CN107052113B - A kind of oblique bent technique of the change ramp of Transmission Towers - Google Patents

A kind of oblique bent technique of the change ramp of Transmission Towers Download PDF

Info

Publication number
CN107052113B
CN107052113B CN201710148274.9A CN201710148274A CN107052113B CN 107052113 B CN107052113 B CN 107052113B CN 201710148274 A CN201710148274 A CN 201710148274A CN 107052113 B CN107052113 B CN 107052113B
Authority
CN
China
Prior art keywords
angle steel
main material
front plate
slope
side panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710148274.9A
Other languages
Chinese (zh)
Other versions
CN107052113A (en
Inventor
张帝起
杜连喜
岑金海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ZENGLI STEEL STRUCTURE Co Ltd
Original Assignee
GUANGZHOU ZENGLI STEEL STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ZENGLI STEEL STRUCTURE Co Ltd filed Critical GUANGZHOU ZENGLI STEEL STRUCTURE Co Ltd
Priority to CN201710148274.9A priority Critical patent/CN107052113B/en
Publication of CN107052113A publication Critical patent/CN107052113A/en
Application granted granted Critical
Publication of CN107052113B publication Critical patent/CN107052113B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D11/00Bending not restricted to forms of material mentioned in only one of groups B21D5/00, B21D7/00, B21D9/00; Bending not provided for in groups B21D5/00 - B21D9/00; Twisting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D11/00Bending not restricted to forms of material mentioned in only one of groups B21D5/00, B21D7/00, B21D9/00; Bending not provided for in groups B21D5/00 - B21D9/00; Twisting
    • B21D11/22Auxiliary equipment, e.g. positioning devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/16Heating or cooling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ladders (AREA)

Abstract

The present invention provides a kind of change ramp of Transmission Towers tiltedly bent technique, includes the following steps:To become slope front plate on the basis of the connecting hole of upper main material angle steel and lower main material angle steel, the stupefied line position of angle steel of main material angle steel and lower main material angle steel is drawn;Point on the basis of the intersection point that the stupefied line of angle steel of the above main material angle steel and the stupefied line of the angle steel of lower main material angle steel extend, it is that fiery curve location is tiltedly bent by change slope front plate to take the folder bisector of angle of the stupefied line of the angle steel of main material angle steel and the stupefied line of angle steel of lower main material angle steel;On the basis of becoming slope front plate, the corresponding plate hole locations for becoming slope side panel are drawn on becoming slope front plate, measure the end holes for becoming slope side panel to the distance for becoming slope front datum mark further according to slope front plate is become, shifting hole is carried out to becoming slope side panel;Take point on the basis of the intersection point that the stupefied line of the angle steel of the stupefied line of the angle steel of main material angle steel and lower main material angle steel extends, take the folder bisector of angle of the stupefied line of the angle steel of main material angle steel and the stupefied line of angle steel of lower main material angle steel be fiery curve location will change slope side panel it is tiltedly bent.

Description

A kind of oblique bent technique of the change ramp of Transmission Towers
Technical field
The present invention relates to a kind of oblique bent works of the change ramp of the technical field of Transmission Towers more particularly to Transmission Towers Skill.
Background
As shown in Figure 1, Transmission Towers tower body grade changing of main member position generally comprises front plate 100, side panel 200, upper master Material angle steel 300 and lower main material angle steel 400;Transmission Towers in the prior art are during setting-out, tower body grade changing of main member position Horizontal fire bent mode is all made of when putting sample;Since gradient gap is smaller negligible, fiery curve takes two sides angular bisector To define oblique song.
But because four tower body main materials of Transmission Towers form isosceles trapezoid, if expanding horizontally tower body main material, It is formed and is more than 90 ° of angle of releases;Due to upper main material angle steel 300 and the unsuitable angle of release of lower main material angle steel 400, after welding, four tower body main materials Front plate 100 and side panel 200 weld after with the junction of upper main material angle steel 300 and lower main material angle steel 400 can form gap 500。
Invention content
Angle steel main material can be removed it is an object of the invention to overcome the deficiencies of the prior art and provide one kind and becomes slope front Plate and become the gap after the welding of slope side panel Transmission Towers the oblique bent technique of change ramp.
In order to achieve the above object, the present invention uses following technical scheme:A kind of oblique bent work of the change ramp of Transmission Towers Skill, which is characterized in that include the following steps:
To become slope front plate on the basis of the connecting hole of upper main material angle steel and lower main material angle steel, main material angle steel is drawn respectively With the stupefied line position of angle steel of lower main material angle steel;Wherein, the stupefied line of angle steel of the stupefied line of angle steel of the above main material angle steel and lower main material angle steel The intersection point of extension is the datum mark of fiery curve, takes the angle of the stupefied line of the angle steel of main material angle steel and the stupefied line of angle steel of lower main material angle steel Bisector be the fiery curve location for becoming slope front plate, to become slope front plate carry out it is tiltedly bent;
On the basis of becoming slope front plate, the corresponding plate hole locations for becoming slope side panel, then root are drawn on becoming slope front plate The end holes for becoming slope side panel are measured to the distance for becoming slope front plate fire curve datum mark, to becoming slope side according to slope front plate is become Plate carries out shifting hole;
It is the benchmark of fiery curve to take the intersection point that the stupefied line of angle steel of the stupefied line of the angle steel of main material angle steel and lower main material angle steel extends Point, it is the fire for becoming slope side panel to take the folder bisector of angle of the stupefied line of the angle steel of main material angle steel and the stupefied line of angle steel of lower main material angle steel Curve location carries out tiltedly song to becoming slope side panel.
Further, when the fiery curve for becoming slope front plate is pressed onto the Transmission Towers tabula material holes Transverse Cai, by tabula material The fiery curve that tabula material is obtained by the bent method of horizontal fire, then in the fiery curve phase for the fiery curve and tabula material for becoming slope front plate A transitional pore is bored at the position of friendship, then is made curved, sealing weld and polished.
Further, when the fiery curve for becoming slope side panel is pressed onto the Transmission Towers tabula material holes Transverse Cai, by tabula material The fiery curve that tabula material is obtained by the bent method of horizontal fire, then in the fiery curve phase for the fiery curve and tabula material for becoming slope side panel A transitional pore is bored at the position of friendship, then is made curved, sealing weld and polished.
Further, a diameter of 17.5mm or 21.5mm of the transitional pore.
Further, to become the fiery curve of slope front plate and the fiery curve for becoming slope side panel as connecting line, slope front will be become Plate and change slope side panel splicing are integrated;Main material angle steel and lower main material angle steel are installed again.
Compared with prior art, tiltedly bent technique efficiently solves change slope front plate to the change ramp of Transmission Towers of the invention With becoming after the welding of slope side panel gap is led to the problem of with upper main material angle steel and lower main material Bolted angle connection;So that become slope front plate or Become slope side panel and be bonded gapless with upper main material angle steel and lower main material angle steel, meets design requirement and installation requirement.
Description of the drawings
Attached drawing is to be used to provide further understanding of the present invention, an and part for constitution instruction, and following specific Embodiment is used to explain the present invention together, but should not be construed as limiting the invention.In the accompanying drawings,
Fig. 1:The splicing stereogram of front plate and side panel in the prior art;
Fig. 2:The present invention becomes the making schematic diagram of slope front plate fire curve;
Fig. 3:The present invention becomes the making schematic diagram of slope side panel fire curve;
Fig. 4:The present invention becomes slope front plate and becomes the splicing stereogram after the oblique song of slope side panel;
Fig. 5:The splicing stereogram of tower body grade changing of main member of the present invention position.
Specific implementation mode
As shown in Figures 2 to 5, the oblique bent technique of the change ramp of Transmission Towers of the invention, includes the following steps:
First, the fiery curve 11 for becoming slope front plate 1 is made:To become slope front plate 1 and upper main material angle steel 3 and lower main material angle steel On the basis of 4 connecting hole, main material angle steel 3 and the stupefied line 30 of angle steel of lower main material angle steel 4,40 positions are drawn respectively;Wherein, above The intersection point that the stupefied line 30 of angle steel of main material angle steel 3 and the stupefied line 40 of angle steel of lower main material angle steel 4 extend is the datum mark 5 of fiery curve 11, It is to become slope front plate to take the bisector of the angle α of the stupefied line of the angle steel of the stupefied line of the angle steel of main material angle steel 3 30 and lower main material angle steel 4 30 1 fiery curve location carries out oblique song to becoming slope front plate 1.
Further, when the fiery curve 11 for becoming slope front plate 1 is pressed onto the 8 material holes Transverse of Transmission Towers tabula material, in order to keep away Exempt from after the Transverse materials hole slopes Chu Jiangbian front plate 1 is tiltedly bent, the problem that tabula material 8 is not installed occurs, tabula material 8 is bent by horizontal fire Method obtain the fiery curve 12 of tabula material 8, then in 12 phase of fiery curve for the fiery curve 11 and tabula material 8 for becoming slope front plate 1 A transitional pore 6 is bored at the position of friendship, then will become slope front plate 1 make from the transitional pore 6 it is curved;Wherein, the diameter of the transitional pore 6 For 17.5mm or 21.5mm so that become slope front plate 1 can smoothly make it is curved;Finally, then by 6 sealing weld of the transitional pore, mill It is flat.When the diameter of the transitional pore 6 be less than 17.5mm when, it is difficult to again will become slope front plate 1 make it is curved, when the transitional pore When 6 diameter is more than 21.5mm, will become slope front plate 1 make it is curved after be difficult to sealing weld and polish.
Then, the fiery curve 21 for becoming slope side panel 2 is made:On the basis of becoming slope front plate 1, drawn on becoming slope front plate 1 Go out it is corresponding become slope side panel 2 plate hole locations, further according to become slope front plate 1 measure become slope side panel 2 end holes to change The distance of 1 fire curve datum mark 5 of slope front plate, carries out shifting hole so that become the plate hole 20 on slope side panel 2 to becoming slope side panel 2 It is staggered with 10 position of plate hole become in slope front plate 1;Wherein, the end holes of the described change slope side panel 2 are and change slope front plate 1 The plate hole of fiery 5 vertical range of curve datum mark minimum.
Then, it is to become to take the intersection point that the stupefied line 40 of angle steel of the stupefied line 30 of the angle steel of main material angle steel 3 and lower main material angle steel 4 extends The datum mark 5 of the fiery curve of slope side panel 2 takes the stupefied line of the angle steel of the stupefied line 30 of the angle steel of main material angle steel 3 and lower main material angle steel 4 30 Angular bisector is the fiery curve location for becoming slope side panel 2, and oblique song is carried out to becoming slope side panel 2.
When the fiery curve 21 for becoming slope side panel 2 is pressed onto the 8 material holes Transverse of Transmission Towers tabula material, in order to avoid Transverse materials Tiltedly after song, there is the problem that tabula material 8 is not installed in the hole slopes Chu Jiangbian side panel 2, and tabula material 8 is taken by the bent method of horizontal fire The fiery curve 22 of tabula material 8 is obtained, then in the position that the fiery curve 22 of the fiery curve 21 and tabula material 8 that become slope side panel 2 intersects A transitional pore 6 is bored at place, then will become slope side panel 2 make from the transitional pore 6 it is curved;Wherein, a diameter of 17.5mm of the transitional pore 6 Or 21.5mm so that become slope side panel 2 can smoothly make it is curved, finally, then by 6 sealing weld of the transitional pore, polish.When The diameter of the transitional pore 6 be less than 17.5mm when, it is difficult to again will become slope front plate 1 make it is curved, when the diameter of the transitional pore 6 is big When 21.5mm, will become slope front plate 1 make it is curved after be difficult to sealing weld and polish.
Finally, to become the fiery curve 11 of slope front plate 1 and the fiery curve 21 for becoming slope side panel 2 as connecting line, slope will become just Panel 1 and change slope side panel 2 splice by welding to be integrated;Main material angle steel 3 and lower main material angle steel 4 are installed again.
To sum up, the change ramp of Transmission Towers of the invention tiltedly bent technique first to become slope front plate 1 and upper main material angle steel 3 On the basis of the connecting hole of lower main material angle steel 4,30,40, the stupefied line of angle steel of main material angle steel 3 and lower main material angle steel 4 is drawn respectively It sets;The intersection point that the stupefied line 30 of angle steel of the above main material angle steel 3 and the stupefied line 40 of angle steel of lower main material angle steel 4 extend is the benchmark of fiery curve Point 5, it is to become slope front plate 1 to take the angular bisector of the stupefied line of the angle steel of the stupefied line of the angle steel of main material angle steel 3 30 and lower main material angle steel 4 40 Fiery curve location, to become slope front plate 1 carry out oblique song;Then, it on the basis of becoming slope front plate 1, is drawn on becoming slope front plate 1 Go out it is corresponding become slope side panel 2 plate hole locations, further according to become slope front plate 1 measure become slope side panel 2 end holes to change The distance of 1 fire curve datum mark 5 of slope front plate, shifting hole is carried out to becoming slope side panel 2;Take the stupefied line of the angle steel of main material angle steel 3 30 The intersection point extended with the stupefied line 40 of angle steel of lower main material angle steel 4 is the datum mark 5 for becoming the fiery curve of slope side panel 2, takes main material angle steel 3 The angular bisector of the stupefied line of angle steel 40 of the stupefied line of angle steel 30 and lower main material angle steel 4 be the fiery curve location for becoming slope side panel 2, to change Slope side panel 2 carries out oblique song.To efficiently solve become slope front plate 1 with become slope side panel 2 weld after with upper main material angle steel 3 and The lower connection of main material angle steel 4 leads to the problem of gap;So that becoming slope front plate 1 or becoming slope side panel 2 and upper main material angle steel 3 and lower master Material angle steel 4 is bonded gapless, meets design requirement and installation requirement.
According to the disclosure and teachings of the above specification, those skilled in the art in the invention can also be to above-mentioned embodiment party Formula is changed and is changed.Therefore, the invention is not limited in specific implementation modes disclosed and described above, to the present invention's Some modifications and changes should also be as falling into the scope of the claims of the present invention.In addition, although being used in this specification Some specific terms, these terms are merely for convenience of description, does not limit the present invention in any way.

Claims (5)

1. a kind of oblique bent technique of the change ramp of Transmission Towers, which is characterized in that include the following steps:
To become slope front plate on the basis of the connecting hole of upper main material angle steel and lower main material angle steel, main material angle steel is drawn respectively under The stupefied line position of angle steel of main material angle steel;Wherein, the stupefied line of angle steel of the above main material angle steel and the stupefied line of the angle steel of lower main material angle steel extend Intersection point be fiery curve datum mark, take the flat of the stupefied line of the angle steel of main material angle steel and the angle of the stupefied line of angle steel of lower main material angle steel Separated time is the fiery curve location for becoming slope front plate, and tiltedly song is carried out to becoming slope front plate;
On the basis of becoming slope front plate, the corresponding plate hole locations for becoming slope side panel are drawn on becoming slope front plate, further according to change Slope front plate measure become slope side panel end holes to become slope front plate fire curve datum mark distance, to change slope side panel into Row moves hole;
It is the datum mark of fiery curve to take the intersection point that the stupefied line of angle steel of the stupefied line of the angle steel of main material angle steel and lower main material angle steel extends, and is taken The folder bisector of angle of the stupefied line of angle steel of upper main material angle steel and the stupefied line of angle steel of lower main material angle steel is the fiery curve for becoming slope side panel Position carries out tiltedly song to becoming slope side panel.
2. the oblique bent technique of the change ramp of Transmission Towers as described in claim 1, it is characterised in that:When the fire for becoming slope front plate When curve is pressed onto the Transmission Towers tabula material holes Transverse Cai, the fire that tabula material is obtained to tabula material by the bent method of horizontal fire is bent Line, then become slope front plate fiery curve and tabula material fiery curve intersection position at bore a transitional pore, then make it is curved, fill out It welds and polishes.
3. the oblique bent technique of the change ramp of Transmission Towers as described in claim 1, it is characterised in that:When the fire for becoming slope side panel When curve is pressed onto the Transmission Towers tabula material holes Transverse Cai, the fire that tabula material is obtained to tabula material by the bent method of horizontal fire is bent Line, then become slope side panel fiery curve and tabula material fiery curve intersection position at bore a transitional pore, then make it is curved, fill out It welds and polishes.
4. the oblique bent technique of the change ramp of Transmission Towers as claimed in claim 2 or claim 3, it is characterised in that:The transitional pore A diameter of 17.5mm or 21.5mm.
5. the oblique bent technique of the change ramp of Transmission Towers as described in claim 1, it is characterised in that:To become the fire of slope front plate The fiery curve of curve and change slope side panel will become slope front plate and change slope side panel splicing is integrated into connecting line;It installs again Main material angle steel and lower main material angle steel.
CN201710148274.9A 2017-03-14 2017-03-14 A kind of oblique bent technique of the change ramp of Transmission Towers Active CN107052113B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710148274.9A CN107052113B (en) 2017-03-14 2017-03-14 A kind of oblique bent technique of the change ramp of Transmission Towers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710148274.9A CN107052113B (en) 2017-03-14 2017-03-14 A kind of oblique bent technique of the change ramp of Transmission Towers

Publications (2)

Publication Number Publication Date
CN107052113A CN107052113A (en) 2017-08-18
CN107052113B true CN107052113B (en) 2018-09-18

Family

ID=59623040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710148274.9A Active CN107052113B (en) 2017-03-14 2017-03-14 A kind of oblique bent technique of the change ramp of Transmission Towers

Country Status (1)

Country Link
CN (1) CN107052113B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111496025A (en) * 2020-04-24 2020-08-07 江苏大盛铁塔制造有限公司 Processing technology for angle steel variable slope bending

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013143230A1 (en) * 2012-03-28 2013-10-03 中兴通讯股份有限公司 Iron tower
CN103590646A (en) * 2013-11-11 2014-02-19 国家电网公司 Triangular fracture surface angle steel tower for power transmission line
CN203452436U (en) * 2013-06-24 2014-02-26 浙江盛达铁塔有限公司 Angle-iron tower derrick supporting hanging point structure
CN203924857U (en) * 2013-11-22 2014-11-05 国家电网公司 A kind of tower variable cross-section combined joint and steel tower
CN104594697A (en) * 2015-02-05 2015-05-06 中国电力工程顾问集团西南电力设计院有限公司 Variable slope joint for section of non-filler plate four-piece combined angle steel of power transmission tower
CN205713396U (en) * 2016-05-05 2016-11-23 中国电力科学研究院 Attachment means for power transmission tower
CN205805105U (en) * 2016-07-02 2016-12-14 温州泰昌铁塔制造有限公司 A kind of connecting plate being connected with tower body change slope for angle steel tower closing in cross-arm

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO332791B1 (en) * 2011-05-27 2013-01-14 Owec Tower As Transition element for attaching a twine to a jacket

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013143230A1 (en) * 2012-03-28 2013-10-03 中兴通讯股份有限公司 Iron tower
CN203452436U (en) * 2013-06-24 2014-02-26 浙江盛达铁塔有限公司 Angle-iron tower derrick supporting hanging point structure
CN103590646A (en) * 2013-11-11 2014-02-19 国家电网公司 Triangular fracture surface angle steel tower for power transmission line
CN203924857U (en) * 2013-11-22 2014-11-05 国家电网公司 A kind of tower variable cross-section combined joint and steel tower
CN104594697A (en) * 2015-02-05 2015-05-06 中国电力工程顾问集团西南电力设计院有限公司 Variable slope joint for section of non-filler plate four-piece combined angle steel of power transmission tower
CN205713396U (en) * 2016-05-05 2016-11-23 中国电力科学研究院 Attachment means for power transmission tower
CN205805105U (en) * 2016-07-02 2016-12-14 温州泰昌铁塔制造有限公司 A kind of connecting plate being connected with tower body change slope for angle steel tower closing in cross-arm

Also Published As

Publication number Publication date
CN107052113A (en) 2017-08-18

Similar Documents

Publication Publication Date Title
CN107264724A (en) It is used for the baseline design method that fitting-out piping is installed in the anti-state segmentation of cabin curved surface
CN107988908A (en) The total assembling method of tubular arch
CN107052113B (en) A kind of oblique bent technique of the change ramp of Transmission Towers
CN204781020U (en) Side slope stock and soil nail draw testing arrangement
CN206617698U (en) Funneling cut-off joint
CN210217729U (en) Shield constructs quick-witted and vertical translation device in bracket station
CN104149932B (en) Ton bulk goods deadwood pre-installs closure workmanship
CN103419899B (en) Onboard quick accurate positioning installation method for straight-through straight-bar rudder system
CN204918659U (en) A blow automatic coupling mechanism of argon for making steel automatic mechanism of aligning in area in technology
CN217176641U (en) Cast lining lapping device and tunnel lining trolley
CN107554692B (en) A kind of method for loading of ship side structure body
CN103015333B (en) Guiding structure for culvert section jacking and jacking method using guiding structure
CN105625462A (en) Precast beam pedestal construction process
CN204178007U (en) Fiber adapter shell
CN109457741B (en) Device for preventing abutment from shifting and sand leakage and implementation method thereof
CN103510472B (en) A kind of can automatic deviation correction incremental launching construction guiding carriage
CN206828926U (en) A kind of both sides of the road limiting structure of highway engineering construction
CN208917699U (en) A kind of positioning device of high-speed railway bridge pier template
CN106764078A (en) The technique for fixing of the interim auxiliary stand of pipeline sea-freight
CN203498759U (en) Pushing construction guide sliding device capable of automatically rectifying deviations
CN104438497B (en) Clod wash channel-section steel forming method
CN206407075U (en) A kind of container guide rails support structure
CN107717333A (en) A kind of pylon structure manufacture craft
CN204988154U (en) Aligning device is used in shaft coupling installation
CN204584695U (en) Equipment pre-buried steel backing plate levelling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant