CN107069801A - A kind of power distribution network isolated island division methods based on minimum Custom interruption cost - Google Patents

A kind of power distribution network isolated island division methods based on minimum Custom interruption cost Download PDF

Info

Publication number
CN107069801A
CN107069801A CN201710144090.5A CN201710144090A CN107069801A CN 107069801 A CN107069801 A CN 107069801A CN 201710144090 A CN201710144090 A CN 201710144090A CN 107069801 A CN107069801 A CN 107069801A
Authority
CN
China
Prior art keywords
node
isolated island
load
distribution network
power source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710144090.5A
Other languages
Chinese (zh)
Other versions
CN107069801B (en
Inventor
苏剑
刘海涛
梁惠施
李洋
宋杉
顾伟
聂颖惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Southeast University
State Grid Zhejiang Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
Southeast University
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Southeast University, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201710144090.5A priority Critical patent/CN107069801B/en
Publication of CN107069801A publication Critical patent/CN107069801A/en
Application granted granted Critical
Publication of CN107069801B publication Critical patent/CN107069801B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of power distribution network isolated island division methods based on minimum Custom interruption cost, this method comprises the following steps:Step 10)Build dead electricity regional distribution network simplified model after failure;Step 20)According to dead electricity region actual conditions, different classes of Subscriber Unit loss of outage function is determined;Step 30)Determine exert oneself situation and it is expected that the power off time of dead electricity moment distributed power source;Step 40)Set up to reduce isolated island partitioning model of the Custom interruption cost as target;Step 50)Feasible zone is searched for, isolated island partitioning model is solved, obtains isolated island division methods, isolated island division is carried out according to the isolated island division methods.On the premise of the various operation constraintss of power distribution network are met, this method reduction Custom interruption cost.

Description

A kind of power distribution network isolated island division methods based on minimum Custom interruption cost
Technical field
The invention belongs to power distribution network steady-state analysis field, it is related to a kind of power distribution network isolated island division methods, more particularly, to A kind of power distribution network isolated island division methods based on minimum Custom interruption cost.
Background technology
Islet operation pattern is a kind of new method of operation that distribution system is introduced after distributed power generation.In this state Under, power consumer is only by distributed power source (abbreviation DG in text) power supply.In this case, make rational planning for the connecing of distributed power source Access point, access capacity have obvious action to reducing power distribution network loss of outage, improving system reliability.However, it is contemplated that by Caused by failure there is hidden danger in unplanned isolated island to grid equipment safety, personal safety, while departing from distributed power source after major network Power supply quality be difficult to ensure that, require not allowing the appearance of islet operation pattern in IEEE929-2000 standards.With distribution The maturation of generation technology and popularization, IEEE1547-2003 standards no longer forbid the presence of islet operation pattern, encourage supply of electric power Business realizes islet operation by technological means:All distributed power sources are out of service in short-term after failure occurs, after Fault Isolation Using the power supply of distributed power source recovered part load.
For islet operation pattern, how to exert oneself power-balance, circuit between workload demand meeting distributed power source On the basis of the requirement such as trend constraint, it is considered to recover user's confession while the controllability and significance level of load as much as possible Electricity, be in recent years more popular research topic simultaneously, in terms of engineering actual angle, isolated island divides and is used as the one of fault recovery The means of kind, are timely responded to quickly handling very necessary, thus the rapidity of isolated island splitting scheme is also that appraisal procedure is good and bad Key factor.The purpose that isolated island is divided is reduction loss of outage, and the target of isolated island partitioning model is used as using Custom interruption cost So that the effect that isolated island is divided is more directly perceived notable.
The content of the invention
Technical problem:The present invention provides a kind of power distribution network isolated island division methods based on minimum Custom interruption cost, full On the premise of the sufficient various operation constraintss of power distribution network, Custom interruption cost is reduced.
Technical scheme:In order to solve the above technical problems, the embodiment of the present invention uses following technical scheme:
A kind of power distribution network isolated island division methods based on minimum Custom interruption cost, this method comprises the following steps:
Step 10) build dead electricity regional distribution network simplified model after failure;
Step 20) according to dead electricity region actual conditions, determine different classes of Subscriber Unit loss of outage function;
Step 30) determine exert oneself situation and it is expected that the power off time of dead electricity moment distributed power source;
Step 40) set up to reduce isolated island partitioning model of the Custom interruption cost as target;
Step 50) search feasible zone, isolated island partitioning model is solved, isolated island division methods are obtained, according to the isolated island division side Method carries out isolated island division.
As preference, the step 10) include:By the transformer that may be broken down in actual power distribution network, feeder line section And switch element is regarded as the structure node that fault rate is definite value, load is 0;It is 0, load that customer charge is regarded as into fault rate For the load bus of definite value, power distribution network is converted into the topological structure being made up of the node comprising fault rate and information on load.
As preference, the step 20) in, according to dead electricity region all types of user history loss of outage statistics, intend Close all types of user unit loss of outage function for the region.
As preference, the step 40) specifically include:Based on the step 10) build dead electricity regional distribution network letter Change model, set up to reduce Custom interruption cost as target, using power, line current and node voltage as the isolated island of constraints Partitioning model;
It is described shown as the function such as formula (1) of target to reduce Custom interruption cost:
Wherein, loss is total Custom interruption cost, and n is dead electricity Area Node number, tfFor estimated power off time, LiFor i-th The load value of node, fk(t) it is corresponding unit loss of outage function, x when i-th of node institute on-load is kth type loadiFor Whether i-th of node is included into isolated island, xi=1 represents that the node is not resumed, and power failure causes economic loss, xi=0 represents the section Point is included into isolated island, and power failure does not cause economic loss to it;
The constraints is included:
Set up the power constraint as shown in formula (2):
Wherein, PGiRepresent the active power output of i-th of distributed power source in the range of isolated island, LjFor node j active demand;
Set up the line current constraint as shown in formula (3):
Ii.max<Ii.NFormula (3)
Wherein, Ii.maxThe maximum load current born for i-th line road or transformer;Ii.NFor i-th line road or transformer Load current value;
Set up the node voltage constraint as shown in formula (4):
0.95UN<Uk<1.05UNFormula (4)
Wherein, UkFor k-th of node voltage value, UNFor k-th of node load voltage value.
As preference, the step 50) in, search feasible zone includes:
Node where power supply is the center of circle in a distributed manner, along all directions of network topology, with dead electricity moment distributed power source Exert oneself as radius, according to the constraint formulations as shown in formula (5), search is possible to be included into the node of isolated island, forms isolated island division The feasible zone of model:
Wherein, path l between node j node g where node i to distributed power sourcei,gOn a bit, LjFor node j's Active demand, G exerts oneself for distributed power source.
As preference, the step 50) in, solve isolated island partitioning model process as follows:
Step 501) find the dead electricity moment and exert oneself the distributed power source of minimum, determine the distribution according to the feasible zone that searches The isolated island of formula power supply divides feasible zone scope;
Step 502) definition node weight, average weight index, accumulative load index;
Step 503) the maximum node of average weight is chosen, by the node and its to node shortest path where distributed power source All nodes on footpath, i.e. upstream node all includes isolated island;If multiple node average weights are identical, accumulative load is chosen Maximum node carries out above-mentioned processing;
Step 504) isolated island division target and distributed power source residual capacity are updated, update the whole for being included into isolated island node The average weight of downstream node and accumulative information on load, by accumulative load being averaged more than the node of distributed power source residual capacity Weight index and accumulative load index are reset;
Step 505) judge whether the accumulative load of each node in the range of isolated island division feasible zone has been cleared, such as It is that then the distributed power source completes isolated island division work, into step 506), otherwise return to step 503);
Step 506) raw information of all nodes for being included into isolated island is all reset, distributed power source residue is held Amount is regarded as negative load;Then judge whether that the isolated island for completing all distributed power sources is divided, in this way, that is, complete step 506) Isolated island partitioning model solution procedure, otherwise return to step 501) isolated island division is carried out to remaining distributed power source.
Beneficial effect:The present invention compared with prior art, with advantages below:The inventive method is directed to it is determined that position connects Enter the power distribution network of distributed power source, the Custom interruption cost that reduction distribution network failure is caused is divided by isolated island, by power distribution network Fail-safe analysis combines with economic evaluation.Meanwhile, the derivation algorithm time complexity of the inventive method is low, meets actual To the rapidity demand of isolated island division work in engineering.The inventive method first divides Subscriber Unit loss of outage as isolated island During distribution network load node weight index.The higher load of unit loss of outage is even more important, extensive in distributed power source It should be considered first during multiple power supply.Compared with prior art, by introducing Subscriber Unit loss of outage so that distribution Load bus in net possesses changeable weight.This make it that under different power failure situations isolated island divides recovery load bus and powered Precedence, compare fixed weight, more tally with the actual situation.
Brief description of the drawings
Fig. 1 is the method flow schematic diagram of the embodiment of the present invention;
Fig. 2 is structural representation after the PG&E69 Node power distribution system failures transformed;
Fig. 3 is isolated island partitioning model solution schematic flow sheet in the embodiment of the present invention;
Fig. 4 is the PG&E69 Node power distribution system isolated island division result schematic diagrames of transformation.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with drawings and Examples pair The present invention is in depth described in detail.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in restriction invention.
As shown in figure 1, a kind of power distribution network isolated island division methods based on minimum Custom interruption cost of the present invention, following step Suddenly:
Step 10) build dead electricity regional distribution network simplified model after failure.
Step 10) specifically include:By the transformer that may be broken down in actual power distribution network, feeder line section and switch element It is regarded as the structure node that fault rate is definite value, load is 0;It is the load that 0, load is definite value that customer charge is regarded as into fault rate Node, power distribution network is converted into the topological structure being made up of the node comprising fault rate and information on load.
Step 20) according to dead electricity region actual conditions, determine different classes of Subscriber Unit loss of outage function.
Step 20) in, according to dead electricity region all types of user history loss of outage statistics, fitting is each for the region Class Subscriber Unit loss of outage function.The history loss of outage includes direct economic loss and indirect loss.
Step 30) determine exert oneself situation and it is expected that the power off time of dead electricity moment distributed power source.
Distributed power source is constrained due to the primary energy of conversion by natural conditions, present the fluctuation exerted oneself with it is random Property;And in isolated island partition problem, it is believed that exerted oneself within a certain period of time when distributed power source is equipped with energy storage device constant, thus It needs to be determined that the situation of exerting oneself of dead electricity moment distributed power source is as the power constraints in isolated island partitioning model solution procedure, Meanwhile, Custom interruption cost and power failure duration are closely related, need to determine estimated power off time before isolated island partitioning model is solved.
Step 40) set up to reduce isolated island partitioning model of the Custom interruption cost as target.
Step 40) specifically include:Based on the step 10) the dead electricity regional distribution network simplified model that builds, set up to drop Low Custom interruption cost is target, the isolated island partitioning model by constraints of power, line current and node voltage;
It is described shown as the function such as formula (1) of target to reduce Custom interruption cost:
Wherein, loss is total Custom interruption cost, and n is dead electricity Area Node number, tfFor estimated power off time, LiFor i-th The load value of node, fk(t) it is corresponding unit loss of outage function, x when i-th of node institute on-load is kth type loadiFor Whether i-th of node is included into isolated island, xi=1 represents that the node is not resumed, and power failure causes economic loss, xi=0 represents the section Point is included into isolated island, and power failure does not cause economic loss to it;
The reactive requirement of load is met by local compensation, therefore power constraint considers that DG active power output is with bearing in isolated island Active balance between lotus demand.Set up the power constraint as shown in formula (2):
Wherein, PGiRepresent the active power output of i-th of distributed power source in the range of isolated island, LjFor node j active demand;
Set up the line current constraint as shown in formula (3):
Ii.max<Ii.NFormula (3)
Wherein, Ii.maxThe maximum load current born for i-th line road or transformer;Ii.NFor i-th line road or transformer Load current value;
Set up the node voltage constraint as shown in formula (4):
0.95UN<Uk<1.05UNFormula (4)
Wherein, UkFor k-th of node voltage value, UNFor k-th of node load voltage value.
Step 50) search feasible zone, isolated island partitioning model is solved, isolated island division methods are obtained, according to the isolated island division side Method carries out isolated island division.
The step 50) in, search feasible zone includes:
Node where power supply is the center of circle in a distributed manner, along all directions of network topology, with dead electricity moment distributed power source Exert oneself as radius, according to the constraint formulations as shown in formula (5), search is possible to be included into the node of isolated island, forms isolated island division The feasible zone of model:
Wherein, path l between node j node g where node i to distributed power sourcei,gOn a bit, LjFor node j's Active demand, G exerts oneself for distributed power source.
As shown in figure 3, it is as follows to solve isolated island partitioning model process:
Step 501) find the dead electricity moment and exert oneself the distributed power source of minimum, determine the distribution according to the feasible zone that searches The isolated island of formula power supply divides feasible zone scope;
Step 502) definition node weight, average weight index, accumulative load index;
Correspondence power off time tfKth class Subscriber Unit loss of outage functional value be i-th node weights ωi, description is such as Under:
ωi=fk(tf)
Average weight index ΩiIt is defined as follows:
Accumulative load index XiIt is defined as follows:
Wherein, JiRepresent the set of all nodes on the shortest path of node where from i-th of node to DG (not including the I node), LjRepresent the active demand of j-th of node;ωjRepresent the weight of j-th of node.LiRepresent the active need of node i Ask.
Step 503) the maximum node of average weight is chosen, by the node and its to node shortest path where distributed power source All nodes on footpath, i.e. upstream node all includes isolated island;If multiple node average weights are identical, i.e., average weight is more Individual node gets equal maximum, then chooses the maximum node of accumulative load and carry out above-mentioned processing;
Step 504) isolated island division target and distributed power source residual capacity are updated, update the whole for being included into isolated island node The average weight of downstream node and accumulative information on load, by accumulative load being averaged more than the node of distributed power source residual capacity Weight index and accumulative load index are reset;
Step 505) judge whether the accumulative load of each node in the range of isolated island division feasible zone has been cleared, such as It is that then the distributed power source completes isolated island division work, into step 506), otherwise return to step 503);
Step 506) raw information of all nodes for being included into isolated island is all reset, distributed power source residue is held Amount is regarded as negative load;Then judge whether that the isolated island for completing all distributed power sources is divided, in this way, that is, complete step 506) Isolated island partitioning model solution procedure, otherwise return to step 501) isolated island division is carried out to remaining distributed power source.
The method of above-described embodiment passes through step 40), unit power failure is introduced in the object function of isolated island partitioning model and is damaged Function is lost, as the determination foundation of load changeable weight, the purpose of reduction user's loss is realized.Meanwhile, above-mentioned implementation The method of example passes through step 20), it is not necessary to structure is simplified to power distribution network repeatedly and carries out tree-shaped search and iteration, isolated island is improved and draws The computational efficiency divided.
A specific embodiment is enumerated below.
As shown in Fig. 2 in the present embodiment, choosing the PG&E69 nodes changed as distribution example.Node 5,19, 32nd, 36,52,65 access distributed power source.Failure occurs between position shown in Fig. 2, i.e. node 2 and 3, downstream after Fault Isolation System whole dead electricity.
Simplified model of distribution networks is as follows:
It is fixed that the transformer that may be broken down in actual power distribution network, feeder line section and switch element are regarded as into fault rate Value, load are 0 structure node, and it is the load bus that 0, load is definite value that customer charge is regarded as into fault rate, and power distribution network is turned The topological structure being made up of the node comprising fault rate and information on load is turned to, as shown in Figure 2.
According to dead electricity region all types of user history loss of outage statistics, all types of user unit of the fitting for the region Loss of outage function, the solution for follow-up isolated island partitioning model.The history loss of outage include direct economic loss and Connect loss.Distributed power source is constrained due to the primary energy of conversion by natural conditions, present the fluctuation exerted oneself with it is random Property;And in isolated island partition problem, it is believed that exerted oneself within a certain period of time when distributed power source is equipped with energy storage device constant, thus It needs to be determined that the situation of exerting oneself of dead electricity moment distributed power source is as the power constraints in isolated island partitioning model solution procedure, Meanwhile, Custom interruption cost and power failure duration are closely related, need to determine estimated power off time before isolated island partitioning model is solved.
In the present embodiment, have a power failure 6 DG of the moment exert oneself be followed successively by 250kW, 400kW, 40kW, 50kW, 1300kW, 100kW, the expection power off time for the moment generation that has a power failure is 1 hour.Describe for convenience, the load in the region is divided into 3 classes, recognized It is respectively 1 $/kWh, 10 $/kWh, 100 $/kWh for the correspondence unit loss of outage of 1 hour, then corresponds to what is this time had a power failure Load bus information is as shown in table 1.
Table 1PG&E69 Node power distribution system load bus information (load power units:kW)
Powered to recover the big load of loss of outage as far as possible, while recovering load as much as possible, based on dead electricity area Domain simplified model of distribution networks, sets up to reduce Custom interruption cost as target, using power, line current and node voltage as constraint The isolated island partitioning model of condition, it is described to be described as follows using reducing Custom interruption cost as the function of target:
Power constraint is described as follows:
Line current constraint is as follows:
Ii.max<Ii.N
Node voltage constraint is as follows:
0.95UN<Uk<1.05UN
For a certain distributed power source, it is as follows that the isolated island centered on it divides feasible zone search procedure:
Node where power supply is the center of circle in a distributed manner, along all directions of network topology, with dead electricity moment distributed power source Exert oneself as radius, search for the node for being possible to be included into isolated island according to following constraint formulations, formation isolated island partitioning model can Row domain:
In the present embodiment, by taking the DG3 accessed at node 32 as an example, the institute for meeting above formula statement is found in all directions There is node, then the corresponding feasible zones of DG3 are { 29,30,31,32,33,34,35 }
Isolated island partitioning model solution procedure is as follows:
(1) find the dead electricity moment to exert oneself the distributed power source of minimum, the distributed electrical is determined according to the feasible zone that searches The isolated island in source divides feasible zone scope.In the present embodiment, isolated island division is carried out to DG3 first;
(2) definition node weight, average weight index, accumulative load index:
In the present embodiment, 9*8 isolated island Matrix dividing I record cast solution procedurees are set up, matrix is as follows:
Wherein, l is that isolated island divides target, is initially ∑ Li`fk(tf);S is DG residual capacity, is initially fault moment DG's exerts oneself;2nd~8 row the 1st, 2 rows record the average weight index and accumulative load of 7 alternative load buses and refer to respectively Mark;The identifier that whether is included into of 3rd~9 row the 1st row 7 alternative load buses of record, be initially 1 (1 expression is not included into, It can still cause damage;0 represents to be included into, and does not result in loss;0) identifier of node is where giving tacit consent to DG;Remaining 7*7 matrixes Topological relation between area identification load bus, RmjIdentify the annexation between node m and node j, Rmj=0 represents node m It is indirect between node j to be connected or do not connect;The angle of node, R where from DGmj=1 represents that node m saves for node j father Point, Rmj=-1 represents the child node that node m is node j.The then initial isolated island Matrix dividing I centered on DG3 of the present embodiment It is as follows:
(3) the maximum node of average weight is chosen, by the node and its on node shortest path where distributed power source All nodes, i.e. upstream node all includes isolated island, if multiple node average weights are identical, chooses accumulative load maximum Node carry out above-mentioned processing.For the present embodiment, node 35 first is selected, is recalled successively according to node annexation and found Its upstream node 33,34;
(4) update isolated island and divide target and distributed power source residual capacity, will be included into isolated island whole nodes it is flat Equal weight index and accumulative load index are reset, and are updated the average weight for the whole downstream nodes for being included into isolated island node and are added up Information on load, it is as follows:
Wherein, l is that isolated island divides target, is initially ∑ Li`fk(tf);L ' divides target, Ω for the isolated island after updatingkFor section The corresponding average weight indexs of point k, XkFor the corresponding accumulative load indexs of node k;S is DG residual capacity, is initially failure Moment DG's exerts oneself;S ' is the DG residual capacities after updating;ΩupFor the node k corresponding average weight index of each node in upstream, Ω’upFor the Ω after renewalup, XupFor the node k corresponding accumulative load index of each node in upstream, X 'upFor the X after renewalup, ΩdownFor the node k corresponding average weight index of each node in downstream, Ω 'downFor the Ω after renewaldown, XdownFor node k's The corresponding accumulative load index of each node in downstream;X’downX after respectively updatingdown
It is important to note that for selected node k, its father node i is unique, and node i may be also In the presence of other child nodes, it is also required to update average weight and accumulative information on load for these branch nodes.
Meanwhile, the average weight index and accumulative load that accumulative load is more than to the node of distributed power source residual capacity refer to SD zero, is not considered further that.In the present embodiment, for DG3 first time isolated island divide after, isolated island Matrix dividing I be updated to as Shown in lower:
(5) judge whether that the accumulative load of each node has been cleared, in this way, then the distributed power source completes isolated island stroke The division of labor is made, into step (6), otherwise return to step (3);
(6) raw information of all nodes for being included into isolated island is all reset, prevents to repeat when isolated island crosses Calculate, influence isolated island division result;Distributed power source residual capacity is regarded as negative load, after judge whether to complete and be distributed The isolated island of formula power supply is divided, and in this way, that is, completes the solution procedure of whole isolated island partitioning model, otherwise return to step (1) is to residue Distributed power source carry out isolated island division.In the present embodiment, node 32, then be considered as by residue 0.5kW surplus after DG3 is divided Load be -0.5kW, unit loss of outage be 10 $/kWh node, hereafter successively using DG4, DG6, DG1, DG2 and DG5 as Center carries out isolated island division work, and here is omitted.
After initial isolated island division terminates, initial isolated island is verified according to isolated island partitioning model constraints, obtained most Whole isolated island division result, as shown in Figure 4.It is $ 13888.9 that this isolated island, which divides obtained loss of outage, compares and does not carry out orphan There being $ 70502 loss of outage when island is divided is greatly reduced.Meanwhile, isolated island divides target and is intuitively demonstrated by economic index, The quality of isolated island splitting scheme is set to be compared at a glance.
Above-described embodiment is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill of the art For personnel, under the premise without departing from the principles of the invention, some improvement and equivalent substitution can also be made, these are to the present invention Claim be improved with the technical scheme after equivalent substitution, each fall within protection scope of the present invention.

Claims (6)

1. a kind of power distribution network isolated island division methods based on minimum Custom interruption cost, it is characterised in that this method includes as follows Step:
Step 10) build dead electricity regional distribution network simplified model after failure;
Step 20) according to dead electricity region actual conditions, determine different classes of Subscriber Unit loss of outage function;
Step 30) determine exert oneself situation and it is expected that the power off time of dead electricity moment distributed power source;
Step 40) set up to reduce isolated island partitioning model of the Custom interruption cost as target;
Step 50) search feasible zone, isolated island partitioning model is solved, isolated island division methods is obtained, enters according to the isolated island division methods Row isolated island is divided.
2. the power distribution network isolated island division methods according to claim 1 based on minimum Custom interruption cost, it is characterised in that The step 10) include:The transformer that may be broken down in actual power distribution network, feeder line section and switch element are regarded as failure The structure node that rate is definite value, load is 0;It is the load bus that 0, load is definite value that customer charge is regarded as into fault rate, will Power distribution network is converted into the topological structure being made up of the node comprising fault rate and information on load.
3. the power distribution network isolated island division methods according to claim 1 or 2 based on minimum Custom interruption cost, its feature exists In the step 20) in, according to dead electricity region all types of user history loss of outage statistics, fitting is each for the region Class Subscriber Unit loss of outage function.
4. the power distribution network isolated island division methods according to claim 1 or 2 based on minimum Custom interruption cost, its feature exists In the step 40) specifically include:Based on the step 10) the dead electricity regional distribution network simplified model that builds, set up to reduce Custom interruption cost is target, the isolated island partitioning model by constraints of power, line current and node voltage;
It is described shown as the function such as formula (1) of target to reduce Custom interruption cost:
Wherein, loss is total Custom interruption cost, and n is dead electricity Area Node number, tfFor estimated power off time, LiFor i-th of node Load value, fk(t) it is corresponding unit loss of outage function, x when i-th of node institute on-load is kth type loadiFor i-th Whether node is included into isolated island, xi=1 represents that the node is not resumed, and power failure causes economic loss, xi=0 represents the node quilt Isolated island is included, power failure does not cause economic loss to it;
The constraints is included:
Set up the power constraint as shown in formula (2):
Wherein, PGiRepresent the active power output of i-th of distributed power source in the range of isolated island, LjFor node j active demand;
Set up the line current constraint as shown in formula (3):
Ii.max<Ii.NFormula (3)
Wherein, Ii.maxThe maximum load current born for i-th line road or transformer;Ii.NFor i-th line road or the volume of transformer Determine current value;
Set up the node voltage constraint as shown in formula (4):
0.95UN<Uk<1.05UNFormula (4)
Wherein, UkFor k-th of node voltage value, UNFor k-th of node load voltage value.
5. the power distribution network isolated island division methods according to claim 1 or 2 based on minimum Custom interruption cost, its feature exists In the step 50) in, search feasible zone includes:
Node where power supply is the center of circle in a distributed manner, along all directions of network topology, is exerted oneself with dead electricity moment distributed power source For radius, according to the constraint formulations as shown in formula (5), search is possible to be included into the node of isolated island, forms isolated island partitioning model Feasible zone:
Wherein, path l between node j node g where node i to distributed power sourcei,gOn a bit, LjFor the active of node j Demand, G exerts oneself for distributed power source.
6. the power distribution network isolated island division methods according to claim 1 or 2 based on minimum Custom interruption cost, its feature exists In the step 50) in, solve isolated island partitioning model process as follows:
Step 501) find the dead electricity moment and exert oneself the distributed power source of minimum, determine the distributed electrical according to the feasible zone that searches The isolated island in source divides feasible zone scope;
Step 502) definition node weight, average weight index, accumulative load index;
Step 503) the maximum node of average weight is chosen, by the node and its on node shortest path where distributed power source All nodes, i.e. upstream node all includes isolated island;If multiple node average weights are identical, accumulative load is chosen maximum Node carry out above-mentioned processing;
Step 504) isolated island division target and distributed power source residual capacity are updated, update the whole downstreams for being included into isolated island node The average weight of node and accumulative information on load, accumulative load are more than the average weight of the node of distributed power source residual capacity Index and accumulative load index are reset;
Step 505) judge whether the accumulative load of each node in the range of isolated island division feasible zone has been cleared, in this way, Then the distributed power source completes isolated island division work, into step 506), otherwise return to step 503);
Step 506) raw information of all nodes for being included into isolated island is all reset, distributed power source residual capacity is regarded Make negative load;Then the isolated island for judging whether to complete all distributed power sources is divided, in this way, that is, completes step 506) isolated island Partitioning model solution procedure, otherwise return to step 501) isolated island division is carried out to remaining distributed power source.
CN201710144090.5A 2017-03-13 2017-03-13 A kind of power distribution network isolated island division methods based on minimum Custom interruption cost Expired - Fee Related CN107069801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710144090.5A CN107069801B (en) 2017-03-13 2017-03-13 A kind of power distribution network isolated island division methods based on minimum Custom interruption cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710144090.5A CN107069801B (en) 2017-03-13 2017-03-13 A kind of power distribution network isolated island division methods based on minimum Custom interruption cost

Publications (2)

Publication Number Publication Date
CN107069801A true CN107069801A (en) 2017-08-18
CN107069801B CN107069801B (en) 2019-09-24

Family

ID=59621688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710144090.5A Expired - Fee Related CN107069801B (en) 2017-03-13 2017-03-13 A kind of power distribution network isolated island division methods based on minimum Custom interruption cost

Country Status (1)

Country Link
CN (1) CN107069801B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107611963A (en) * 2017-09-01 2018-01-19 东南大学 A kind of PMU Optimal Configuration Methods for considering loss of outage coefficient
CN110518572A (en) * 2019-07-12 2019-11-29 国网浙江省电力有限公司杭州供电公司 A kind of power distribution network isolated island division methods based on minimum load loss
CN111626603A (en) * 2020-05-26 2020-09-04 中国石油化工股份有限公司 Oil field ordered power utilization system with genetic algorithm and ordered power utilization distribution method thereof
CN112465235A (en) * 2020-12-01 2021-03-09 国网浙江杭州市富阳区供电有限公司 Power failure interval prediction method for reducing electric quantity loss
CN112989531A (en) * 2021-02-22 2021-06-18 国网安徽省电力有限公司合肥供电公司 Method and system for automatically generating platform-to-platform project planning scheme

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101986496B (en) * 2010-09-29 2012-08-08 天津大学 Method for forming islands of distribution system containing distributed power supply
CN103078391A (en) * 2013-01-10 2013-05-01 长兴县供电局 Power distribution network power supply power restoration method based on photovoltaic power generation system
CN105098762A (en) * 2014-05-09 2015-11-25 国家电网公司 Island dividing method for power distribution network having distributed power sources
CN106340899A (en) * 2016-09-21 2017-01-18 东南大学 Dynamic islanding method for reducing user outage loss target

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101986496B (en) * 2010-09-29 2012-08-08 天津大学 Method for forming islands of distribution system containing distributed power supply
CN103078391A (en) * 2013-01-10 2013-05-01 长兴县供电局 Power distribution network power supply power restoration method based on photovoltaic power generation system
CN105098762A (en) * 2014-05-09 2015-11-25 国家电网公司 Island dividing method for power distribution network having distributed power sources
CN106340899A (en) * 2016-09-21 2017-01-18 东南大学 Dynamic islanding method for reducing user outage loss target

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107611963A (en) * 2017-09-01 2018-01-19 东南大学 A kind of PMU Optimal Configuration Methods for considering loss of outage coefficient
CN107611963B (en) * 2017-09-01 2019-08-20 东南大学 A kind of PMU Optimal Configuration Method considering loss of outage coefficient
CN110518572A (en) * 2019-07-12 2019-11-29 国网浙江省电力有限公司杭州供电公司 A kind of power distribution network isolated island division methods based on minimum load loss
CN111626603A (en) * 2020-05-26 2020-09-04 中国石油化工股份有限公司 Oil field ordered power utilization system with genetic algorithm and ordered power utilization distribution method thereof
CN111626603B (en) * 2020-05-26 2023-08-04 中国石油化工股份有限公司 Oil field ordered electricity utilization system with genetic algorithm and ordered electricity utilization distribution method thereof
CN112465235A (en) * 2020-12-01 2021-03-09 国网浙江杭州市富阳区供电有限公司 Power failure interval prediction method for reducing electric quantity loss
CN112989531A (en) * 2021-02-22 2021-06-18 国网安徽省电力有限公司合肥供电公司 Method and system for automatically generating platform-to-platform project planning scheme
CN112989531B (en) * 2021-02-22 2022-09-23 国网安徽省电力有限公司合肥供电公司 Method and system for automatically generating platform-to-platform project planning scheme

Also Published As

Publication number Publication date
CN107069801B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN107069801A (en) A kind of power distribution network isolated island division methods based on minimum Custom interruption cost
CN102983629B (en) Auxiliary decision-making method for on-line power system restoration
Zhou et al. Distributed secondary control for islanded microgrids with mobile emergency resources
CN104820865B (en) Intelligent distribution network fault recovery intelligent optimization method based on graph theory
CN104537580B (en) The construction method of distribution network structure based on K means clusters
CN107017622A (en) The multiple faults multiple target of distribution containing DG combined optimization repairing recovery policy is asked for
CN105762790A (en) Evaluation index algorithm for AC and DC distribution network power supply mode selection
CN102801790A (en) Microgrid energy management system based on IEC (International Electrotechnical Commission) 61850 and multi-agent method
CN110350511B (en) Power distribution network fault recovery method based on transfer power affinity
CN109598377B (en) AC/DC hybrid power distribution network robust planning method based on fault constraint
CN107622360A (en) A kind of critical circuits recognition methods for considering subjective and objective factor
Zand et al. Sensitivity analysis index to determine the optimal location of multi-objective UPFC for improvement of power quality parameters
CN111079972A (en) Method, device and medium for planning reliability of active power distribution network
CN106655253A (en) Single-/three-phase multi-micro-grid region dynamic partitioning method
CN105958472B (en) A kind of power distribution network operation optimizing system
CN103106561B (en) Power system load recovers aid decision-making system and decision making method thereof
CN107017635A (en) A kind of adaptive islanding control method and system
CN108092267A (en) A kind of power distribution network access planning system and method based on intelligent body
CN107294086B (en) The service restoration method realized based on network equivalent and parallelization
CN110472867A (en) Power distribution network Network adaptation assessment processing method and device
CN115549075A (en) Power supply recovery method and system for power distribution network containing micro-grid
Huang et al. Multi-objective Day-ahead Polarity Switching Optimization for Voltage Unbalance in Bipolar DC Distribution Networks
CN105576658A (en) Method for analyzing economy of power distribution network reconstruction project on basis of wiring mode
CN111092453A (en) Power grid key line identification method for multipoint access photovoltaic power supply
CN109066675A (en) A kind of topological arrangement method for power distribution network wide area self-healing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: SOUTHEAST University

Address before: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant before: China Electric Power Research Institute

Applicant before: State Grid Corporation of China

Applicant before: Southeast University

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20180905

Address after: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: SOUTHEAST University

Applicant after: STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Address before: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant before: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant before: State Grid Corporation of China

Applicant before: Southeast University

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190924

Termination date: 20200313

CF01 Termination of patent right due to non-payment of annual fee