CN107059773A - 一种软土地基上的装配整体式驳岸结构及其施工方法 - Google Patents
一种软土地基上的装配整体式驳岸结构及其施工方法 Download PDFInfo
- Publication number
- CN107059773A CN107059773A CN201710390361.5A CN201710390361A CN107059773A CN 107059773 A CN107059773 A CN 107059773A CN 201710390361 A CN201710390361 A CN 201710390361A CN 107059773 A CN107059773 A CN 107059773A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- pile
- panel
- prefabricated pile
- riser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002689 soil Substances 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000005266 casting Methods 0.000 claims abstract description 5
- 238000004458 analytical method Methods 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000007613 environmental effect Effects 0.000 abstract description 10
- 238000004134 energy conservation Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000010923 batch production Methods 0.000 description 2
- 239000004035 construction material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/066—Quays
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
本发明公开了一种软土地基上的装配整体式驳岸结构,包括预制立板、预制底板和预制桩基;预制底板的顶端设置有预制立板,预制底板的底端设置有预制桩基;预制立板和预制底板采用一体浇筑而成;预制桩基包括若干根预制桩;每根预制桩的顶部伸入预制底板;预制底板上均匀的设置有若干个预制桩桩孔,每个预制桩桩孔与预制桩一一对应,且预制桩桩孔位于对应的预制桩的正上方;本发明还公开了一种软土地基上的装配整体式驳岸结构的施工方法;本发明采用预制桩基与预制立板、预制底板进行整体装配,共同形成低桩承台的驳岸结构,墙后的水平力等荷载由驳岸结构承担而达到结构安全稳定、可靠的作用,又能达到高效、节能、绿色、环保的目的。
Description
技术领域
本发明涉及驳岸结构技术领域,特别是一种软土地基上的装配整体式驳岸结构及其施工方法。
背景技术
驳岸是指沿河地面以下,保护河岸(阻止河岸崩塌或冲刷)的构筑物;随着国家经济的不断发展,人们的生活水平不断的提高,人们对自身所居住的环境提出了更高的要求,希望天更蓝,水更清,随之出现装配式建筑的工程理念,也就是要求建筑工程建设中尽量高效、节能、绿色、环保的建设手段。在近几年的工程建设中,建筑行业已如火如荼开展了装配式施工,可在我国的水利行业、水运行业中极少开展此项工作,尤其是在水利行业、水运行业的驳岸建设中均采用传统的建设施工方案,软土地基中常常采用现浇的低桩承台方案,即桩基基础上的现浇L型挡墙驳岸,采用现浇结构不仅需要大量的模板,现场的作业量大,工期也较长,建筑材料浪费也很多。目前,在软土地基上建设驳岸尚未有一种既能满足结构挡土需要,又能达到高效、节能、绿色、环保的结构。
发明内容
本发明的目的在于提供一种结构简单、施工方便、绿色环保的软土地基上的装配整体式驳岸结构及其施工方法。
实现本发明目的的技术解决方案为:
一种软土地基上的装配整体式驳岸结构,其特征在于,包括预制立板、预制底板和预制桩基;所述预制底板的顶端设置有预制立板,预制底板的底端设置有预制桩基;所述预制立板和预制底板组合成一体式预制L型挡墙,预制立板和预制底板采用一体浇筑而成;所述预制桩基包括若干根预制桩;每根预制桩的顶部伸入预制底板;所述预制底板上均匀的设置有若干个预制桩桩孔,每个预制桩桩孔与预制桩一一对应,且预制桩桩孔位于对应的预制桩的正上方。
优选地,所述预制立板上设置有若干个排水孔。
优选地,所述预制桩的顶部设置有桩头连接筋。
优选地,所述预制底板通过预制桩桩孔内混凝土浇筑与预制桩基相固定连接。
优选地,所述预制桩桩孔呈喇叭形。
一种软土地基上的装配整体式驳岸结构的施工方法,其特征在于,包括以下步骤:
步骤一:根据驳岸的现行规范进行结构稳定、强度计算,确定预制立板、预制底板的尺寸;
步骤二:根据驳岸的现行规范进行桩基承载力计算,确定预制桩的数量、桩长和断面;
步骤三:根据步骤一中确定预制立板、预制底板的尺寸后,预制立板和预制底板采用一体浇筑制成;
步骤四:根据步骤二中确定预制桩的数量、桩长和断面后,选用合适的预制桩,并对预制桩进行现场施工;
步骤五:将预制桩运送至现场,并对预制桩进行现场沉桩施工;
步骤六:预制桩沉桩施工完成后,进行基坑土方开挖施工形成边坡线;
步骤七:通过吊装设备吊装预制底板使预制底板上的预制桩桩孔与预制桩一一对应;
步骤八:对预制底板上的预制桩桩孔进行浇筑,使得预制底板和预制桩基牢固地连接在一起;
步骤九:最后对预制立板与边坡线间进行填入回填料,则完成了软土地基上的装配整体式驳岸结构的施工。
本发明与现有技术相比,其显著优点:
(1)本发明软土地基上的装配整体式驳岸结构采用预制桩基与预制立板、预制底板进行整体装配,共同形成低桩承台的驳岸结构,墙后的水平力等荷载由驳岸结构承担而达到结构安全稳定、可靠的作用,又能达到高效、节能、绿色、环保的目的。
(2)本发明软土地基上的装配整体式驳岸结构具有工厂化制作、施工快、资源浪费少、绿色环保、经济等特点,适用于软土地基、环境要求高、工期紧等地方,应用前景广阔。
下面结合附图对本发明作进一步详细描述。
附图说明
图1为本发明软土地基上的装配整体式驳岸结构的结构示意图。
图2为本发明软土地基上的装配整体式驳岸结构的俯视图。
具体实施方式
实施例1:
如图1和图2所示,一种软土地基上的装配整体式驳岸结构,包括预制立板1、预制底板2和预制桩基3;所述预制底板2的顶端设置有预制立板1,预制底板2的底端设置有预制桩基3;所述预制立板1和预制底板2组合成一体式预制L型挡墙,预制立板1和预制底板2采用一体浇筑而成;所述预制桩基3包括若干根预制桩5;每根预制桩5的顶部伸入预制底板2;所述预制底板2上均匀的设置有若干个预制桩桩孔4,每个预制桩桩孔4与预制桩5一一对应,且预制桩桩孔4位于对应的预制桩5的正上方。
所述预制立板1上设置有若干个排水孔8。
所述预制桩5的顶部设置有桩头连接筋。
所述预制底板2通过预制桩桩孔(4)内混凝土浇筑与预制桩基3相固定连接。
所述预制桩桩孔4呈喇叭形。
一种软土地基上的装配整体式驳岸结构的施工方法,包括以下步骤:
步骤一:根据驳岸的现行规范进行结构稳定、强度计算,确定预制立板1、预制底板2的尺寸;
步骤二:根据驳岸的现行规范进行桩基承载力计算,确定预制桩5的数量、桩长和断面;
步骤三:根据步骤一中确定预制立板1、预制底板2的尺寸后,预制立板1和预制底板2采用一体浇筑制成;
步骤四:根据步骤二中确定预制桩5的数量、桩长和断面后,选用合适的预制桩5,并对预制桩5进行现场施工;
步骤五:将预制桩(5)运送至现场,并对预制桩(5)进行现场沉桩施工;
步骤六:预制桩(5)沉桩施工完成后,进行基坑土方开挖施工形成边坡线(6);
步骤七:通过吊装设备吊装预制底板(2)使预制底板(2)上的预制桩桩孔(4)与预制桩(5)一一对应;
步骤八:对预制底板(2)上的预制桩桩孔(4)进行浇筑,使得预制底板(2)和预制桩基(3)牢固地连接在一起;
步骤九:最后对预制立板(1)与边坡线(6)间进行填入回填料(7),则完成了软土地基上的装配整体式驳岸结构的施工。
综上所述,本发明软土地基上的装配整体式驳岸结构采用预制桩基与预制挡墙、预制底板进行整体装配,共同形成低桩承台的驳岸结构,墙后的水平力等荷载由驳岸结构承担而达到结构安全稳定、可靠的作用,又能达到高效、节能、绿色、环保的目的;本发明软土地基上的装配整体式驳岸结构具有工厂化制作、施工快、资源浪费少、绿色环保、经济等特点,适用于软土地基、环境要求高、工期紧等地方,应用前景广阔。
Claims (6)
1.一种软土地基上的装配整体式驳岸结构,其特征在于,包括预制立板(1)、预制底板(2)和预制桩基(3);所述预制底板(2)的顶端设置有预制立板(1),预制底板(2)的底端设置有预制桩基(3);所述预制立板(1)和预制底板(2)组合成一体式预制L型挡墙,预制立板(1)和预制底板(2)采用一体浇筑而成;所述预制桩基(3)包括若干根预制桩(5);每根预制桩(5)的顶部伸入预制底板(2);所述预制底板(2)上均匀的设置有若干个预制桩桩孔(4),每个预制桩桩孔(4)与预制桩(5)一一对应,且预制桩桩孔(4)位于对应的预制桩(5)的正上方。
2.根据权利要求1所述的软土地基上的装配整体式驳岸结构,其特征在于,所述预制立板(1)上设置有若干个排水孔(8)。
3.根据权利要求1所述的软土地基上的装配整体式驳岸结构,其特征在于,所述预制桩(5)的顶部设置有桩头连接筋。
4.根据权利要求1所述的软土地基上的装配整体式驳岸结构,其特征在于,所述预制底板(2)通过预制桩桩孔(4)内混凝土浇筑与预制桩基(3)相固定连接。
5.根据权利要求1所述的软土地基上的装配整体式驳岸结构,其特征在于,所述预制桩桩孔(4)呈喇叭形。
6.一种根据权利要求1所述的软土地基上的装配整体式驳岸结构的施工方法,其特征在于,包括以下步骤:
步骤一:根据驳岸的现行规范进行结构稳定、强度计算,确定预制立板(1)、预制底板(2)的尺寸;
步骤二:根据驳岸的现行规范进行桩基承载力计算,确定预制桩(5)的数量、桩长和断面;
步骤三:根据步骤一中确定预制立板(1)、预制底板(2)的尺寸后,预制立板(1)和预制底板(2)采用一体浇筑制成;
步骤四:根据步骤二中确定预制桩(5)的数量、桩长和断面后,在工厂内或现场进行预制施工;
步骤五:将预制桩(5)运送至现场,并对预制桩(5)进行现场沉桩施工;
步骤六:预制桩(5)沉桩施工完成后,进行基坑土方开挖施工形成边坡线(6);
步骤七:通过吊装设备吊装预制底板(2)使预制底板(2)上的预制桩桩孔(4)与预制桩(5)一一对应;
步骤八:对预制底板(2)上的预制桩桩孔(4)进行浇筑,使得预制底板(2)和预制桩基(3)牢固地连接在一起;
步骤九:最后对预制立板(1)与边坡线(6)间进行填入回填料(7),则完成了软土地基上的装配整体式驳岸结构的施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710390361.5A CN107059773A (zh) | 2017-05-27 | 2017-05-27 | 一种软土地基上的装配整体式驳岸结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710390361.5A CN107059773A (zh) | 2017-05-27 | 2017-05-27 | 一种软土地基上的装配整体式驳岸结构及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107059773A true CN107059773A (zh) | 2017-08-18 |
Family
ID=59617424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710390361.5A Pending CN107059773A (zh) | 2017-05-27 | 2017-05-27 | 一种软土地基上的装配整体式驳岸结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107059773A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881983A (zh) * | 2017-10-30 | 2018-04-06 | 上海市政工程设计研究总院(集团)有限公司 | 一种装配式护岸及其施工方法 |
CN108018825A (zh) * | 2017-10-30 | 2018-05-11 | 上海市政工程设计研究总院(集团)有限公司 | 一种护岸 |
CN108018826A (zh) * | 2017-10-30 | 2018-05-11 | 上海市政工程设计研究总院(集团)有限公司 | 一种护岸的施工方法 |
CN108035302A (zh) * | 2017-10-30 | 2018-05-15 | 上海市政工程设计研究总院(集团)有限公司 | 一种适用于复杂岸线的护岸施工方法 |
CN108130917A (zh) * | 2017-12-25 | 2018-06-08 | 中国二十冶集团有限公司 | 桩基挡土墙施工方法 |
CN108166441A (zh) * | 2017-12-19 | 2018-06-15 | 上海市政工程设计研究总院(集团)有限公司 | 一种桩基装配式护岸 |
CN109555077A (zh) * | 2018-12-14 | 2019-04-02 | 中交第三航务工程勘察设计院有限公司 | 一种适用于软土地基的装配式生态驳岸结构及其施工方法 |
CN109555081A (zh) * | 2018-12-14 | 2019-04-02 | 中交第三航务工程勘察设计院有限公司 | 一种适用于软土地基的扶壁式生态驳岸结构及其施工方法 |
CN111501662A (zh) * | 2020-01-19 | 2020-08-07 | 浙江广川工程咨询有限公司 | 一种软土地基堤防结构 |
CN112627107A (zh) * | 2020-12-04 | 2021-04-09 | 上海市政工程设计研究总院(集团)有限公司 | 装配式护岸构件及装配式护岸施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203066026U (zh) * | 2013-01-22 | 2013-07-17 | 中交第三航务工程勘察设计院有限公司 | 一种新型驳岸组合结构 |
CN203514345U (zh) * | 2013-09-16 | 2014-04-02 | 安徽省城建设计研究院 | 连接式预制混凝土挡土墙 |
CN203795465U (zh) * | 2014-02-20 | 2014-08-27 | 中铁第四勘察设计院集团有限公司 | 一种适用于深厚松软土地基的扶壁式挡墙结构 |
JP2015183453A (ja) * | 2014-03-25 | 2015-10-22 | 株式会社横河住金ブリッジ | 堤体 |
CN105862663A (zh) * | 2016-06-02 | 2016-08-17 | 江苏省水利勘测设计研究院有限公司 | 一种叉桩与卸荷板相结合的岸壁式支挡结构 |
CN105970993A (zh) * | 2016-06-30 | 2016-09-28 | 上海勘测设计研究院有限公司 | 预制桩与预制承台的水下连接结构及其施工方法 |
CN106012960A (zh) * | 2016-07-14 | 2016-10-12 | 中交第三航务工程勘察设计院有限公司 | 一种装配式高桩码头上部结构体系及其施工方法 |
CN206815278U (zh) * | 2017-05-27 | 2017-12-29 | 中交第三航务工程勘察设计院有限公司 | 一种软土地基上的装配整体式驳岸结构 |
-
2017
- 2017-05-27 CN CN201710390361.5A patent/CN107059773A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203066026U (zh) * | 2013-01-22 | 2013-07-17 | 中交第三航务工程勘察设计院有限公司 | 一种新型驳岸组合结构 |
CN203514345U (zh) * | 2013-09-16 | 2014-04-02 | 安徽省城建设计研究院 | 连接式预制混凝土挡土墙 |
CN203795465U (zh) * | 2014-02-20 | 2014-08-27 | 中铁第四勘察设计院集团有限公司 | 一种适用于深厚松软土地基的扶壁式挡墙结构 |
JP2015183453A (ja) * | 2014-03-25 | 2015-10-22 | 株式会社横河住金ブリッジ | 堤体 |
CN105862663A (zh) * | 2016-06-02 | 2016-08-17 | 江苏省水利勘测设计研究院有限公司 | 一种叉桩与卸荷板相结合的岸壁式支挡结构 |
CN105970993A (zh) * | 2016-06-30 | 2016-09-28 | 上海勘测设计研究院有限公司 | 预制桩与预制承台的水下连接结构及其施工方法 |
CN106012960A (zh) * | 2016-07-14 | 2016-10-12 | 中交第三航务工程勘察设计院有限公司 | 一种装配式高桩码头上部结构体系及其施工方法 |
CN206815278U (zh) * | 2017-05-27 | 2017-12-29 | 中交第三航务工程勘察设计院有限公司 | 一种软土地基上的装配整体式驳岸结构 |
Non-Patent Citations (1)
Title |
---|
何炫辉: "低桩承台后板桩结构在鹭江道驳岸工程中的应用", 《水运工程》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881983A (zh) * | 2017-10-30 | 2018-04-06 | 上海市政工程设计研究总院(集团)有限公司 | 一种装配式护岸及其施工方法 |
CN108018825A (zh) * | 2017-10-30 | 2018-05-11 | 上海市政工程设计研究总院(集团)有限公司 | 一种护岸 |
CN108018826A (zh) * | 2017-10-30 | 2018-05-11 | 上海市政工程设计研究总院(集团)有限公司 | 一种护岸的施工方法 |
CN108035302A (zh) * | 2017-10-30 | 2018-05-15 | 上海市政工程设计研究总院(集团)有限公司 | 一种适用于复杂岸线的护岸施工方法 |
CN108166441A (zh) * | 2017-12-19 | 2018-06-15 | 上海市政工程设计研究总院(集团)有限公司 | 一种桩基装配式护岸 |
CN108130917A (zh) * | 2017-12-25 | 2018-06-08 | 中国二十冶集团有限公司 | 桩基挡土墙施工方法 |
CN109555077A (zh) * | 2018-12-14 | 2019-04-02 | 中交第三航务工程勘察设计院有限公司 | 一种适用于软土地基的装配式生态驳岸结构及其施工方法 |
CN109555081A (zh) * | 2018-12-14 | 2019-04-02 | 中交第三航务工程勘察设计院有限公司 | 一种适用于软土地基的扶壁式生态驳岸结构及其施工方法 |
CN111501662A (zh) * | 2020-01-19 | 2020-08-07 | 浙江广川工程咨询有限公司 | 一种软土地基堤防结构 |
CN112627107A (zh) * | 2020-12-04 | 2021-04-09 | 上海市政工程设计研究总院(集团)有限公司 | 装配式护岸构件及装配式护岸施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059773A (zh) | 一种软土地基上的装配整体式驳岸结构及其施工方法 | |
EP2837554A1 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
CN103422501B (zh) | 砂层地质中的抗浮锚杆结构及其施工方法 | |
CN104389318B (zh) | 用于海上风电的钢砼‑钢构混合重力式基础及其施工方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN102561384A (zh) | 钢抱箍桁架式高桩承台塔吊基础的施工方法及结构 | |
CN209855277U (zh) | 一种用于既有建筑地下增层的转换层结构 | |
CN216041201U (zh) | 一种先撑后挖双层斜向支撑基坑围护体系 | |
CN206815278U (zh) | 一种软土地基上的装配整体式驳岸结构 | |
CN102220764B (zh) | 深基坑支护体系的施工方法 | |
CN203768914U (zh) | 一种用于基坑围护的斜向支撑桩结构 | |
CN109736295B (zh) | 一种建筑结构竖向支撑体系及其施工方法 | |
CN209760136U (zh) | 一种装配式低桩承台生态驳岸结构 | |
CN204282390U (zh) | 用于海上风电的钢砼-钢构混合重力式基础 | |
CN203782738U (zh) | 预制式通信基站基础 | |
CN207295746U (zh) | 一种筒型基础钢板桩组合式围堰 | |
CN102605801A (zh) | 一种地下圆形水池悬挂半逆作施工方法 | |
CN106120690B (zh) | 一种逆变器箱变平台及其制作方法 | |
CN203049588U (zh) | 坑中坑筒模 | |
CN102733414B (zh) | 方锥型锚墩联合水平撑杆的水池抗浮方法 | |
CN107700519A (zh) | 一种举升塔吊基础安装方法 | |
CN204370378U (zh) | 一种柔性拦渣坝结构 | |
CN207032222U (zh) | 一种装配式桩基承台驳岸的预制桩 | |
CN101200900A (zh) | 一种离心法预制止水组合连续墙施工方法 | |
CN207121898U (zh) | 超大直径钻埋钢管空心基桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: No. 831 zhaojiaman Road, Xuhui District, Shanghai Applicant after: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. Address before: 200032 831 Zhaojia Bang Road, Xuhui District, Shanghai Applicant before: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170818 |