CN205965967U - Fluorite mine gathers and uses fluorite multi -stage crushing device - Google Patents

Fluorite mine gathers and uses fluorite multi -stage crushing device Download PDF

Info

Publication number
CN205965967U
CN205965967U CN201620945552.4U CN201620945552U CN205965967U CN 205965967 U CN205965967 U CN 205965967U CN 201620945552 U CN201620945552 U CN 201620945552U CN 205965967 U CN205965967 U CN 205965967U
Authority
CN
China
Prior art keywords
fluorite
electronic
broken
bracing wire
mounting seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620945552.4U
Other languages
Chinese (zh)
Inventor
董小洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gan County Hong Lei Mineral Products Co Ltd
Original Assignee
Gan County Hong Lei Mineral Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gan County Hong Lei Mineral Products Co Ltd filed Critical Gan County Hong Lei Mineral Products Co Ltd
Priority to CN201620945552.4U priority Critical patent/CN205965967U/en
Application granted granted Critical
Publication of CN205965967U publication Critical patent/CN205965967U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Grinding (AREA)

Abstract

The utility model relates to a fluorite breaker especially relates to a fluorite mine gathers and uses fluorite multi -stage crushing device. The to -be -solved technical problem of the utility model is to provide a fluorite mine gathers and uses fluorite multi -stage crushing device of the breakage is thorough, crushing speed is fast, convenient operation. In order to solve the technical problem, the utility model provides a such fluorite mine gathers and uses fluorite multi -stage crushing device, including bottom plate, slide rail, slider, broken frame, first electronic reel, firstly act as go -between, right side frame, L type connecting rod, fixed pulley, first mount pad, arc -shaped connection rod etc. Bottom plate inside ceiling panel center is equipped with the slide rail, is equipped with the slider on the slide rail, is equipped with broken frame on the slider, and bottom plate top right side is equipped with right side frame, and right side frame left side middle part is connected with the feeder hopper, and feeder hopper inner wall symmetry is equipped with electronic broken wheel, and right side frame left side lower part is equipped with bottom plate top left side and is equipped with L type connecting rod. The utility model discloses reached broken thoroughly, fast, the convenient operation's of crushing speed effect.

Description

Fluorite Multi-stage crushing plant is used in a kind of fluorite ore collection
Technical field
This utility model is related to a kind of fluorite breaker, more particularly, to a kind of fluorite ore collection fluorite multiple stage crushing dress Put.
Background technology
Fluorite, also known as fluorite, is the main source of industrial fluorine element, is 20 several important nonmetallic minerals in the world One of raw material.Pure water white fluorite can be used as optical material, and fluorite beautiful in colour can act also as gem-jade and technique Art carving raw material.Fluorite be again fluorine chemistry industry base stock, its product be widely used in space flight, aviation, refrigeration, medicine, The fields such as pesticide, anti-corrosion, fire extinguishing, electronics, electric power, machinery and atomic energy.
Existing fluorite breaker have the shortcomings that broken not thoroughly, broken speed is slow, complex operation, therefore need badly and grind Fluorite Multi-stage crushing plant is used in the fluorite ore collection that to send out a kind of broken thoroughly, broken speed is fast, easy to operate.
Utility model content
(1) technical problem to be solved
Existing fluorite breaker presence is broken not thoroughly, broken speed is slow, it is numerous to operate in order to overcome for this utility model Trivial shortcoming, the technical problems to be solved in the utility model is the firefly providing a kind of broken thorough, broken speed fast, easy to operate Fluorite Multi-stage crushing plant is used in stone ore collection.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides such a fluorite ore collection fluorite multiple stage crushing Device, include base plate, slide rail, slide block, broken frame, the first electronic reel, the first bracing wire, right shelf, L-type connecting rod, fixed pulley, First mounting seat, curved rod, fix bar, the second electronic reel, guide plate, the second mounting seat, electric pushrod, second draw Line, briquetting, feed hopper and electronic broken wheel, base plate inside ceiling panel center is provided with slide rail, and slide rail is provided with slide block, and slide block is provided with brokenly Broken frame, base plate top right side is provided with right shelf, and right shelf left side central portion is connected with feed hopper, and feed hopper inwall is arranged with electronic broken Wheel, right shelf left lower is provided with base plate top left side and is provided with L-type connecting rod, and L-type connecting rod right-hand member is connected with right side top, L-type connecting rod Bottom left is provided with the second electronic reel, the first mounting seat and fixed pulley, and fixed pulley is located on the right side of the first mounting seat, the first peace Dress seat bottom is articulated and connected curved rod, is sequentially provided with guide plate and the first electronic reel from top to bottom, leads on the right side of L-type connecting rod Pilot hole is had on plate, guide plate top left side is provided with the second mounting seat, the second mounting seat top is hingedly connected with electronic pushing away Bar, electric pushrod top is articulated and connected with curved rod left end, and curved rod right-hand member is articulated and connected fix bar, and fixing right side connects There is the second bracing wire, the second bracing wire bypasses fixed pulley, and is connected with briquetting through pilot hole, briquetting is located at directly over broken frame, Bracing wire is all wound with the first electronic reel and the second electronic reel, left side bracing wire is connected with the left of broken frame, right side bracing wire It is connected with the right side of broken frame.
Preferably, also include travel switch, slide rail top is arranged with travel switch, travel switch is all electronic with first Broken wheel and the second electronic broken wheel pass through connection.
Operation principle:When needing fluorite is carried out broken, workman controls the first electronic reel and second electronic first Reel rotates clockwise, and left side bracing wire is released by the first electronic reel, and right side bracing wire is packed up by the second electronic reel, enters And driving broken frame to move right on slide rail by slide block, when immediately below moving right to feed hopper, control first is electronic Reel and the second electronic coiling quit work, then control electronic broken wheel high-speed rotation, and fluorite is poured in feed hopper by workman, Electronic broken wheel is tentatively crushed to fluorite, and the fluorite after the completion of tentatively crushing will land into broken inframe, when in feed hopper Fluorite tentatively broken after the completion of, control electronic broken wheel to quit work.Control again the first electronic reel and second electronic around Line wheel rotates counterclockwise, and left side bracing wire is packed up by the first electronic reel, and right side bracing wire is released by the second electronic reel, and then Drive broken frame to pass through slide block on slide rail to left movement, when moving to immediately below briquetting to the left, control the first electronic coiling Wheel and the second electronic coiling quit work, then control electric pushrod to shorten, and electric pushrod drives curved rod left end swung downward, Electric pushrod drives curved rod right-hand member to be swung up, and then drives fix bar to be swung up, and the second bracing wire is released, and briquetting is in weight Move downward under power effect, control electric pushrod elongation, electric pushrod drives curved rod left end to be swung up, electric pushrod band Dynamic curved rod right-hand member swung downward, and then drive fix bar swung downward, the second bracing wire is packed up, and bracing wire drives briquetting to transport upwards Dynamic, so repeatedly so that briquetting moves up and down, what fluorite after the completion of tentatively broken for the broken inframe was crushed is more thorough, when broken Broken complete and when briquetting returns to initial position, control electric pushrod to quit work, broken inframe is crushed the firefly completing by workman again Stone takes out.
Because also including travel switch, slide rail top is arranged with travel switch, and travel switch is all electronic with first broken Broken wheel and the second electronic broken wheel pass through connection;When slide block moves right to contact right side travel switch, first is electronic Broken wheel and the second electronic broken wheel rotate counterclockwise, and when slide block moves to contact left side travel switch to the left, first is electronic Broken wheel and the second electronic broken wheel rotate clockwise, so more precisely quick.
(3) beneficial effect
This utility model has reached fast, the easy to operate effect of broken thorough, broken speed.
Brief description
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is second main structure diagram of the present utility model.
Being labeled as in accompanying drawing:1- base plate, 2- slide rail, 3- slide block, 4- crushes frame, the electronic reel of 5- first, 6- first Bracing wire, 7- right shelf, 8-L type connecting rod, 9- fixed pulley, 10- first mounting seat, 11- curved rod, 12- fix bar, 13- second electricity Dynamic reel, 14- guide plate, 15- second mounting seat, 16- electric pushrod, 17- pilot hole, 18- second bracing wire, 19- briquetting, 20- feed hopper, the electronic broken wheel of 21-, 22- travel switch.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further described.
Embodiment 1
Fluorite Multi-stage crushing plant is used in a kind of collection of fluorite ore, as shown in Figure 1-2, include base plate 1, slide rail 2, slide block 3, Broken frame 4, the first electronic reel 5, the first bracing wire 6, right shelf 7, L-type connecting rod 8, fixed pulley 9, the first mounting seat 10, arc are even Bar 11, fix bar 12, the second electronic reel 13, guide plate 14, the second mounting seat 15, electric pushrod 16, the second bracing wire 18, pressure Block 19, feed hopper 20 and electronic broken wheel 21, base plate 1 inside ceiling panel center is provided with slide rail 2, and slide rail 2 is provided with slide block 3, on slide block 3 It is provided with broken frame 4, base plate 1 top right side is provided with right shelf 7, right shelf 7 left side central portion is connected with feed hopper 20, feed hopper 20 inwall pair Claim to be provided with electronic broken wheel 21, right shelf 7 left lower is provided with base plate 1 top left side and is provided with L-type connecting rod 8, L-type connecting rod 8 right-hand member with Right side top connects, and L-type connecting rod 8 bottom left is provided with the second electronic reel 13, the first mounting seat 10 and fixed pulley 9, fixed cunning Wheel 9 is located on the right side of the first mounting seat 10, and the first mounting seat 10 bottom is articulated and connected curved rod 11, from up on the right side of L-type connecting rod 8 Under be sequentially provided with guide plate 14 and the first electronic reel 5, guide plate 14 has pilot hole 17, guide plate 14 top left side sets There is the second mounting seat 15, the second mounting seat 15 top is hingedly connected with electric pushrod 16, electric pushrod 16 top and curved rod 11 left ends are articulated and connected, and curved rod 11 right-hand member is articulated and connected fix bar 12, fixing on the right side of be connected with the second bracing wire 18, second draws Line 18 bypasses fixed pulley 9, and is connected with briquetting 19 through pilot hole 17, and briquetting 19 is located at directly over broken frame 4, and first is electronic Bracing wire is all wound with reel 5 and the second electronic reel 13, left side bracing wire is connected with broken frame 4 left side, right side bracing wire with break Broken frame 4 right side connects.
Also include travel switch 22, slide rail 2 top is arranged with travel switch 22, and travel switch 22 is all electronic with first Broken wheel 21 and the second electronic broken wheel 21 pass through connection.
Operation principle:When needing fluorite is carried out with broken, workman controls the first electronic reel 5 and second electronic first Reel 13 rotates clockwise, and left side bracing wire is released by the first electronic reel 5, and right side bracing wire is received by the second electronic reel 13 Rise, and then drive broken frame 4 to move right on slide rail 2 by slide block 3, when immediately below moving right to feed hopper 20, control Make the first electronic reel 5 and the second electronic coiling quits work, then control 21 high-speed rotations of electronic broken wheel, workman is by fluorite Pour in feed hopper 20, electronic broken wheel 21 is tentatively crushed to fluorite, and the fluorite after the completion of tentatively crushing will land into broken In broken frame 4, after the completion of the fluorite in feed hopper 20 is tentatively broken, electronic broken wheel 21 is controlled to quit work.Control first again Electronic reel 5 and the second electronic reel 13 rotate counterclockwise, and left side bracing wire is packed up by the first electronic reel 5, the second electricity Right side bracing wire is released by dynamic reel 13, and then drives broken frame 4 to pass through slide block 3 on slide rail 2 to left movement, when to left movement During to briquetting 19, control the first electronic reel 5 and the second electronic coiling to quit work, then control electric pushrod 16 to contract Short, electric pushrod 16 drives curved rod 11 left end swung downward, and electric pushrod 16 drives curved rod 11 right-hand member to be swung up, And then driving fix bar 12 to be swung up, the second bracing wire 18 is released, and briquetting 19 moves downward under gravity, controls electronic pushing away Bar 16 extends, electric pushrod 16 drive curved rod 11 left end be swung up, electric pushrod 16 drive curved rod 11 right-hand member to Lower swing, and then drive fix bar 12 swung downward, the second bracing wire 18 is packed up, and bracing wire drives briquetting 19 to move upwards, so instead Again so that briquetting 19 moves up and down, what the fluorite after the completion of tentatively broken in broken frame 4 was crushed is more thorough, completes when broken And briquetting 19 is when returning to initial position, electric pushrod 16 is controlled to quit work, workman again will the broken fluorite completing in broken frame 4 Take out.
Because also including travel switch 22, slide rail 2 top is arranged with travel switch 22, and travel switch 22 is all with first Electronic broken wheel 21 and the second electronic broken wheel 21 pass through connection;When slide block 3 moves right to contact right side travel switch When 22, the first electronic broken wheel 21 and the second electronic broken wheel 21 rotate counterclockwise, when slide block 3 moves to contact left row to the left During Cheng Kaiguan 22, the first electronic broken wheel 21 and the second electronic broken wheel 21 rotate clockwise, so more precisely quick.
Embodiment described above only have expressed preferred implementation of the present utility model, and its description is more concrete and detailed, But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that it is common for this area For technical staff, without departing from the inventive concept of the premise, some deformation, improvement and replacement can also be made, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.

Claims (2)

1. a kind of fluorite ore collection fluorite Multi-stage crushing plant is it is characterised in that include base plate (1), slide rail (2), slide block (3), crush frame (4), the first electronic reel (5), the first bracing wire (6), right shelf (7), L-type connecting rod (8), fixed pulley (9), first Mounting seat (10), curved rod (11), fix bar (12), the second electronic reel (13), guide plate (14), the second mounting seat (15), electric pushrod (16), the second bracing wire (18), briquetting (19), feed hopper (20) and electronic broken wheel (21), in base plate (1) Top board center is provided with slide rail (2), and slide rail (2) is provided with slide block (3), and slide block (3) is provided with broken frame (4), base plate (1) top right Side is provided with right shelf (7), and right shelf (7) left side central portion is connected with feed hopper (20), and feed hopper (20) inwall is arranged with electronic broken Wheel (21), right shelf (7) left lower is provided with base plate (1) top left side and is provided with L-type connecting rod (8), L-type connecting rod (8) right-hand member and right side Top connects, and L-type connecting rod (8) bottom left is provided with the second electronic reel (13), the first mounting seat (10) and fixed pulley (9), Fixed pulley (9) is located on the right side of the first mounting seat (10), and the first mounting seat (10) bottom is articulated and connected curved rod (11), and L-type is even It is sequentially provided with guide plate (14) and the first electronic reel (5) from top to bottom, guide plate has pilot hole on (14) on the right side of bar (8) (17), guide plate (14) top left side is provided with the second mounting seat (15), and the second mounting seat (15) top is hingedly connected with electronic pushing away Bar (16), electric pushrod (16) top is articulated and connected with curved rod (11) left end, and curved rod (11) right-hand member is articulated and connected solid Fixed pole (12), is connected with the second bracing wire (18) on the right side of fixation, the second bracing wire (18) bypasses fixed pulley (9), and passes through pilot hole (17) be connected with briquetting (19), briquetting (19) is located at directly over broken frame (4), the first electronic reel (5) and second electronic around Bracing wire is all wound with line wheel (13), left side bracing wire is connected with the left of broken frame (4), and right side bracing wire is connected with the right side of broken frame (4).
2. a kind of fluorite ore collection fluorite Multi-stage crushing plant according to claim 1 is it is characterised in that also include Travel switch (22), slide rail (2) top is arranged with travel switch (22), all electronic with the first broken wheel of travel switch (22) (21) and the second electronic broken wheel (21) passes through connection.
CN201620945552.4U 2016-08-26 2016-08-26 Fluorite mine gathers and uses fluorite multi -stage crushing device Expired - Fee Related CN205965967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620945552.4U CN205965967U (en) 2016-08-26 2016-08-26 Fluorite mine gathers and uses fluorite multi -stage crushing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620945552.4U CN205965967U (en) 2016-08-26 2016-08-26 Fluorite mine gathers and uses fluorite multi -stage crushing device

Publications (1)

Publication Number Publication Date
CN205965967U true CN205965967U (en) 2017-02-22

Family

ID=58036393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620945552.4U Expired - Fee Related CN205965967U (en) 2016-08-26 2016-08-26 Fluorite mine gathers and uses fluorite multi -stage crushing device

Country Status (1)

Country Link
CN (1) CN205965967U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106861844A (en) * 2017-02-28 2017-06-20 李水旺 A kind of electronic waste multistage disassembles retracting device
CN106914302A (en) * 2017-04-05 2017-07-04 杨田文 A kind of discarded medical packaging bottle compression treatment device
CN107115910A (en) * 2017-06-27 2017-09-01 刘冰 A kind of road construction ratchel efficiency crushing equipment
CN108906268A (en) * 2018-06-22 2018-11-30 郑州郑先医药科技有限公司 A kind of pharmaceutical purpose raw materials for production mashing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106861844A (en) * 2017-02-28 2017-06-20 李水旺 A kind of electronic waste multistage disassembles retracting device
CN106914302A (en) * 2017-04-05 2017-07-04 杨田文 A kind of discarded medical packaging bottle compression treatment device
CN107115910A (en) * 2017-06-27 2017-09-01 刘冰 A kind of road construction ratchel efficiency crushing equipment
CN108906268A (en) * 2018-06-22 2018-11-30 郑州郑先医药科技有限公司 A kind of pharmaceutical purpose raw materials for production mashing device

Similar Documents

Publication Publication Date Title
CN205965967U (en) Fluorite mine gathers and uses fluorite multi -stage crushing device
CN205965963U (en) Fluorite mine fluorite is high -efficient breaker of gear formula for collection
CN205761336U (en) A kind of Copper Ores efficiency crushing device
CN205965969U (en) Fluorite mine is metallurgical with fluorite rack and pinion formula breaker
CN208790092U (en) Broken bag cutting-up mechanism for jumbo bag bale breaker
CN206139257U (en) Highway construction is with energy -saving stone breaker
CN206008800U (en) Quick crashing device is used in a kind of fluorite ore fluorite collection
CN109108830B (en) A kind of cuts in metallic pipe device
CN207185810U (en) It is a kind of scale, the automatic machining device of hacking integrated form fish products
CN109248749A (en) A kind of automatic grinding mechanism of medicine intermediate
CN205929152U (en) High -efficient breaker of scraped car plastic part
CN209193209U (en) A kind of continuity automation cutting mechanism
CN208375623U (en) A kind of cutting head for crystal silicon hilted broadsword shear
CN107055105B (en) A kind of application method of double-station Copper bar collection device
CN203752145U (en) Carrying arm
CN206662693U (en) Assembly equipment
CN205965970U (en) Fluorite mine exploitation gear formula breaker for fluorite
CN208840440U (en) A kind of automatic processing stamping equipment for pliers rivet automatic blanking
CN208326611U (en) A kind of automatic discharging device
CN207759655U (en) A kind of cross bar pushing meanss in inductance process equipment
CN208868835U (en) It is a kind of for producing the material collecting device of LED lamp holder
CN206200048U (en) Stainless steel support wire rod preparation paying out machine
CN206395033U (en) A kind of bottled fertilizer applicator of improvement type
CN208345065U (en) A kind of automation control conveying device
CN104338578B (en) A kind of rubber rubber powder pulverizer of band emergency stop device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20170826