- CN107060794B CN107060794B CN201710229497.8A CN201710229497A CN107060794B CN 107060794 B CN107060794 B CN 107060794B CN 201710229497 A CN201710229497 A CN 201710229497A CN 107060794 B CN107060794 B CN 107060794B
- Authority
- CN
- China
- Prior art keywords
- cylinder
- knife
- oil cylinder
- replaces
- gate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 150000001875 compounds Chemical class 0.000 title claims abstract description 15
- 230000008569 process Effects 0.000 title claims abstract description 15
- 239000003921 oil Substances 0.000 claims abstract description 125
- 238000011017 operating method Methods 0.000 claims abstract description 7
- 239000000346 nonvolatile oil Substances 0.000 claims abstract description 6
- 238000011010 flushing procedure Methods 0.000 claims description 59
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 45
- 230000007246 mechanism Effects 0.000 claims description 18
- 238000001514 detection method Methods 0.000 claims description 17
- 238000009434 installation Methods 0.000 claims description 12
- 230000003139 buffering effect Effects 0.000 claims description 10
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 8
- 239000000725 suspension Substances 0.000 claims description 8
- 230000002459 sustained effect Effects 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 8
- 230000008859 change Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 27
- 230000001276 controlling effect Effects 0.000 description 5
- 238000004080 punching Methods 0.000 description 4
- 239000002689 soil Substances 0.000 description 4
- 235000014121 butter Nutrition 0.000 description 3
- 239000010721 machine oil Substances 0.000 description 3
- 230000001681 protective effect Effects 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000005406 washing Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
- E21D9/0875—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket
- E21D9/0879—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
- E21D9/11—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
- E21D9/112—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines by means of one single rotary head or of concentric rotary heads
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Fluid-Pressure Circuits (AREA)
- Gear Processing (AREA)
Abstract
The present invention provides the technical solutions that hobboing cutter serrated knife under a kind of compound stratum shield normal pressure exchanges process, including following operating procedure: step 1 rinses knife cylinder;Step 2, fixed oil cylinder;Step 3 unclamps knife cylinder bolt;Step 4 withdraws oil cylinder, lifts by crane knife cylinder;Step 5, flush gate;Step 6, closed shutter;Step 7, in balance gate and gate it is outer between pressure difference;Step 8 thoroughly withdraws oil cylinder;Step 9 is removed oil cylinder and is temporarily stored;Step 10, knife cylinder are fully drawn out;Step 11, the cutter on more tool changing cylinder;Step 12 installs knife cylinder.The present invention is successfully realized under normal pressure hobboing cutter serrated knife exchange technology under hobboing cutter technology and normal pressure of replacing for the first time, substantially reduces tool change time, reduces costs, and ensure that going on smoothly for shield machine driving.
Description
Technical field
The present invention relates to hobboing cutter serrated knives under a kind of compound stratum shield normal pressure to exchange process.
Background technique
No. 8 line cross-river tunnel Project Shield sections of Wuhan Rail Transit have the soft soil layers such as full face Extra-fine sand, also have
Top is highly permeable Extra-fine sand and lower part is cemented rock compound stratum, and according to the cutting principle of shield cutter, shield is in weak soil
Driving relies primarily on serrated knife, the scraper cutting soil body, and relies primarily on the hobboing cutter cutting soil body in lithostratigraphy, and either serrated knife is scraped
Knife or hobboing cutter, during slurry balance shield construction, cutter often needs to be replaced as vulnerable part.Tool changing
Time is an important factor for determining the driving speed speed of entire shield machine.During previous shield machine construction, more tool changing
Tool need to be entered by people's lock carries out tool changing operation with pressure much higher than the excavation storehouse of atmospheric pressure, this process usually has following lack
Point:
(1) warehouse entry replacement cutter with pressure is also very unfavorable to operator's health to operator's dangerous;
(2) operator is excavating in storehouse and can only work very short time, and replacement cutter needs for a long time, and disengaging is excavated repeatedly
Storehouse further increases the time of replacement cutter;
Application No. is 201110304204.0 tool pan back-loading type device for changing tool of slurry-balanced shield machine under normal pressure, application No. is
A kind of 201420034202.3 normal-pressure hobbing cutter changing, and application No. is a kind of detachable normal of 20161024163.X
Tool changing device is pressed, three patents all refer to normal pressure cutter replacing equipment, but three equipment are incomplete, are not directed to hobboing cutter under normal pressure
Serrated knife exchanges technology, this is existing deficiencies in the technology.
Summary of the invention
The technical problems to be solved by the invention aiming at deficiency of the prior art, and provide a kind of compound
Hobboing cutter serrated knife exchanges the technical solution of process under the shield normal pressure of stratum.The present invention realizes hob teeth under shield machine normal pressure
The exchange of knife, reduces costs, and ensure that going on smoothly for shield machine driving.
This programme is achieved by the following technical measures: hobboing cutter serrated knife exchanges under a kind of compound stratum shield normal pressure
Process, including following operating procedure:
Step 1 rinses knife cylinder;
Step 2, fixed oil cylinder;
Step 3 unclamps knife cylinder bolt;
Step 4 withdraws oil cylinder, lifts by crane knife cylinder;
Step 5, flush gate;
Step 6, closed shutter;
Step 7, in balance gate and gate it is outer between pressure difference;
Step 8 thoroughly withdraws oil cylinder;
Step 9 is removed oil cylinder and is temporarily stored;
Step 10, knife cylinder are fully drawn out;
Step 11, the cutter on more tool changing cylinder;
Step 12 installs knife cylinder.
Hobboing cutter serrated knife exchanges process under compound stratum shield normal pressure of the invention, can be walked using following operation
It is rapid:
The step 1 replaces with, and water pipe is connected with the flushing ball valve on knife cylinder, opens and rinses ball valve flushing knife cylinder, punching
It is closed after washing and rinses ball valve and remove water pipe, closed wear detection ball valve, then remove wear detection pipeline;
The step 2 replaces with, and slings oil cylinder using tool changing loop wheel machine, makes oil cylinder and oil cylinder fixing base in sustained height, adopt
Oil cylinder is fixed on oil cylinder fixing base with connector, and locked with pin;
The step 3 replaces with, it is ensured that the locking mechanism of oil cylinder tail portion and chain in the horizontal direction, by control valve and oil
The pipeline of cylinder is attached, and the piston rod for controlling oil cylinder is stretched out and connect with knife cylinder, by locking mechanism controls at 1 grade, it is ensured that with
After upper step, on some point pressures to oil cylinder, knife cylinder bolt is then unclamped;
The step 4 replaces with, and the piston rod band moving knife cylinder for controlling oil cylinder is retracted to position of strobe, knife collet chuck is had solid
It is scheduled on knife cylinder, air hoist suspension hook is hung on knife collet chuck tool, and make power on air hoist band, knife cylinder bracket is fixed on knife
Cylinder bottom;The step 5 replaces with, and water pipe is connected in the flushing pipeline of gate, opens the flushing ball valve in flushing pipeline
Carry out flush gate, after flushing, closes and rinse ball valve, and remove water pipe;
The step 6 replaces with, and by the piping connection of control valve and gate, removes the yellow on gate oil cylinder piston rod
Protective case shuts gate, after shutting gate, it is ensured that gate clamping screw is locked;
The step 7 replaces with, and ball valve is opened with balance gate inside and outside differential pressure, after inside and outside differential pressure balance, by ball valve
It shuts, by locking mechanism controls at 2 grades;
The step 8 replaces with, and control cylinder secondary is withdrawn completely;
The step 9 replaces with, and removes connector, separates oil cylinder with fixing seat, will be oily using second air hoist
Cylinder is sling and is temporarily stored to a suitable position;
The step 10 replaces with, and knife cylinder is fully drawn out, and knife cylinder is transported to material transportation channel;
The step 11 replaces with, the cutter on more tool changing cylinder;
The step 12 replaces with, and carries out installation operation to the knife cylinder after replacement cutter.
Hobboing cutter serrated knife exchanges process under compound stratum shield normal pressure of the invention, can be walked using following operation
It is rapid:
The step 1 replaces with, and controls area surface pressure, water pipe is connected with the flushing ball valve on knife cylinder, opens and rinses
Ball valve rinses knife cylinder, closes after flushing and rinses ball valve and remove water pipe, close wear detection ball valve, then removes abrasion and visit
Test tube line;The step 2 replaces with, and oil cylinder is hung knife cylinder position using tool changing loop wheel machine, and oil cylinder is fixed to the lifting lug of knife cylinder
On;
The step 3 replaces with, and the pipeline of control valve and oil cylinder is attached, and oil cylinder is fully extended, uses pin
Oil cylinder and stand are locked, the screw thread anchor ear of cylinder piston rod outer ring is unclamped;
The step 4 replaces with, and the piston rod band moving knife cylinder for controlling oil cylinder is retracted to position of strobe, knife collet chuck is had solid
It is scheduled on knife cylinder, air hoist suspension hook is hung on knife collet chuck tool, and make power on air hoist band, knife cylinder bracket is fixed on knife
Cylinder bottom;The step 5 replaces with, and water pipe is connected in the flushing pipeline of gate, opens the flushing ball valve in flushing pipeline
Carry out flush gate, after flushing, closes and rinse ball valve, and remove water pipe;
The step 6 replaces with, and by the piping connection of control valve and gate, removes the yellow on gate oil cylinder piston rod
Protective case shuts gate, after shutting gate, it is ensured that gate clamping screw is locked;
The step 7 replaces with, and ball valve is opened with balance gate inside and outside differential pressure, after inside and outside differential pressure balance, by ball valve
It shuts, positioning pin is extracted from knife cylinder lifting lug, oil cylinder is then stretched out into 100mm to next pin hole again, again inserts pin
On, it is ensured that it is locked with spring catch;
The step 8 replaces with, and control cylinder secondary is withdrawn completely;
The step 9 replaces with, and oil cylinder is removed and is temporarily stored to a suitable position;
The step 10 replaces with, and knife cylinder is fully drawn out, and is transported to material transportation channel;
The step 11 replaces with, the cutter on more tool changing cylinder;
The step 12 replaces with, and carries out installation operation to the knife cylinder after replacement cutter.
Hobboing cutter serrated knife exchanges process under compound stratum shield normal pressure of the invention, can be walked using following operation
It is rapid:
The step 1 replaces with, and controls area surface pressure, water pipe is connected with the flushing ball valve on knife cylinder, opens and rinses
Ball valve rinses knife cylinder, closes after flushing and rinses ball valve and remove water pipe, close wear detection ball valve, then removes abrasion and visit
Test tube line;The step 2 replaces with, and cylinder pedestal is fixed to cutterhead back wall, slings oil cylinder using tool changing loop wheel machine, will
Oil cylinder fixing base is fixed to oil cylinder stack shell appropriate location, is fixed oil cylinder and cylinder pedestal using oil cylinder clip, and use pinlock
Extremely;
The step 3 replaces with, and the pipeline of control valve and oil cylinder is attached, and the piston rod for controlling oil cylinder stretches out simultaneously
It is connect with knife cylinder, by locking mechanism controls at 1 grade, it is ensured that after above step, on some point pressures to oil cylinder, then unclamp knife
Cylinder bolt;
The step 4 replaces with, and oil cylinder is withdrawn completely, and knife collet chuck tool is fixed on knife cylinder, and buffering chain sling is suspended to
On knife collet chuck tool, one section of buffering chain sling on knife collet chuck tool is hung on air hoist suspension hook, and make power on air hoist band, it will
Knife cylinder bracket is fixed on knife cylinder bottom;
The step 5 replaces with, and hangers is fixed on knife drum flange face, and jack is connected to buffering chain sling and hangers
It goes up and tenses, water pipe is connected in flushing pipeline all on gate valve body, open all flushing ball valves and be rinsed, rinse
Afterwards, ball valve is closed, water pipe is then removed;
The step 6 replaces with, and by the piping connection of control valve and gate, removes the yellow on gate oil cylinder piston rod
Protective case shuts gate, after shutting gate, it is ensured that gate clamping screw is locked;
The step 7 replaces with, and ball valve is opened with balance gate inside and outside differential pressure, after inside and outside differential pressure balance, by ball valve
It shuts, by locking mechanism controls at 2 grades;
The step 8 replaces with, and control cylinder secondary is withdrawn completely;
The step 9 replaces with, and removes connector, separates oil cylinder with fixing seat, will be oily using second air hoist
Cylinder is sling and is temporarily stored to a suitable position;
The step 10 replaces with, and removes cylinder pedestal, knife cylinder is fully drawn out, and be transported to material transportation channel;
The step 11 replaces with, the cutter on more tool changing cylinder;
The step 12 replaces with, and carries out installation operation to the knife cylinder after replacement cutter.
The beneficial effect of this programme can according to the description of the above program, and the present invention is successfully realized under normal pressure for the first time
It replaces hobboing cutter serrated knife under hobboing cutter technology and normal pressure and exchanges technology, substantially reduce tool change time, reduce costs, ensure that shield
Machine driving is gone on smoothly.
It can be seen that compared with prior art, the present invention having substantive features and progress, the beneficial effect implemented
It is obvious.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of step 1 in the first specific embodiment of the invention.
Fig. 2 is the structural schematic diagram of step 2 in the first specific embodiment of the invention.
Fig. 3 is the structural schematic diagram of step 3 in the first specific embodiment of the invention.
Fig. 4 is the structural schematic diagram of step 4 and step 5 in the first specific embodiment of the invention.
Fig. 5 is the structural schematic diagram of step 6 in the first specific embodiment of the invention.
Fig. 6 is the structural schematic diagram of step 7 in the first specific embodiment of the invention.
Fig. 7 is the structural schematic diagram of step 8 in the first specific embodiment of the invention.
Fig. 8 is the structural schematic diagram of step 9 in the first specific embodiment of the invention.
Fig. 9 is the structural schematic diagram of step 10 in the first specific embodiment of the invention.
Figure 10 is the structural schematic diagram of step 1 in second of specific embodiment of the invention.
Figure 11 is the structural schematic diagram of step 2 in second of specific embodiment of the invention.
Figure 12 is the structural schematic diagram of step 3 in second of specific embodiment of the invention.
Figure 13 is the structural schematic diagram of step 4 in second of specific embodiment of the invention.
Figure 14 is the structural schematic diagram of step 4 in second of specific embodiment of the invention.
Figure 15 is the structural schematic diagram of step 6 in second of specific embodiment of the invention.
Figure 16 is step 7 in second of specific embodiment of the invention and eight structural schematic diagram.
Figure 17 is step 9 in second of specific embodiment of the invention and ten structural schematic diagram.
Figure 18 is the structural schematic diagram of step 1 in the third specific embodiment of the invention.
Figure 19 is the structural schematic diagram of step 2 in the third specific embodiment of the invention.
Figure 20 is the structural schematic diagram of step 3 in the third specific embodiment of the invention.
Figure 21 is the structural schematic diagram of step 4 in the third specific embodiment of the invention.
Figure 22 is the structural schematic diagram of step 5 in the third specific embodiment of the invention.
Figure 23 is the structural schematic diagram of step 6 in the third specific embodiment of the invention.
Figure 24 is the structural schematic diagram of step 7 in the third specific embodiment of the invention.
Figure 25 is the structural schematic diagram of step 8 in the third specific embodiment of the invention.
Figure 26 is the structural schematic diagram of step 9 in the third specific embodiment of the invention.
Figure 27 is the structural schematic diagram of step 10 in the third specific embodiment of the invention.
In figure, 1 is rinses ball valve, and 1.1 be ball valve, and 2 be wear detection ball valve, and 3 be oil cylinder fixing base, and 4 be oil cylinder, and 4.1
It is knife cylinder for piston rod, 5,6 be connector, and 7 have for knife collet chuck, and 8 be air hoist;9 be gate, and 10 be to rinse ball valve, 10.1
It is lifting lug for ball valve, 11,12 be oil cylinder, and 13 be stand, and 14 be knife cylinder, and 15 be knife cylinder bracket;16 be gate, and 17 be bulb syringe
Valve, 17.1 be ball valve, and 18 be cylinder pedestal, and 19 be cutterhead back wall, and 20 be oil cylinder, and 21 have for knife collet chuck, and 22 hang for buffering
Chain, 23 be hangers, and 24 be jack, and 25 be knife cylinder, and 26 be gate.
Specific embodiment
In order to clarify the technical characteristics of the invention, below by a specific embodiment, and its attached drawing is combined, it is right
This programme is illustrated.
Hobboing cutter serrated knife exchanges process, including following operating procedure under a kind of compound stratum shield normal pressure:
Step 1 rinses knife cylinder, and the purpose for rinsing knife cylinder is to clean out the silt between interior knife cylinder and outer knife cylinder, with
Interior knife cylinder is avoided to be blocked during the motion by silt;
Step 2, fixed oil cylinder, oil cylinder provide certain pulling force as power part, for the movement of knife cylinder;
Step 3 unclamps knife cylinder bolt;
Step 4 withdraws oil cylinder, lifts by crane knife cylinder, the withdrawal oil cylinder of this step is that knife cylinder is recovered to position of strobe;
Step 5, flush gate, the purpose of flush gate are to rinse the silt in gate and gate card slot well, are avoided
Gate Gai Buyan or the phenomenon that do not cover;
Step 6, closed shutter, after closing gate, the front of gate will with the mud connection of face, gate
Front is higher-pressure region, and the rear portion of gate is atmospheric area, and operator carries out the replacement of cutter in atmospheric area;
Step 7, in balance gate and gate it is outer between pressure difference;
Step 8, thoroughly withdraws oil cylinder, and the withdrawal oil cylinder of this step is to be completely pulled out knife cylinder;
Step 9 is removed oil cylinder and is temporarily stored;
Step 10, knife cylinder are fully drawn out;
Step 11, the cutter on more tool changing cylinder;
Step 12 installs knife cylinder.
Different according to the Cutting trajectory of cutter, when tool changing, is also different to the dismounting step of cutter and tool used.
The first specific embodiment:
Step 1 is shown in Fig. 1, and water pipe is connected with the flushing ball valve 1 on knife cylinder 5, opens and rinses the flushing knife cylinder 5 of ball valve 1, punching
It is closed after washing and rinses ball valve 1 and remove water pipe, closed wear detection ball valve 2 (for detecting whether cutter wears), then
Remove wear detection pipeline;
Step 2 is shown in Fig. 2, slings oil cylinder 4 using tool changing loop wheel machine, makes oil cylinder 4 and oil cylinder fixing base 3 in sustained height, adopts
Oil cylinder 4 is fixed on oil cylinder fixing base 3 with connector 6, and locked with pin;
Step 3 is shown in Fig. 3, it is ensured that the locking mechanism of 4 tail portion of oil cylinder and chain in the horizontal direction, by control valve and oil cylinder 4
Pipeline be attached, control oil cylinder 4 piston rod stretch out simultaneously is connect with knife cylinder 5, by locking mechanism controls at 1 grade, it is ensured that with
After upper step, to knife cylinder bolt on some point pressures to oil cylinder 4, is then unclamped, the purpose of control valve described in this step is to use
In the flexible of control cylinder piston rod;
Step 4, is shown in Fig. 4, controls the piston rod 4.1 of oil cylinder 4 and with moving knife cylinder 5 is retracted to 26 position of gate (#1-#18 knife is big
435mm is about withdrawn, #25/26 knife about withdraws 695mm), knife collet chuck tool 7 is fixed on knife cylinder 5,8 suspension hook of air hoist is hung
On knife collet chuck tool 7, and air hoist 8 is made to take power, knife cylinder bracket (because the total weight of knife cylinder 5 and knife is larger, is weighed 1 ton
It is more, to avoid the failure of air hoist 8 from generating safety accident, so being provided with knife cylinder bracket) be fixed on 5 bottom of knife cylinder and (at least make
With the bolt of 3 M27X 100);
Step 5 is shown in Fig. 4, water pipe is connected in the flushing pipeline of gate 26, opens the flushing ball valve in flushing pipeline
Carry out flush gate 26, after flushing, closes and rinse ball valve, and remove water pipe;
Step 6 is shown in Fig. 5, and by the piping connection of control valve and gate 26, the yellow removed on gate oil cylinder piston rod is protected
Sheath shuts gate 26, after shutting gate 26, it is ensured that gate clamping screw is locked, and in this step, the effect of control valve is to use
In control oil pressure, and then the open and-shut mode of regulating gate 26, gate oil cylinder drive the opening and closing of gate 26, lock under normal driving state
Door 26 is open, and part bolt, which is fallen, when to avoid driving state pounds gate piston rod, so early period can protect equipped with yellow
Sheath;
Step 7 is shown in Fig. 6, ball valve 1.1 is opened with 26 inside and outside differential pressure of balance gate, after inside and outside differential pressure balance, by ball
Valve 1.1 is shut, by locking mechanism controls at 2 grades;
Step 8 is shown in Fig. 7,4 two withdrawals completely of control oil cylinder;
Step 9, is shown in Fig. 8, removes connector 6, separates oil cylinder 4 with fixing seat, using second air hoist by oil cylinder
4 sling and are temporarily stored to a suitable position, are sure to that oil cylinder 4 and other weights are not placed on to the distachable platform of tool changing
On;
Step 10 is shown in Fig. 9, is fully drawn out and (pays attention to shake or swinging after knife cylinder 5 is extracted out) knife cylinder 5, and be transported to object
Expect transport channel;
Step 11, the cutter on more tool changing cylinder 5;
Step 12 carries out installation operation to the knife cylinder 5 after replacement cutter.
The installation of knife cylinder 5 is substantially the contrary operation that knife cylinder 5 is removed, but is the steps of and has to carry out in place: (1) knife
It,, must will be inside gate before knife cylinder 5 is put into gate valve body without jam plate is locked into 2 grades when cylinder 5 puts into gate valve body
(can contact) cleans out completely, and is smeared 5 outer surface of knife cylinder completely using machine oil or butter: (2) open gate 26 it
Before, water is filled in the small space between knife cylinder 5 and gate 26 by the flushing ball valve 1 on knife cylinder 5, added hydraulic pressure need to be with the palm
Sub- surface pressure is consistent;(3) during Jia Shui, a ball valve 1.1 in the flushing pipeline on knife cylinder 5 need to be opened so that gas is arranged
Out;(4) when the space between knife cylinder 5 and gate 26, which fills its water of water, overflows from flushing ball valve 1, flushing pipeline ball is shut again
Valve;(5) when knife cylinder 5 being promoted gate valve body, notice that positioning pin consistent (must pay attention to location hole on gate valve body on knife cylinder 5
The position of positioning pin).
Locking mechanism is locked in 1 grade and 2 grades, wherein 1 grade and 2 grades is equivalent to two limiters, locking mechanism is locked in 1 grade
When oil cylinder 4 can only be recovered to a designated position, oil cylinder 4 can only be recovered to another specific bit when locking mechanism is scheduled on 2 grades
It sets.
Second of specific embodiment:
Step 1 is shown in Figure 10, controls area surface pressure, water pipe is connected with the flushing ball valve 10 on knife cylinder 14, opens punching
It washes ball valve 10 and rinses knife cylinder 14, closed after flushing and rinse ball valve 10 and remove water pipe, closed wear detection ball valve, then tear open
Except wear detection pipeline;
Step 2 is shown in Figure 11, and oil cylinder 12 is hung 14 position of knife cylinder using tool changing loop wheel machine, and oil cylinder 12 is fixed to knife cylinder 14
Lifting lug 11 on;
Step 3 is shown in Figure 12, and the pipeline of control valve and oil cylinder 12 is attached, and oil cylinder 12 is fully extended, uses 2
Pin locks oil cylinder 12 and stand 13, and the screw thread anchor ear of cylinder piston rod outer ring is unclamped;
Step 4 is shown in Figure 13 and Figure 14, and the piston rod band moving knife cylinder 14 for controlling oil cylinder 12 is retracted to 9 position of gate, by knife
Collet chuck tool is fixed on knife cylinder 14, air hoist suspension hook is hung on knife collet chuck tool, and hang power on air hoist band (just
Firmly), knife cylinder bracket 15 is fixed on 14 bottom of knife cylinder, at least uses the bolt of 3 M27;
Water pipe is connected in the flushing pipeline of gate 9 by step 5, opens the flushing ball valve 10 in flushing pipeline to rinse
Gate 9 after flushing, closes and rinses ball valve 10, and remove water pipe;
Step 6 is shown in Figure 15, and by the piping connection of control valve and gate 9, the yellow removed on gate oil cylinder piston rod is protected
Sheath shuts gate 9, after shutting gate 9, it is ensured that gate clamping screw is locked;
Step 7 is shown in Figure 16, ball valve 10.1 is opened with 9 inside and outside differential pressure of balance gate, after inside and outside differential pressure balance, by ball
Valve 10.1 is shut, and positioning pin is extracted from knife cylinder lifting lug 11, then again by the stretching 100mm of oil cylinder 12 to next pin hole, then
It is secondary to plug pin, it is ensured that locked with spring catch;
Step 8 is shown in Figure 16,12 2 withdrawals completely of control oil cylinder;
Step 9 is shown in Figure 17, and oil cylinder 12 is removed and is temporarily stored to a suitable position;
Step 10 is shown in Figure 17, is fully drawn out and (pays attention to shake or swinging after knife cylinder 14 is extracted out) knife cylinder 14, and be transported to
Material transportation channel;
Step 11, the cutter on more tool changing cylinder 14;
Step 12 carries out installation operation to the knife cylinder 14 after replacement cutter.
The installation of knife cylinder 14 is substantially the contrary operation that knife cylinder 14 is removed, but following additional step has to carry out
Position: (1) before knife cylinder 14 being put into gate 9, must clean out (can contact) is walked in gate 9 completely, and using machine oil or
Butter smears 14 outer surface of knife cylinder completely;(2) before opening gate 9, by the flushing ball valve 10 on knife cylinder 14 in knife cylinder 14
And water is filled in the small space between gate 9, added hydraulic pressure need to be consistent with area surface pressure;(3) during Jia Shui, knife
A ball valve 10.1 in flushing pipeline on cylinder 14 need to open so that gas is discharged;(4) when the sky between knife cylinder 14 and gate 9
Between fill its water of water from rinse ball valve 10 overflow when, shut again rinse ball valve 10;(5) before opening gate 9, pressure is carried out
Compensation;(6) when knife cylinder 14 being promoted gate valve body, notice that positioning pin must be consistent with location hole on gate valve body on knife cylinder 14
(position for paying attention to positioning pin).
The third specific embodiment:
Step 1 is shown in Figure 18, controls area surface pressure, water pipe is connected with the flushing ball valve 17 on knife cylinder 25, opens punching
It washes ball valve 17 and rinses knife cylinder 25, closed after flushing and rinse ball valve 17 and remove water pipe, closed wear detection ball valve, then tear open
Except wear detection pipeline;
Step 2 is shown in Figure 19, and cylinder pedestal 18 is fixed to cutterhead back wall 19, slings oil cylinder using tool changing loop wheel machine
20, oil cylinder fixing base is fixed to 20 stack shell appropriate location of oil cylinder, it is using oil cylinder clip that oil cylinder 20 and cylinder pedestal 18 is fixed,
And it is locked with pin;
Step 3 is shown in Figure 20, and the pipeline of control valve and oil cylinder 20 is attached, and the piston rod of control oil cylinder 20 stretches out simultaneously
It is connect with knife cylinder 25, by locking mechanism controls at 1 grade, it is ensured that after above step, give on some point pressures to oil cylinder 20, it is then loose
Operate on a bolt;
Step 4 is shown in Figure 21, and oil cylinder 20 is withdrawn to (about withdrawal 695mm) completely, and knife collet chuck tool 21 is fixed to knife cylinder
On 25, buffering chain sling 22 is suspended on knife collet chuck tool 21, knife collet chuck is had 22 1 sections of buffering chain sling on 21 and hangs over air hoist
On suspension hook, and make power on air hoist band, knife cylinder bracket 15 is fixed on 25 bottom of knife cylinder, at least uses the spiral shell of 3 M27X100
Bolt;
Step 5 is shown in Figure 22, by hangers 23 be fixed to 25 flange face of knife cylinder on, by jack 24 be connected to buffering chain sling 22 and
It on hangers 23 and tenses, water pipe is connected in flushing pipeline all on gate valve body, open all flushing ball valves and rushed
It washes, after flushing, closes ball valve, then remove water pipe;
Step 6 is shown in Figure 23, and by the piping connection of control valve and gate 16, the yellow removed on gate oil cylinder piston rod is protected
Sheath shuts gate 16, after shutting gate 16, it is ensured that gate clamping screw is locked;
Step 7 is shown in Figure 24, ball valve is opened with 16 inside and outside differential pressure of balance gate, after inside and outside differential pressure balance, by ball valve
It shuts, by locking mechanism controls at 2 grades;
Step 8 is shown in Figure 25,20 2 withdrawals (withdrawing 92mm) completely of control oil cylinder;
Step 9 is shown in Figure 26, removes oil cylinder clip, separates oil cylinder 20 with fixing seat, will using second air hoist
Oil cylinder 20 is sling and is temporarily stored to a suitable position;
Step 10 is shown in Figure 27, removes cylinder pedestal 18, knife cylinder 25 is fully drawn out, and be transported to material transportation channel;
Step 11, the cutter on more tool changing cylinder 25;
Step 12 carries out installation operation to the knife cylinder 25 after replacement cutter.
The installation of knife cylinder 25 is substantially the contrary operation that knife cylinder 25 is removed, but following additional step has to carry out
Position: (1) when knife cylinder 25 puts into gate valve body, without jam plate is suspended to 2 grades;(2) before knife cylinder 25 being put into gate valve body,
It must clean out (can contact) is walked in gate valve body completely, and be applied 25 outer surface of knife cylinder completely using machine oil or butter
It smears;(3) before opening gate 16, by the flushing ball valve 17 on knife cylinder 25 in knife cylinder 25 and the small space between gate 16
Water is inside filled, added hydraulic pressure need to be consistent with area surface pressure;(4) one in flushing pipeline during Jia Shui, on knife cylinder 25
A ball valve 17.1 need to be opened so that gas is discharged;(5) when the space between knife cylinder 25 and gate 16 fills its water of water from bulb syringe
When valve 17 overflows, flushing ball valve is shut again;(6) before opening gate 16, pressure compensation is carried out, knife cylinder 25 is promoted into gate
When valve body, notice that positioning pin must be consistent (position for paying attention to positioning pin) with location hole on gate valve body on knife cylinder 25.
In the present invention, is constructed using a φ 12.51m slurry balance shield machine, be successfully realized under normal pressure and replace for the first time
Hobboing cutter serrated knife exchanges technology under hobboing cutter technology and normal pressure, and cutterhead digging diameter is that 12.55m is normal pressure warehouse entry formula cutterhead, aperture opening ratio
About 28.5%, the replaceable hobboing cutter of normal pressure is 15, and hobboing cutter is exchanged having a size of 19 cun of achievable hobboing cutter serrated knives.
Although above-mentioned be described in conjunction with specific embodiment of the attached drawing to invention, not to the scope of the present invention
Limitation, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not required to
Make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.
Claims (4)
1. hobboing cutter serrated knife exchanges process under a kind of compound stratum shield normal pressure, characterized in that including following operating procedure:
Step 1 rinses knife cylinder;
Step 2, fixed oil cylinder;
Step 3 unclamps knife cylinder bolt;
Step 4 withdraws oil cylinder, lifts by crane knife cylinder;
Step 5, flush gate;
Step 6, closed shutter;
Step 7, in balance gate and gate it is outer between pressure difference;
Step 8 thoroughly withdraws oil cylinder;
Step 9 is removed oil cylinder and is temporarily stored;
Step 10, knife cylinder are fully drawn out;
Step 11, the cutter on more tool changing cylinder;
Step 12 installs knife cylinder.
2. hobboing cutter serrated knife exchanges process under compound stratum shield normal pressure according to claim 1, characterized in that packet
Include following operating procedure:
The step 1 replaces with, and water pipe is connected with the flushing ball valve on knife cylinder, opens and rinses ball valve flushing knife cylinder, has rinsed
It is closed after finishing and rinses ball valve and remove water pipe, closed wear detection ball valve, then remove wear detection pipeline;
The step 2 replaces with, and slings oil cylinder using tool changing loop wheel machine, makes oil cylinder and oil cylinder fixing base in sustained height, using even
Oil cylinder is fixed on oil cylinder fixing base by fitting, and locked with pin;
The step 3 replaces with, it is ensured that the locking mechanism of oil cylinder tail portion and chain in the horizontal direction, by control valve and oil cylinder
Pipeline is attached, and the piston rod for controlling oil cylinder is stretched out and connect with knife cylinder, by locking mechanism controls at 1 grade, then to a bit
On point pressure to oil cylinder, knife cylinder bolt is then unclamped;
The step 4 replaces with, and the piston rod band moving knife cylinder for controlling oil cylinder is retracted to position of strobe, and knife collet chuck tool is fixed on
On knife cylinder, air hoist suspension hook is hung on knife collet chuck tool, and make power on air hoist band, knife cylinder bracket is fixed on knife cylinder bottom
Portion;
The step 5 replaces with, and water pipe is connected in the flushing pipeline of gate, opens the flushing ball valve in flushing pipeline
Flush gate after flushing, closes and rinses ball valve, and remove water pipe;
The step 6 replaces with, and by the piping connection of control valve and gate, removes the yellow protection on gate oil cylinder piston rod
Set, gate is shut, after shutting gate, it is ensured that gate clamping screw is locked;
The step 7 replaces with, and will rinse ball valve and opens with balance gate inside and outside differential pressure, after inside and outside differential pressure balance, will rinse
Ball valve is shut, by locking mechanism controls at 2 grades;
The step 8 replaces with, and control cylinder secondary is withdrawn completely;
The step 9 replaces with, and removes connector, separates oil cylinder with fixing seat, hung oil cylinder using second air hoist
It rises and is temporarily stored to a suitable position;
The step 10 replaces with, and knife cylinder is fully drawn out, and knife cylinder is transported to material transportation channel;
The step 11 replaces with, the cutter on more tool changing cylinder;
The step 12 replaces with, and carries out installation operation to the knife cylinder after replacement cutter.
3. hobboing cutter serrated knife exchanges process under compound stratum shield normal pressure according to claim 1, characterized in that packet
Include following operating procedure:
The step 1 replaces with, and controls area surface pressure, water pipe is connected with the flushing ball valve on knife cylinder, opens and rinses ball valve
Knife cylinder is rinsed, is closed after flushing and rinses ball valve and remove water pipe, closed wear detection ball valve, then remove wear detection pipe
Line;
The step 2 replaces with, and oil cylinder is hung knife cylinder position using tool changing loop wheel machine, oil cylinder is fixed on the lifting lug of knife cylinder;
The step 3 replaces with, and the pipeline of control valve and oil cylinder is attached, and oil cylinder is fully extended, will be oily using pin
Cylinder and stand are locked, and the screw thread anchor ear of cylinder piston rod outer ring is unclamped, and then unclamp knife cylinder bolt;The step 4 replacement
For the piston rod band moving knife cylinder for controlling oil cylinder is retracted to position of strobe, and knife collet chuck tool is fixed on knife cylinder, air hoist is hung
It is hooked on knife collet chuck tool, and makes power on air hoist band, knife cylinder bracket is fixed on knife cylinder bottom;
The step 5 replaces with, and water pipe is connected in the flushing pipeline of gate, opens the flushing ball valve in flushing pipeline
Flush gate after flushing, closes and rinses ball valve, and remove water pipe;
The step 6 replaces with, and by the piping connection of control valve and gate, removes the yellow protection on gate oil cylinder piston rod
Set, gate is shut, after shutting gate, it is ensured that gate clamping screw is locked;
The step 7 replaces with, and will rinse ball valve and opens with balance gate inside and outside differential pressure, after inside and outside differential pressure balance, will rinse
Ball valve is shut, and positioning pin is extracted from knife cylinder lifting lug, and oil cylinder is then stretched out 100mm to next pin hole, again by pin again
Son is plugged, it is ensured that locked with spring catch;
The step 8 replaces with, and control cylinder secondary is withdrawn completely;
The step 9 replaces with, and oil cylinder is removed and is temporarily stored to a suitable position;
The step 10 replaces with, and knife cylinder is fully drawn out, and is transported to material transportation channel;
The step 11 replaces with, the cutter on more tool changing cylinder;
The step 12 replaces with, and carries out installation operation to the knife cylinder after replacement cutter.
4. hobboing cutter serrated knife exchanges process under compound stratum shield normal pressure according to claim 1, characterized in that packet
Include following operating procedure:
The step 1 replaces with, and controls area surface pressure, water pipe is connected with the flushing ball valve on knife cylinder, opens and rinses ball valve
Knife cylinder is rinsed, is closed after flushing and rinses ball valve and remove water pipe, closed wear detection ball valve, then remove wear detection pipe
Line;
The step 2 replaces with, and cylinder pedestal is fixed to cutterhead back wall, oil cylinder is sling using tool changing loop wheel machine, by oil cylinder
Fixing seat is fixed to oil cylinder stack shell appropriate location, is fixed oil cylinder and cylinder pedestal using oil cylinder clip, and locked with pin;
The step 3 replaces with, and the pipeline of control valve and oil cylinder is attached, and the piston rod for controlling oil cylinder stretches out and and knife
Cylinder connection, then on some point pressures to oil cylinder, then unclamps knife cylinder bolt by locking mechanism controls at 1 grade;
The step 4 replaces with, and oil cylinder is withdrawn completely, and knife collet chuck tool is fixed on knife cylinder, and buffering chain sling is suspended to knife cylinder
On fixture, one section of buffering chain sling on knife collet chuck tool is hung on air hoist suspension hook, and make power on air hoist band, by knife cylinder
Bracket is fixed on knife cylinder bottom;
The step 5 replaces with, and hangers is fixed on knife drum flange face, and jack is connected on buffering chain sling and hangers simultaneously
It tenses, water pipe is connected in flushing pipeline all on gate valve body, open all flushing ball valves and be rinsed, after flushing,
Ball valve is closed, water pipe is then removed;
The step 6 replaces with, and by the piping connection of control valve and gate, removes the yellow protection on gate oil cylinder piston rod
Set, gate is shut, after shutting gate, it is ensured that gate clamping screw is locked;
The step 7 replaces with, and will rinse ball valve and opens with balance gate inside and outside differential pressure, after inside and outside differential pressure balance, will rinse
Ball valve is shut, by locking mechanism controls at 2 grades;
The step 8 replaces with, and control cylinder secondary is withdrawn completely;
The step 9 replaces with, and removes connector, separates oil cylinder with fixing seat, hung oil cylinder using second air hoist
It rises and is temporarily stored to a suitable position;
The step 10 replaces with, and removes cylinder pedestal, knife cylinder is fully drawn out, and be transported to material transportation channel;
The step 11 replaces with, the cutter on more tool changing cylinder;
The step 12 replaces with, and carries out installation operation to the knife cylinder after replacement cutter.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710229497.8A CN107060794B (en) | 2017-04-10 | 2017-04-10 | Hobboing cutter serrated knife exchanges process under a kind of compound stratum shield normal pressure |
PCT/CN2018/082130 WO2018188527A1 (en) | 2017-04-10 | 2018-04-08 | Process method for exchanging hob and toothed cutter at atmospheric pressure for use in composite stratum shield |
DE112018001937.3T DE112018001937T5 (en) | 2017-04-10 | 2018-04-08 | METHOD FOR REPLACING A GEAR MILL AND A TOOTH CUTTER AT ATMOSPHERIC PRINTING FOR A MIXED LAYER SHIELD |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710229497.8A CN107060794B (en) | 2017-04-10 | 2017-04-10 | Hobboing cutter serrated knife exchanges process under a kind of compound stratum shield normal pressure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107060794A CN107060794A (en) | 2017-08-18 |
CN107060794B true CN107060794B (en) | 2019-07-26 |
Family
ID=59602078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710229497.8A Active CN107060794B (en) | 2017-04-10 | 2017-04-10 | Hobboing cutter serrated knife exchanges process under a kind of compound stratum shield normal pressure |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN107060794B (en) |
DE (1) | DE112018001937T5 (en) |
WO (1) | WO2018188527A1 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060794B (en) * | 2017-04-10 | 2019-07-26 | 中铁十四局集团有限公司 | Hobboing cutter serrated knife exchanges process under a kind of compound stratum shield normal pressure |
CN109502490B (en) * | 2018-11-27 | 2023-10-17 | 中铁工程装备集团有限公司 | Transfer device |
CN109372537A (en) * | 2018-11-28 | 2019-02-22 | 中铁工程装备集团有限公司 | Based on electrichydraulic control can rapid changing knife New Kind of Hob tool apron |
CN109899078A (en) * | 2019-04-19 | 2019-06-18 | 中铁工程装备集团有限公司 | A kind of knife cylinder antiseize device |
CN110153951A (en) * | 2019-06-19 | 2019-08-23 | 中铁工程装备集团有限公司 | A kind of normal pressure changes alloy cutter sealing device maintenance replacement tooling and method |
CN110259469B (en) * | 2019-06-26 | 2020-12-04 | 中国铁建重工集团股份有限公司 | Shield machine and shield machine cutter head thereof |
CN112682053B (en) * | 2021-02-26 | 2022-04-29 | 中铁工程装备集团有限公司 | Tool and method for replacing hob of shield machine cutter head at 12 o' clock position |
CN113371586B (en) * | 2021-05-25 | 2022-03-25 | 苏州中车建设工程有限公司 | Multiple tool bit quick replacement device of tunnel shield machine |
CN114607401B (en) * | 2022-03-25 | 2022-11-29 | 英诺威阀业有限公司 | Double-double tool changing gate |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102052079A (en) * | 2010-11-19 | 2011-05-11 | 中铁一局集团有限公司 | Method for exchanging tool of shield machine for tunnel construction |
CN102322271A (en) * | 2011-10-10 | 2012-01-18 | 沈阳重型机械集团有限责任公司 | Tool pan back-loading type device for changing tool of slurry-balanced shield machine under normal pressure |
CN104589266A (en) * | 2014-11-20 | 2015-05-06 | 中国铁建重工集团有限公司 | Replacement device for shield cutters |
CN105781563A (en) * | 2016-03-22 | 2016-07-20 | 东北大学 | Auxiliary tool changing device of slurry balance shield tunneling machine and application method of auxiliary tool changing device |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4408992C1 (en) * | 1994-03-16 | 1995-02-09 | Herrenknecht Gmbh | Shield driving machine |
DE19633784C2 (en) * | 1995-08-30 | 1998-08-20 | Volker Dipl Ing Hentschel | Shield boring machine |
JPH08253953A (en) * | 1996-01-31 | 1996-10-01 | Hashimoto Setsubi Kogyosho:Kk | Pneumatic transporting method for earth and soil |
JP2001342798A (en) * | 2000-06-01 | 2001-12-14 | Mitsubishi Heavy Ind Ltd | Tunnel excavator, and attaching construction and replacing method for roller cutter |
CN203769792U (en) * | 2014-01-21 | 2014-08-13 | 中铁隧道集团有限公司 | Ordinary pressure hob replacing device |
CN105484755B (en) * | 2015-12-22 | 2019-05-24 | 中国铁建重工集团有限公司 | The cutterhead and shield machine of shield machine |
CN105507911A (en) * | 2015-12-22 | 2016-04-20 | 中国铁建重工集团有限公司 | Shield machine and cutter head thereof |
CN205382939U (en) * | 2016-03-14 | 2016-07-13 | 中交天和机械设备制造有限公司 | Removable formula hobbing cutter device of ordinary pressure |
CN105736005B (en) * | 2016-04-19 | 2018-01-30 | 中铁工程装备集团有限公司 | A kind of detachable normal pressure tool changing device |
CN106499401B (en) * | 2016-12-19 | 2019-04-05 | 中交隧道工程局有限公司 | A kind of super-large-diameter shield machine normal pressure tool changing device and method |
CN106640102B (en) * | 2016-12-20 | 2019-01-18 | 上海隧道工程有限公司 | Cutterhead periphery hobboing cutter normal pressure more changing device and its replacing options |
CN107060794B (en) * | 2017-04-10 | 2019-07-26 | 中铁十四局集团有限公司 | Hobboing cutter serrated knife exchanges process under a kind of compound stratum shield normal pressure |
CN107139128B (en) * | 2017-07-10 | 2023-05-12 | 中铁工程装备集团有限公司 | Method for replacing tool by adopting normal pressure tool changing device of shield machine to seal and replace tool |
CN107893663A (en) * | 2017-12-26 | 2018-04-10 | 中铁工程装备集团有限公司 | A kind of replaceable doctor blade device of normal pressure |
-
2017
- 2017-04-10 CN CN201710229497.8A patent/CN107060794B/en active Active
-
2018
- 2018-04-08 DE DE112018001937.3T patent/DE112018001937T5/en active Pending
- 2018-04-08 WO PCT/CN2018/082130 patent/WO2018188527A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102052079A (en) * | 2010-11-19 | 2011-05-11 | 中铁一局集团有限公司 | Method for exchanging tool of shield machine for tunnel construction |
CN102322271A (en) * | 2011-10-10 | 2012-01-18 | 沈阳重型机械集团有限责任公司 | Tool pan back-loading type device for changing tool of slurry-balanced shield machine under normal pressure |
CN104589266A (en) * | 2014-11-20 | 2015-05-06 | 中国铁建重工集团有限公司 | Replacement device for shield cutters |
CN105781563A (en) * | 2016-03-22 | 2016-07-20 | 东北大学 | Auxiliary tool changing device of slurry balance shield tunneling machine and application method of auxiliary tool changing device |
Non-Patent Citations (3)
Title |
---|
常压更换刀具换刀程序和改进方案;王志成;《隧道建设》;20100630;第30卷(第3期);第339-343页 |
广州地区软硬复合地层盾构施工技术研究;李婕等;《广州建筑》;20140630;第42卷(第3期);第26-32页 |
超大直径泥水平衡盾构施工中常压换刀工法的优化与运用;谢波;《江苏建筑》;20140831(第4期);第56-59页 |
Also Published As
Publication number | Publication date |
---|---|
CN107060794A (en) | 2017-08-18 |
DE112018001937T5 (en) | 2019-12-19 |
WO2018188527A1 (en) | 2018-10-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060794B (en) | Hobboing cutter serrated knife exchanges process under a kind of compound stratum shield normal pressure | |
CN206721958U (en) | A kind of full-automatic open caisson digging system of major diameter | |
CN111441403B (en) | Intelligent detection and protection system based on pressure of excavator bucket | |
CN105970900A (en) | Offshore wind turbine gravity type foundation installation seabed treatment process | |
CN107219089A (en) | A kind of pivot angle split box corer and its sampling method | |
CN108194704B (en) | One kind wearing river technique | |
CN105926584B (en) | Construction method for diaphragm walls under ultra-wide pipeline | |
CN209538258U (en) | A kind of construction equipment for replacing bored concrete pile | |
CN104453916B (en) | A kind of shaft construction job that requires special skills robot | |
JP3818519B2 (en) | Drilling tool for earth drill | |
CN115354673B (en) | Anti-slide pile pore-forming method for red-layer soft rock area and hoisting type artificial auxiliary device | |
KR200476754Y1 (en) | An excavator having removable forefinger | |
CN106195445A (en) | A kind of for administering the sand throwing method that submarine pipeline is unsettled | |
CN210858736U (en) | Device for preventing shield spiral conveyor from gushing | |
CN106869298B (en) | Overflow opening quick-opening door structure | |
CN205917751U (en) | Thick clay layer device that fetches earth | |
JP3392810B2 (en) | Shaft excavator | |
CN111648426B (en) | Drilling and grabbing device and winch for underground diaphragm wall construction | |
CN108086982A (en) | A kind of pipe jacking tool and its jacking method | |
CN207499873U (en) | A kind of pipe jacking tool | |
CN209569015U (en) | A kind of antitorque moment device of chute-type matched with sinking method shaft excavation machine | |
CN106150516A (en) | Quarrying apparatus and control method, development machine | |
JP2012121673A (en) | Horizontal excavation bucket | |
CN206173968U (en) | Automatically unhook ware under water | |
CN208995574U (en) | A kind of digging slag device of galvanized bath |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |