and the hanging beam lower end is horizontally disposed with along the longitudinal direction N number of equipment master Beam;
Two shuttering supporting frameworks, respectively positioned at the steel box-girder left and right sides, the shuttering supporting frame vertical straight is fixed on homonymy The outboard end of hanging beam;
N number of slide, is horizontally installed to steel box-girder upper end along the longitudinal direction, and each girder is slidably mounted in corresponding slide;
Locking device, is arranged on slide, for by the not busy locked fixation of your slide of equipment girder;
Template, its tail end is installed on shuttering supporting framework by hinge;
Oil cylinder, its lower end is installed with shuttering supporting frame articulation, and its piston rod head end is hinged installation with template;And
Vertical shift mechanism, it drives hanging beam to be slided by equipment girder along slide fore-and-aft direction, when the piston rod of oil cylinder all stretches out When, the angle of inclination of the template upper surface is consistent with the edge of a wing position lower surface angle of inclination of concrete bridge deck.
Above-mentioned locking device includes some pressing plates and some screws being arranged in slide, the screw head end and pressing plate It is in contact, the pressing plate is pressed on equipment girder.
Above-mentioned vertical shift structure is vertical shift oil cylinder, and the tail end of the vertical shift oil cylinder, which is hinged, to be installed on steel box-girder, its piston rod Head end is connected with vertical shift mechanism, and the vertical shift mechanism slips are arranged at the lower end of equipment girder.
In order to improve the firmness of template, in addition to threaded rod, the threaded rod sequentially passes through hanging beam and mould from top to bottom Plate, when the piston rod of oil cylinder all stretches out, threaded rod upper end is fastened by nut I with respect to hanging beam, and threaded rod lower end passes through spiral shell Female II opposite formwork fastening.
In order to which hanging beam makes stress balance, in addition to it is arranged at the balancing weight of hanging beam medial extremity.
Also include the pedal for being horizontally installed to shuttering supporting framework lower end.
Workmen walks for convenience, and above-mentioned pedal upper end is equipped with checkered steel plate.
In order to further improve security, above-mentioned pedal surrounding is respectively arranged with guardrail.
In order to improve the stability of pedal, in addition to the connecting rod being obliquely installed, the small end is fixed on shuttering supporting On framework, its lower end is fixed on pedal.
The beneficial effects of the invention are as follows:When casting concrete, the equipment girder of hydraulic foldable mould bases passes through locking device Locked to be fixed on slide, hydraulic oil cylinder driving template is swung up.The casting concrete bridge floor on steel box-girder, is poured in template afterwards The edge of a wing position of concrete bridge deck is built, when pouring construction finishes die sinking, hydraulic oil cylinder driving template is rotated down, and makes itself and concrete bridge The edge of a wing in face is separated, and vertical shift mechanism urges whole equipment is slided with respect to slide afterwards, realizes reach, and rear matched moulds carries out new in place One wheel construction.Whole work progress, only in bridge upper operating, and job parallelism under bridge, and need not in setting support under bridge, Work progress is easy, and required workmen, machinery are few, improve efficiency of construction, shorten construction period, solve on bridge under bridge The problem of construction intersects.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention;
Fig. 2 is side structure schematic view of the invention;
In figure, the template of 1. hanging beam, 2. shuttering supporting framework, 3. equipment girder, 4. slide, 5. concrete bridge deck, 6. balancing weight 7. 8. the guardrail 16. of 14. checkered steel plate of bearing pin 9. oil cylinder, 10. threaded rod, 11. nut, I 12. nut, II 13. pedal 15. connects The steel box-girder of 17. vertical shift oil cylinder of bar 18..
Embodiment
Below in conjunction with the accompanying drawings 1, the present invention will be further described for accompanying drawing 2.
A kind of hydraulic foldable mould bases, including:Two hanging beams 1, are horizontally placed on before the top of steel box-girder 18, the lower end edge of hanging beam 1 There is N number of equipment girder 3 at rear to horizontally disposed;Two shuttering supporting frameworks 2, respectively positioned at the left and right sides of steel box-girder 18, template Support frame 2 is fixed on the outboard end of the hanging beam 1 of homonymy vertically;N number of slide 4, is horizontally installed to steel box-girder 18 along the longitudinal direction Upper end, each girder 3 is slidably mounted in corresponding slide 4;Locking device, is arranged on slide 4, for by equipment girder 3 The locked fixation of not busy your slide 4;Template 7, its tail end is hinged by bearing pin 8 and is installed on shuttering supporting framework 2;Oil cylinder 9, its lower end Installation is hinged with shuttering supporting framework 2, its piston rod head end is hinged installation with template 7;And vertical shift mechanism, it drives hanging beam 1 Slided by equipment girder 3 along the fore-and-aft direction of slide 4, when the piston rod of oil cylinder 9 all stretches out, the inclination of the upper surface of template 7 Angle is consistent with the edge of a wing position lower surface angle of inclination of concrete bridge deck 5.When casting concrete, hydraulic foldable mould bases Equipment girder 3 is fixed on slide 4 by the way that locking device is locked, and the driving of oil cylinder 9 template 7 is swung up.Afterwards in steel box-girder 18 Upper casting concrete bridge floor 5, the edge of a wing position of casting concrete bridge floor 5 in template 7, when pouring construction finishes die sinking, oil cylinder 9 Driving template 7 is rotated down, and the edge of a wing of itself and concrete bridge deck 5 is separated, vertical shift mechanism urges whole equipment is relative afterwards Slide is slided, and realizes reach, and rear matched moulds carries out new round construction in place.Whole work progress, only in bridge upper operating, with bridge Lower job parallelism, and need not be in setting support under bridge, work progress is easy, and required workmen, machinery are few, improve construction Efficiency, shortens construction period, solves the problem of intersecting of being constructed on bridge under bridge.
Further, locking device includes some pressing plates and some screws being arranged in slide 4, screw head end and pressure Plate is in contact, and pressing plate is pressed on equipment girder 3.By tightening screw, screw-driven pressing plate is set to be contacted with equipment girder 3, from And equipment girder 3 and slide 4 are locked by stiction, it is easy to operate, it is simple in construction.Vertical shift structure can be using vertical Oil cylinder 17 is moved, the tail end of vertical shift oil cylinder 17, which is hinged, to be installed on steel box-girder 18, and its piston rod head end is connected with vertical shift mechanism, vertical shift Mechanism slips are arranged at the lower end of equipment girder 3.The piston rod action of vertical shift oil cylinder 17, can driving equipment by vertical shift mechanism Girder 3 is slided with respect to slide 4, realizes overall vertical shift.
Further, in addition to threaded rod 10, threaded rod 10 sequentially passes through hanging beam 1 and template 7 from top to bottom, when oil cylinder 9 Piston rod when all stretching out, the upper end of threaded rod 10 is fastened with respect to hanging beam 1 by nut I 11, and the lower end of threaded rod 10 passes through nut II 12 opposite formworks 7 are fastened.Threaded rod 10 is lifted using pulling force to template 7, so that not only rear end utilizes bearing pin 9 to template 7 Fixed, its front end is pulled by threaded rod 10, so that it is guaranteed that during casting concrete template 7 stability, prevent it from deforming The edge of a wing of concrete bridge deck 5 is caused to occur the situation of deviation.The balancing weight 6 for being arranged at the medial extremity of hanging beam 1, counterweight can also be included Block 6 with the stress of the left and right sides of balance hanging beam 1, can improve the stability of equipment operation.
The pedal 13 for being horizontally installed to the lower end of shuttering supporting framework 2 can also be included, by setting pedal 13 to facilitate Workmen stands and constructed on pedal 13, further improves the convenience of operation.The upper end of pedal 13 can be equipped with checkered steel plate 14.The walking of workmen is further facilitated by laying checkered steel plate 14.Pedal 13 may also function as high-altitude object and fall simultaneously The effect of protection.By setting guardrail 15 in the surrounding of pedal 13, with the further security for improving construction.It is preferred that, in addition to The connecting rod 16 being obliquely installed, the upper end of connecting rod 16 is fixed on shuttering supporting framework 2, and its lower end is fixed on pedal 13, connecting rod 16 The bonding strength of pedal 13 and shuttering supporting framework 2 is improved, reliability is further increased.

Claims (9)

1. a kind of hydraulic foldable mould bases, it is characterised in that including:
Two hanging beams(1), it is horizontally placed on steel box-girder(18)Top, the hanging beam(1)Lower end is horizontally disposed with along the longitudinal direction N Individual equipment girder(3);
Two shuttering supporting frameworks(2), respectively positioned at steel box-girder(18)The left and right sides, the shuttering supporting framework(2)It is vertical solid Due to the hanging beam of homonymy(1)Outboard end;
N number of slide(4), steel box-girder is horizontally installed to along the longitudinal direction(18)Upper end, each girder(3)It is slidably mounted on corresponding Slide(4)In;
Locking device, is arranged at slide(4)On, for by equipment girder(3)Your not busy slide(4)Locked fixation;
Template(7), its tail end passes through bearing pin(8)It is hinged and is installed on shuttering supporting framework(2)On;
Oil cylinder(9), its lower end and shuttering supporting framework(2)Installation is hinged, its piston rod head end and template(7)It is hinged installation;With And
Vertical shift mechanism, it drives hanging beam(1)Pass through equipment girder(3)Along slide(4)Fore-and-aft direction is slided, and works as oil cylinder(9)Work When stopper rod all stretches out, the template(7)The angle of inclination of upper surface and concrete bridge deck(5)Edge of a wing position lower surface tilt Angle is consistent.
2. hydraulic foldable mould bases according to claim 1, it is characterised in that:The locking device includes being arranged at slide (4)Interior some pressing plates and some screws, the screw head end is in contact with pressing plate, and the pressing plate is pressed in equipment girder (3)On.
3. hydraulic foldable mould bases according to claim 1, it is characterised in that:The vertical shift structure is vertical shift oil cylinder(17), The vertical shift oil cylinder(17)Tail end be hinged and be installed on steel box-girder(18)On, its piston rod head end is connected with vertical shift mechanism, described Vertical shift mechanism slips are arranged at equipment girder(3)Lower end.
4. the hydraulic foldable mould bases according to claim 1 or 2 or 3, it is characterised in that:Also include threaded rod(10), it is described Threaded rod(10)Hanging beam is sequentially passed through from top to bottom(1)And template(7), work as oil cylinder(9)Piston rod all stretch out when, threaded rod (10)Upper end passes through nut I(11)With respect to hanging beam(1)Fastening, threaded rod(10)Lower end passes through nut II(12)Opposite formwork(7) Fastening.
5. hydraulic foldable mould bases according to claim 4, it is characterised in that:Also include being arranged at hanging beam(1)Medial extremity Balancing weight(6).
6. hydraulic foldable mould bases according to claim 4, it is characterised in that:Also include being horizontally installed to shuttering supporting framework (2)The pedal of lower end(13).
7. hydraulic foldable mould bases according to claim 6, it is characterised in that:The pedal(13)Upper end is equipped with riffled iron Plate(14).
8. hydraulic foldable mould bases according to claim 6, it is characterised in that:The pedal(13)Surrounding is respectively arranged with shield Column(15).
9. hydraulic foldable mould bases according to claim 6, it is characterised in that:Also include the connecting rod being obliquely installed(16), institute State connecting rod(16)Shuttering supporting framework is fixed in upper end(2)On, pedal is fixed in its lower end(13)On.
CN201710445380.3A 2017-06-14 2017-06-14 A kind of hydraulic foldable mould bases Pending CN107090778A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710445380.3A CN107090778A (en) 2017-06-14 2017-06-14 A kind of hydraulic foldable mould bases

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710445380.3A CN107090778A (en) 2017-06-14 2017-06-14 A kind of hydraulic foldable mould bases

Publications (1)

Publication Number Publication Date
CN107090778A true CN107090778A (en) 2017-08-25

Family

ID=59640518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710445380.3A Pending CN107090778A (en) 2017-06-14 2017-06-14 A kind of hydraulic foldable mould bases

Country Status (1)

Country Link
CN (1) CN107090778A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505447A (en) * 2018-04-28 2018-09-07 宁波昌盛丰机械科技有限公司 A kind of Cast-in-place Bent Cap construction method
CN110700112A (en) * 2019-10-31 2020-01-17 广西路建工程集团有限公司 Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam and construction method
CN113216399A (en) * 2021-05-25 2021-08-06 中国建筑第二工程局有限公司 Large-span steel reinforced concrete structure and construction method thereof
CN115369771A (en) * 2022-09-03 2022-11-22 南通路桥工程有限公司 Novel cast-in-place support system of steel-concrete composite beam bridge deck cantilever

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117791A (en) * 2007-08-22 2008-02-06 中铁大桥局股份有限公司 Abnormal shape steel case and orthotropic plate bottom formwork combined type moving die carrier framework and construction method thereof
JP2008038449A (en) * 2006-08-04 2008-02-21 Sumitomo Mitsui Construction Co Ltd Bridge girder constructing method
CN201377174Y (en) * 2009-04-14 2010-01-06 中铁二十一局集团有限公司 Box girder walking type post-pouring flange plate support
CN202658535U (en) * 2012-06-27 2013-01-09 中铁四局集团机电设备安装有限公司 Mobile formwork forming girder
CN102953343A (en) * 2012-11-30 2013-03-06 山东省路桥集团有限公司 Descending bracket self-mobile model framework bridge fabrication machine
WO2014200443A1 (en) * 2013-06-11 2014-12-18 Nrs Consulting Co., Ltd. Self-launching movable scaffolding system
CN204608613U (en) * 2015-05-06 2015-09-02 山东恒堃机械有限公司 A kind of mobile formwork template foldable structure
CN105064219A (en) * 2015-07-22 2015-11-18 山东恒堃机械有限公司 Mobile framework moving trolley
CN105350455A (en) * 2015-11-12 2016-02-24 山东恒堃机械有限公司 Multifunctional trolley of movable formwork
CN105507165A (en) * 2016-01-20 2016-04-20 长沙理工大学 Hanging basket for corrugated steel web plate construction and construction process
CN207512607U (en) * 2017-06-14 2018-06-19 山东恒堃机械有限公司 A kind of hydraulic foldable mould bases

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008038449A (en) * 2006-08-04 2008-02-21 Sumitomo Mitsui Construction Co Ltd Bridge girder constructing method
CN101117791A (en) * 2007-08-22 2008-02-06 中铁大桥局股份有限公司 Abnormal shape steel case and orthotropic plate bottom formwork combined type moving die carrier framework and construction method thereof
CN201377174Y (en) * 2009-04-14 2010-01-06 中铁二十一局集团有限公司 Box girder walking type post-pouring flange plate support
CN202658535U (en) * 2012-06-27 2013-01-09 中铁四局集团机电设备安装有限公司 Mobile formwork forming girder
CN102953343A (en) * 2012-11-30 2013-03-06 山东省路桥集团有限公司 Descending bracket self-mobile model framework bridge fabrication machine
WO2014200443A1 (en) * 2013-06-11 2014-12-18 Nrs Consulting Co., Ltd. Self-launching movable scaffolding system
CN204608613U (en) * 2015-05-06 2015-09-02 山东恒堃机械有限公司 A kind of mobile formwork template foldable structure
CN105064219A (en) * 2015-07-22 2015-11-18 山东恒堃机械有限公司 Mobile framework moving trolley
CN105350455A (en) * 2015-11-12 2016-02-24 山东恒堃机械有限公司 Multifunctional trolley of movable formwork
CN105507165A (en) * 2016-01-20 2016-04-20 长沙理工大学 Hanging basket for corrugated steel web plate construction and construction process
CN207512607U (en) * 2017-06-14 2018-06-19 山东恒堃机械有限公司 A kind of hydraulic foldable mould bases

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505447A (en) * 2018-04-28 2018-09-07 宁波昌盛丰机械科技有限公司 A kind of Cast-in-place Bent Cap construction method
CN108505447B (en) * 2018-04-28 2019-02-01 江苏拓科集团有限公司 A kind of Cast-in-place Bent Cap construction method
CN110700112A (en) * 2019-10-31 2020-01-17 广西路建工程集团有限公司 Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam and construction method
CN113216399A (en) * 2021-05-25 2021-08-06 中国建筑第二工程局有限公司 Large-span steel reinforced concrete structure and construction method thereof
CN115369771A (en) * 2022-09-03 2022-11-22 南通路桥工程有限公司 Novel cast-in-place support system of steel-concrete composite beam bridge deck cantilever
CN115369771B (en) * 2022-09-03 2023-08-25 南通路桥工程有限公司 Cast-in-situ bracket system for cantilever of reinforced concrete composite beam bridge deck

Similar Documents

Publication Publication Date Title
CN107090778A (en) A kind of hydraulic foldable mould bases
CN103074854B (en) Rear supporting point triangular bracket hanging basket and bridge construction method using same
CN104564104B (en) A kind of table system for tunnel-liner
CN105297635B (en) Assembled lifting type construction platform for pier column construction and construction method thereof
CN101922143A (en) Construction method of bent cap
CN104763446B (en) The multi-functional chassis of metro station construction
CN201762666U (en) Capping construction support
CN109594479A (en) A kind of parallel overpass center anticollision barrier of double width while construct mould bases and method
CN201056836Y (en) Dual-function screw prop creeping formwork system
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN105839542A (en) High bridge pier self-lifting outer frame over-form device
CN207512607U (en) A kind of hydraulic foldable mould bases
CN208122461U (en) The construction equipment of towering structure
CN107268455A (en) Concrete girder gooseneck combining structure beam cradle construction method
CN214497202U (en) Strutting arrangement is used in construction of steel-concrete composite beam decking
CN104929660B (en) Formation and construction set for continuous open-cut tunnel
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN107858929B (en) Cast-in-situ Beam form fixer is filled with and removes the construction method of cast-in-place beam forms
CN103953187B (en) A kind of sliding-mode platform system of band center vertical tube structure
CN210127416U (en) Hang basket convenient to it is gliding
CN201567784U (en) City elevated collision-preventing wall formwork and scaffold combination device
CN201264290Y (en) Prefabricated box girder means for adjusting limit of movement
CN109252448B (en) Prepressing construction method of bridge tower column cross beam support
CN100497834C (en) Construction equipment for integral roof-holding highway bridge top structure
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination