CN107051674B - A kind of discarded stone brick crushing device in construction site - Google Patents

A kind of discarded stone brick crushing device in construction site Download PDF

Info

Publication number
CN107051674B
CN107051674B CN201710342658.4A CN201710342658A CN107051674B CN 107051674 B CN107051674 B CN 107051674B CN 201710342658 A CN201710342658 A CN 201710342658A CN 107051674 B CN107051674 B CN 107051674B
Authority
CN
China
Prior art keywords
baffle
bracing wire
treatment box
briquetting
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710342658.4A
Other languages
Chinese (zh)
Other versions
CN107051674A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Woyang County Shengfeng New Building Co ltd
Original Assignee
GUOYANG SHENGFENG NEW BUILDING MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUOYANG SHENGFENG NEW BUILDING MATERIAL CO Ltd filed Critical GUOYANG SHENGFENG NEW BUILDING MATERIAL CO Ltd
Priority to CN201710342658.4A priority Critical patent/CN107051674B/en
Publication of CN107051674A publication Critical patent/CN107051674A/en
Application granted granted Critical
Publication of CN107051674B publication Critical patent/CN107051674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/06Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
    • B02C18/14Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives within horizontal containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/14Stamping mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/0084Disintegrating by knives or other cutting or tearing members which chop material into fragments specially adapted for disintegrating garbage, waste or sewage
    • B02C18/0092Disintegrating by knives or other cutting or tearing members which chop material into fragments specially adapted for disintegrating garbage, waste or sewage for waste water or for garbage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/16Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C2201/00Codes relating to disintegrating devices adapted for specific materials
    • B02C2201/06Codes relating to disintegrating devices adapted for specific materials for garbage, waste or sewage

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)
  • Disintegrating Or Milling (AREA)

Abstract

The present invention relates to a kind of crushing devices more particularly to a kind of construction site to discard stone brick crushing device.The technical problem to be solved in the present invention is to provide a kind of construction sites to discard stone brick crushing device.In order to solve the above-mentioned technical problems, the present invention provides such a construction sites to discard stone brick crushing device, includes treatment box, first baffle, second baffle, strainer, collection frame, mobile device etc.;Treatment box inner left wall is hingedly connected with first baffle, treatment box inner right wall is hingedly connected with second baffle, the first elastic component is connected at the top of first baffle and at the top of second baffle between processing chamber interior wall, first baffle and second baffle are located at below mobile device, and strainer is equipped in treatment box.The present invention is by the cooperation of mobile device and auxiliary device, to carrying out broken construction site and discard stone brick to carry out multiple broken, has achieved the effect that sufficiently broken to discarded stone brick, and the stability of device is strong.

Description

A kind of discarded stone brick crushing device in construction site
Technical field
The present invention relates to a kind of crushing devices more particularly to a kind of construction site to discard stone brick crushing device.
Background technique
It is a kind of building waste that stone brick is discarded in construction site, and building waste refers in engineering due to artificial or natural etc. The construction waste that reason generates.These materials are itself no any help for building, but in the mistake of building The substance generated in journey needs to perform corresponding processing, and can reach ideal Engineering Project Construction in this way, just because of being one A whole process such as can also damage environment without processing, so it is also the considerations of crushing recycling link Critically important.
In today of rapid developmentization, the continuous renewal of building, so that building waste increasing number, wherein especially with discarded Stone brick quantity is more, but these waste material volumes are larger, it has not been convenient to which directly to its transport processing, and many crushing devices are broken at present It is ineffective, it cannot sufficiently be crushed, therefore need to research and develop that a kind of can to carry out sufficiently broken construction site to discarded stone brick useless Abandon stone brick crushing device.
Summary of the invention
(1)Technical problems to be solved
The present invention is in order to overcome today in rapid developmentization, the continuous renewal of building, so that building waste quantity is acute Increase, wherein it is especially more with discarded stone brick quantity, but these waste material volumes are larger, it has not been convenient to directly to its transport processing, and at present Many crushing device crushing effects are bad, and the disadvantage that cannot be sufficiently crushed, the technical problem to be solved in the present invention is to provide one kind Stone brick crushing device is discarded in construction site.
(2)Technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a construction sites to discard stone brick crushing device, packet Treatment box, first baffle, second baffle, strainer, collection frame, mobile device, auxiliary device and the first elastic component are included;Treatment box Inner top is equipped with mobile device, and treatment box inner left wall is hingedly connected with first baffle, and treatment box inner right wall is hingedly connected with second Baffle, is connected with the first elastic component between processing chamber interior wall at the top of first baffle and at the top of second baffle, first baffle and Second baffle is located at below mobile device, and strainer is equipped in treatment box, and strainer is located at the lower section of first baffle and second baffle, filters Net top is equipped with auxiliary device, and bottom is placed with collection frame in treatment box, and processing right wall of box is provided with the first opening and the second opening, Second opening is located at the lower section of the first opening.
Preferably, mobile device includes motor, first bearing seat, nut, screw rod, second bearing seat, connecting rod and electronic Broken wheel, treatment box inner top are successively arranged motor, first bearing seat and second bearing seat from left to right, first bearing seat and the Screw rod is installed between two bearing bracket, screw rod left end is connect with motor right end, and screw rod is equipped with nut, and screw rod and nut cooperate, Nut bottom is equipped with connecting rod, and connecting rod lower end is connected with electronic broken wheel.
Preferably, auxiliary device includes the second elastic component, the first briquetting, guide rod, the second briquetting, the first bracing wire, One electronic reel and the first strut, treatment box inner left wall are equipped with guide rod, and guide rod is located above strainer, treatment box inner left wall Guide rod is respectively connected with the second elastic component in two sides up and down, and the second elastic component right end is connected with the first briquetting, is provided on the first briquetting First through hole, guide rod pass through first through hole, contact at the top of the first briquetting bottom and strainer, the second briquetting is equipped with above strainer, Second briquetting is located at the first briquetting right, and treatment box inner right wall is equipped with the first strut, and the first strut is located above strainer, and first Bar left end is connected with the first electronic reel, and the first bracing wire, the first end of pulling and the first pressure are wound on the first electronic reel Connection on the right side of block.
It preferably, further include having the first fixed pulley, the second bracing wire, the first pull ring, third bracing wire, the second fixed pulley and second Pull ring, treatment box left wall are provided with the second through-hole, and processing right wall of box is provided with third through-hole, and the second through-hole is located at the lower-left of first baffle Side, third through-hole are located at the lower right of second baffle, and treatment box left wall is equipped with the first fixed pulley, and it is logical that the first fixed pulley is located at second The lower left in hole, processing right wall of box are equipped with the second fixed pulley, and the second fixed pulley is located at the lower right first baffle bottom of third through-hole Portion is equipped with the second bracing wire, and second is drawstring through the second through-hole, and the second bracing wire bypasses the first fixed pulley, and the second end of pulling is connected with First pull ring, second baffle bottom are equipped with third bracing wire, and third is drawstring through third through-hole, and third bracing wire is fixed sliding around second Wheel, third end of pulling are connected with the second pull ring.
It preferably, further include thering is the second electronic reel, the second strut, sliding rail, sliding block, third elastic component and the 4th to draw Line, bottom is equipped with the second strut and sliding rail in treatment box, and the second strut is located at the left of sliding rail, and the second strut upper end is connected with the Two electronic reels, slidingtype is connected with sliding block on sliding rail, collects frame bottom and connect with slider top, sliding block right side and treatment box It is connected with third elastic component between inner right wall, the 4th bracing wire is wound on the second electronic reel, the 4th end of pulling and sliding block are left Side connection.
It preferably, further include having the first limited block and guide plate, bottom is equipped with guide plate in treatment box, and guide plate is located at the Between two struts and sliding rail, pilot hole is provided on guide plate, the 4th is drawstring through pilot hole, and sliding rail top right side is equipped with the first limit Position block.
It preferably, further include having the second limited block, electromagnet and iron block, treatment box inner top is equipped with the second limited block, the Two limited blocks are equipped with iron block, are equipped on the left of second baffle between first bearing seat and second bearing seat on the right side of first baffle Electromagnet.
Preferably, the material of connecting rod is stainless steel.
Preferably, the first elastic component, the second elastic component and third elastic component are spring.
Preferably, the first bracing wire, the second bracing wire, third bracing wire and the 4th bracing wire are wirerope.
Working principle:When needing to be crushed the discarded stone brick on construction site, staff leads to discarded stone brick It crosses the first opening to be poured into treatment box, starting mobile device work, mobile device is crushed discarded stone brick, when being crushed Bi Hou, staff open first baffle and second baffle, and discarded stone brick is fallen in auxiliary device, start auxiliary device work Make, auxiliary device is further crushed discarded stone brick, and the broken discarded stone brick finished falls to collection frame by strainer Interior, collection frame can be collected discarded stone brick clast, and staff is taken out collection frame by the second opening.
Because mobile device includes motor, first bearing seat, nut, screw rod, second bearing seat, connecting rod and electronic broken Wheel, treatment box inner top are successively arranged motor, first bearing seat and second bearing seat, first bearing seat and the second axis from left to right It holds and screw rod is installed between seat, screw rod left end is connect with motor right end, and screw rod is equipped with nut, and screw rod and nut cooperate, nut Bottom is equipped with connecting rod, and connecting rod lower end is connected with electronic broken wheel, so starting motor when needing to be crushed discarded stone brick It carries out intermittent along reversion, to drive screw rod intermittence along reversion, drives nut side-to-side movement, to drive connecting rod and electronic Broken wheel side-to-side movement, while starting electronic broken wheel work, electronic broken wheel side-to-side movement while, rotate to discarded stone brick It is crushed.
Because auxiliary device includes the second elastic component, the first briquetting, guide rod, the second briquetting, the first bracing wire, the first electricity Dynamic reel and the first strut, treatment box inner left wall are equipped with guide rod, and guide rod is located above strainer, treatment box inner left wall guiding Bar is respectively connected with the second elastic component in two sides up and down, and the second elastic component right end is connected with the first briquetting, is provided with first on the first briquetting Through-hole, guide rod pass through first through hole, contact at the top of the first briquetting bottom and strainer, equipped with the second briquetting above strainer, second Briquetting is located at the first briquetting right, and treatment box inner right wall is equipped with the first strut, and the first strut is located above strainer, and the first strut is left End is connected with the first electronic reel, and the first bracing wire is wound on the first electronic reel, and the first end of pulling and the first briquetting are right Side connection, so the electronic reel of starting first is intermittent when discarded stone brick is fallen between the first briquetting and the second briquetting Along reversion, first electronic the first bracing wire of reel folding and unfolding, the first bracing wire drives the first briquetting side-to-side movement, the first briquetting and second Briquetting cooperation, is further crushed discarded stone brick.
Because further including thering is the first fixed pulley, the second bracing wire, the first pull ring, third bracing wire, the second fixed pulley and second to draw Ring, treatment box left wall are provided with the second through-hole, and processing right wall of box is provided with third through-hole, and the second through-hole is located at the lower-left of first baffle Side, third through-hole are located at the lower right of second baffle, and treatment box left wall is equipped with the first fixed pulley, and it is logical that the first fixed pulley is located at second The lower left in hole, processing right wall of box are equipped with the second fixed pulley, and the second fixed pulley is located at the lower right first baffle bottom of third through-hole Portion is equipped with the second bracing wire, and second is drawstring through the second through-hole, and the second bracing wire bypasses the first fixed pulley, and the second end of pulling is connected with First pull ring, second baffle bottom are equipped with third bracing wire, and third is drawstring through third through-hole, and third bracing wire is fixed sliding around second Wheel, third end of pulling are connected with the second pull ring, so staff pulls when needing to open first baffle and second baffle First pull ring and the second pull ring, the first pull ring pulls the second bracing wire, so that first baffle moves downward, the second pull ring pulls third Bracing wire, so that first baffle and second baffle are opened, reaches a time saving and energy saving effect so that second baffle moves downward Fruit.
Because further including having the second electronic reel, the second strut, sliding rail, sliding block, third elastic component and the 4th bracing wire, place It manages bottom in case and is equipped with the second strut and sliding rail, the second strut is located at the left of sliding rail, and the second strut upper end is connected with the second electricity Reel is moved, slidingtype is connected with sliding block on sliding rail, and it collects frame bottom and is connect with slider top, sliding block right side and the right side in treatment box It is connected with third elastic component between wall, the 4th bracing wire is wound on the second electronic reel, is connected on the left of the 4th end of pulling and sliding block It connects, so when staff needs to take out collection frame, the electronic reel reversion of starting second, the second electronic reel releases the Four bracing wires drive collection frame to move right, when collection frame moves to the second opening, second is electronic so that sliding block moves right Reel stops working, and staff can take out collection frame.
Because further including having the first limited block and guide plate, bottom is equipped with guide plate in treatment box, and guide plate is located at second Between strut and sliding rail, pilot hole is provided on guide plate, the 4th is drawstring through pilot hole, and sliding rail top right side is equipped with the first limit Block, so guide plate can make the 4th bracing wire operably more stable, the first limited block can limit the move distance of sliding block, The stability of enhancement device.
Because further including having the second limited block, electromagnet and iron block, treatment box inner top is equipped with the second limited block, the second limit Position block is equipped with iron block, is equipped with electromagnetism on the left of second baffle between first bearing seat and second bearing seat on the right side of first baffle Iron, so the second limited block can limit the move distance of nut, the stability of enhancement device, originally electromagnet is energization shape State, electromagnet band are magnetic, and iron block is sucked, so that first baffle and second baffle closure are stronger, when needing to open first It when baffle and second baffle, is powered off to electromagnet, electromagnet discharges iron block, allows to open first baffle and second baffle.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode and circuit connection are not explained with the present invention.
(3)Beneficial effect
The present invention passes through the cooperation of mobile device and auxiliary device, discards the progress of stone brick to carry out broken construction site It is multiple broken, achieve the effect that sufficiently broken to discarded stone brick, and the stability of device is strong, easy to operate, replicability By force.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of mobile device of the present invention.
Fig. 3 is the schematic view of the front view of servicing unit of the present invention.
Fig. 4 is the first part schematic view of the front view of the invention.
Fig. 5 is second of part schematic view of the front view of the invention.
Fig. 6 is the third part schematic view of the front view of the invention.
Fig. 7 is the 4th kind of part schematic view of the front view of the invention.
Label in attached drawing be:1- treatment box, 2- first baffle, 3- second baffle, 4- strainer, 5- collection frame, 6- are mobile Device, 60- motor, 61- first bearing seat, 62- nut, 63- screw rod, 64- second bearing seat, 65- connecting rod, 66- are electronic broken Wheel, 7- auxiliary device, the second elastic component of 70-, the first briquetting of 71-, 72- first through hole, 73- guide rod, the second briquetting of 74-, 75- First bracing wire, the electronic reel of 76- first, the first strut of 77-, 8- first are open, and the first elastic component of 9-, 10- second is open, The first fixed pulley of 11-, the second bracing wire of 12-, the second through-hole of 13-, the first pull ring of 14-, 15- third through-hole, 16- third bracing wire, 17- Second fixed pulley, the second pull ring of 18-, the electronic reel of 19- second, the second strut of 20-, 21- sliding rail, 22- sliding block, 23- third Elastic component, the 4th bracing wire of 24-, the first limited block of 25-, 26- guide plate, 27- pilot hole, the second limited block of 28-, 29- electromagnet, 30- iron block.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
It includes as shown in figs. 1-7 treatment box 1, first baffle 2, second that stone brick crushing device is discarded in a kind of construction site Baffle 3, strainer 4, collection frame 5, mobile device 6, auxiliary device 7 and the first elastic component 9;1 inner top for the treatment of box is equipped with mobile dress 6 are set, 1 inner left wall for the treatment of box is hingedly connected with first baffle 2, and 1 inner right wall for the treatment of box is hingedly connected with second baffle 3, first gear 2 top of plate and 3 top of second baffle are connected with the first elastic component 9, first baffle 2 and second gear between 1 inner wall for the treatment of box Plate 3 is located at 6 lower section of mobile device, is equipped with strainer 4 in treatment box 1, and strainer 4 is located at the lower section of first baffle 2 and second baffle 3, Auxiliary device 7 is equipped at the top of strainer 4, bottom is placed with collection frame 5 in treatment box 1, and 1 right wall for the treatment of box is provided with 8 He of the first opening Second opening 10, the second opening 10 are located at the lower section of the first opening 8.
Embodiment 2
It includes as shown in figs. 1-7 treatment box 1, first baffle 2, second that stone brick crushing device is discarded in a kind of construction site Baffle 3, strainer 4, collection frame 5, mobile device 6, auxiliary device 7 and the first elastic component 9;1 inner top for the treatment of box is equipped with mobile dress 6 are set, 1 inner left wall for the treatment of box is hingedly connected with first baffle 2, and 1 inner right wall for the treatment of box is hingedly connected with second baffle 3, first gear 2 top of plate and 3 top of second baffle are connected with the first elastic component 9, first baffle 2 and second gear between 1 inner wall for the treatment of box Plate 3 is located at 6 lower section of mobile device, is equipped with strainer 4 in treatment box 1, and strainer 4 is located at the lower section of first baffle 2 and second baffle 3, Auxiliary device 7 is equipped at the top of strainer 4, bottom is placed with collection frame 5 in treatment box 1, and 1 right wall for the treatment of box is provided with 8 He of the first opening Second opening 10, the second opening 10 are located at the lower section of the first opening 8.
Mobile device 6 includes motor 60, first bearing seat 61, nut 62, screw rod 63, second bearing seat 64, connecting rod 65 With electronic broken wheel 66,1 inner top for the treatment of box is successively arranged motor 60, first bearing seat 61 and second bearing seat from left to right 64, screw rod 63 is installed, 63 left end of screw rod is connect with 60 right end of motor, screw rod between first bearing seat 61 and second bearing seat 64 63 are equipped with nut 62, and screw rod 63 and nut 62 cooperate, and 62 bottom of nut is equipped with connecting rod 65, and 65 lower end of connecting rod is connected with electronic broken Broken wheel 66.
Embodiment 3
It includes as shown in figs. 1-7 treatment box 1, first baffle 2, second that stone brick crushing device is discarded in a kind of construction site Baffle 3, strainer 4, collection frame 5, mobile device 6, auxiliary device 7 and the first elastic component 9;1 inner top for the treatment of box is equipped with mobile dress 6 are set, 1 inner left wall for the treatment of box is hingedly connected with first baffle 2, and 1 inner right wall for the treatment of box is hingedly connected with second baffle 3, first gear 2 top of plate and 3 top of second baffle are connected with the first elastic component 9, first baffle 2 and second gear between 1 inner wall for the treatment of box Plate 3 is located at 6 lower section of mobile device, is equipped with strainer 4 in treatment box 1, and strainer 4 is located at the lower section of first baffle 2 and second baffle 3, Auxiliary device 7 is equipped at the top of strainer 4, bottom is placed with collection frame 5 in treatment box 1, and 1 right wall for the treatment of box is provided with 8 He of the first opening Second opening 10, the second opening 10 are located at the lower section of the first opening 8.
Mobile device 6 includes motor 60, first bearing seat 61, nut 62, screw rod 63, second bearing seat 64, connecting rod 65 With electronic broken wheel 66,1 inner top for the treatment of box is successively arranged motor 60, first bearing seat 61 and second bearing seat from left to right 64, screw rod 63 is installed, 63 left end of screw rod is connect with 60 right end of motor, screw rod between first bearing seat 61 and second bearing seat 64 63 are equipped with nut 62, and screw rod 63 and nut 62 cooperate, and 62 bottom of nut is equipped with connecting rod 65, and 65 lower end of connecting rod is connected with electronic broken Broken wheel 66.
Auxiliary device 7 includes the second elastic component 70, the first briquetting 71, guide rod 73, the second briquetting 74, the first bracing wire 75, the first electronic reel 76 and the first strut 77,1 inner left wall for the treatment of box are equipped with guide rod 73, and guide rod 73 is located on strainer 4 Side, 1 inner left wall guide rod for the treatment of box, about 73 two sides are respectively connected with the second elastic component 70, and 70 right end of the second elastic component is connected with the One briquetting 71, first through hole 72 is provided on the first briquetting 71, and guide rod 73 passes through first through hole 72,71 bottom of the first briquetting and filter It is contacted at the top of net 4, the second briquetting 74 is equipped with above strainer 4, the second briquetting 74 is located at 71 right of the first briquetting, the right side in treatment box 1 Wall is equipped with the first strut 77, and the first strut 77 is located at 4 top of strainer, and 77 left end of the first strut is connected with the first electronic reel 76, the first bracing wire 75 is wound on the first electronic reel 76, is connected on the right side of 75 end of the first bracing wire and the first briquetting 71.
Embodiment 4
It includes as shown in figs. 1-7 treatment box 1, first baffle 2, second that stone brick crushing device is discarded in a kind of construction site Baffle 3, strainer 4, collection frame 5, mobile device 6, auxiliary device 7 and the first elastic component 9;1 inner top for the treatment of box is equipped with mobile dress 6 are set, 1 inner left wall for the treatment of box is hingedly connected with first baffle 2, and 1 inner right wall for the treatment of box is hingedly connected with second baffle 3, first gear 2 top of plate and 3 top of second baffle are connected with the first elastic component 9, first baffle 2 and second gear between 1 inner wall for the treatment of box Plate 3 is located at 6 lower section of mobile device, is equipped with strainer 4 in treatment box 1, and strainer 4 is located at the lower section of first baffle 2 and second baffle 3, Auxiliary device 7 is equipped at the top of strainer 4, bottom is placed with collection frame 5 in treatment box 1, and 1 right wall for the treatment of box is provided with 8 He of the first opening Second opening 10, the second opening 10 are located at the lower section of the first opening 8.
Mobile device 6 includes motor 60, first bearing seat 61, nut 62, screw rod 63, second bearing seat 64, connecting rod 65 With electronic broken wheel 66,1 inner top for the treatment of box is successively arranged motor 60, first bearing seat 61 and second bearing seat from left to right 64, screw rod 63 is installed, 63 left end of screw rod is connect with 60 right end of motor, screw rod between first bearing seat 61 and second bearing seat 64 63 are equipped with nut 62, and screw rod 63 and nut 62 cooperate, and 62 bottom of nut is equipped with connecting rod 65, and 65 lower end of connecting rod is connected with electronic broken Broken wheel 66.
Auxiliary device 7 includes the second elastic component 70, the first briquetting 71, guide rod 73, the second briquetting 74, the first bracing wire 75, the first electronic reel 76 and the first strut 77,1 inner left wall for the treatment of box are equipped with guide rod 73, and guide rod 73 is located on strainer 4 Side, 1 inner left wall guide rod for the treatment of box, about 73 two sides are respectively connected with the second elastic component 70, and 70 right end of the second elastic component is connected with the One briquetting 71, first through hole 72 is provided on the first briquetting 71, and guide rod 73 passes through first through hole 72,71 bottom of the first briquetting and filter It is contacted at the top of net 4, the second briquetting 74 is equipped with above strainer 4, the second briquetting 74 is located at 71 right of the first briquetting, the right side in treatment box 1 Wall is equipped with the first strut 77, and the first strut 77 is located at 4 top of strainer, and 77 left end of the first strut is connected with the first electronic reel 76, the first bracing wire 75 is wound on the first electronic reel 76, is connected on the right side of 75 end of the first bracing wire and the first briquetting 71.
It further include having the first fixed pulley 11, the second bracing wire 12, the first pull ring 14, third bracing wire 16,17 and of the second fixed pulley Second pull ring 18,1 left wall for the treatment of box are provided with the second through-hole 13, and 1 right wall for the treatment of box is provided with third through-hole 15, and the second through-hole 13 is located at The lower left of first baffle 2, third through-hole 15 are located at the lower right of second baffle 3, and 1 left wall for the treatment of box is equipped with the first fixed pulley 11, the first fixed pulley 11 is located at the lower left of the second through-hole 13, and 1 right wall for the treatment of box is equipped with the second fixed pulley 17, the second fixed pulley 17 2 bottoms of lower right first baffle for being located at third through-hole 15 are equipped with the second bracing wire 12, and the second bracing wire 12 passes through the second through-hole 13, Second bracing wire 12 bypasses the first fixed pulley 11, and 12 end of the second bracing wire is connected with the first pull ring 14, and 3 bottom of second baffle is equipped with the Three bracing wires 16, third bracing wire 16 pass through third through-hole 15, and third bracing wire 16 bypasses the second fixed pulley 17, and 16 end of third bracing wire connects It is connected to the second pull ring 18.
It further include having the second electronic reel 19, the second strut 20, sliding rail 21, sliding block 22, third elastic component 23 and the 4th Bracing wire 24, bottom is equipped with the second strut 20 and sliding rail 21 in treatment box 1, and the second strut 20 is located at the left of sliding rail 21, and second 20 upper end of bar is connected with the second electronic reel 19, and slidingtype is connected with sliding block 22,5 bottom of collection frame and sliding block 22 on sliding rail 21 Top connection, is connected with third elastic component 23 between the right side of sliding block 22 and 1 inner right wall for the treatment of box, on the second electronic reel 19 around There is the 4th bracing wire 24, is connected on the left of 24 end of the 4th bracing wire and sliding block 22.
It further include having the first limited block 25 and guide plate 26, bottom is equipped with guide plate 26 in treatment box 1, and guide plate 26 is located at Between second strut 20 and sliding rail 21, pilot hole 27 is provided on guide plate 26, the 4th bracing wire 24 passes through pilot hole 27, and sliding rail 21 pushes up The first limited block 25 is equipped on the right side of portion.
It further include having the second limited block 28, electromagnet 29 and iron block 30,1 inner top for the treatment of box is equipped with the second limited block 28, Second limited block 28 is equipped with iron block 30, second gear between first bearing seat 61 and second bearing seat 64 on the right side of first baffle 2 Electromagnet 29 is equipped on the left of plate 3.
The material of connecting rod 65 is stainless steel.
First elastic component 9, the second elastic component 70 and third elastic component 23 are spring.
First bracing wire 75, the second bracing wire 12, third bracing wire 16 and the 4th bracing wire 24 are wirerope.
Working principle:When needing to be crushed the discarded stone brick on construction site, staff leads to discarded stone brick It crosses the first opening 8 to be poured into treatment box 1, starting mobile device 6 works, and mobile device 6 is crushed discarded stone brick, when broken After broken, staff opens first baffle 2 and second baffle 3, and discarded stone brick is fallen in auxiliary device 7, starting auxiliary Device 7 works, and auxiliary device 7 is further crushed discarded stone brick, and the broken discarded stone brick finished is fallen by strainer 4 To collection frame 5, collection frame 5 can be collected discarded stone brick clast, and staff is taken collection frame 5 by the second opening 10 Out.
Because mobile device 6 includes motor 60, first bearing seat 61, nut 62, screw rod 63, second bearing seat 64, connects Bar 65 and electronic broken wheel 66,1 inner top for the treatment of box is successively arranged motor 60, first bearing seat 61 and second bearing from left to right Seat 64, is equipped with screw rod 63,63 left end of screw rod is connect with 60 right end of motor, silk between first bearing seat 61 and second bearing seat 64 Bar 63 is equipped with nut 62, and screw rod 63 and nut 62 cooperate, and 62 bottom of nut is equipped with connecting rod 65, and 65 lower end of connecting rod is connected with electronic Broken wheel 66, so starting motor 60 carries out intermittence along reversion, to drive silk when needing to be crushed discarded stone brick Bar 63 is intermittent along reversion, 62 side-to-side movement of nut is driven, to drive 66 side-to-side movements of connecting rod 65 and electronic broken wheel, simultaneously Start electronic 66 work of broken wheel, rotates while 66 side-to-side movement of electronic broken wheel and discarded stone brick is crushed.
Because auxiliary device 7 includes the second elastic component 70, the first briquetting 71, guide rod 73, the drawing of the second briquetting 74, first Line 75, the first electronic reel 76 and the first strut 77,1 inner left wall for the treatment of box are equipped with guide rod 73, and guide rod 73 is located at strainer 4 Top, 1 inner left wall guide rod for the treatment of box, about 73 two sides are respectively connected with the second elastic component 70, and 70 right end of the second elastic component is connected with First briquetting 71, is provided with first through hole 72 on the first briquetting 71, and guide rod 73 passes through first through hole 72,71 bottom of the first briquetting with It is contacted at the top of strainer 4, the second briquetting 74 is equipped with above strainer 4, the second briquetting 74 is located at 71 right of the first briquetting, in treatment box 1 Right wall is equipped with the first strut 77, and the first strut 77 is located at 4 top of strainer, and 77 left end of the first strut is connected with the first electronic reel 76, the first bracing wire 75 is wound on the first electronic reel 76, is connected on the right side of 75 end of the first bracing wire and the first briquetting 71, so working as When discarded stone brick is fallen between the first briquetting 71 and the second briquetting 74, the intermittent suitable reversion of the first electronic reel 76 of starting, First electronic 76 the first bracing wire of folding and unfolding 75 of reel, the first bracing wire 75 drive 71 side-to-side movement of the first briquetting, the first briquetting 71 with The cooperation of second briquetting 74, is further crushed discarded stone brick.
Because further including having the first fixed pulley 11, the second bracing wire 12, the first pull ring 14, third bracing wire 16, the second fixed pulley 17 and second pull ring 18,1 left wall for the treatment of box be provided with the second through-hole 13,1 right wall for the treatment of box is provided with third through-hole 15, the second through-hole 13 Positioned at the lower left of first baffle 2, third through-hole 15 is located at the lower right of second baffle 3, and it is fixed sliding that 1 left wall for the treatment of box is equipped with first Wheel 11, the first fixed pulley 11 are located at the lower left of the second through-hole 13, and 1 right wall for the treatment of box is equipped with the second fixed pulley 17, and second is fixed sliding 2 bottom of lower right first baffle that wheel 17 is located at third through-hole 15 is equipped with the second bracing wire 12, and the second bracing wire 12 passes through the second through-hole 13, the second bracing wire 12 bypasses the first fixed pulley 11, and 12 end of the second bracing wire is connected with the first pull ring 14, and 3 bottom of second baffle is set There is third bracing wire 16, third bracing wire 16 passes through third through-hole 15, and third bracing wire 16 bypasses the second fixed pulley 17,16 end of third bracing wire End is connected with the second pull ring 18, so staff pulls the first pull ring when needing to open first baffle 2 and second baffle 3 14 and second pull ring 18, the first pull ring 14 pulls the second bracing wire 12, so that first baffle 2 moves downward, the second pull ring 18 is pulled Third bracing wire 16 so that second baffle 3 moves downward so that first baffle 2 and second baffle 3 are opened, reach one it is time saving Labour-saving effect.
Because further including having the second electronic reel 19, the second strut 20, sliding rail 21, sliding block 22,23 and of third elastic component 4th bracing wire 24, bottom is equipped with the second strut 20 and sliding rail 21 in treatment box 1, and the second strut 20 is located at the left of sliding rail 21, the Two struts, 20 upper end is connected with the second electronic reel 19, and slidingtype is connected with sliding block 22,5 bottom of collection frame and cunning on sliding rail 21 It is connected at the top of block 22, is connected with third elastic component 23, the second electronic reel 19 between 22 right side of sliding block and 1 inner right wall for the treatment of box On be wound with the 4th bracing wire 24, connected on the left of 24 end of the 4th bracing wire and sliding block 22, so needing to take out collection frame 5 as staff When, the electronic reel 19 of starting second inverts, and the second electronic reel 19 releases the 4th bracing wire 24, so that sliding block 22 is transported to the right It is dynamic, drive collection frame 5 to move right, when collection frame 5 is moved at the second opening 10, the second electronic reel 19 stops working, Staff can take out collection frame 5.
Because further including having the first limited block 25 and guide plate 26, bottom is equipped with guide plate 26, guide plate 26 in treatment box 1 Between the second strut 20 and sliding rail 21, pilot hole 27 is provided on guide plate 26, the 4th bracing wire 24 passes through pilot hole 27, sliding rail 21 top right sides are equipped with the first limited block 25, so guide plate 26 can make the 4th bracing wire 24 operably more stable, first Limited block 25 can limit the move distance of sliding block 22, the stability of enhancement device.
Because further including having the second limited block 28, electromagnet 29 and iron block 30,1 inner top for the treatment of box is equipped with the second limited block 28, the second limited block 28 is equipped with iron block 30 between first bearing seat 61 and second bearing seat 64 on the right side of first baffle 2, the Electromagnet 29 is equipped on the left of two baffles 3, so the second limited block 28 can limit the move distance of nut 62, enhancement device it is steady Qualitative, originally electromagnet 29 is energized state, and 29 band of electromagnet is magnetic, and iron block 30 is sucked, so that first baffle 2 and second gear Plate 3 be closed it is stronger, when needing to open first baffle 2 and second baffle 3, to electromagnet 29 power off, electromagnet 29 discharge Iron block 30 allows to open first baffle 2 and second baffle 3.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode and circuit connection are not explained with the present invention.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (4)

1. stone brick crushing device is discarded in a kind of construction site, which is characterized in that include treatment box (1), first baffle (2), Two baffles (3), strainer (4), collection frame (5), mobile device (6), auxiliary device (7) and the first elastic component (9);Treatment box (1) Inner top is equipped with mobile device (6), and treatment box (1) inner left wall is hingedly connected with first baffle (2), treatment box (1) inner right wall hinge It is connected to second baffle (3), is connected between treatment box (1) inner wall at the top of first baffle (2) and at the top of second baffle (3) in succession Have the first elastic component (9), first baffle (2) and second baffle (3) are located at below mobile device (6), and filter is equipped in treatment box (1) Net (4), strainer (4) are located at the lower section of first baffle (2) and second baffle (3), are equipped with auxiliary device (7) at the top of strainer (4), place Reason case (1) interior bottom is placed with collection frame (5), and treatment box (1) right wall is provided with the first opening (8) and second and is open (10), and second (10) are open positioned at the lower section of the first opening (8);Mobile device (6) includes motor (60), first bearing seat (61), nut (62), screw rod (63), second bearing seat (64), connecting rod (65) and electronic broken wheel (66), treatment box (1) inner top is from left to right It is successively arranged motor (60), first bearing seat (61) and second bearing seat (64), first bearing seat (61) and second bearing seat (64) it being equipped between screw rod (63), screw rod (63) left end is connect with motor (60) right end, and screw rod (63) is equipped with nut (62), Screw rod (63) and nut (62) cooperate, and nut (62) bottom is equipped with connecting rod (65), and connecting rod (65) lower end is connected with electronic broken wheel (66);Auxiliary device (7) includes the second elastic component (70), the first briquetting (71), guide rod (73), the second briquetting (74), One bracing wire (75), the first electronic reel (76) and the first strut (77), treatment box (1) inner left wall are equipped with guide rod (73), lead It is located above strainer (4) to bar (73), two sides are respectively connected with the second elastic component to treatment box (1) inner left wall guide rod (73) up and down (70), the second elastic component (70) right end is connected with the first briquetting (71), is provided on the first briquetting (71) first through hole (72), guiding Bar (73) passes through first through hole (72), contacts at the top of the first briquetting (71) bottom and strainer (4), second is equipped with above strainer (4) Briquetting (74), the second briquetting (74) are located at the first briquetting (71) right, and treatment box (1) inner right wall is equipped with the first strut (77), the One strut (77) is located above strainer (4), and the first strut (77) left end is connected with the first electronic reel (76), first it is electronic around It is wound in line wheel (76) the first bracing wire (75), is connect on the right side of the first bracing wire (75) end and the first briquetting (71);It further include having One fixed pulley (11), the second bracing wire (12), the first pull ring (14), third bracing wire (16), the second fixed pulley (17) and the second pull ring (18), treatment box (1) left wall is provided with the second through-hole (13), and treatment box (1) right wall is provided with third through-hole (15), the second through-hole (13) Positioned at the lower left of first baffle (2), third through-hole (15) is located at the lower right of second baffle (3), and treatment box (1) left wall is equipped with First fixed pulley (11), the first fixed pulley (11) are located at the lower left of the second through-hole (13), and it is fixed that treatment box (1) right wall is equipped with second Pulley (17), the second fixed pulley (17) are located at the lower right of third through-hole (15), and first baffle (2) bottom is equipped with the second bracing wire (12), the second bracing wire (12) passes through the second through-hole (13), and the second bracing wire (12) bypasses the first fixed pulley (11), the second bracing wire (12) End is connected with the first pull ring (14), and second baffle (3) bottom is equipped with third bracing wire (16), and third bracing wire (16) is logical across third Hole (15), third bracing wire (16) bypass the second fixed pulley (17), and third bracing wire (16) end is connected with the second pull ring (18);Also wrap The second electronic reel (19), the second strut (20), sliding rail (21), sliding block (22), third elastic component (23) and the 4th drawing are included Line (24), treatment box (1) interior bottom are equipped with the second strut (20) and sliding rail (21), and the second strut (20) is located at a left side for sliding rail (21) Side, the second strut (20) upper end are connected with the second electronic reel (19), and slidingtype is connected with sliding block (22) on sliding rail (21), receive It is connect at the top of collection frame (5) bottom and sliding block (22), is connected with third elasticity on the right side of sliding block (22) between treatment box (1) inner right wall Part (23) is wound with the 4th bracing wire (24) on the second electronic reel (19), connects on the left of the 4th bracing wire (24) end and sliding block (22) It connects;It further include having the first limited block (25) and guide plate (26), treatment box (1) interior bottom is equipped with guide plate (26), guide plate (26) it between the second strut (20) and sliding rail (21), is provided on guide plate (26) pilot hole (27), the 4th bracing wire (24) is worn It crosses pilot hole (27), sliding rail (21) top right side is equipped with the first limited block (25);It further include having the second limited block (28), electromagnet (29) and iron block (30), treatment box (1) inner top are equipped with the second limited block (28), and the second limited block (28) is located at first bearing seat (61) between second bearing seat (64), iron block (30) are equipped on the right side of first baffle (2), electromagnetism is equipped on the left of second baffle (3) Iron (29).
2. stone brick crushing device is discarded in a kind of construction site according to claim 1, which is characterized in that the material of connecting rod (65) Matter is stainless steel.
3. stone brick crushing device is discarded in a kind of construction site according to claim 1, which is characterized in that the first elastic component (9), the second elastic component (70) and third elastic component (23) are spring.
4. stone brick crushing device is discarded in a kind of construction site according to claim 1, which is characterized in that the first bracing wire (75), the second bracing wire (12), third bracing wire (16) and the 4th bracing wire (24) are wirerope.
CN201710342658.4A 2017-05-16 2017-05-16 A kind of discarded stone brick crushing device in construction site Active CN107051674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710342658.4A CN107051674B (en) 2017-05-16 2017-05-16 A kind of discarded stone brick crushing device in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710342658.4A CN107051674B (en) 2017-05-16 2017-05-16 A kind of discarded stone brick crushing device in construction site

Publications (2)

Publication Number Publication Date
CN107051674A CN107051674A (en) 2017-08-18
CN107051674B true CN107051674B (en) 2018-11-23

Family

ID=59609421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710342658.4A Active CN107051674B (en) 2017-05-16 2017-05-16 A kind of discarded stone brick crushing device in construction site

Country Status (1)

Country Link
CN (1) CN107051674B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107867733A (en) * 2017-09-18 2018-04-03 韦敬生 A kind of environmental protection equipment of sewage disposal
CN108209525A (en) * 2017-09-18 2018-06-29 韦文生 A kind of Juice squeezing cup
CN107983447A (en) * 2017-09-18 2018-05-04 韦德远 A kind of intelligent robot
CN107626377B (en) * 2017-09-27 2019-05-17 王静 A kind of discarded breaker plastic housing processor
CN107999215B (en) * 2017-11-29 2019-06-11 江苏双兴工贸有限公司 It is a kind of to crush the environmental protection machinery recycled for glass
CN108144695B (en) * 2017-12-23 2020-07-28 贵州同得利新型建材有限公司 Gypsum coarse grinding device
CN108380361A (en) * 2018-02-12 2018-08-10 曾玉凤 A kind of rare earth processing crusher
CN109225565A (en) * 2018-10-22 2019-01-18 刘传会 A kind of heavy duty detergent Rare Earth Production crushing device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US472367A (en) * 1892-04-05 Crushing and grinding mill
US1618721A (en) * 1925-06-03 1927-02-22 Joseph T Norman Coal breaker
CN205651478U (en) * 2016-05-13 2016-10-19 东亚装饰股份有限公司 Plank reducing mechanism for interior decoration
CN205761370U (en) * 2016-06-27 2016-12-07 黄涛 A kind of novel dustbin
CN106362827B (en) * 2016-08-20 2018-07-31 梁林燕 A kind of mosaic tiles porcelain stone grinding device
CN205965963U (en) * 2016-08-27 2017-02-22 赣县金磊鑫矿业有限公司 Fluorite mine fluorite is high -efficient breaker of gear formula for collection
CN106179682B (en) * 2016-08-29 2018-11-27 泉州台商投资区百亚网络科技有限公司 A kind of medical surgery solid refuse efficiency crushing device

Also Published As

Publication number Publication date
CN107051674A (en) 2017-08-18

Similar Documents

Publication Publication Date Title
CN107051674B (en) A kind of discarded stone brick crushing device in construction site
CN106985175B (en) A kind of pharmaceutical factory's medicinal material cutting and crushing device
CN104255193B (en) Apple picking and method of operating thereof
CN106595232B (en) High effective dehydration device is used in a kind of recycling of rare earth waste
CN205627375U (en) Dust collecting device of weaving machine
CN102873055A (en) Automatic washing, drying and storing system of spraying lamp shade and processing method thereof
CN107962453A (en) Iron filings separation equipment in a kind of Dumpage type cutting fluid
CN106861830A (en) A kind of household water filter surface wipes talcum reducing mechanism
CN105964380A (en) Ampoule bottle breaking device for medical pediatrics
CN205496058U (en) Tealeaves machinery leaf -stalk separator
CN108176456A (en) One boar food is prepared with corn multiple stage crushing equipment
CN107675001B (en) A kind of rare earth mother solution dehydration device
CN109759890A (en) A kind of debris collection device for lathe process
CN202943051U (en) Blast lamp shade automatic cleaning and drying and storing system
CN205965967U (en) Fluorite mine gathers and uses fluorite multi -stage crushing device
CN207891485U (en) A kind of moveable spinning machine dust exhaust apparatus
CN109127692A (en) A kind of soil restoring device that metallic element can be filtered
CN205892084U (en) Material distributing device
CN212975497U (en) Cutting device for metal casting
CN214488017U (en) Automatic brucite powder production equipment
CN116196705B (en) Anti-blocking clinker cement production line waste gas treatment device and method
CN106824336A (en) Superclean bench
CN208727741U (en) A kind of iron remover for belt conveyor
CN207391883U (en) A kind of dust removal integrated cloth inspecting machine of light source
CN207153880U (en) A kind of electronic stripping off device of rare earth metal fused salt

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181008

Address after: 233611 A area of Zhabei Town Industrial Park, Woyang County, Bozhou, Anhui

Applicant after: Woyang County Shengfeng New Building Co.,Ltd.

Address before: 343000 No. 56 health Road, Ji'an, Jiangxi

Applicant before: Wei Yinan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A device for crushing abandoned stone bricks on construction sites

Effective date of registration: 20231008

Granted publication date: 20181123

Pledgee: Xingyang County, Xingyang financing Company limited by guarantee

Pledgor: Woyang County Shengfeng New Building Co.,Ltd.

Registration number: Y2023980060247

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20181123

Pledgee: Xingyang County, Xingyang financing Company limited by guarantee

Pledgor: Woyang County Shengfeng New Building Co.,Ltd.

Registration number: Y2023980060247

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A crushing device for abandoned stone bricks on construction sites

Granted publication date: 20181123

Pledgee: Xingyang County, Xingyang financing Company limited by guarantee

Pledgor: Woyang County Shengfeng New Building Co.,Ltd.

Registration number: Y2024980011296