CN105958472B - A kind of power distribution network operation optimizing system - Google Patents

A kind of power distribution network operation optimizing system Download PDF

Info

Publication number
CN105958472B
CN105958472B CN201610254733.7A CN201610254733A CN105958472B CN 105958472 B CN105958472 B CN 105958472B CN 201610254733 A CN201610254733 A CN 201610254733A CN 105958472 B CN105958472 B CN 105958472B
Authority
CN
China
Prior art keywords
distribution network
real
power
bus
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610254733.7A
Other languages
Chinese (zh)
Other versions
CN105958472A (en
Inventor
宫林
胡晓锐
周李
刘育明
向菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN201610254733.7A priority Critical patent/CN105958472B/en
Publication of CN105958472A publication Critical patent/CN105958472A/en
Application granted granted Critical
Publication of CN105958472B publication Critical patent/CN105958472B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A kind of power distribution network operation optimizing system includes real-time data base, with electrically optimized computing module, real-time query and setting module, parameter and historical data interface module, DA server and interface module and configuration module.It realizes the optimization of breaker allocation plan and the optimization of the power distribution network method of operation by automated information processing platform, significantly improves power grid power supply reliability, reduces line loss.

Description

A kind of power distribution network operation optimizing system
Technical field
The present invention relates to power distribution network running technology field, especially a kind of system for optimizing the power distribution network method of operation.
Background technique
Power distribution network is by overhead transmission line, cable, shaft tower, distribution transformer, disconnecting switch, reactive-load compensator and some attached The compositions such as facility, be the network that important distribution electric energy effect is played in power network.Power distribution network is national economy and social development Important public infrastructure.In recent years, distribution network construction investment in China's continues to increase, and power distribution network development obtains remarkable effect, but Electricity consumption level still has a gap with respect to international most advanced level, urban and rural areas disparate development, and power supply quality is to be improved.Power distribution network is The end section of power grid, it is large number of, structure is complicated, loss is big like the capillary of human body.At the same time, power distribution network is transported The economic benefit of capable reliability and the economical quality of life for being directly related to electricity consumption user and grid company.
Summary of the invention
It is an object of the invention to provide a kind of power distribution network operation optimizing systems, it passes through automated information processing platform, It realizes the optimization of breaker allocation plan and the optimization of the power distribution network method of operation, significantly improves power grid power supply reliability, reduces line Path loss consumption.
It is realized the purpose of the present invention is technical solution in this way, it includes real-time data base, with electrically optimized meter Calculate module, real-time query and setting module, parameter and historical data interface module, DA server and interface module and group morphotype Block;Configuration module and parameter and the data interaction of historical data base interface module, parameter is with historical data base interface module and in real time Database data interaction, real-time data base is respectively and with electrically optimized computing module, real-time query and setting module and DA server And interface module data interaction;
Power distribution network optimal operation mode, meter are calculated for calculating breaker best configuration scheme with electrically optimized computing module The power supply reliability in operator region;
Specific step is as follows for the calculating power distribution network optimal operation mode:
1) single supply radial distribution networks system model is established;
2) it is directed to power distribution network, is established by Complicated Distribution Network to the decomposition algorithm of single supply radial distribution networks;
3) power flow algorithm of the single supply radial distribution networks in conjunction with distribution SCADA is established;
4) it is set out based on loss minimization, under the premise of further considering power supply reliability and safety, calculates power distribution network The optimized operation combination of breaker;
Specific step is as follows for decomposition algorithm described in step 2):
The topological structure parameter for 2-1) reading more power supply Complicated Distribution Network systems, by whole route objects, interconnection switch pair As the direction discernment traffic sign placement with block switch object is false;
2-2) using the power supply number in power distribution network as cyclic variable, the corresponding single supply radial distribution networks of each power supply System model, and the state variable of current single supply electricity distribution network model is initialized, state variable includes the model number of plies and each layer Bus number;
The property parameters of current power, i.e. institute's connection line 2-3) are read, and the source side Search Flags of route are modified Be it is true, calculate the corresponding bus of institute's connection line, the bus, that is, current single supply system first layer bus, using first layer as Current layer;
2-4) calculate whole attributes of current layer whole bus, including inlet highway, whole outlet lines and all loads Branch;
Whether the whole output line numbers for 2-5) judging current layer whole bus are 0;If 0, then terminate to current power Calculating, 1 otherwise is added to bus layer number variable, and using whole output line numbers of upper one layer whole buses as the mother of current layer Line number;
2-6) repeat step 2-4) and step 2-5), continue to calculate current single supply electricity distribution network model until completing;
Mains cycle variable 2-7) is added 1, repeats step 2-3), step 2-4), step 2-5) and step 2-6) calculate under The defeated calculating for penetrating shape distribution network system until completing all power of the corresponding single supply of one power supply;
Power flow algorithm described in step 3) is as follows:
In formula, OutLineNum is the output circuitry number of a certain bus;OutLoadNum is load number on a certain bus;For the power input electric current of a certain bus;
In formula, Rij0It is the resistivity of route, LijIt is the length of route, PTotalLoss(k)It is the damage in kth time iterative process Consumption, BusLayerNum are the bus number of plies, BusNumLayer[i]It is i-th layer of bus number.
Further, parameter and historical data interface module, for accessing parameter database and historical data library file, including It reads and is written, and carry out data interaction with real-time data base, establish data.
Further, real-time data base establishes real-time data base memory, for save whole system operation needed for parameter and Real-time status data;Unified data platform is established, while being Optimization Calculation Program, real-time query program and external data interface Program provides unified database service interface.
Further, DA server and interface module receive distribution SCADA system for establishing the real-time data base of system The either next power distribution network real-time status data of SCADA system transmission, the power distribution network real-time status data includes switch shape State, supply voltage and customer charge.
Further, configuration module, for creating parameter database, management system parameter database, input system structure ginseng Number;The management system parameter database includes increase, deletion, insertion and modification operation;The input system structural parameters It include input system parameter list, distribution system parameter list, line parameter circuit value table, interconnection switch parameter list, block switch parameter list With load parameter table.
Further, real-time query and setting module are used for real-time query distribution network system real-time status variable, manual modification Or setting system real-time status variable.
Further, the specific algorithm for calculating breaker best configuration scheme is as follows:
P=Min (CS+CL)
In formula, CSFor killer switch investment cost model, CLFor load point interruption cost computation model;
In formula: nLPFor load point sum;TjThere is T for j-th of load pointjKind interruption duration classification;EENStjFor load The corresponding power loss amount of point j t kind interruption duration;CLjtHave a power failure for the corresponding unit of load point j t kind interruption duration Loss;
In formula: M is switchtype sum;NjThe number of units being installed in addition with is switched for jth kind;CSjIt is existing that separate unit investment is switched for jth kind Value, i.e. present worth unit price;I is discount rate;PjFor the service life of jth kind switchgear;
Keep P minimum, completes the configuration optimization of power distribution circuit breakers switch.
By adopting the above-described technical solution, the present invention has the advantage that:
(1) the present invention is based on Visual C++6.0 language to carry out program development, has calculating speed fast and real-time property Strong advantage is conducive to that program function is extended and is goed deep into next step research;
(2) the compatible Access and SQL Server system of Database Systems, is conducive to according to system scale and cost needs It is reasonably selected;
(3) application function and platform feature are subjected to modularization separation, establish whole system real-time server platform, is convenient for Integrated function is established with other systems, facilitates the data of access electric power system power distribution SCADA and SCADA dispatching system;
(4) based on unified data platform, monitoring and the manual modification window of real time data are established convenient for debugging;
(5) killer switch placement algorithm is scientific, reliable, has stronger engineering application value;
(6) show that optimized operation scheme is scientific, practical by optimized operation computational algorithm;
(7) the optimal evaluation criterion established has combined operation of power networks reliability, science and economy, has relatively strong Application value.
Other advantages, target and feature of the invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.Target and other advantages of the invention can be wanted by following specification and right Book is sought to be achieved and obtained.
Detailed description of the invention
Detailed description of the invention of the invention is as follows.
Fig. 1 is single supply radial distribution networks system topology schematic diagram;
Fig. 2 is the relational graph between whole busbar laminates and every layer of whole buses;
Fig. 3 is the flow diagram of decomposition algorithm;
Fig. 4 is flow diagram of the invention.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
A kind of operation interface of power distribution network operation optimizing system includes that data maintenance and administration interface, real time data are inquired Interface is calculated with manual modification interface and power distribution network running optimizatin and configuration optimization.
Data maintenance and administration interface are the bases of whole system, and the main topological structure for handling power distribution network is to establish The basis that power distribution network switching optimization and power distribution network optimal operation mode calculate.Entire distribution network system is mainly by following Table constitute: system parameter table, distribution subsystem parameter list, line parameter circuit value table, interconnection switch parameter list, block switch parameter list, Power parameter table and load parameter table, in addition, there are also switchtype tables etc..
Real time data inquiry needs to use from distribution SCADA with manual modification interface during computing system trend The either real time data of SCADA dispatching system.The function of the subsystem is exactly the correctness of real-time monitoring real time data, not When can receive real time data, the calculating of optimal operation mode can be completed by manual modification real time data.
Power distribution network running optimizatin and configuration optimization calculate interface, including distribution net work structure identifies sub-interface, distribution power flow Calculate sub-interface, breaker distributes sub-interface rationally and optimized operation scheme calculates sub-interface.Distribution net work structure identifies sub-interface, Based on the network architecture parameters of power distribution network, in combination with by distribution SCADA system transmit Lai breaker real-time status meter The structure of distribution network system is calculated, or configures system in real time according to given switch state vector, which is the premise of Load flow calculation. Distribution power system load flow calculation sub-interface calculates trend in distribution subsystem according to the calculated model of distribution net work structure recognizer Distribution and grid loss, and be compared with optimal evaluation index.Breaker distributes sub-interface rationally, topology identification, On the basis of Load flow calculation and maintenance cost calculate, optimal breaker allocation plan is calculated.Optimized operation scheme calculates son Interface, on the basis of network topology identification and Load flow calculation, by the every kind of state of exploitation for changing switch state vector Index value under vector, and optimized operation scheme is calculated according to index value to compare.
Fig. 1 is single supply radial distribution networks system topology schematic diagram, the base that Complicated Distribution Network system load flow calculates This thought is that Complicated Distribution Network is decomposed into the progress of several single supply electric power distribution network systems, and the total losses of whole network are equal to complete The sum of the loss of portion's single supply subsystem.Therefore, the model for establishing single supply radial distribution networks system is computing system loss Basis, and using forward-backward sweep method calculate single supply distribution subsystem trend precondition.
Since C Plus Plus has computational efficiency high, it is suitable for calculating in real time, using bus nodes as core, establishes and use C++ language The object model that speech indicates is conducive to the exploitation and calculating of whole system.Whole system whole busbar laminate and every layer of whole buses Between relationship can be summarized as Fig. 2.In Fig. 2, the data structure of each bus object are as follows:
typedef struct_BusModel_
{WORD BusNo;| | this bus number
WORD LaBusBus;| | upper one layer of bus number
WORD InLineNo;| | incoming line number
WORD OutLineNum;| | output line number
WORD OutLine[MaxNum];| | outlet line object
WORD OutLoadNum;| | even load number;
WORD OutLoad[MaxNum];| | even load object;
}BusModel;
As shown in figure 3, specific step is as follows for decomposition algorithm described in step 2):
The topological structure parameter for 2-1) reading more power supply Complicated Distribution Network systems, by whole route objects, interconnection switch pair As the direction discernment traffic sign placement with block switch object is false;
2-2) using the power supply number in power distribution network as cyclic variable, the corresponding single supply radial distribution networks of each power supply System model, and the state variable of current single supply electricity distribution network model is initialized, state variable includes the model number of plies and each layer Bus number;
The property parameters of current power, i.e. institute's connection line 2-3) are read, and the source side Search Flags of route are modified Be it is true, calculate the corresponding bus of institute's connection line, the bus, that is, current single supply system first layer bus, using first layer as Current layer;
2-4) calculate whole attributes of current layer whole bus, including inlet highway, whole outlet lines and all loads Branch;
Whether the whole output line numbers for 2-5) judging current layer whole bus are 0;If 0, then terminate to current power Calculating, 1 otherwise is added to bus layer number variable, and using whole output line numbers of upper one layer whole buses as the mother of current layer Line number;
2-6) repeat step 2-4) and step 2-5), continue to calculate current single supply electricity distribution network model until completing;
Mains cycle variable 2-7) is added 1, repeats step 2-3), step 2-4), step 2-5) and step 2-6) calculate under The defeated calculating for penetrating shape distribution network system until completing all power of the corresponding single supply of one power supply;
Embodiment:
The present invention is applied in certain switching station's distribution network system, certain switching station's distribution network system is become by A substation and B Power station power supply, centre are connected with feeder pillar.According to the application method of the developed software systems of this project, certain opening and closing is summarized first The network model of institute's distribution network system, including 2 power supplys, 13 routes, 1 interconnection switch, 6 block switches, 12 nodes It is loaded with 17.The administrative load of certain switching station's distribution network system is shown in table 1.
Certain the administrative load meter of switching station's distribution network system of table 1
Table 2 is the administrative distribution line and its length of certain switching station's distribution network system.Wherein, the route that length is 0 be for Meet topology controlment to need and increased virtual circuit.
Certain the administrative circuit table of switching station's distribution network system of table 2
Under the premise of meeting distribution network system reliability, there are three kinds of typical power supply moulds for certain switching station's distribution network system Formula, as shown in table 3.
Certain the switching station's distribution network system powering mode table of table 3
Number Mode state
1 Interconnection switch disconnects, other switches close
2 601 switches disconnect, other switches close
3 602 switches disconnect, other switches close
The present invention is in underloading in specified state of value and bus I in all loads respectively and bus II is in rated condition 2 kinds of load patterns under calculate the optimized operation mode of certain switching station's distribution network system, and comparative analysis operation result.
(1), under rated load state
Corresponding line losses management when running under mode one, two and three respectively, the results are shown in Table 4:
Each powering mode corresponds to network loss table to certain switching station of table 4 at rated loads
Number Mode state Corresponding loss (kW)
1 Interconnection switch disconnects, other switches close 380.5
2 601 switches disconnect, other switches close 711.1
3 602 switches disconnect, other switches close 423.2
By table 4 as it can be seen that under nominal load operating condition, the corresponding network loss of mode 1 is the smallest, therefore calculated is matched herein Grid operation mode is optimal, loss minimization.If operating in other both of which, network loss will respectively increase 330.6kW and 42.7kW。
(2), bus I is in underloading, and bus II is in rated value
When the load of system changes, it is assumed that the actual value of a certain moment whole load is as shown in table 5
A certain variation moment forecast load meter (bus I underloading) of certain the switching station's system of table 5
Load number Load name Load rated power
1 3B 20kVA
2 5B 10kVA
3 7B 20kVA
4 8B 10kVA
5 9B 10kVA
6 10B 10kVA
7 12B 10kVA
8 11B 1000kVA
9 6B 1000kVA
10 4B 1000kVA
11 2B 1000kVA
12 Specially become 1B 1250kVA
13 1B 800kVA
14 2B 630kVA
15 3B 630kVA
16 Load 16 1000kVA
17 Load 17 800kVA
The actual power all loaded is set as the given operating condition value of table 5, optimized operation mode is calculated, optimizes operation side Formula is: disconnecting 602 switches, closes interconnection switch and other 5 block switches.Meanwhile mould of all powering listed by table 3 is respectively set Formula simultaneously calculates corresponding network loss.In the case where bus I is lightly loaded load condition, corresponding line losses management when mode is once run;In bus I It is lightly loaded under load condition, corresponding line losses management when being run under mode two;In the case where bus I is lightly loaded load condition, mode three is lower to be transported Corresponding line losses management when row.
The corresponding calculated result of three of the above powering mode is concluded, as shown in table 6.
The powering mode table under bus I light duty of 6 certain electric substation of table
Number Mode state Corresponding loss (kW)
1 Interconnection switch disconnects, other switches close 272.3
2 601 switches disconnect, other switches close 277.0
3 602 switches disconnect, other switches close 168.8
As it can be seen that in bus I underloading, under bus II is in rated value operating condition, the corresponding network loss of calculated operational mode is The minimum value of network loss under all possibility modes, therefore mode 3 is the optimal method of operation at this time.If empirically system transported Row is in mode 1, then network loss will increase 103.5kW.
It can be seen that the power distribution network optimization system that the present invention develops can be according to the real-time change of load from analysis above Change the optimized operation mode for providing distribution network system, loss minimization, to improve the economy of power distribution network operation.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of the technical program, should all be covered in the present invention Scope of the claims in.

Claims (7)

1. a kind of power distribution network operation optimizing system, which is characterized in that the system comprises have real-time data base, match electrically optimized calculating Module, real-time query and setting module, parameter and historical data interface module, DA server and interface module and configuration module; Configuration module and parameter and the data interaction of historical data base interface module, parameter and historical data base interface module and real time data Library data interaction, real-time data base is respectively and with electrically optimized computing module, real-time query and setting module and DA server and connecing Mouth module data interaction;
Power distribution network optimal operation mode is calculated, son is calculated for calculating breaker best configuration scheme with electrically optimized computing module The power supply reliability in region;
Specific step is as follows for the calculating power distribution network optimal operation mode:
1) single supply radial distribution networks system model is established;
2) it is directed to power distribution network, is established by Complicated Distribution Network to the decomposition algorithm of single supply radial distribution networks;
3) power flow algorithm of the single supply radial distribution networks in conjunction with distribution SCADA is established;
4) it is set out based on loss minimization, under the premise of further considering power supply reliability and safety, calculates power distribution network open circuit The optimized operation combination of device;
Specific step is as follows for decomposition algorithm described in step 2):
The topological structure parameter for 2-1) reading more power supply Complicated Distribution Network systems, by whole route objects, interconnection switch object and The direction discernment traffic sign placement of block switch object is false;
2-2) using the power supply number in power distribution network as cyclic variable, the corresponding single supply radial distribution networks system of each power supply Model, and the state variable of current single supply electricity distribution network model is initialized, state variable includes the bus of the model number of plies and each layer Number;
The property parameters of current power, i.e. institute's connection line 2-3) are read, and the source side Search Flags of route are revised as very, Calculate the corresponding bus of institute's connection line, the bus, that is, current single supply system first layer bus, using first layer as current Layer;
2-4) calculate whole attributes of current layer whole bus, including inlet highway, whole outlet lines and whole load branch;
Whether the whole output line numbers for 2-5) judging current layer whole bus are 0;If 0, then terminate the meter to current power It calculates, 1 otherwise is added to bus layer number variable, and using whole output line numbers of upper one layer whole buses as the bus of current layer Number;
2-6) repeat step 2-4) and step 2-5), continue to calculate current single supply electricity distribution network model until completing;
Mains cycle variable 2-7) is added 1, repeats step 2-3), step 2-4), step 2-5) and step 2-6) calculate it is next The defeated calculating for penetrating shape distribution network system until completing all power of the corresponding single supply of power supply;
Power flow algorithm described in step 3) is as follows:
In formula, OutLineNum is the output circuitry number of a certain bus;OutLoadNum is load number on a certain bus; For the power input electric current of a certain bus;
In formula, Rij0It is the resistivity of route, LijIt is the length of route, PTotalLoss(k)It is the loss in kth time iterative process, BusLayerNum is the bus number of plies, BusNumLayer[i]It is i-th layer of bus number.
2. power distribution network operation optimizing system as described in claim 1, it is characterised in that: parameter and historical data interface module, Data interaction is carried out for accessing parameter database and historical data library file, including reading and write-in, and with real-time data base, Establish data.
3. power distribution network operation optimizing system as described in claim 1, it is characterised in that: real-time data base establishes real time data Library memory, for parameter and real-time status data needed for saving whole system operation;Unified data platform is established, is simultaneously Optimization Calculation Program, real-time query program and external data interface program provide unified database service interface.
4. power distribution network operation optimizing system as described in claim 1, it is characterised in that: DA server and interface module are used for The real-time data base of system is established, the power distribution network real-time status number that the either SCADA system transmission of distribution SCADA system comes is received According to the power distribution network real-time status data includes switch state, supply voltage and customer charge.
5. power distribution network operation optimizing system as described in claim 1, it is characterised in that: configuration module, for creating parameter number According to library, management system parameter database, input system structural parameters;The management system parameter database includes to increase, delete Remove, be inserted into and modify operation;The input system structural parameters include input system parameter list, distribution system parameter list, line Road parameter list, interconnection switch parameter list, block switch parameter list and load parameter table.
6. power distribution network operation optimizing system as described in claim 1, it is characterised in that: real-time query and setting module are used for Real-time query distribution network system real-time status variable, manual modification or setting system real-time status variable.
7. power distribution network operation optimizing system as described in claim 1, which is characterized in that the calculating breaker best configuration side The specific algorithm of case is as follows:
P=Min (CS+CL)
In formula, CSFor killer switch investment cost model, CLFor load point interruption cost computation model;
In formula: nLPFor load point sum;TjThere is T for j-th of load pointjKind interruption duration classification;EENStjFor load point j The corresponding power loss amount of t kind interruption duration;CLjtFor the corresponding unit loss of outage of load point j t kind interruption duration;
In formula: M is switchtype sum;NjThe number of units being installed in addition with is switched for jth kind;CSjSeparate unit time-adjusted investment is switched for jth kind, i.e., Present worth unit price;I is discount rate;PjFor the service life of jth kind switchgear;
Keep P minimum, completes the configuration optimization of power distribution circuit breakers switch.
CN201610254733.7A 2016-04-21 2016-04-21 A kind of power distribution network operation optimizing system Active CN105958472B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610254733.7A CN105958472B (en) 2016-04-21 2016-04-21 A kind of power distribution network operation optimizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610254733.7A CN105958472B (en) 2016-04-21 2016-04-21 A kind of power distribution network operation optimizing system

Publications (2)

Publication Number Publication Date
CN105958472A CN105958472A (en) 2016-09-21
CN105958472B true CN105958472B (en) 2019-01-08

Family

ID=56914755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610254733.7A Active CN105958472B (en) 2016-04-21 2016-04-21 A kind of power distribution network operation optimizing system

Country Status (1)

Country Link
CN (1) CN105958472B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106877335B (en) * 2017-03-31 2019-10-25 中国联合网络通信集团有限公司 The treating method and apparatus of supply network
CN107526003A (en) * 2017-07-20 2017-12-29 北京天泰怡和科技有限公司 Intelligent distribution network automatic analysis system
CN111404581B (en) * 2020-03-24 2021-10-29 佳源科技有限公司 High-speed reliable Internet of things power broadband carrier High Performance Liquid Chromatography (HPLC) system
CN112291324A (en) * 2020-10-23 2021-01-29 贵州电网有限责任公司 Management method and system suitable for regulating and controlling service

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254256A (en) * 2011-07-21 2011-11-23 福建省电力有限公司福州电业局 Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof
CN104092211A (en) * 2014-07-14 2014-10-08 国家电网公司 Switch optimal configuration method capable of meeting self-healing requirement of distribution network
US20150012144A1 (en) * 2013-07-08 2015-01-08 Eaton Corporation Method and apparatus for optimizing a hybrid power system with respect to long-term characteristics by online optimization, and real-time forecasts, prediction or processing
CN104362623A (en) * 2014-11-10 2015-02-18 国家电网公司 Multi-target network reestablishing method for active power distribution network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254256A (en) * 2011-07-21 2011-11-23 福建省电力有限公司福州电业局 Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof
US20150012144A1 (en) * 2013-07-08 2015-01-08 Eaton Corporation Method and apparatus for optimizing a hybrid power system with respect to long-term characteristics by online optimization, and real-time forecasts, prediction or processing
CN104092211A (en) * 2014-07-14 2014-10-08 国家电网公司 Switch optimal configuration method capable of meeting self-healing requirement of distribution network
CN104362623A (en) * 2014-11-10 2015-02-18 国家电网公司 Multi-target network reestablishing method for active power distribution network

Also Published As

Publication number Publication date
CN105958472A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN106291252B (en) A kind of 10kV line loss and low-voltage platform area line loss management analysis method
CN102722764B (en) Integration network optimization computer-aided decision support System
CN105958472B (en) A kind of power distribution network operation optimizing system
CN102437573B (en) Evaluation and control method and system for reliability of electric distribution network based on fuzzy modeling
CN108020750A (en) A kind of power distribution network power failure range analysis method and analytical equipment
CN109274095A (en) Low-voltage distribution network users topology estimation method and system based on mutual information
CN104156835B (en) A kind of bulk power grid wide-area distribution type integration topology analyzing method
CN106655207A (en) Power distribution network reactive power optimization system and method based on multi-data analysis
CN110263391A (en) A kind of active power distribution network intelligence Sofe Switch planing method based on chance constraint
CN107463732A (en) A kind of multiterminal alternating current-direct current active distribution network scheduling controlling analogue system and method
CN110414810A (en) Meter and the multiterminal intelligence Sofe Switch Optimal Configuration Method and system for losing load risk
CN109978295A (en) A kind of lean decision system of data-driven power distribution network
CN107069801A (en) A kind of power distribution network isolated island division methods based on minimum Custom interruption cost
CN107145969A (en) A kind of development zone distribution network planning method and system
CN112232382A (en) Method and system for identifying branch and ammeter membership of low-voltage transformer area
CN107133870B (en) Electric power spot transaction security check method based on 30-second period static analysis
CN112134277A (en) Power grid topology optimization checking method and system based on full-grid marketing and distribution multi-source data
CN108092267A (en) A kind of power distribution network access planning system and method based on intelligent body
CN110414796A (en) AC/DC hybrid power distribution network frame planning method and device and storage medium
CN104063757B (en) Transformer substation main electrical connection assessment method suitable for different development stages of power grids
CN105404933A (en) Computing system for enhancing power supply reliability for power distribution network and computing method thereof
CN110690700B (en) Energy internet planning method based on mixed integer planning
CN105976044B (en) A kind of power distribution network running optimizatin method
CN109002938B (en) Double-layer planning method for alternating current-direct current hybrid power distribution network considering N-1 safety criterion
CN111582626A (en) Power grid planning adaptability method based on big data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant