CN102882153B - Phase replacing insulator string method in charged for replacement circuit many times towers - Google Patents

Phase replacing insulator string method in charged for replacement circuit many times towers Download PDF

Info

Publication number
CN102882153B
CN102882153B CN201210316624.5A CN201210316624A CN102882153B CN 102882153 B CN102882153 B CN 102882153B CN 201210316624 A CN201210316624 A CN 201210316624A CN 102882153 B CN102882153 B CN 102882153B
Authority
CN
China
Prior art keywords
insulator
pulley
fixture
lifting
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210316624.5A
Other languages
Chinese (zh)
Other versions
CN102882153A (en
Inventor
吴志成
陈永红
姚青煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN201210316624.5A priority Critical patent/CN102882153B/en
Publication of CN102882153A publication Critical patent/CN102882153A/en
Application granted granted Critical
Publication of CN102882153B publication Critical patent/CN102882153B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Insulators (AREA)

Abstract

The invention discloses phase replacing insulator string method in a kind of charged for replacement circuit many times towers, method of the present invention, pulley jig is utilized to carry out replacing insulator string, achieve indirect operation to install, it transfers to ground stringing operation from tower, greatly reduce gap operating workload, improve operating efficiency, reduce labour intensity.

Description

带电更换线路多回塔中相绝缘子串更换方法Replacement method of phase insulator string in multi-circuit tower of live replacement line

技术领域 technical field

               本发明涉及一种双回塔中相绝缘子串更换,特别是一种带电更换线路多回塔中相绝缘子串更换方法。 The present invention relates to a replacement of phase insulator strings in double-circuit towers, in particular to a method for replacing phase insulator strings in multi-circuit towers for live replacement lines.

背景技术 Background technique

由于线路走廊征用越来越难,送电线路大量采用双回路或多回路同塔架设杆塔,如110KV线路双回路直线塔导线采用垂直排列,中相横担与上相横担一般为3.5米,扣除绝缘子串长度和中相横担高度后,中相横担与上导线距离只有1.2米左右,若按常规带电作业法更换中相绝缘子,人员需进入中相横担端部作业,1.2米的间隙无法满足安全要求,只能停电作业,这就使得供电量遭受到大量的损失,同时降低了供电可靠性。 As it becomes more and more difficult to requisition line corridors, a large number of power transmission lines use double-circuit or multi-circuit towers on the same tower. For example, the conductors of the 110KV line double-circuit straight towers are arranged vertically, and the middle phase cross arm and upper phase cross arm are generally 3.5 meters. After deducting the length of the insulator string and the height of the middle-phase cross-arm, the distance between the middle-phase cross-arm and the upper conductor is only about 1.2 meters. The gap cannot meet the safety requirements, and the operation can only be performed in a power outage, which causes a large loss of power supply and reduces the reliability of power supply.

发明内容 Contents of the invention

本发明的目的在于克服现有技术的不足之处,而提供一种可适用于地电位带电更换线路双回塔或多回塔中相绝缘子的带电更换线路多回塔中相绝缘子串更换方法。 The purpose of the present invention is to overcome the deficiencies of the prior art, and provide a method for replacing phase insulator strings in multi-circuit towers of live replacement lines, which is applicable to the replacement of phase insulators in double-circuit towers or multi-circuit towers on ground potential live lines.

一种带电更换线路多回塔中相绝缘子串更换方法,其具体步骤如下:(1)首先将滑轮卡具及绝缘绳组成滑轮组,所述的滑轮卡具具体包括有卡具及两个的动滑轮组,所述的卡具为翼形结构,在翼形结构的中间部位设置有沟通卡具前后面的可卡入横担的开口缝,及沿着翼形结构的两侧翼方向延伸的与开口缝垂直的方槽,该方槽的槽口位于卡具下端面,在卡具两侧翼的下端面分别设置有定滑轮组,每一定滑轮组具有一个以上的定滑轮,在卡具的上端部设置有用于吊起卡具的挂耳,每一动滑轮组上的滑轮数与卡具一侧翼上的定滑轮组的定滑轮个数相匹配,在每一动滑轮组的下部设置有用于吊起导线的挂钩; A method for replacing phase insulator strings in multi-circuit towers of live replacement lines. The specific steps are as follows: (1) Firstly, a pulley clamp and an insulating rope are formed into a pulley block. The pulley clamp specifically includes a clamp and two moving parts. The pulley block, the fixture is a wing-shaped structure, and the middle part of the wing-shaped structure is provided with an opening slit that communicates with the front and back of the fixture and can be snapped into the cross-arm, and an opening that extends along the direction of the two wings of the wing-shaped structure. A vertical square groove is slit. The notch of the square groove is located on the lower end surface of the fixture. Fixed pulley blocks are respectively arranged on the lower end surfaces of the two wings of the fixture. Each fixed pulley set has more than one fixed pulley. For lifting the lugs of the jig, the number of pulleys on each movable pulley block matches the number of fixed pulleys of the fixed pulley block on the side wing of the fixture, and a hook for lifting wires is provided at the bottom of each movable pulley block;

(2)一塔上作业人员登塔至上横担端部,在上横担处挂好滑车绳,地面作业人员由此滑车绳开始吊升滑轮组; (2) The operators on the first tower climb to the end of the upper cross-arm, hang the pulley on the upper cross-arm, and the ground operators start to lift the pulley block from this pulley;

(3) 另一塔上作业人员登塔至中横担根部用操作杆把滑轮卡具安装于中横担末端绝缘子串悬点处,使卡具中间的开口缝隙和方槽紧密固定于横担上,并把两动滑轮组的挂钩挂入导线; (3) The operator on the other tower climbs to the root of the middle cross arm and installs the pulley clamp on the insulator string suspension point at the end of the middle cross arm with the operating rod, so that the opening gap and square groove in the middle of the clamp are tightly fixed on the cross arm and hang the hooks of the two moving pulleys into the wire;

(4)     地面作业人员由滑轮组绝缘绳的尾端收紧绝缘绳,使绝缘子荷载转移至滑轮组上; (4) Ground workers tighten the insulating rope from the end of the insulating rope of the pulley block to transfer the load of the insulator to the pulley block;

(5)     用操作杆取下导线侧弹簧销,脱开绝缘子; (5) Use the operating lever to remove the spring pin on the wire side and disengage the insulator;

(6)     按相反步骤装上良好的绝缘子,卸掉作业工器具,人员撤离。 (6) Install a good insulator according to the reverse steps, remove the operating tools, and evacuate the personnel.

以上的方法主要适用于更换合成绝缘子,为了能列好的更换瓷瓶绝缘子,本发明还在步骤5与6之间增加如下步骤:由两作业人员到中相横担根部处,配合用操作杆把装于滑车绳上的自制吊点卡固定于合成绝缘子上端部,或瓷瓶绝缘子的第一片,用绝缘子调整器调整好绝缘子位置,取下横担侧弹簧销,利用绝缘子吊点卡平衡提升绝缘子串,脱开连接绝缘子的球头,把绝缘子放至地面。 The above method is mainly applicable to the replacement of composite insulators. In order to replace the porcelain insulators, the present invention also adds the following steps between steps 5 and 6: two operators go to the root of the middle phase cross arm, and use the operating lever to handle the The self-made lifting point card installed on the pulley rope is fixed on the upper end of the synthetic insulator, or the first piece of the porcelain insulator, adjust the position of the insulator with the insulator adjuster, remove the spring pin on the side of the cross arm, and use the insulator lifting point card to balance and lift the insulator string, disengage the ball joint connecting the insulator, and place the insulator to the ground.

在动滑轮组上设置有用于悬挂起动滑轮组的挂耳。 Hanging lugs for hanging the starting pulley are arranged on the movable pulley.

在卡具的两定滑轮组之间的卡具上还设置有两个的定滑轮,两定滑轮分设于开口缝两侧的侧翼上。 Two fixed pulleys are also arranged on the jig between the two fixed pulley groups of the jig, and the two fixed pulleys are respectively arranged on the flanks on both sides of the opening slit.

在卡具的两定滑轮组之间增设一个定滑轮,在更换瓷瓶绝缘子时,由于瓷瓶绝缘子重量很重,因此可用绳索将瓷瓶通过该定滑轮吊起,起到减轻重量的作用。 A fixed pulley is added between the two fixed pulley blocks of the jig. When replacing the insulator of the porcelain bottle, since the weight of the insulator of the porcelain bottle is very heavy, the porcelain bottle can be lifted by the rope through the fixed pulley to reduce the weight.

所述的吊点卡为由两弧形片构成的抱箍式结构,在两弧形片上设置有方便将该吊点卡向上吊起的吊耳,在吊点卡上还设置有方便用绝缘操作杆操作的操作环。 The lifting point card is a hoop-type structure composed of two arc-shaped pieces. Lifting lugs are provided on the two arc-shaped pieces to facilitate lifting the lifting point card upwards. The lifting point card is also provided with a convenient insulation Operating ring for joystick operation.

在使用时,用绝缘操作杆将吊点卡卡在绝缘子上端部或瓷瓶绝缘子的第一片,而后用绝缘绳通过吊点卡上的吊耳将吊点卡固定。 When in use, use the insulating operating rod to clamp the lifting point card on the upper end of the insulator or the first piece of the porcelain insulator, and then use the insulating rope to fix the lifting point card through the lifting ear on the lifting point card.

综上所述的,本发明相比现有技术如下优点: In summary, compared with the prior art, the present invention has the following advantages:

(1)     本发明的带电更换线路多回塔中相绝缘子串更换方法,实现了间接操作安装,它把紧线操作从塔上转移到地面,大大减少了间隙操作工作量,提高了作业效率,降低了劳动强度; (1) The method for replacing the phase insulator strings in the multi-return tower of the live replacement line of the present invention realizes indirect operation and installation. It transfers the line tightening operation from the tower to the ground, greatly reduces the workload of the gap operation, and improves the operation efficiency. Reduced labor intensity;

(2)     按照常规作业方法,承力工具挂点与绝缘子串挂点均需错开400mm左右,间接装脱绝缘子串非常困难,劳动强度极大,该方法通过吊点卡与滑轮卡具的配合,实现了定位装、脱绝缘子,操作简单快速,并同时可适用于合成绝缘子和瓷瓶(玻璃)绝缘子的间接装卸工作; (2) According to the conventional operation method, the hanging point of the load-bearing tool and the hanging point of the insulator string need to be staggered by about 400mm. It is very difficult to install and remove the insulator string indirectly, and the labor intensity is extremely high. This method cooperates with the lifting point card and the pulley clamp. It realizes positioning installation and removal of insulators, and the operation is simple and fast, and it is also suitable for indirect loading and unloading of composite insulators and porcelain (glass) insulators;

(3)     使用时采用两套承力工具作业,当其中任一套工具失效时,另一套工具仍可正常工作,大提高了作业安全系数; (3) Two sets of load-bearing tools are used for operation. When any one of the tools fails, the other set of tools can still work normally, which greatly improves the operating safety factor;

(4)     该项目研究的作业方法,工器具轻便灵活,操作简单; (4) The working method studied in this project, the tools and tools are light and flexible, and the operation is simple;

附图说明 Description of drawings

图1是本发明的实施例1的卡具的结构示意图。 Fig. 1 is a schematic structural view of the jig according to Embodiment 1 of the present invention.

图2是图1的俯视图。 FIG. 2 is a top view of FIG. 1 .

图3是滑轮卡具与绝缘绳组成滑轮组的示意图。 Fig. 3 is a schematic diagram of a pulley block composed of a pulley fixture and an insulating rope.

图4是本发明实施例1的滑轮卡具在使用状态的示意图。 Fig. 4 is a schematic view of the pulley fixture in use according to Embodiment 1 of the present invention.

图5是本发明实施例2的吊点卡具结构示意图。 Fig. 5 is a schematic diagram of the structure of the lifting point fixture according to Embodiment 2 of the present invention.

图6是图5的俯视图。 FIG. 6 is a top view of FIG. 5 .

 标号说明 1滑轮卡具11卡具111卡具卡入横担的开口缝112卡具上与开口缝相垂直的方槽12动滑轮组121动滑轮组下部的挂钩122动滑轮组的挂耳13定滑轮组14卡具上端部的挂耳2绝缘绳3吊点卡31吊耳32吊点卡上的操作环4横担。 Reference Signs Explanation 1 pulley fixture 11 fixture 111 fixture clamped into the opening slit of the cross arm 112 square groove perpendicular to the opening slit on the fixture 12 movable pulley block 121 hook at the lower part of the movable pulley block 122 hanging lug of the movable pulley block 13 fixed pulley block 14 Hanging lug 2 insulating ropes 3 lifting point cards 31 lifting lugs 32 operating rings 4 crossarms on the lifting point cards at the upper end of the fixture.

具体实施方式 Detailed ways

下面结合实施例对本发明进行更详细的描述。 The present invention will be described in more detail below in conjunction with examples.

实施例1 Example 1

一种带电更换线路多回塔中相绝缘子串更换方法,其具体步骤如下:(1)首先将滑轮卡具1及绝缘绳2组成滑轮组如图1-4所示,所述的滑轮卡具具体包括有卡具11及两个的动滑轮组12,所述的卡具为翼形结构,在翼形结构的中间部位设置有沟通卡具前后面的可卡入横担4的开口缝111,及沿着翼形结构的两侧翼方向延伸的与开口缝垂直的方槽112,该方槽的槽口位于卡具下端面,在卡具两侧翼的下端面分别设置有定滑轮组13,每一定滑轮组具有一个以上的定滑轮,在卡具的上端部设置有用于吊起卡具的挂耳14,每一动滑轮组上的滑轮数与卡具一侧翼上的定滑轮组的定滑轮个数相匹配,在每一动滑轮组的下部设置有用于吊起导线的挂钩121,在动滑轮组上设置有用于悬挂起动滑轮组的挂耳122; A method for replacing phase insulator strings in multi-circuit towers of live replacement lines. The specific steps are as follows: (1) Firstly, the pulley fixture 1 and the insulating rope 2 are formed into a pulley block as shown in Figure 1-4. The specific steps of the pulley fixture are as follows: It includes a jig 11 and two movable pulley blocks 12. The jig is a wing-shaped structure, and an opening 111 that communicates with the front and back of the jig and can be snapped into the cross-arm 4 is arranged in the middle of the wing-shaped structure, and The square groove 112 extending along the direction of the two wings of the airfoil structure and perpendicular to the opening seam, the notch of the square groove is located at the lower end surface of the clamp, and fixed pulley blocks 13 are respectively arranged on the lower end surfaces of the two wings of the clamp, each fixed pulley block There is more than one fixed pulley, and the upper end of the fixture is provided with a hanging lug 14 for lifting the fixture. The number of pulleys on each movable pulley block matches the number of fixed pulleys on the fixed pulley block on the side wing of the fixture. The bottom of each moving pulley block is provided with a hook 121 for lifting the wire, and a hanging lug 122 for hanging the starting pulley block is arranged on the moving pulley block;

(2)一塔上作业人员登塔至上横担端部,在上横担处挂好滑车绳,地面作业人员由此滑车绳开始吊升滑轮组; (2) The operators on the first tower climb to the end of the upper cross-arm, hang the pulley on the upper cross-arm, and the ground operators start to lift the pulley block from this pulley;

(3)   另一塔上作业人员登塔至中横担根部用操作杆把滑轮卡具安装于中横担末端绝缘子串悬点处,使卡具中间的开口缝隙和方槽紧密固定于横担上,并把两动滑轮组的挂钩挂入导线; (3) The operator on the other tower climbs to the root of the middle cross arm and installs the pulley clamp on the insulator string suspension point at the end of the middle cross arm with the operating rod, so that the opening gap and square groove in the middle of the clamp are tightly fixed on the cross arm and hang the hooks of the two moving pulleys into the wire;

(4)     地面作业人员由滑轮组绝缘绳的尾端收紧绝缘绳,使绝缘子荷载转移至滑轮组上; (4) Ground workers tighten the insulating rope from the end of the insulating rope of the pulley block to transfer the load of the insulator to the pulley block;

(5)     用操作杆取下导线侧弹簧销,脱开绝缘子; (5) Use the operating lever to remove the spring pin on the wire side and disengage the insulator;

(6)     按相反步骤装上良好的绝缘子,卸掉作业工器具,人员撤离。 (6) Install a good insulator according to the reverse steps, remove the operating tools, and evacuate the personnel.

本实施例未述部分与现有技术相同。 The parts not described in this embodiment are the same as the prior art.

实施例2 Example 2

本实施例与实施例1基本相同,只是在实施例1的步骤5之后增加下述步骤,由两作业人员到中相横担根部处,配合用操作杆把装于滑车绳上的自制吊点卡固定于合成绝缘子上端部,或瓷瓶绝缘子的第一片,吊点卡上的吊耳悬挂于滑轮卡具上的两定滑轮组之间的两个定滑轮上,用绝缘子调整器调整好绝缘子位置,取下横担侧弹簧销,利用绝缘子吊点卡如图5、6平衡提升绝缘子串,脱开连接绝缘子的球头,把绝缘子放至地面;所述的吊点卡3为由两弧形片构成的抱箍式结构,在两弧形片上设置有方便将该吊点卡向上吊起的吊耳31,在吊点卡上还设置有方便用绝缘操作杆操作的操作环32。在卡具的两定滑轮组之间还设置有两个的定滑轮,两定滑轮分设于开口缝两侧的侧翼上。吊点卡利用其上的吊耳悬挂于两个的定滑轮上。 This embodiment is basically the same as Embodiment 1, except that the following steps are added after step 5 of Embodiment 1. The two operators go to the root of the middle phase cross-arm, and use the operating lever to lift the self-made lifting point mounted on the pulley rope. The card is fixed on the upper end of the synthetic insulator, or the first piece of the porcelain bottle insulator, and the lifting lug on the lifting point card is hung on the two fixed pulleys between the two fixed pulley blocks on the pulley fixture, and the position of the insulator is adjusted with the insulator adjuster , remove the spring pin on the side of the cross arm, use the insulator lifting point card as shown in Fig. The hoop-type structure composed of two arc-shaped pieces is provided with lifting lugs 31 which are convenient for lifting the lifting point card upwards, and an operating ring 32 which is convenient for operating with an insulating operating rod is also arranged on the lifting point card. Two fixed pulleys are also arranged between the two fixed pulley blocks of the jig, and the two fixed pulleys are respectively arranged on the flanks on both sides of the opening slit. The lifting point card is suspended on the two fixed pulleys by using the lifting lugs on it.

本实施例未述部分与实施例1相同。 The parts not described in this embodiment are the same as those in Embodiment 1.

Claims (2)

1.一种带电更换线路多回塔中相绝缘子串更换方法,其特征在于:具体步骤如下:(1)首先将滑轮卡具及绝缘绳组成滑轮组,所述的滑轮卡具具体包括有卡具及两个的动滑轮组,所述的卡具为翼形结构,在翼形结构的中间部位设置有沟通卡具前后面的可卡入横担的开口缝,及沿着翼形结构的两侧翼方向延伸的与开口缝垂直的方槽,该方槽的槽口位于卡具下端面,在卡具两侧翼的下端面分别设置有定滑轮组,每一定滑轮组具有一个以上的定滑轮,在卡具的上端部设置有用于吊起卡具的挂耳,每一动滑轮组上的滑轮数与卡具一侧翼上的定滑轮组的定滑轮个数相匹配,在每一动滑轮组的下部设置有用于吊起导线的挂钩; 1. A method for replacing phase insulator strings in multi-circuit towers of live replacement lines, characterized in that: the specific steps are as follows: (1) first, a pulley clamp and an insulating rope are formed into a pulley block, and the pulley clamp specifically includes a clamp and two movable pulley blocks, the clamp is an airfoil structure, and the middle part of the airfoil structure is provided with an opening slit that communicates with the front and rear of the clamp and can be inserted into the cross arm, and along the two side wings of the airfoil structure A square groove extending in the direction perpendicular to the opening seam. The notch of the square groove is located on the lower end surface of the fixture. Fixed pulley blocks are respectively arranged on the lower end surfaces of the two wings of the fixture. Each fixed pulley set has more than one fixed pulley. The upper end of the upper end is provided with hanging lugs for lifting the jig, the number of pulleys on each movable pulley block matches the number of fixed pulleys on the fixed pulley block on one side of the fixture, and the lower part of each movable pulley block is provided. the hook; (2)一塔上作业人员登塔至上横担端部,在上横担处挂好滑车绳,地面作业人员由此滑车绳开始吊升滑轮组; (2) The operators on the first tower climb to the end of the upper cross-arm, hang the pulley on the upper cross-arm, and the ground operators start to lift the pulley block from this pulley; (3)另一塔上作业人员登塔至中横担根部用操作杆把滑轮卡具安装于中横担末端绝缘子串悬点处,使卡具中间的开口缝隙和方槽紧密固定于横担上,并把两动滑轮组的挂钩挂入导线; (3) The operator on the other tower climbs to the root of the middle cross arm and installs the pulley fixture at the suspension point of the insulator string at the end of the middle cross arm with the operating rod, so that the opening gap and square groove in the middle of the fixture are tightly fixed on the cross arm and hang the hooks of the two moving pulleys into the wire; (4)地面作业人员由滑轮组绝缘绳的尾端收紧绝缘绳,使绝缘子荷载转移至滑轮组上; (4) The ground operator tightens the insulating rope from the end of the insulating rope of the pulley block to transfer the load of the insulator to the pulley block; (5)用操作杆取下导线侧弹簧销,脱开绝缘子; (5) Use the operating lever to remove the spring pin on the wire side and disengage the insulator; 两作业人员到中相横担根部处,配合用操作杆把装于滑车绳上的自制吊点卡固定于合成绝缘子上端部,或瓷瓶绝缘子的第一片,用绝缘子调整器调整好绝缘子位置,取下横担侧弹簧销,利用绝缘子吊点卡平衡提升绝缘子串,脱开连接绝缘子的球头,把绝缘子放至地面,在动滑轮组上设置有用于悬挂起动滑轮组的挂耳,在卡具的两定滑轮组之间的卡具上还设置有两个的定滑轮,两定滑轮分设于开口缝两侧的侧翼上; The two operators go to the root of the middle phase cross arm, and use the operating rod to fix the self-made lifting point card installed on the pulley rope to the upper end of the composite insulator, or the first piece of the porcelain bottle insulator, and adjust the position of the insulator with the insulator adjuster. Take off the spring pin on the side of the cross arm, use the insulator lifting point to balance and lift the insulator string, disengage the ball head connecting the insulator, put the insulator on the ground, and set the hanging lug for hanging the starting pulley on the moving pulley block. The jig between the two fixed pulley blocks is also provided with two fixed pulleys, and the two fixed pulleys are respectively arranged on the flanks on both sides of the opening; (6)按相反步骤装上良好的绝缘子,卸掉作业工器具,人员撤离。 (6) Install a good insulator according to the reverse steps, remove the operating tools, and evacuate the personnel. 2.根据权利要求1所述的带电更换线路多回塔中相绝缘子串更换方法,其特征在于:所述的吊点卡为由两弧形片构成的抱箍式结构,在两弧形片上设置有方便将该吊点卡向上吊起的吊耳,在吊点卡上还设置有方便用绝缘操作杆操作的操作环。 2. The method for replacing phase insulator strings in multi-circuit towers of live replacement lines according to claim 1, characterized in that: the lifting point card is a hoop-type structure composed of two arc-shaped sheets, and is mounted on two arc-shaped sheets. There are lifting lugs which are convenient for lifting the lifting point card upwards, and an operating ring which is convenient for operating with an insulating operating rod is arranged on the lifting point card.
CN201210316624.5A 2012-08-30 2012-08-30 Phase replacing insulator string method in charged for replacement circuit many times towers Active CN102882153B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210316624.5A CN102882153B (en) 2012-08-30 2012-08-30 Phase replacing insulator string method in charged for replacement circuit many times towers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210316624.5A CN102882153B (en) 2012-08-30 2012-08-30 Phase replacing insulator string method in charged for replacement circuit many times towers

Publications (2)

Publication Number Publication Date
CN102882153A CN102882153A (en) 2013-01-16
CN102882153B true CN102882153B (en) 2015-09-30

Family

ID=47483381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210316624.5A Active CN102882153B (en) 2012-08-30 2012-08-30 Phase replacing insulator string method in charged for replacement circuit many times towers

Country Status (1)

Country Link
CN (1) CN102882153B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103872621B (en) * 2014-03-10 2016-08-24 国家电网公司 A kind of earth potential method charged changing tension-resisting insulator fixture and operational method
CN103928867A (en) * 2014-04-24 2014-07-16 国家电网公司 Double-hoisting-point pole head clamp for replacing straight-line insulator of 220 kV line steel pipe pole in electrified mode
CN104201629B (en) * 2014-09-24 2017-08-01 国家电网公司 A kind of insulator chain hanging point attachment structure
CN105514862B (en) * 2015-12-04 2017-03-29 国家电网公司 Multiple-loop line transmission line of electricity jumper suspension insulator chain charged for replacement method and device
CN107086495B (en) * 2017-06-28 2019-05-31 云南电网有限责任公司曲靖供电局 Load transfer tool and electric power maintenance equipment
CN107069562B (en) * 2017-06-28 2019-03-08 云南电网有限责任公司曲靖供电局 Replacing insulator under electrified method and load transfer device
CN107611846B (en) * 2017-09-29 2023-10-13 国家电网公司 Insulator segment replacement device and replacement method
CN109586205B (en) * 2018-11-21 2023-10-31 国网宁夏电力有限公司电力科学研究院 Transmission line grounding clamp auxiliary installation device
CN110112678A (en) * 2019-06-20 2019-08-09 中国南方电网有限责任公司超高压输电公司柳州局 A kind of complete Work tool of charged for replacement duplex V-type pendency composite insulator
CN112993858A (en) * 2021-03-26 2021-06-18 国家电网有限公司 Tool for replacing insulator string of ultra-high voltage transmission line in electrified manner

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201466574U (en) * 2009-06-11 2010-05-12 华北电力科学研究院有限责任公司 A device for equipotential replacement of transmission line tower insulators and accessories
CN201518397U (en) * 2009-06-16 2010-06-30 福建省福州电业局 220kV line conductor live replacement linear insulator string tool
CN102163824A (en) * 2011-02-14 2011-08-24 福建省电力有限公司厦门电业局 Operating tool and operation method for electrically replacing T-type mounting point suspending insulator in 110kV line steel pipe rod

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201466574U (en) * 2009-06-11 2010-05-12 华北电力科学研究院有限责任公司 A device for equipotential replacement of transmission line tower insulators and accessories
CN201518397U (en) * 2009-06-16 2010-06-30 福建省福州电业局 220kV line conductor live replacement linear insulator string tool
CN102163824A (en) * 2011-02-14 2011-08-24 福建省电力有限公司厦门电业局 Operating tool and operation method for electrically replacing T-type mounting point suspending insulator in 110kV line steel pipe rod

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
110kV双回线路直线塔中相绝缘子的带电更换;吴志成;《供用电》;20090228;第26卷(第1期);第62-64页 *

Also Published As

Publication number Publication date
CN102882153A (en) 2013-01-16

Similar Documents

Publication Publication Date Title
CN102882153A (en) Multi-return tower middle-phase insulator string replacement method for electrified replacement circuit
CN202014054U (en) Overhaul tool for dead end insulator on +/- 660kV DC power transmission line
CN103618251A (en) Technology for electrified overhaul of +-800kV ultrahigh voltage direct-current transmission line
CN201323409Y (en) Tool for live line replacing of high voltage transmission line V-shaped insulator chain
CN104201613B (en) Far-end operation changes device and the application process thereof of straight line list insulator string
CN105337217B (en) A kind of instrument and its method of charged for replacement extra-high voltage ground electrode circuit linear insulator
CN102136695A (en) Overhauling tool used for +/-660kV direct-current transmission line
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN105162028A (en) Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN204927971U (en) A embrace pole for electrified insulator chain that changes of transmission line
CN102163824A (en) Operating tool and operation method for electrically replacing T-type mounting point suspending insulator in 110kV line steel pipe rod
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202308909U (en) Clamping device for live line insulator string replacement
CN102208776B (en) Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof
CN203039295U (en) Working tool used for hot-line replacement of three-hole duplex plate linear insulator chain
CN202856238U (en) Tool for live-line replacement of phase insulator chain in multi-circuit steel tower
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN203423430U (en) Insulator maintenance device
CN106207850B (en) The operational method of charged for replacement holes duplex board linear insulator chain
CN203983864U (en) 500kV overhead transmission line tangent tower lightning conducter lifting operation device
CN104134948A (en) 500kV overhead line tangent tower lightning conductor lifting working device
CN205304094U (en) A fixture that is used for electrified two independent many yoke plates of some combination insulator chain that hang that change
CN104201606B (en) A kind of 800KV strain insulator strings disengaging fixture
CN103606849A (en) Multi-bundled live conductor lifting device for transmission tower and special fixture of multi-bundled live conductor lifting device
CN207572853U (en) A kind of shaft tower insulator chain electrification replacing tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant