CN107069535B - A kind of high-altitude coaster sets up component - Google Patents

A kind of high-altitude coaster sets up component Download PDF

Info

Publication number
CN107069535B
CN107069535B CN201710073582.XA CN201710073582A CN107069535B CN 107069535 B CN107069535 B CN 107069535B CN 201710073582 A CN201710073582 A CN 201710073582A CN 107069535 B CN107069535 B CN 107069535B
Authority
CN
China
Prior art keywords
claw
traction rope
connecting rods
stent
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710073582.XA
Other languages
Chinese (zh)
Other versions
CN107069535A (en
Inventor
韩云豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC Saiwei Intelligent Technology Co.,Ltd.
Original Assignee
Sichuan Fei Fei Ldk Aviation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Fei Fei Ldk Aviation Technology Co Ltd filed Critical Sichuan Fei Fei Ldk Aviation Technology Co Ltd
Priority to CN201710073582.XA priority Critical patent/CN107069535B/en
Publication of CN107069535A publication Critical patent/CN107069535A/en
Application granted granted Critical
Publication of CN107069535B publication Critical patent/CN107069535B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Abstract

The invention discloses a kind of high-altitude coasters to set up component, including stent, two connecting rods and the pulley for being arranged on pedestal lower end, further include traction rope and two claws being oppositely arranged, and two claw lower ends are hinged and are arranged on pedestal upper end, the opposite one end end of two connecting rods passes through pin-hinges, the other end of two connecting rods is hinged respectively at two claw epimeres, the both ends of tension spring are connected respectively at two claw hypomere side walls, guide collar is equipped in dowel ends, traction rope one end is fixed on stent, and the activity of the traction rope other end runs through the guide collar.Inventor develops a kind of erection component, pass through the cooperation with rotor wing unmanned aerial vehicle, so that staff can realize on the ground is fixed the support section of pulley assembly installation, shorten the working hour for setting up pulley assembly, while improve the security reliability of staff's construction.

Description

A kind of high-altitude coaster sets up component
Technical field
The present invention relates to high-altitude stringing or maintenance fields, and in particular to a kind of high-altitude coaster sets up component.
Background technology
Increase with the dynamics of infrastructure construction, the demand of aerial work platform is continuously increased.Aerial work platform Be for transport staff and working equipment to specified altitude assignment carry out operation a kind of large-scale engineering machinery equipment, and extensively For electric power, street lamp, municipal administration, gardens, communication, airport, shipbuilding, traffic, advertisement, photography luminaire field of aerial work.National standard GB3608.93《High-rise working is classified》Regulation:" VL is in 2 meters of height of fall datum level or more it is possible that the eminence fallen is made Industry, referred to as high-rise working." high-altitude stringing or upkeep operation belong to high-rise working scope, current high-altitude stringing or upkeep operation Many occasions need to set up coaster in advance, and operation Work tool and operating personnel then are transported to working at height point using coaster, It needs to spend very big energy and long time, and dangerous larger, efficiency is low.
Invention content
Present invention aims at providing a kind of high-altitude coaster to set up component, to solve the above problems.
The present invention is achieved through the following technical solutions:
A kind of high-altitude coaster sets up component, including stent, two connecting rods and the pulley for being arranged on pedestal lower end, further includes Traction rope and two claws being oppositely arranged, and two claw lower ends are hinged and are arranged on pedestal upper end, two The opposite one end end of a connecting rod is hinged by pin-hinges, the other end of two connecting rods respectively at two claw epimeres, The both ends of tension spring are connected respectively at two claw hypomere side walls, are equipped with guide collar in dowel ends, traction rope one end is fixed on branch On frame, and the activity of the traction rope other end runs through the guide collar.In the prior art, it before high-altitude stringing or upkeep operation, needs It is supreme so that working at height Work tool and operating personnel are transported in a high risk situation when setting up coaster on split conductor Idle job point, since pulley assembly needs the load of carrying more than 200Kg, and pulley assembly own wt is relatively large, i.e., When staff realizes that pulley assembly high-altitude is set up, need the time spent and energy more huge so that the frame of pulley assembly It is set as excessively high;For such situation, inventor develops a kind of erection component, passes through the cooperation with rotor wing unmanned aerial vehicle so that Staff can realize on the ground is fixed the support section of pulley assembly installation, shortens the work for setting up pulley assembly When, while improve the security reliability of staff's construction.
When specifically used, two claws and two connecting rods are hinged and form a quadrilateral structure that can be deformed upon, Traction rope one end is fixed on stent, and the other end is connect after running through guide collar with rotor wing unmanned aerial vehicle, is driven after unmanned plane lift-off Quadrilateral structure is risen to below split conductor, and unmanned plane continues to move upwardly until that two connecting rods connect with split conductor lower surface It touches, and two claw epimeres are then located at the both sides of split conductor respectively, adjusting unmanned plane at this time is allowed to change course, i.e., by dividing The side of conducting wire is moved to opposite side, and traction rope is overlapped in the upper surface of split conductor at this time, is fallen after rise in unmanned plane to ground Afterwards, by pullling traction rope so that quadrilateral structure continues to move up, and can be produced between the two after connecting rod is contacted with split conductor Raw opposite extruding, since two connecting rods belong to flexible connection, and split conductor is fixed, then is compeled because of the extruding of split conductor Two connecting rods is made to generate downward displacement, and connecting rod drive claw by the both sides of split conductor draw close thereto by portion, until two Claw epimere engages split conductor completely, realizes the locking to split conductor, that is, completes the installation of coaster.Two claws it Between spacing it is larger when, tension spring is in tensional state, claw gradually in split conductor snap-fitting process, tension spring gradually restores shape Become, i.e., the tractive force that split conductor is directed toward by claw is generated to claw, to accelerate the closing speed of two claws, is dropped simultaneously The pulling force of traction rope is exported on low land face, reduces the labor intensity of staff.
The hook being fixed on stent is further included, the end of the traction rope is fixed on hook.It sets and hangs on stent Hook is fixed for one end of traction rope, after coaster use, after the loading below pulley is cancelled, needs to quadrangle knot Structure is unlocked, so that quadrilateral structure is removed from split conductor, and traction rope is fixed on hook, can Rapid reversal pair The restriction of traction rope, while the node that outer diameter is more than guide collar internal diameter is equipped on the traction rope section positioned at guide collar lower end, Staff on ground pulls traction rope, and tension spring gradually becomes tensional state by original state, two under the drive of traction rope Being hinged for a connecting rod a little moves up, and interlinking lever end generates an outside thrust to claw, forces two claws outside Until two claw upper ends are detached from split conductor, connection with traction rope, i.e. frame are also kept due to entirely setting up component for expansion If component will not cause it that the movement of falling object occurs after split conductor is completely disengaged, to ensure the safety of ground handling operator And set up the integrality of component in itself.
The claw includes main body, the both ends of the main body respectively in same direction be formed by bending hinge segment and mounting Section, and the hinge segment is hinged with pedestal upper end, the mounting section matches with split conductor.Claw includes main body and main body Hinge segment that both ends are formed respectively by being bent, mounting section, i.e. claw is integrally arched, is being opened completely in two claws When, two spacing mounted between section ends are more than the outer diameter of split conductor, to facilitate between two mounting sections and split conductor Quick-fit or disengaging, mitigate live load of the surface personnel when pullling traction rope.
Two connecting rods and two claws are symmetrical along pin, and when two connecting rods form one side by side During parallel with horizontal line straight line, tension spring reaches its largest deformation amount.In two claws and split conductor engagement process, two The end that is hinged of connecting rod can move up and down, and claw to be driven to realize opening and closing, and two interlinking lever ends is mutual Hinge joint A is hingedly formed, and the other end of connecting rod and claw are side walls hinged, i.e., are respectively formed hinge joint on two claw side walls B, C, and hinge joint B, C are in same horizontal line, when hinge joint A, B and C three point on a straight line, the opening width of two claws reaches To maximum, while tension spring also reaches its largest deformation amount, to ensure the service life of tension spring, while passes through above and below hinge joint A Mobile, the stress of two claws in the horizontal direction remains balance, i.e., the mobile status of two claws keeps synchronizing, prevent Any one contact of appearance with split conductor in two claws is unstable and coaster is caused significantly to shake, it is ensured that is using The stability of coaster in the process.
The traction rope is insulating cord.Preferably, traction rope uses insulating cord, made with adapting to high-altitude stringing or maintenance The working environment of industry, it is ensured that the security reliability of user.
Compared with prior art, the present invention it has the following advantages and advantages:
1st, a kind of high-altitude coaster of the present invention sets up component, and when the spacing between two claws is larger, tension spring, which is in, to be stretched State, claw gradually in split conductor snap-fitting process, tension spring gradually restores deformation, i.e., to claw generate one referred to by claw To the tractive force of split conductor, to accelerate the closing speed of two claws, while reduce and the pulling force of traction rope exported on ground, Reduce the labor intensity of staff;
2nd, a kind of high-altitude coaster of the present invention sets up component, and claw includes main body and main body both ends respectively by being bent and shape Into hinge segment, mounting section, i.e. claw is integrally arched, when two claws are in complete open, between two mounting section ends Spacing be more than split conductor outer diameter, with facilitate two mounting sections and split conductor between quick-fits or disengaging, subtract Light live load of the surface personnel when pullling traction rope;
3rd, a kind of high-altitude coaster of the present invention sets up component, and two interlinking lever ends are hinged to form hinge joint A, and connecting rod The other end and claw it is side walls hinged, i.e., be respectively formed hinge joint B, C on two claw side walls, and hinge joint B, C are in same On one horizontal line, when hinge joint A, B and C three point on a straight line, the opening width of two claws reaches maximum, while tension spring also reaches Its largest deformation amount, to ensure the service life of tension spring, while moving up and down by hinge joint A, two claws are in level side Upward stress remains balance, i.e., the mobile status of two claws keeps synchronizing, and prevents any one in two claws Contact of the appearance with split conductor is unstable and coaster is caused significantly to shake, it is ensured that the stability of coaster in use.
Description of the drawings
Attached drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention.
Label and corresponding parts title in attached drawing:
1- pulleys, 2- stents, 3- hooks, 4- tension springs, 5- claws, 6- connecting rods, 7- pins, 8- split conductors.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment 1
As shown in Figure 1, the present embodiment includes 2, two connecting rods 6 of stent and the pulley 1 for being arranged on 2 lower end of stent, also wrap Traction rope and two claws 5 being oppositely arranged are included, and two 5 lower ends of claw are hinged and are arranged on stent 2 End, the opposite one end end of two connecting rods 6 is hinged by pin 7, and the other end of two connecting rods 6 is respectively at two claws 5 Epimere is hinged, and the both ends of tension spring 4 are connected respectively at two 5 hypomere side walls of claw, and guide collar, traction rope are equipped in 7 end of pin One end is fixed on stent 2, and the activity of the traction rope other end runs through the guide collar.In the prior art, in high-altitude stringing or Before upkeep operation, need in a high risk situation when setting up coaster on split conductor 8, so as to by working at height Work tool and work Industry personnel are transported to working at height point, since pulley assembly needs the load of carrying more than 200Kg, and pulley assembly itself weight It measures relatively large, i.e., when staff realizes that pulley assembly high-altitude is set up, needs the time spent and energy more huge so that The erection cost of pulley assembly is excessively high;For such situation, inventor develops a kind of erection component, by with rotor wing unmanned aerial vehicle Cooperation so that staff can realize on the ground is fixed the support section of pulley assembly installation, shorten set up The working hour of pulley assembly, while improve the security reliability of staff's construction.
When specifically used, two claws 5 and two connecting rods 6 are hinged and form a quadrangle knot that can be deformed upon Structure, traction rope one end are fixed on stent 2, and the other end is connect after running through guide collar with rotor wing unmanned aerial vehicle, after unmanned plane lift-off Quadrilateral structure is driven to rise to 8 lower section of split conductor, unmanned plane continues to move upwardly until two connecting rods 6 and split conductor 8 Lower surface contacts, and two 5 epimeres of claw are then located at the both sides of split conductor 8 respectively, adjusts unmanned plane at this time and is allowed to change boat To being moved to opposite side by the side of split conductor 8, traction rope is overlapped in the upper surface of split conductor 8 at this time, at nobody Machine is fallen after rise to ground, by pullling traction rope so that quadrilateral structure continues to move up, and is contacted in connecting rod 6 with split conductor 8 Opposite extruding can be generated between the two afterwards, since two connecting rods 6 belong to flexible connection, and split conductor 8 is fixed, then because dividing It splits the extruding of conducting wire 8 and two connecting rods 6 is forced to generate downward displacement, and connecting rod 6 drives both sides of the claw 5 by split conductor 8 Portion is drawn close thereto, until two 5 epimeres of claw engage split conductor 8 completely, realizes the locking to split conductor 8, i.e., complete Into the installation of coaster.When spacing between two claws 5 is larger, tension spring 4 is in tensional state, claw 5 gradually with division In 8 snap-fitting process of conducting wire, tension spring 4 gradually restores deformation, i.e., a traction that split conductor 8 is directed toward by claw 5 is generated to claw 5 Power to accelerate the closing speed of two claws 5, while reduces and the pulling force of traction rope is exported on ground, reduces staff's Labor intensity.
The present embodiment further includes the hook 3 being fixed on stent 2, and the end of the traction rope is fixed on hook 3.It is propping up Setting hook 3 is fixed for one end of traction rope on frame 2, after coaster use, after the loading below pulley 1 is cancelled, It needs to be unlocked quadrilateral structure, so that quadrilateral structure is removed from split conductor 8, and traction rope is fixed on hook On 3, can restriction of the Rapid reversal to traction rope, while on the traction rope section positioned at guide collar lower end be equipped with outer diameter be more than lead To the node of circle internal diameter, the staff on ground pulls traction rope, and tension spring 4 gradually becomes tensional state by original state, Drive lower being hinged for two connecting rods 6 of traction rope a little moves up, and 6 end of connecting rod generates claw 5 pushing away outward Power forces two claws 5 to expand outwardly, until two 5 upper ends of claw are detached from split conductor 8, due to entirely setting up component also Keep the connection with traction rope, that is, setting up component will not cause it that the movement of falling object occurs after split conductor 8 is completely disengaged, To ensure the safety of ground handling operator and set up the integrality of component in itself.
Wherein, the claw 5 includes main body, the both ends of the main body respectively in same direction be formed by bending hinge segment and Section is mounted, and the hinge segment is hinged with 2 upper end of stent, the mounting section matches with split conductor 8.Claw 5 includes main body And hinge segment, the mounting section that main body both ends are formed respectively by being bent, i.e. claw 5 is whole arched, exists in two claws 5 When opening completely, the spacing between two mounting section ends is more than the outer diameter of split conductor 8, to facilitate two mounting sections and division Quick-fit or disengaging between conducting wire 8 mitigate live load of the surface personnel when pullling traction rope.
Further, two connecting rods 6 and two claws 5 are symmetrical along pin 7, and when two companies When bar 6 forms a straight line parallel with horizontal line side by side, tension spring 4 reaches its largest deformation amount.It is led in two claws 5 with division In 8 engagement process of line, the end that is hinged of two connecting rods 6 can move up and down, claw 5 to be driven to realize opening and closing, And two being hinged for 6 end of connecting rod to form hinge joint A, and the other end of connecting rod 6 and claw 5 are side walls hinged, i.e., at two Hinge joint B, C are respectively formed on 5 side wall of claw, and hinge joint B, C are in same horizontal line, as hinge joint A, B and C at 3 points When conllinear, the opening width of two claws 5 reaches maximum, while tension spring 4 also reaches its largest deformation amount, to ensure making for tension spring 4 With the service life, while moving up and down by hinge joint A, the stress of two claws 5 in the horizontal direction remain balance, i.e., two The mobile status of a claw 5 keeps synchronizing, and prevents any one appearance contact with split conductor 8 in two claws 5 unstable Determine and coaster is caused significantly to shake, it is ensured that the stability of coaster in use.
Preferably, traction rope uses insulating cord, to adapt to the working environment of high-altitude stringing or upkeep operation, it is ensured that make The security reliability of user.
Above-described specific embodiment has carried out the purpose of the present invention, technical solution and advantageous effect further It is described in detail, it should be understood that the foregoing is merely the specific embodiment of the present invention, is not intended to limit the present invention Protection domain, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (3)

1. a kind of high-altitude coaster sets up component, including stent (2), two connecting rods (6) and the pulley for being arranged on stent (2) lower end (1), it is characterised in that:Further include traction rope and two claws (5) being oppositely arranged, and two claw (5) lower ends It is hinged and is arranged on stent (2) upper end, the opposite one end end of two connecting rods (6) is hinged by pin (7), two connecting rods (6) the other end is hinged respectively at two claw (5) epimeres, and the both ends of tension spring (4) are respectively at two claw (5) hypomere sides Wall connects, and is equipped with guide collar in pin (7) end, traction rope one end is fixed on stent (2), and traction rope other end activity is passed through Wear the guide collar;The hook (3) being fixed on stent (2) is further included, the end of the traction rope is fixed on hook (3); The claw (5) includes main body, the both ends of the main body respectively in same direction be formed by bending hinge segment and mounting section, and institute It states hinge segment and stent (2) upper end is hinged, the mounting section matches with split conductor (8).
2. a kind of high-altitude coaster according to claim 1 sets up component, it is characterised in that:Two connecting rods (6) and two A claw (5) is symmetrical along pin (7), and when two connecting rods (6) form side by side one it is parallel with horizontal line During straight line, tension spring (4) reaches its largest deformation amount.
3. a kind of high-altitude coaster according to claim 1 sets up component, it is characterised in that:The traction rope is insulating cord.
CN201710073582.XA 2017-02-10 2017-02-10 A kind of high-altitude coaster sets up component Active CN107069535B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710073582.XA CN107069535B (en) 2017-02-10 2017-02-10 A kind of high-altitude coaster sets up component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710073582.XA CN107069535B (en) 2017-02-10 2017-02-10 A kind of high-altitude coaster sets up component

Publications (2)

Publication Number Publication Date
CN107069535A CN107069535A (en) 2017-08-18
CN107069535B true CN107069535B (en) 2018-07-06

Family

ID=59598198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710073582.XA Active CN107069535B (en) 2017-02-10 2017-02-10 A kind of high-altitude coaster sets up component

Country Status (1)

Country Link
CN (1) CN107069535B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066472A (en) * 2018-09-28 2018-12-21 国网山东省电力公司威海供电公司 A kind of suspension centre pulley and its application method
CN113241673B (en) * 2021-05-21 2022-12-20 国网河北省电力有限公司沧州供电分公司 High-altitude paying-off tackle and guide rope entering mechanism thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07336829A (en) * 1994-06-01 1995-12-22 Yoneda Toshio Wire layout apparatus
CN102412525A (en) * 2011-11-15 2012-04-11 江苏省电力公司徐州供电公司 Anti-falling hook for power insulating protective umbrella
CN102664368A (en) * 2012-05-11 2012-09-12 辽宁省电力有限公司盘锦供电公司 Locking hook for use in high-altitude live-wire operation
CN203740875U (en) * 2014-03-20 2014-07-30 国家电网公司 Automatic hanging safety hook
CN104064991A (en) * 2014-06-26 2014-09-24 国家电网公司 High-altitude operation automatic rope locking device
CN105470867A (en) * 2016-01-05 2016-04-06 国网湖南省电力公司带电作业中心 Unmanned aerial vehicle based automatic pole-climbing method and apparatus
CN205335750U (en) * 2016-01-14 2016-06-22 国家电网公司 Sliding trolley device
CN206412695U (en) * 2017-02-10 2017-08-15 四川中飞赛维航空科技有限公司 A kind of high-altitude coaster

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2860696B2 (en) * 1990-06-21 1999-02-24 中電工事株式会社 Wire crossover work tool
JPH07336828A (en) * 1994-06-01 1995-12-22 Yoneda Toshio Line-crossing tool

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07336829A (en) * 1994-06-01 1995-12-22 Yoneda Toshio Wire layout apparatus
CN102412525A (en) * 2011-11-15 2012-04-11 江苏省电力公司徐州供电公司 Anti-falling hook for power insulating protective umbrella
CN102664368A (en) * 2012-05-11 2012-09-12 辽宁省电力有限公司盘锦供电公司 Locking hook for use in high-altitude live-wire operation
CN203740875U (en) * 2014-03-20 2014-07-30 国家电网公司 Automatic hanging safety hook
CN104064991A (en) * 2014-06-26 2014-09-24 国家电网公司 High-altitude operation automatic rope locking device
CN105470867A (en) * 2016-01-05 2016-04-06 国网湖南省电力公司带电作业中心 Unmanned aerial vehicle based automatic pole-climbing method and apparatus
CN205335750U (en) * 2016-01-14 2016-06-22 国家电网公司 Sliding trolley device
CN206412695U (en) * 2017-02-10 2017-08-15 四川中飞赛维航空科技有限公司 A kind of high-altitude coaster

Also Published As

Publication number Publication date
CN107069535A (en) 2017-08-18

Similar Documents

Publication Publication Date Title
CN206412696U (en) A kind of insulation coaster that construction is carried based on rotor wing unmanned aerial vehicle
CN105442458B (en) Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN102882153B (en) Phase replacing insulator string method in charged for replacement circuit many times towers
CN107069535B (en) A kind of high-altitude coaster sets up component
CN107248710A (en) A kind of step-by-step movement line walking obstacle removing robot and its method
CN103001146B (en) Usage method of steel pipe pole operation platform
CN105256728A (en) Cable-stayed bridge warren steel truss cantilever erection method
CN206412695U (en) A kind of high-altitude coaster
CN102344092B (en) Single-rope double-suspension-point horizontal suspension arm retracting and folding mechanism
CN207834953U (en) Cable wears CSE trailer systems
CN102163824B (en) Operating tool and operation method for electrically replacing T-type mounting point suspending insulator in 110kV line steel pipe rod
CN204376311U (en) The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device
CN103663171A (en) Crane and gin pole thereof
CN202029999U (en) Helicopter hanger
CN103422432A (en) Overhaul system of stayed cable of sing-cable-plane cable-stayed bridge and application thereof
CN103470057A (en) Method of hoisting high altitude components
CN203135309U (en) Tension-free cable-releasing spanning device
CN209545015U (en) A kind of transmission line high-altitude operation platform device
CN202658521U (en) Overhauling system of stayed cable of single plane cable stayed bridge
CN102358581A (en) Single-rope three-section type horizontal suspension arm folding buffering and self-locking device
CN201946913U (en) Working tool for electrified replacement of T-shaped hanging point suspension insulator on 110 kV line steel tube rod
CN108233275A (en) Cable wears CSE auxiliary traction systems
CN204040498U (en) A kind of steel work Multi-section column lifting automatic decoupling device
CN202906301U (en) Steel-pipe pole operation platform
CN205173916U (en) Mounting structure of transformer substation monitoring camera convenient to overhaul

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 610000 No. 9, floor 1, building 62, No. 10, Xiaojiahe middle street, high tech Zone, Chengdu, Sichuan

Patentee after: AVIC Saiwei Intelligent Technology Co.,Ltd.

Address before: 610000 No. 9, floor 1, building 62, No. 10, Xiaojiahe middle street, high tech Zone, Chengdu, Sichuan

Patentee before: SICHUAN ZHONGFEI SUNWAY AVIATION TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder