CN107059495A - The extensible bolting system - Google Patents

The extensible bolting system Download PDF

Info

Publication number
CN107059495A
CN107059495A CN201710151409.7A CN201710151409A CN107059495A CN 107059495 A CN107059495 A CN 107059495A CN 201710151409 A CN201710151409 A CN 201710151409A CN 107059495 A CN107059495 A CN 107059495A
Authority
CN
China
Prior art keywords
sealing cap
screw thread
sleeve pipe
service sleeve
service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710151409.7A
Other languages
Chinese (zh)
Inventor
于俭海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Lino Group Co Ltd
Original Assignee
Dalian Lino Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Lino Group Co Ltd filed Critical Dalian Lino Group Co Ltd
Priority to CN201710151409.7A priority Critical patent/CN107059495A/en
Publication of CN107059495A publication Critical patent/CN107059495A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/09Ballastless systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of the extensible bolting system, including service sleeve, connection sleeve pipe, upper sealing cap and lower sealing cap, the lower sealing cap is threadingly attached to service sleeve lower end, connection sleeve pipe is threadedly attached in service sleeve upper end, upper sealing cap is threadedly attached in connection sleeve pipe upper end, the different screw thread of two kinds of rotation directions above and below having in the connection sleeve pipe, screw thread below coordinates with the service sleeve screw thread being connected, and screw thread above coordinates with the upper sealing cap screw thread being connected.The fixation problem of service sleeve when the system can solve to start pre-buried, the fixation problem between service sleeve and template can also be solved, when secondary pre-buried after once pre-buried end, pre-buried bottom plate is fixed well, the height adjustment problem of pre-buried bottom plate is very easily solved, the adjustment problem on basis when follow-up basis is settled also is can solve.

Description

The extensible bolting system
Technical field
The present invention relates to track foundation fixed adjustment system, specifically a kind of the extensible bolting system.
Background technology
It is inconvenient that traditional service sleeve is all constructed in terms of installation and adjustment, after especially being settled on basis, it is impossible to Quickly adjusted, if using pre-embedded bolt, regulation is even more difficulty.
The content of the invention
In order to overcome prior art not enough, the present invention devises a kind of the extensible bolting system, when can solve to start pre-buried The fixation problem of service sleeve, can also solve the fixation problem between service sleeve and template, two after once pre-buried end When secondary pre-buried, pre-buried bottom plate is fixed well, is very easily solved the height adjustment problem of pre-buried bottom plate, can also be solved well The adjustment problem on basis when certainly follow-up basis is settled.
The technical proposal of the invention is realized in this way:The extensible bolting system, including service sleeve, connection sleeve pipe, upper envelope Cap and lower sealing cap, the lower sealing cap are threadingly attached to service sleeve lower end, and connection sleeve pipe is threadedly attached in pre-buried set Pipe upper end, can once pre-buried when fixed form, embedded board can also be adjusted secondary pre-buried when, upper sealing cap leads to Cross and be threaded in connection sleeve pipe upper end, embedded board height is adjusted by the upper sealing cap of rotation, sealing cap is taken away after installing;Institute The different screw thread of two kinds of rotation directions above and below having in connection sleeve pipe is stated, screw thread below coordinates with the service sleeve screw thread being connected, above Screw thread coordinate with the upper sealing cap screw thread that is connected.
Further, there is the aperture that can wear reinforcing bar on lower sealing cap, reinforcing bar fixes service sleeve through aperture, convenient pre- The positioning of bushing burying.
Further, a plane places template on the service sleeve.
Further, lengthening sleeve pipe is additionally provided with the system, is used when big sedimentation occurs for basis, be connected to two companies Between female connector pipe, the situation of all foundation settlements can be met.
Beneficial effects of the present invention are:The extensible bolting system of the present invention, i.e., ensure that the fixation of anchor system well Problem, also solves relative position dimensional problem, is that next step installation is smoothed out providing guarantee.By connection sleeve pipe and in advance Rotation between bushing burying, can conveniently and efficiently adjust the height of embedded board, and upper sealing cap can fix embedded board well, Facilitate positioning of the embedded board when irrigating clay.In addition, when basis appearance is significantly settled, can be conveniently and efficiently by adding Long sleeve pipe solves basis and raises problem, and the invention of this set the extensible bolting system can greatly simplify the pre-buried mistake of service sleeve system Journey, conveniently and efficiently completes system burying work beforehand.
Brief description of the drawings
Fig. 1 the extensible bolting system structure diagrams.
Fig. 2 the extensible bolting system call interception views.
Fig. 3 the extensible bolting system call interception views.
The extensible bolting system call interception view when Fig. 4 is significantly settled.
Embodiment
Explanation is further explained to the present invention with reference to specific embodiment.
As shown in figure 1, the extensible bolting system includes:Service sleeve 3, connection sleeve pipe 2, upper sealing cap 1 and lower sealing cap 4, it is described Lower sealing cap has internal thread, and service sleeve has external screw thread, and lower sealing cap is threadedly attached in small on service sleeve lower end, lower sealing cap Hole 8 can be fixed together with reinforcing bar, facilitate the positioning of service sleeve;There is a plane 9 on the service sleeve, mould can be placed There is external screw thread above plate 5, service sleeve, connection sleeve pipe has internal thread, and connection sleeve pipe can coordinate with pre-embedded bolt screw thread, be used for Fixed form 5, can conveniently pour into a mould concrete(Fig. 2);Concrete casting complete and after being cured, can dismantle template;It is described Connection sleeve pipe have above and below two kinds of screw threads, the screw thread of following screw thread and service sleeve coordinates, the spiral shell of screw thread and upper sealing cap above Line coordinates, two kinds of thread rotary orientation differences;The upper sealing cap 1 has external screw thread, is connected to connection sleeve pipe upper end;The connection sleeve pipe is twisted On service sleeve, direct screw thread is all screwed, and is put into embedded board 6, then screws on upper sealing cap, upper sealing cap rotation direction and pre-buried set Pipe rotation direction is different, after upper sealing cap is tightened, then rotates sealing cap, and the screw thread between connection sleeve pipe and service sleeve starts adjustment, The height of embedded board can so be adjusted(Fig. 3).
When basis, settling height occur excessive(Settling height is more than 100mm), it is necessary to solved by adjusting basis, can be with Basis is quickly and easily solved by lengthening sleeve pipe 7 and raises problem, concrete operations are as follows:Fixture all on embedded board is torn open Open, expose embedded board upper surface, be threaded into previous connection sleeve pipe, be linked to be with former embedded system under sleeve pipe 7 by lengthening It is overall, template is put above sleeve pipe lengthening, the concrete cast after being adjusted, other subsequent operations are with common settling operation Process.This method can heighten basic 100mm.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art in the technical scope of present disclosure, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (4)

1. the extensible bolting system, it is characterised in that including service sleeve, connection sleeve pipe, upper sealing cap and lower sealing cap, the lower sealing cap Service sleeve lower end is threadingly attached to, connection sleeve pipe is threadedly attached in service sleeve upper end, and upper sealing cap passes through screw thread The different screw thread of two kinds of rotation directions above and below having in connection sleeve pipe upper end, the connection sleeve pipe is connected to, following screw thread is with being connected Service sleeve screw thread coordinates, and screw thread above coordinates with the upper sealing cap screw thread being connected.
2. the extensible bolting system according to claim 1, it is characterised in that have the aperture that can wear reinforcing bar on lower sealing cap, Facilitate the positioning of service sleeve.
3. the extensible bolting system according to claim 1, it is characterised in that there is a plane to place on the service sleeve Template.
4. the extensible bolting system according to claim 1, it is characterised in that lengthening sleeve pipe is additionally provided with the system, even It is connected between two connection sleeve pipes.
CN201710151409.7A 2017-03-14 2017-03-14 The extensible bolting system Pending CN107059495A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710151409.7A CN107059495A (en) 2017-03-14 2017-03-14 The extensible bolting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710151409.7A CN107059495A (en) 2017-03-14 2017-03-14 The extensible bolting system

Publications (1)

Publication Number Publication Date
CN107059495A true CN107059495A (en) 2017-08-18

Family

ID=59620005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710151409.7A Pending CN107059495A (en) 2017-03-14 2017-03-14 The extensible bolting system

Country Status (1)

Country Link
CN (1) CN107059495A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5060436A (en) * 1990-06-25 1991-10-29 Delgado Jr David G Apparatus for positioning anchor bolts within concrete
CN105887590A (en) * 2016-05-26 2016-08-24 于俭海 Height direction adjusting system and method after railway foundation subsidence
CN206752207U (en) * 2017-03-14 2017-12-15 大连伊利诺集团有限公司 The extensible bolting system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5060436A (en) * 1990-06-25 1991-10-29 Delgado Jr David G Apparatus for positioning anchor bolts within concrete
CN105887590A (en) * 2016-05-26 2016-08-24 于俭海 Height direction adjusting system and method after railway foundation subsidence
CN206752207U (en) * 2017-03-14 2017-12-15 大连伊利诺集团有限公司 The extensible bolting system

Similar Documents

Publication Publication Date Title
CN208009922U (en) A kind of prefabricated components bearing diagonal and its mounting structure
CN106150055A (en) Concrete embedded part essence flat hanging installment work stand and the installation method of built-in fitting
CN206752207U (en) The extensible bolting system
CN204081445U (en) To encorbelment i iron anchor device
CN102535509A (en) Construction method of high-flatness equipment foundation and adjusting structure thereof
CN209571794U (en) In a kind of shear wall direct-burried distribution box with can turnover type fix device
CN208202159U (en) A kind of elevator hoop component
CN107059495A (en) The extensible bolting system
CN208347137U (en) A kind of reinforcing steel bar connecting device of precast concrete
CN207553599U (en) Build concrete pours pipeline preformed hole mold
CN203891468U (en) Fixing device for pouring building pipeline embedded part
CN106121566A (en) A kind of multifunctional wellhead device
CN206973068U (en) A kind of through-flooring is pre-buried to use the pre-buried adapter of flexible interface adjusting center
CN206903221U (en) A kind of civil engineering pours fixture with multi-purpose
CN107654732A (en) Tubing fixing device
CN209194876U (en) Novel hoisting and anchoring integrated PC component lifting appliance
CN204112729U (en) Pipe well inner sleeve reserves fixed support
CN207176933U (en) A kind of convenient electric power bridge foundation bolt for adjusting pre-buried angle
CN203639934U (en) Pre-buried positioning device for equipment foundation bolt
CN106758663A (en) Buried rubber fastening band installs positioning construction method in one kind
CN213837841U (en) Precast concrete bolt system
CN209620634U (en) A kind of fixed device of embedded iron parts
CN206727565U (en) A kind of wear resistant corrosion resistant cable protection pipe
CN208152575U (en) A kind of multipurpose positioning fixture
CN209016575U (en) A kind of dedicated adjustable support of brickwork electric piping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818