CN107083741A - Bridge with power generator - Google Patents

Bridge with power generator Download PDF

Info

Publication number
CN107083741A
CN107083741A CN201710072447.3A CN201710072447A CN107083741A CN 107083741 A CN107083741 A CN 107083741A CN 201710072447 A CN201710072447 A CN 201710072447A CN 107083741 A CN107083741 A CN 107083741A
Authority
CN
China
Prior art keywords
energy
coal
electric energy
oil
fossils
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710072447.3A
Other languages
Chinese (zh)
Inventor
赵顺九
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710072447.3A priority Critical patent/CN107083741A/en
Publication of CN107083741A publication Critical patent/CN107083741A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D18/00Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B13/00Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Bridge with power generator is to do work to generate electricity using river waterflow impulsive force, and continuous bridge construction installation generates electricity on rivers water channel.Numerous bridges constitute power plant, and variable power transmission station meets the cheap electric energy of the mankind in water channel two sides, production.Being can be with that can change, and water can change cheap electric energy, and cheap electric energy conversion Hydrogen Energy (water electrolysis hydrogen production) replaces the fossils such as coal, oil to do heat energy, kinetic energy with cheap electric energy, Hydrogen Energy.Heat energy, kinetic energy are done without fossils such as coal, oil to develop production, while also just from solving air pollution disaster, environmental pollution disaster, harm mankind's disaster disastrous effect of " greenhouse effects " seriousness at all.Energy critical problem.Also just save and save the fossils such as coal, oil simultaneously.Take and replaced the mankind to be built a dam because power requirements are existing generating, thermal power generation, nuclear power generation, solar power generation, while also just solving the disaster disastrous effect and unfavorable factor of the brought harm mankind.Solve existing electric energy expensive and not enough.

Description

Bridge with power generator
Art:
First, using water flow impact pressure, continuous bridge construction installation generates electricity on rivers, water channel, and numerous bridges constitute power plant, become defeated Power station is in water channel two sides.Production meets the cheap electric energy of the mankind.
2nd, Natural Water, which can be changed, meets the cheap electric energy of the mankind, cheap electric energy conversion Hydrogen Energy (water electrolysis hydrogen production), with low Honest and clean electric energy, Hydrogen Energy are done heat energy, kinetic energy instead of fossils such as coal, oil and developed production.
3rd, solution is done heat energy, kinetic energy with fossils such as coal, oil and developed production, while the cigarette and coal ash pollution air that produce, Pollute environmental hazard mankind's disaster disastrous effect.
Because existing electric energy is expensive and not enough, existing water electrolysis hydrogen production industry is restricted and can not produced, and causes hydrogen cost high High, limiting steel and iron industry hydrogen can not produce for iron ore direct reducing, limit hydrogen and cannot function as conventional fuel in industry Largely used with chemical engineering industry, and increase the industrial products cost relevant with hydrogen.Thoroughly limiting hydrogen cannot function as the energy again, Simply at aspect of firing a rocket in practical application, and cannot function as conventional fuel is used for existing kinetic energy mechanical (aircraft, steamer, fire Car, automobile ...), do not make up fossil fuel and peter out, can't resolve it is existing oil be used as the aircraft of fuel, steamer, The energy critical problem that train, automobile ... are caused.Can not from solve at all it is existing oil be used as the aircraft of fuel, steamer, Train, the cigarette of automobile ... generation pollute deterioration disaster problem to air.
Can not be from solving existing to be cooked, warm oneself etc. the change such as coal, oil with thermal technology's industry, agricultural and people's daily life at all Masonry fuel is used as the develop production cigarette and coal ash of generation of heat energy and causes pollution disaster to environment and air.
Because the expensive industry of existing electric energy is restricted and can not produced with electricity production ammonium nitrate fertilizer, electric furnace smelting steel etc..
Because the expensive and not enough agricultural production of existing electric energy is affected, such as irrigation by electric power, multi-stage power water suction is even more serious.
Because existing electric energy is expensive, not enough and hydrogen costliness can not solve coal, oil to be used as the transport and power consumption needed for fuel.
Because existing electric energy is expensive, the expensive various industrial, agricultural products relevant with electric energy, Hydrogen Energy of not enough and hydrogen accordingly all add Big product cost.
Because existing electric energy is expensive, not enough and hydrogen costliness directly limitation industry, agricultural and people's daily life are cooked, warm oneself Using electricity instead of coal and fuel is done for coal, oil with hydrogen.Cause to can't resolve existing thermal power generation, industrial iron and steel smelting and other use heat Industry, people's daily life is cooked, warmed oneself, agricultural greenhouse nursery, drying corps, the mechanical aircraft of existing kinetic energy, steamer, fire Car, automobile ... force people very reluctantly to pollute environment, atmosphere pollution deterioration disaster, " greenhouse effects " seriousness of climate and energy Source crisis cost exchange for it is uncontrolled largely locality descend reserves limited, it is disposable, increasingly exhausted important industrial chemicals resource coal, Oil is used as fuel energy and burns up reality of developping production, and deteriorates the fine Green Homeland earth environment of the mankind, causes human survival It is difficult.
The existing hydroelectric generation of main energy sources dam (the Chinese Sanmenxia Gorge, gorges Hydropower, positioned at Brazil and Paraguay side Yi Taipu power stations ... on the Ba Lana rivers on boundary) it is too poor using the kinetic energy and water channel physical geography condition of water, again can not be It is continuous on water channel to build dam generating, cause generated energy few, cause to feel that geographical conditions and waterpower resourses limitation can not generate electricity again, formed Existing electric energy is expensive and not enough, and can not meet the mankind can be to the demand of electric energy.Dam generating is built on water channel, soil is largely flooded, Mobile a large amount of big resettlements, it is impossible to keep balance of nature, threaten the mankind, it is possible to cause environmental destruction, and dam Once consequence of breakdowning will be hardly imaginable, and sent out it is high per once electricity price lattice, not with the earth share a common destiny, life or death natural water this Big energy utilized is that country and the mankind one lose greatly well.
Existing main energy sources thermal power generation (inner mongolia Yi Min thermal power generation, the thermal power generation of Shanxi Province Yangcheng, Henan Province The thermal power generation ... of Sanmenxia Gorge Shan County) reserves it is limited, disposable, increasingly the fossil such as exhausted coal, oil to be used as fuel big Amount burn-up, to country with the mankind into the wasting of resources and loss, while the cigarette and coal ash that produce cause dirt to air and environment Disaster is contaminated, land occupation is more, and the every once electricity price lattice sent out are expensive, and energy crisis disastrous effect is accelerated.
Existing main energy sources nuclear power generation is no doubt clean under normal circumstances, but just in case occurring nuclear leakage, consequence is same Fearful, the problem of discarded nuclear fuel is one quite difficult to manage again, land occupation is more, and the every once electricity price lattice sent out It is high.
Existing solar power generation reform of nature ability.First, the energy profile density of irradiation is small, i.e., to take huge face Product.2nd, by the four seasons, round the clock and rain or shine etc. meteorological condition is limited.3rd, it is costly, real realistic scale can not be reached again.
Goal of the invention is intended to:1st, the cheap electric energy of the mankind, Hydrogen Energy requirement are met.Solve existing electric energy expensive and not enough, Replace the fossils such as coal, oil to do heat energy, kinetic energy with cheap electric energy, Hydrogen Energy to develop production, energy critical problem.Take for coal, The fossils such as oil are used as heat energy, kinetic energy as fuel and developed production.Save and preserve the fossils such as coal stone oil.2nd, solution coal, oil Do coal charge Deng fossil and developed production with heat energy, kinetic energy, while the coal ash pollution environmental hazard produced, cigarette cause atmosphere pollution calamity Evil, the disaster disastrous effect of " greenhouse effects " seriousness.3rd, take for the mankind built a dam because electrical energy demands are existing generating, thermal power generation, core hair Electricity, solar power generation, solve brought harm mankind's disaster disastrous effect and unfavorable factor.
Inventive technique:1st, continuous bridge construction installation is generated electricity using water flow impact pressure acting on rivers water channel, numerous bridges compositions Power plant, variable power transmission station meets the cheap electric class of the mankind in water channel two sides, production.2nd, Hydrogen Energy (electrolysis is changed with cheap electric energy Water hydrogen manufacturing).3rd, the fossils such as coal, oil are replaced to do heat energy, kinetic energy with cheap electric energy, Hydrogen Energy.4th, it is used as without fossils such as coal, oil Heat energy, kinetic energy are developed production, and are used as transport needed for fuel while solving a coal, oil and are consumed energy, also just from it is basic save with Disposable, the increasingly fossil such as exhausted coal, oil is saved, heat energy is done while solving the fossils such as a coal, oil as fuel, moves (thermal technology's industry can be used, people's daily life is cooked, warmed oneself, drying corps, nursed young plants in hothouses.Kinetic energy machinery aircraft, steamer, Train, automobile ...) generation of developping production coal ash pollution environmental hazard, cigarette pollute air deteriorate disaster, " greenhouse imitate Should " harm mankind's disaster disastrous effect of seriousness.Solve energy critical problem simultaneously.5th, take for existing generating of building a dam, feel Geographical conditions and waterpower resourses limitation can not generate electricity, largely flooding soil, immigrant, largely big resettlement, weldings can not keep raw State balance etc. a series of unfavorable factors, send out often once electricity price lattice height and generated energy it is few, can not meet demand of the mankind to electric energy. 6th, from relieving existing firepower electricity at all, reserves it is limited it is disposable, increasingly the fossil such as exhausted coal, oil be used as fuel burn-up Generate electricity, the wasting of resources and loss are caused to country and the mankind, while the cigarette and coal ash that produce pollute calamity to environment and air Evil.Land occupation it is many and sent out it is expensive per once electricity price lattice, energy critical problem is accelerated again.7th, take for existing core Generate electricity, that is sent out is high per once electricity price lattice, but just in case the dire consequences of generation nuclear leakage and discarded nuclear fuel are quite difficult to manage Problem.8th, take for existing solar energy, generate electricity, area occupied is huge, costly, irradiation energy profile density is small, by The four seasons, the meteorological condition limitation such as round the clock and rain or shine and straight positive realistic scale can not be reached.9th, existing electric energy is solved expensive and not Foot.
Bridge with power generator has the advantage that compared with prior art:1st, generating of building a dam is avoided, generated energy is few, send out per kilowatt-hour Price is high, feels that geographical conditions and waterpower resourses limitation can not generate electricity, can not meet mankind's electrical energy demands, largely flood soil again Ground, a large amount of big resettlements of immigrant.2nd, avoid solar power generation reform of nature ability, irradiation energy profile density it is small, to account for With huge area, by the four seasons, round the clock and rain or shine etc. meteorological condition limited, it is costly and real realistic scale can not be reached. 3rd, avoid thermal power generation, nuclear power generation the fossils such as coal, oil, core do fuel burn-up generate electricity to country and the mankind cause resource wave Take and lose, energy critical problem is accelerated again, that is sent out is expensive per once electricity price lattice.Coal ash pollution environmental hazard, smoke pollution Leakage terrible consequences and discarded nuclear fuel problem quite difficult to manage occur for air disaster, core contingency.
Realize bridge with power generator purpose measure:
1st, it is numerous according to the continuous bridge construction installation generating on rivers water channel of human demand utilization of power water flow impact pressure is met Bridge constitutes power plant, and variable power transmission station is in water channel two sides.Water, which can be changed, meets the cheap electric energy of the mankind.
2nd, cheap electric energy conversion Hydrogen Energy (water electrolysis hydrogen production).
3rd, replace the fossils such as coal, oil to be used as heat energy, kinetic energy as fuel with cheap electric energy, Hydrogen Energy to develop production.
4th, it is used as heat energy, kinetic energy as fuel without fossils such as coal, oil to develop production.
5th, take for existing:Build a dam generating, nuclear power generation, solar power generation.
6th, from releasing existing thermal power generation at all.
7th, existing electric energy is solved expensive and not enough.
8th, a bridge
Double deck.Or the single bridge deck assembling according to required upper and lower layer bridge floor equipment in building is used.
Upper deck of bridge is to install generator and computer room and miscellaneous equipment.
Two bridge pier surfaces
1st, bridge pier is elongated, and bridge pier water resistance upstream is semicircle.
2nd, bridge pier surface zigzag people walking along the street only has one side to have zigzag people's walking along the street from upper deck of bridge to lower floor's bridge floor.
3rd, there is obvious water-level measuring post on bridge pier two sides in lower floor's bridge upstream.Water-level measuring post upper end is neat with lower floor's bridge floor, and lower end is extended to Under water 18 chi (in water).
4th, trough with straight angle:Groove upper end is higher by 12 chi of lower floor's bridge floor, and lower end is extended under water 18 chi (in water).
Ledge must not be higher by bridge pier 3 D plane, and bottom land plane is relative with impeller jack-post in line towards the downstream of water, This ledge is swum under water into domatic, and groove width can be installed into as width with T-shaped metallic channel.
On groove part and lower floor bridge floor it is neat under water (in water) 18 chi of bottom land planes have stretched out out of bridge pier it is numerous into Two perpendicular row arrangement studs.Stud top has tabular to stand after hole is tightened for nut to insert the tabular latch gradually widened by narrow end and press closer Nut reinforces nut.Stud is for installing, fixed T-shaped metallic channel.
Groove top is installed by fixed block.
Two trough with straight angle are respectively built in lower floor's bridge upstream bridge pier two sides.
5th, T-shaped metallic channel:Often section is preferably short should not grow 6 chi, and wide can be installed into the trough with straight angle of bridge pier surface construction is advisable, Bottom land plane has circular diameter to be slightly larger than the stud circular diameter, position that the trough with straight angle baseplane of bridge pier surface construction is stretched out out of bridge pier Put the stud position stretched out with the trough with straight angle baseplane of bridge pier surface construction out of bridge pier be consistent circular hole, into two perpendicular rows arrangements, every Row respectively has several circular holes, and groove upper end two is helped respectively to have a circular hole for handling.T-shaped metallic channel applies antirust thing.
T-shaped metallic channel is arranged in the trough with straight angle of bridge pier surface construction, and notch is relative with impeller jack-post towards the downstream of water It is screwed in line.Upper and lower interface must be aligned during two section T-shaped metallic channel docking.Installed in bridge pier surface construction Trough with straight angle in T-shaped metallic channel upper end be advisable together with lower floor bridge floor, ledge must not super-high pier 3 D plane.
6th, thick stick is moved:It is length that thick stick, which can be installed into the upper and lower motion of T-shaped metallic channel interior energy, and metal wheel, thick stick are respectively installed in thick stick two ends Steel wire rope one end connection on long middle part and sleeve, connects boom hoist cable one end simultaneously in the middle part of thick stick length.Apply antirust thing.
Metal wheel inner round wall installs bearing, and bearing installs water proof equipment.Metal wheel in T-shaped metallic channel on dead beat kinetic energy, Lower motion is advisable.Metal wheel is arranged on motion thick stick two ends.
Thick stick is moved to be arranged in each trough with straight angle of bridge pier surface construction in mounted T-shaped metallic channel, by lifting steel wire Rope control, as impeller lifts upper and lower motion.
7th, plane road flushes two trough with straight angle that row extends beyond bridge pier surface construction in lower floor's bridge upstream and lower floor's bridge floor.
3 square holes of plane road are installation personnels and dynamic when T-shaped metallic channel is installed in two trough with straight angle of bridge pier surface construction Terraced road I staff respectively passes through space.
Respectively there is plane road on bridge pier two sides.
8th, aerial ladder road:I, aerial ladder road are to build a T-slot in the middle of two trough with straight angle.Upper end is higher by 12 chi of right angles of plane road Groove width is in ladder width, top installation group pulley, and lower end extends under water that 18 chi of right angle groove widths are not less than 1.5 cities (in water) Chi, right angle groove depth is more than the chi of T-slot baseplane 0.5, and ledge must not be higher by bridge pier 3 D plane.
Aerial ladder is installed in T-slot.
II, aerial ladder road are to build a T-slot with impeller jack-post relative deviation upstream.It is straight that upper end is higher by 12 chi of lower floor's bridge floor Chamfered groove is wider than ladder width, groove top installation group pulley, and lower end extends under water that 18 chi of right angle groove widths are not less than 1.5 (in water) Chi, right angle groove depth is more than the chi of T-slot baseplane 0.5, and ledge must not be higher by bridge pier 3 D plane.
Aerial ladder is installed in T-slot.
III, aerial ladder:6 chi of ladder length is often saved, respectively there is screw thread the upper and lower end of the leg of ladder two, and the leg lower end of ladder two is each to twist There is tubular nut.
At present end thread and the sub two leg lower end screw threads of fly on the section leg of ladder two are installed to align, fly two Leg lower end tubular nut is down twisted to be saved untill ladders connect two.The aerial ladder connected is arranged in T-slot.Cylinder during dismounting Shape nut is up twisted two section ladders and can just separated.
Aerial ladder road has the floating rattan that safety belt takes long handle month tulwar personnel cut-out impeller jack-post and other positions to wind for body Man Wuyong roads.Respectively there are I, II aerial ladder road in bridge pier two sides.
9th, moon tulwar:Fan-shaped perching knife head is preferably small, is having moon tulwar blade backward close to perching knife head-tail, in perching knife head-tail Pacify long handle front-month tulwar.
Because floating tendril thing body moisture content is easily cut off.
Inside three bridge piers
1st, the wide middle part bridge pier of lower floor's bridge floor end bridge floor only has one side to build middle part in straight parallel hole a to bridge pier.
2nd, middle part is higher by straight parallel hole top to upper deck of bridge into vertical circular holes in bridge pier.
3rd, straight parallel hole, circular vertical hole are for total parallel drive shaft, transmission jack-post space-consuming.
4th, transmission jack-post is installed:Cylinder transmission jack-post only have a section bottom into hemispherical its other position and other cylinders Jack-post construction is the same.
There is the square-shaped metal pier that hemispherical is cheated plane center on being fixed in the straight hole ground of bridge pier interior parallel.Square gold Belong to flat hemisphere hole central point and the vertical circular hole of upper deck of bridge are fixed on pier the positive middle (center) bearing center of circular hole point of hexagonal into Respectively there is a movable drop handle at vertical line, the upper each angle of plane for handling.
Cylindrical transmission jack-post docking finishes upper end and passes through the fixed hexagonal center of the vertical circular hole installation of upper deck of bridge Travelling gear and gear shift device connection transmission are installed in bearing, upper end, and flat pass moving gear and total parallel drive shaft one end are installed in lower end The vertical travelling gear engaged transmission installed, bottom hemispherical and fixed square-shaped metal pier in the straight hole ground of bridge pier interior parallel The contact of upper flat hemisphere hole.
The triangle that installing center at per high 15 chi has bearing is fixed.Triangle hits exactly bearing inner wall and cylindrical jack-post connects Touch, the angle of triangle and circular vertical hole wall contact are goed deep into hole wall and fixed.
Four uppers deck of bridge
1st, the hexagonal that there is bearing vertical circular hole installation center is fixed on bridge floor transmission jack-post top.
2nd, power speed changing equipment.
3rd, generator and miscellaneous equipment.
4th, computer room is built.
5th, power is defeated by gear shift device by impeller and power transmission shaft, transmission jack-post, then is defeated by generator conversion by gear shift device Into electric energy.
Two impellers and a generating set are into a unit.
Five lower floor's bridge floors
1st, lower floor's bridge floor rises (rising) stop higher than water channel water level.
The 2nd, two fixed corner (pin) handling framves are installed per bridge bridge face.Fixed corner (pin) handling frame and electrodynamic machines Tool equipment completes the installment work such as impeller and gear jack-post, and corner (pin) handling frame and electric power are fixed when impeller will start running Plant equipment just turns into jacking equipment visual plant.
Two fixed outer bridge floors of corner (pin) handling frame respectively install one and are furnished with slow shelves gear shift device and electric power winch.
3rd, center has the hexagonal that can install gear-bearing I circular holes to be fixed on bridge floor center tooth in fixed corner (pin) handling frame On the circular hole that wheel jack-post is passed through, each angle circular hole is screwed.
4th, strap fixed on four rope hoisting rings on boom hoist cable one end and heavy burden lifting disk connection, is carried Steel wire rope is risen by fixed corner (pin) handling frame top fixed block, then by the vertical peace of bridge floor in fixed corner (pin) handling frame The electric power winch connection that the fixation lower sheave of dress and the outer bridge floor of fixed corner (pin) handling frame are installed is transmitted to power.Impeller is in fortune Impeller lifting speed is slow when turning, during decline impeller have in itself deadweight impeller can automatic descending controlled to decline by boom hoist cable Speed is slow.
5th, the upright fixed column of I, square:There are 4 upright fixed columns of square, Cheng Zheng in the middle of fixed corner (pin) handling frame Dominant shape is arranged, and lower end is fixed on bridge floor.
Into empty cylinder in each upright fixed column of square, each upright fixed column of square has obvious water-level measuring post to supply Show that ordinary water level declines change and used.
At the upright fixed column upper end of each square, ordinary water level stop, it is higher by bridge floor and flates pass (ordinary water level at driving wheel Decline stop) respectively there is one high, one low circular hole in opposite direction.It is 18 cities that ordinary water level to normal water potential drop, which stops the high distance between, Chi.
The upright fixed column circular hole of each square is for installing dress whippletree.
II, whippletree are installed:Amount to 12 whippletrees.There is screw thread energy nutting at cylindrical whippletree two ends.
First, each whippletree of 4 whippletrees passes through the upright fixed column upper end circular hole of two squares, and 4 are fixed into square Square upright fixed column upper end (impeller handling, lifting stop).Impeller and heavy burden lifting disk, which are installed, could install this four Whippletree.
2nd, each whippletree of 4 whippletrees passes through the upright fixed column ordinary water level stop circular hole of two squares, into square Fix 4 upright fixed columns of square, ordinary water level (impeller is normal) stop.This 4 whippletrees of ordinary water level decline removal.
3rd, each whippletree of 4 whippletrees, which passes through two and be higher by bridge floor, flates pass the upright fixed column normal water of moving gear square Position declines stop circular hole, and 4 upright fixed columns of square are fixed into square, and ordinary water level declines (impeller decline) stop.
6th, heavy burden lifting disk:Into square, only two sides respectively have two square notch to be that to block 4 squares upright Fixed column lifts upper and lower motion with impeller, and heavy burden lifting disk is inaccurate transmission.Plane edge has 4 admittedly on heavy burden lifting disk Determine the arrangement of rope hoisting ring rectangularity and the I-shaped whippletree of lower plane is integrally fixed, on 4 fixed rope hoisting rings Each to fix a strap and propose the connection of steel wire rope one end, in-plane has in two circle spherical bead pilot trench grooves on heavy burden lifting disk Spheroidal bead is installed and is higher by heavy burden lifting disk plane and the contact of circular bulkheads lower plane, heavy burden lifting disk center, which has, can install bearing II circular holes.
It is left and right outside the circular hole of heavy burden lifting disk lower plane center to fix two into parallel lines to be longer than heavy burden lifting disk I-shaped Whippletree, is to reinforce heavy burden lifting disk and decline contact water level to use on schedule.
7th, circular bulkheads:Upper plane has a two circle spherical bead pilot trench, installed in groove spheroidal bead be higher by circular bulkheads plane and The circle of plane two spheroidal bead contact on truncated cone-shaped heavy burden top cover bottom plane contact, circular bulkheads lower plane and heavy burden lifting disk, Circular bulkheads center circular hole is that impeller jack-post tail end passes through required space.
8th, truncated cone-shaped heavy burden top cover:Bottom surface and top surface are all to have circular hole at plane, high 1/2nd, and rounded inside is empty Cylinder.
Truncated cone-shaped heavy burden top cover inner circular sky cylinder is that impeller jack-post tail end passes through circular hole at required space, high 1/2nd It is that adapter lug fixes truncated cone-shaped heavy burden top cover through space and impeller jack-post tail end links into an integrated entity as impeller is rotated together, The circle of plane two spheroidal bead contact on truncated cone-shaped heavy burden top cover baseplane and circular bulkheads.
9th, bearing:I, gear-bearing:Each upper and lower disc of bearing, which respectively has, installs spherical bead in a circle spherical bead pilot trench, groove Son is higher by bearing disc.Inner circle inwall has straight-tooth, and straight-tooth length and inner round wall height are equal, straight-tooth shape and impeller cylin-drical tooth axle axle Post straight-tooth shape is the same, and the impeller cylindrical gear jack-post field of conjugate action will be increased.Inner circle outer wall has a few spherical bead pilot trench.Middle circle Wall is inside and outside respectively installation pearl shape pearl in a few pearl shape pearl grooves, groove.Cylindrical inwall has a few pearl shape ball pilot trench.
II, anodontia wheel bearing:The upper and lower each disc of each disc of bearing, which respectively has, installs pearl in a circle pearl shape pearl groove, groove Shape pearl is higher by bearing disc.Inner circle inwall does not have teeth, and inner circle outer wall has a circle pearl shape pearl groove.Middle round wall is inside and outside respectively to be had Spheroidal bead is installed in one circle pearl shape pearl groove, groove.Cylindrical inwall has a circle spherical bead pilot trench.
Gear-bearing I is arranged on the hexagonal center that lower floor's bridge floor is fixed, inner circle inwall straight-tooth and impeller cylin-drical tooth wheel shaft Post engagement is rotated with impeller cylindrical gear jack-post.The axle bowl wall of installation is occupied in thickening close to impeller second section cylinder Required space when jack-post is loaded and unloaded.Installing middle has circular hole capping, and capping center circular hole is that impeller cylindrical gear jack-post is passed through Space, fixed capping is that control gear-bearing I must not lift upper and lower motion with impeller cylindrical gear jack-post.
Gearless bearing I I is hit exactly installed in heavy burden lifting disk, inner circle inwall and the cylindrical jack-post contact of impeller.Install just In have circular hole capping to fix.
10 and impeller cylin-drical tooth axle jack-post engagement travelling gear safety be mounted in bridge floor, the facade gear teeth and impeller cylinder Shape tooth jack-post engaged transmission, the lower plane gear teeth and the meshed transmission gear that installation is stood on bridge floor cylindrical parallel power transmission shaft.
The travelling gear field of conjugate action engaged with impeller cylindrical gear jack-post will be increased.
11st, it is total parallel drive shaft with the transmission jack-post engaged transmission in straight parallel hole in bridge pier.It is flat in No. 1 impeller of bridge floor Row power transmission shaft upstream is installed by combined parallel power transmission shaft, the digital phase of the gear circular diameter of combined parallel power transmission shaft two ends installation, teeth Together.
Parallel drive shaft construction, docking are copied and justify shape jack-post.
Even on parallel drive shaft to install several parallel drive shaft supporting-points for having a bearing, parallel drive shaft installs protection Cover, travelling gear installs protection oil box.
12nd, clutching device and the connection of total preparation parallel drive shaft one end are installed in total parallel drive shaft one end, always prepare parallel The clutching device connection that power transmission shaft one end and No. 1 impeller parallel drive shaft one end are installed.
It is No. 2 impellers from the impeller gear jack-post of total parallel drive shaft farther out.What No. 2 impeller parallel drive shaft one end were installed Clutching device and the connection of preparation parallel drive shaft one end, preparation parallel drive shaft one end gear and combined parallel power transmission shaft one end are nibbled Close transmission, combined parallel power transmission shaft one end gear and total preparation parallel drive shaft meshed transmission gear.
Being slided in impeller has safe people's water normal operation to be inaccurate closing clutching device.
13rd, an electric power winch is respectively installed on lower floor's bridge floor two ends upstream bridge floor side.Winch drum length 1/2nd (in Between) plus circular bulkheads, the fixed block that two steel wire ropes of winch are respectively installed by the trough with straight angle top of bridge pier surface construction again and Motion thick stick (in the middle part of thick stick length) connection in the trough with straight angle of bridge pier surface construction in mounted T-shaped metallic channel.
Handling T-shaped metallic channel only has steel cable on winch drum.
Two motion thick sticks are while two steel wire ropes carry two motion thick sticks of ascending, descending on hauling winch roller simultaneously.Move under thick stick Drop is transmitted to decline power by impeller deadweight.
14th, lower floor's bridge floor two ends and impeller jack-post respectively have square opening aerial ladder road II outlets by bridge pier deviation upstream relatively.
Under six bridges on the water surface
1st, per bridge hole install two each lower ends and water to connecting in impeller connect cylindrical jack-post connection, upper end with The circle of heavy burden lifting disk, circular bulkheads, truncated cone-shaped heavy burden top cover this section trailing cylindrical jack-post connection is passed through on lower floor's bridge floor Cylindricality gear shaft post.
The parts of someone's water handling situations apply antirust thing.
2nd, I, cylindrical gear jack-post and cylindrical jack-post:Often section length is preferably short should not grow 4.5 chi.To section (connecing) formula.
Cylindrical gear jack-post straight-tooth shape is as gear-bearing inner circle inwall straight-tooth shape, straight-tooth length and cylin-drical tooth Wheel shaft pillar height is equal.
Cylindrical gear jack-post and cylindrical jack-post disc have protrusion tabular to be that upper, disc has under tabular groove is, upper circle Face protrusion tabular is wide, the lower recessed tabular groove width of disc and jack-post circular diameter are equal.There are two circular holes, axle in upper disc protrusion tabular Post upper end only has 3 circular holes (1,2,3) circular hole numeral to count from top to bottom, and two circular holes are also at this 3 in upper disc protrusion tabular In circular hole numeral.The circle hole groove threading shape notch footpath of jack-post lower end two be more than adapter lug nut, screw head, internal diameter be less than nut, Screw head is consistent with two cylinder directions in upper disc protrusion tabular.II connection impellers second section cylinder jack-post is than other cylinders Jack-post is thick, long, shaft has installation pearl shape pearl in a few pearl shape pearl grooves, groove.Pass through heavy burden lifting disk, circular bulkheads and round platform This section trailing cylindrical jack-post of shape heavy burden top cover does not have than other cylindrical shaft column lengths, top only two circular holes, upper discs Protrude tabular.This other position of two nodal axisns post that II is spoken of are as other cylindrical jack-post constructions.
3rd, I, cylindrical gear jack-post and cylindrical jack-post handling are longer than jack-post circular diameter with adapter lug.Load and unload just Take out jack-post upper end circular hole (3) interior adapter lug.
II, the docking of two pitch circle cylindricality gear shaft posts must align the gear teeth.Cylindrical gear jack-post is with two adapter lugs Fixed to complete the docking of two nodal axisn posts, adapter lug nut, screw head are all forbidden to be higher by root diameter.
III someone's water handling situations hand cylinder jack-post fixes completion two nodal axisn posts docking, punching with two adapter lugs Screw and nut, screw head are all forbidden to be higher by circular diameter.
4th, sleeve:It is that two semicircle elongated slots synthesize one piece of long cylinder being screwed.Two semicircle elongated slots only have one Individual semicircle elongated slot outer wall has the equal several fan grooves of spacing distance from top to bottom.Notch has circular hole, and sleeve lining has a few pearls Shape pearl groove.The upper and lower mouth of sleeve respectively has waterproof sealing equipment.
Sleeve is arranged on each each impeller axle pillar height to connecting and goes out at 3 chi of the water surface (the connection nodal axisn of impeller second Post).Sleeve outer wall shape groove face is to the downstream of water, a few interior pearl shape pearl grooves of sleeve and the cylindrical jack-post post of connection impeller second section Spheroidal bead is contacted in a few pearl shape pearl grooves of body.Each shorter steel wire rope is respectively enclosed by a fan groove around sleeve one, Shorter steel wire rope is enclosed around sleeve one be connected to an one long, strap jointly in each fan groove.A short steel Cord one end connects mounted T-shaped metallic channel in the trough with straight angle of the nearlyer impeller jack-post bridge pier surface construction of the bridge pier near from impeller Interior motion thick stick (in the middle part of thick stick length).Long steel cable one end connects another bridge pier from impeller jack-post bridge pier surface construction farther out Trough with straight angle in motion thick stick in mounted T-shaped metallic channel (in the middle part of thick stick length).
Several circular holes of sleeve outer wall fan groove notch are to install card rope equipment to use.
Do not rise and (rise) the operation on the water surface without ice age and ordinary water level.
Seven underwaters
The 1st, two impellers respectively piece jack-post to connecting of connection is installed per bridge hole underwater.Enter water dispenser part and apply antirust Thing.
2nd, impeller:Numerous blades are mounted to circle using jack-post as circle central point is parallel, individual layer or are divided into two layers according to required.
Impeller enters waterleaf face to one chi of the water surface, and water surface floating ice or the excessive impeller underwater penetration of floating object will deepen, impeller Lifting has ordinary water level stop and declines stop, vacantly turns in water.Plane barge is used in impeller handling.
3rd, blade:35 degree of acute angles are into longitudinal, and notch has cylindrical upright fixed column and the upper and lower blade face connection of blade, circle Uprightly fixed intercolumniation is equal for cylindricality, the upright fixed column numeral of notch cylinder is determined according to length of blade, close to petiole blade It is that blade subtracts root of blade density, bottom land petiole and handle using jack-post as circle central point into circular arrangement to be gradually narrower than bucket front Disk, jack-post connection are screwed integral.
The summit of 35 degree of long groove angles of acute angle is that cutwater turns against the current, and groove stress (power) turns downstream.It is dynamic according to that need to use Power situation and the impulsive force of water determine length of blade and blade face width.
When pressing water channel ordinary water level herein, drop 18 chi (should be determined according to reality) is said under water.Impeller is lifted There are 18 chi of stops of ordinary water level stop and water level decreasing.Part dimension is calculated according to power requirement situation.
Plant equipment operating gun-ho is tested in 24 liters of current pilot scales per second, and kinetic energy converting electrical energy is very successful.

Claims (3)

1. generating of being done work using river waterflow impulsive force, it is characterized in that continuous bridge construction installation generates electricity on rivers water channel, production Meet the cheap electric energy of the mankind.
2. can with can conversion, Natural Water can change cheap electric energy, cheap electric energy conversion Hydrogen Energy, it is characterized in that with cheap electric energy, Hydrogen Energy is done heat energy, kinetic energy instead of fossils such as coal, oil and developed production.
3. do heat energy, kinetic energy without fossils such as coal, oil to develop production, it is characterized in that also just saving and saving simultaneously coal, stone The fossils such as oil.Also eliminate the need for simultaneously the fossils such as coal, oil as fuel be used as heat energy, kinetic energy develop production generation coal ash it is dirty Dye environmental hazard, cigarette cause air pollution disaster, harm mankind's disaster disastrous effect of " greenhouse effects " seriousness.Solve energy danger Anxious problem.
CN201710072447.3A 2017-02-03 2017-02-03 Bridge with power generator Pending CN107083741A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710072447.3A CN107083741A (en) 2017-02-03 2017-02-03 Bridge with power generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710072447.3A CN107083741A (en) 2017-02-03 2017-02-03 Bridge with power generator

Publications (1)

Publication Number Publication Date
CN107083741A true CN107083741A (en) 2017-08-22

Family

ID=59614205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710072447.3A Pending CN107083741A (en) 2017-02-03 2017-02-03 Bridge with power generator

Country Status (1)

Country Link
CN (1) CN107083741A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538395A (en) * 2017-09-21 2019-03-29 郭继会 A kind of electricity-generating method that S type double fluid is combined to ocean power generation device with bridge construction
CN112302852A (en) * 2019-07-28 2021-02-02 赵顺九 Power station with lifting impeller on tower gear shaft column on bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1337497A (en) * 2000-08-03 2002-02-27 赵顺九 Bridge with power generator
KR20110016563A (en) * 2009-08-12 2011-02-18 조영철 Equipment to generate electricity utilizing construction of bridge
CN102200088A (en) * 2010-03-23 2011-09-28 王晓川 Bridge structure water truck power generation
CN204780563U (en) * 2015-05-27 2015-11-18 钱明娥 Gate -type steel of installing hydroelectric power generation system constructs bridge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1337497A (en) * 2000-08-03 2002-02-27 赵顺九 Bridge with power generator
KR20110016563A (en) * 2009-08-12 2011-02-18 조영철 Equipment to generate electricity utilizing construction of bridge
CN102200088A (en) * 2010-03-23 2011-09-28 王晓川 Bridge structure water truck power generation
CN204780563U (en) * 2015-05-27 2015-11-18 钱明娥 Gate -type steel of installing hydroelectric power generation system constructs bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538395A (en) * 2017-09-21 2019-03-29 郭继会 A kind of electricity-generating method that S type double fluid is combined to ocean power generation device with bridge construction
CN112302852A (en) * 2019-07-28 2021-02-02 赵顺九 Power station with lifting impeller on tower gear shaft column on bridge

Similar Documents

Publication Publication Date Title
CN201953134U (en) Self supporting maritime wind measurement tower structure
CN106089543A (en) Ultra-large type water-power plant
CN103758705A (en) Double-body floating type offshore wind turbine system
CN102602751A (en) Cable controller, kite, kite drive operating mechanism, kite power generator and automobile and boat wind-driving method
CN101984251A (en) Wave energy generating set
CN101493078A (en) Offshore power generation platform unit plant
CN107620298A (en) Ultra-large type water-power plant
CN107083741A (en) Bridge with power generator
CN108179722A (en) A kind of temperature density current of floating structure is blocked device
CN107542623B (en) Push type floatation type wind-driving power generation apparatus
CN101105081A (en) Wind energy edifice
CN107091192A (en) Ultra-large type water-power plant
CN102071819B (en) Deep water suspension safety swimming pool
CN207985139U (en) A kind of novel offshore wind power submersible buoyant foundation
CN201941947U (en) Anchoring system for wave energy power generator
CN211116407U (en) Floating type offshore high-altitude wind power generation system
CN201351569Y (en) Trapezoidal pontoon hydraulic power station
CN107131088A (en) Ultra-large type water-power plant
Nazir Offshore hydroelectric plant: A techno-economic analysis of a renewable energy source
CN103754333A (en) Automatic lifting water floating platform without external force
CN102926938A (en) Wind power generation system applied between two high-rise buildings or two alpine and gorge regions
CN104176203B (en) A kind of multifunctional comprehensive ocean platform apparatus and system
CN112302852A (en) Power station with lifting impeller on tower gear shaft column on bridge
CN103953016B (en) Channel slope-changing power generation method
CN208266785U (en) A kind of temperature density current of floating structure is blocked device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170822