CN107044289A - A kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel - Google Patents

A kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel Download PDF

Info

Publication number
CN107044289A
CN107044289A CN201710479391.3A CN201710479391A CN107044289A CN 107044289 A CN107044289 A CN 107044289A CN 201710479391 A CN201710479391 A CN 201710479391A CN 107044289 A CN107044289 A CN 107044289A
Authority
CN
China
Prior art keywords
water
main channel
producing fractures
drilling
water producing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710479391.3A
Other languages
Chinese (zh)
Other versions
CN107044289B (en
Inventor
鞠金峰
许家林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710479391.3A priority Critical patent/CN107044289B/en
Publication of CN107044289A publication Critical patent/CN107044289A/en
Application granted granted Critical
Publication of CN107044289B publication Critical patent/CN107044289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Abstract

The invention discloses a kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel, according to the development characteristics of mining overburden height of water flowing fractured zone under specific mining conditions, by the surface drilling column data for collecting each coal mining region, each crucial position layer by layer in overlying strata is determined using position of key stratum method of discrimination, the method for predicting of overlying strata height of water flowing fractured zone is combined afterwards, determine each region water flowing fractured zone development height and its link up the distributed areas in stratum water-bearing layer, finally, the regional assignment water producing fractures main channel distribution in water-bearing layer is linked up in water flowing fractured zone, and according to underworkings position, coal seam buried depth, ground cloth bores condition and determines which kind of inlet well and the construction parameter of drilling implemented;After drilling construction is finished; by slurry pumping to water producing fractures main channel region; block water producing fractures passage; the present invention is possible to adapt to the determination of the water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel under different exploitation condition; can be that mining area coal mining fwaater resources protection and water damage preventing and treating etc. provide safeguard; its application method is reliable, practical.

Description

A kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel
Technical field
It is especially a kind of to be applied to coal mining fwaater resources protection and ore deposit the present invention relates to a kind of top plate water damage prevention and controls The water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel in well water evil Prevention Technique field.
Background technology
Coal underground mining will cause the movement and destruction of overlying rock, so as to form mining induced fissure in overlying strata;Overlying strata Mining induced fissure, which produces both to be lost in for regional water resources, provides passage, while also turning into the geology root that underground flood damage occurs.When , will be along leading by the water-bearing layer water body of Mining failure when preservation has one or more layers watery stronger water-bearing layer in coal measure strata Water crack passage influxs underground goaf, and the crack passage for turning on stratum water-bearing layer is more, aquifer water well is stronger, then underground Water yield is bigger, will trigger top plate water damage problem when serious, and jeopardize mine safety and efficiently produce.From mining overburden water flowing fractured zone The general features of distribution sees that water flowing fractured zone " shape of a saddle " elevated regions (see photo) is in the OF area of productive limit, Cranny development aperture is big, passage conveyance capacity is strong;If the distribution in the region can be accurately identified, and reduction of taking measures on customs clearance The conveyance capacity in crack, this can undoubtedly substantially reduce the water leakage degree in water-bearing layer, mitigate underground flood damage threat.
At present, relevant top plate water damage preventing and treating mainly has two class countermeasures.One class be before seam mining by construction drill extremely Stratum water-bearing layer position, unrestrained before water-bearing layer water body is entered, drainage or reduction aquifer water well, reduces underground gushing water Amount.Another kind of carried out from the angle of control water flowing fractured zone development, i.e., by controlling mining height or improving coal winning technology and method, Water flowing fractured zone development height is reduced, it is not linked up stratum water-bearing layer, so as to reach the purpose for preventing that water damage from occurring.However, The above method all has some limitations, and first kind method is stratum water-bearing layer is more, watery big, aquifer water supply capacity To no longer it be applicable under strong mining conditions, it is simple by the unrestrained purpose for being unable to reach reduction water-bearing layer rich water amount that drills;And the Two class methods are coal seam thickness is big, water-bearing layer apart from coal seam it is near under conditions of be also difficult to be applicable, even in the less situation of mining height Lower water flowing fractured zone can still link up water-bearing layer.Therefore, it is necessary to based on mining overburden water flowing fractured zone development characteristics, carry out people The special design of the water damage prevention and controls of work slip casting closure crack passage.
The content of the invention
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention provides a kind of bored grouting closure overlying strata The water damage prevention and controls of water producing fractures main channel, with reference to seam mining parameter and hydrogeologic condition, by recognizing mining overburden Water producing fractures main channel distributed areas, establish the top plate water damage side for blocking water producing fractures main channel using bored grouting mode Method, is threatened with reducing aquifer water resource leak degree, mitigating underground flood damage, realizes the safe and efficient production of mine.
Technical scheme:To achieve the above object, the technical solution adopted by the present invention is:
A kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel, are adopted according under specific mining conditions The development characteristics of dynamic overlying strata height of water flowing fractured zone, by collecting the surface drilling column data in each coal mining region, using key Layer position method of discrimination determines each crucial position layer by layer in overlying strata, afterwards with reference to the method for predicting of overlying strata height of water flowing fractured zone, really Fixed each region water flowing fractured zone development height and its distributed areas for linking up stratum water-bearing layer, finally, are linked up in water flowing fractured zone The regional assignment water producing fractures main channel distribution in water-bearing layer, and bar is bored according to underworkings position, coal seam buried depth, ground cloth Part determines which kind of inlet well and the construction parameter of drilling implemented.After drilling construction is finished, by slurry pumping to water producing fractures Main channel region, blocks water producing fractures passage.
Specifically include following steps:
A. the geological survey drilling column that mine was once constructed in coal mining region is collected, different production zone roof stratas are obtained Preservation, the physico mechanical characteristic parameter of each rock stratum.Each drill hole key strata of covering rock position is carried out using Judging key stratum method Differentiate, so that it is determined that each region key strata of covering rock position.
B. use " method for predicting of the height of water flowing fractured zone based on position of key stratum ", by key strata of covering rock position with The relation pair mining overburden height of water flowing fractured zone of mining thickness is judged, so that it is high to obtain each region overlying strata water flowing fractured zone Degree and the relativeness of stratum water-bearing layer present position.When there is water-bearing layer in the range of height of water flowing fractured zone, then correspond to and bore Bore region water flowing fractured zone has linked up water-bearing layer, it is necessary to take bored grouting mode to block water producing fractures main channel.When water guide splits When water-bearing layer is not present in gap band altitude range, then bored grouting measure need not be taken.
C. water producing fractures main channel distributed areas delimited in the production zone that stratum water-bearing layer is linked up in water flowing fractured zone, and Slip casting closure is implemented to water producing fractures main channel on ground or underground construction drilling according to condition.
It is preferred that:The slip casting closure is the mixing slurry using cement mortar or yellow mud or both, is pumped to water producing fractures Main channel region, blocks water producing fractures passage.
It is preferred that:Each drill hole key strata of covering rock position is carried out using Judging key stratum software KSPB in the step a Differentiate.
It is preferred that:Water producing fractures main channel distributed areas are in the width range of 30-40m within productive limit.
It is preferred that:Slip casting closure drilling is main according to underworkings position, coal seam buried depth and ground in the step c Cloth is bored depending on condition, and its method for arranging is as follows:
If exist near productive limit can construction drill tunnel, may be selected to construct obliquely in the tunnel slip casting brill Hole.Borehole bottom location drill away from productive limit horizontal range 15-20m, is placed exactly in the distribution strip region of water producing fractures main channel Centre, layer position residing for the whole hole of drilling should be located in the thick hard sand of water-bearing layer bottom.
If near productive limit be not present can construction drill tunnel or coal seam be buried depth be less than 200m shallow buried coal seam, And production zone correspondence earth's surface possesses drilling construction condition, then it may be selected to carry out slip casting closure from ground construction drilling.Drilling is eventually Hole site is placed exactly in water producing fractures main channel distribution strip region center, drilling is eventually away from productive limit horizontal range 15-20m Layer position should be located in the thick hard sand of water-bearing layer bottom residing for hole.
It is preferred that:The spacing of construction drill is 20m in tunnel, and the spacing of surface drilling arrangement can reach 150m.
It is preferred that:The slurry uses the mixing slurry of cement mortar, yellow mud or both.
The influence that the present invention is developed based on coal geology occurrence condition and operational parameter to overlying strata water flowing fractured zone, is not only examined Consider overlying strata water producing fractures main channel distributed areas, and also contemplate underworkings arrangement, coal seam buried depth, earth's surface landform etc. pair The influence of inlet well construction location, the present invention is possible to adapt to bored grouting closure overlying strata water producing fractures under different exploitation condition The determination of the water damage prevention and controls of main channel, can be that mining area coal mining fwaater resources protection and water damage preventing and treating etc. provide safeguard, its Application method is reliable, practical.Compared with prior art in the present invention has advantages below:
(1) the overlying strata water producing fractures for linking up stratum water-bearing layer are taken with the mode of " grabbing principal contradiction ", to the master in overlying strata Want conduit pipe to implement slip casting closure, not only science is reliable, quantities is low, and aquifer water leakage journey can also be effectively reduced Degree, mitigation top plate water damage are threatened;
(2) the water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel under different exploitation condition be can adapt to Determination, strong, top plate water damage the coal mining fwaater resources protection in big mining area and water damage can be threatened to prevent for China's stratum watery Control and provide safeguard, its implementation is simple, practical.
Brief description of the drawings
Fig. 1 is the drilling arrangement of the top plate water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel of the present invention Plan;
Fig. 2 is the drilling arrangement of the top plate water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel of the present invention A-A profiles;
Fig. 3 is the drilling arrangement of the top plate water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel of the present invention B-B profiles;
Fig. 4 is certain colliery 31401 working face T1 drilling columns and position of key stratum differentiation in actual application of the present invention Result schematic diagram;
Fig. 5 is certain colliery 31401 working face T2 drilling columns and position of key stratum differentiation in actual application of the present invention Result schematic diagram;
Fig. 6 is the distribution of certain working face overlying strata water producing fractures main channel of colliery 31401 and note in actual application of the present invention Starch water blockoff firing pattern.
Wherein, 1 construction drill in tunnel is represented, 2 represent district sublevel entry, and 3 represent segment protection coal column, and 4 represent that ground is bored Hole, 5 represent to cut eye, and 6 represent return channel, and 7 represent to stop adopting line, and 8 represent water producing fractures main channel distributed areas.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is furture elucidated, it should be understood that these examples are merely to illustrate this Invention rather than limitation the scope of the present invention, after the present invention has been read, those skilled in the art are various to the present invention's The modification of the equivalent form of value falls within the application appended claims limited range.
As shown in FIG. 1 to 3, the water damage preventing and treating side of a kind of bored grouting of the invention closure overlying strata water producing fractures main channel Method, according to the development characteristics of mining overburden height of water flowing fractured zone under specific mining conditions, by the ground for collecting each coal mining region Face drilling column data, determines each crucial position layer by layer in overlying strata, afterwards with reference to overlying strata water guide using position of key stratum method of discrimination The method for predicting of fissure zone height, determines each region water flowing fractured zone development height and its links up the distributed area in stratum water-bearing layer Domain, finally, the regional assignment water producing fractures main channel distribution in water-bearing layer is linked up in water flowing fractured zone, and according to underworkings Position, coal seam buried depth, ground cloth brill condition etc. determine which kind of inlet well and the construction parameter of drilling implemented;If productive limit Nearby exist can construction drill tunnel, then may be selected inlet well of being constructed obliquely in the tunnel, drilling borehole bottom location away from Productive limit horizontal range 15-20m, is placed exactly in water producing fractures main channel distribution strip region center, layer residing for the whole hole of drilling Position should be located in the thick hard sand of water-bearing layer bottom, and the spacing of construction drill is 20m in tunnel;If being not present near productive limit Can construction drill tunnel or coal seam be shallow buried coal seam that buried depth is less than 200m, and production zone correspondence earth's surface possesses drilling and applied Work condition, then may be selected to carry out slip casting closure, the whole hole position that drilling borehole bottom location drills with underground construction from ground construction drilling Put identical, the spacing of surface drilling arrangement can reach 150m.Specifically include following steps:
A. the geological survey drilling column that mine was once constructed in coal mining region is collected, different production zone roof stratas are obtained Preservation, the physico mechanical characteristic parameter of each rock stratum.Using Judging key stratum software KSPB to each drill hole key strata of covering rock position Differentiated, so that it is determined that each region key strata of covering rock position.
B. use " method for predicting of the height of water flowing fractured zone based on position of key stratum ", by key strata of covering rock position with The relation pair mining overburden height of water flowing fractured zone of mining thickness is judged, so that it is high to obtain each region overlying strata water flowing fractured zone Degree and the relativeness of stratum water-bearing layer present position.When there is water-bearing layer in the range of height of water flowing fractured zone, then correspond to and bore Bore region water flowing fractured zone has linked up water-bearing layer, it is necessary to take bored grouting mode to block water producing fractures main channel.When water guide splits When water-bearing layer is not present in gap band altitude range, then bored grouting measure need not be taken.
C. water producing fractures main channel distributed areas delimited in the production zone that stratum water-bearing layer is linked up in water flowing fractured zone, and Slip casting closure is implemented to water producing fractures main channel on ground or underground construction drilling according to condition.
Water producing fractures main channel distributed areas are in the width range of 30-40m within productive limit.
Situations such as slip casting closure drilling mainly bores condition according to underworkings position, coal seam buried depth and ground cloth Depending on, its method for arranging is as follows:
Can (district sublevel entry 2 near such as stope drift active workings stops adopting line 7 tunnel of construction drill if existing near productive limit Neighbouring return channel 6 etc.), then inlet well of being constructed obliquely in the tunnel may be selected.Borehole bottom location drill away from exploitation side Boundary horizontal range 15-20m, is placed exactly in water producing fractures main channel distribution strip region center, and position is answered in layer position residing for the whole hole of drilling In the thick hard sand of water-bearing layer bottom.The spacing of construction drill 1 is 20m in tunnel.
If near productive limit be not present can construction drill tunnel or coal seam be buried depth be less than 200m shallow buried coal seam, And production zone correspondence earth's surface possesses drilling construction condition, then it may be selected to carry out slip casting closure from ground construction drilling.Drilling is eventually Hole site is placed exactly in water producing fractures main channel distribution strip region center, drilling is eventually away from productive limit horizontal range 15-20m Layer position should be located in the thick hard sand of water-bearing layer bottom residing for hole.The spacing that surface drilling 4 is arranged can reach 150m.
D. after drilling construction is finished, you can using the mixing slurry of cement mortar or yellow mud or both, be pumped to water producing fractures Main channel region, blocks water producing fractures passage.
As shown in Figure 4, Figure 5, in figure it is different production zone drilling posts in certain working face actual application of colliery 31401 The position of key stratum of shape differentiates result, differentiates that result can be seen that 31401 working faces at the two from the position of key stratum of column There is visibly different feature in the rock stratum preservation in drilling region.Thus, the overlying strata water flowing fractured zone in two drilling regions can be developed Judge highly and its to whether stratum water-bearing layer is linked up.It can be seen from working face 6.0m mining height, for T1 drillings region, Overlying strata main key stratum is located at outside 7~10 times of mining heights, therefore water flowing fractured zone is developed to main key stratum bottom interface position, and overlying strata are led Water fissure zone does not link up stratum water-bearing layer.For T1 drillings region, after the same method, key strata of covering rock is respectively positioned on 7~10 Within mining height, overlying strata water producing fractures are developed to tectonic basement, and water flowing fractured zone has linked up stratum water-bearing layer.It is therefore desirable to T2 drillings region correspondence water producing fractures main channel distribution implements bored grouting.
As shown in fig. 6, in the range of T2 drillings region correspondence water flowing fractured zone links up stratum water-bearing layer, having delimited water guide Crack main channel distributed areas are 40m width ranges inside productive limit.Inlet well borehole bottom location away from productive limit level away from From 20m, floor position residing for the whole hole of drilling should be located in the thick siltstones of No. 4 10.62m of water-bearing layer bottom.In view of this layer of position Apart from coal seam farther out (102m), if taking underground, form of construction work drilling construction length is longer obliquely, difficult larger, therefore, adopts Take surface drilling slip casting to block mode to carry out.Because working face is inclined to width 275m, therefore it is logical to stop adopting the water producing fractures master near line Road slip casting closure drilling is arranged in working face tendency middle part, and distance stops adopting line horizontal separation 20m.Near the stope drift active workings of both sides Overlying strata water producing fractures main channel distributed areas, according to region 530m length gauge, be evenly arranged 3 inlet wells, drill Spacing 150m.
The influence that the present invention is developed based on coal geology occurrence condition and operational parameter to overlying strata water flowing fractured zone, is not only examined Consider overlying strata water producing fractures main channel distributed areas, and also contemplate underworkings arrangement, coal seam buried depth, earth's surface landform etc. pair The overlying strata water producing fractures for linking up stratum water-bearing layer are taken the mode of " grabbing principal contradiction " by the influence of inlet well construction location, Slip casting closure is implemented to the main conduit pipe in overlying strata, its implementation science is reliable, quantities is low, can adapt to difference and opens The determination of the water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel, can be mining area coal mining water under the conditions of adopting Protection of resources and water damage preventing and treating etc. provides safeguard.
Described above is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (8)

1. a kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel, it is characterised in that:According to specifically opening The development characteristics of mining overburden height of water flowing fractured zone under the conditions of adopting, are provided by the surface drilling column for collecting each coal mining region Material, determines each crucial position layer by layer in overlying strata, afterwards with reference to overlying strata height of water flowing fractured zone using position of key stratum method of discrimination Method for predicting, determines each region water flowing fractured zone development height and its links up the distributed areas in stratum water-bearing layer, finally, in water guide Fissure zone link up water-bearing layer regional assignment water producing fractures main channel distribution, and according to underworkings position, coal seam buried depth, Ground cloth bores condition and determines which kind of inlet well and the construction parameter of drilling implemented;After drilling construction is finished, by slurry pumping To water producing fractures main channel region, water producing fractures passage is blocked.
2. bored grouting blocks the water damage prevention and controls of overlying strata water producing fractures main channel according to claim 1, its feature exists In comprising the following steps:
A. the geological survey drilling column that mine was once constructed in coal mining region is collected, different production zone roof stratas is obtained and assigns Deposit, the physico mechanical characteristic parameter of each rock stratum;Each drill hole key strata of covering rock position is sentenced using Judging key stratum method Not, so that it is determined that each region key strata of covering rock position;
B. " method for predicting of the height of water flowing fractured zone based on position of key stratum " is used, passes through key strata of covering rock position and coal seam The relation pair mining overburden height of water flowing fractured zone of mining height judged, thus obtain each region overlying strata height of water flowing fractured zone with The relativeness of stratum water-bearing layer present position;When there is water-bearing layer in the range of height of water flowing fractured zone, then bore area is corresponded to Domain water flowing fractured zone has linked up water-bearing layer, it is necessary to take bored grouting mode to block water producing fractures main channel;Work as water flowing fractured zone When water-bearing layer is not present in altitude range, then bored grouting measure need not be taken;
C. water flowing fractured zone link up stratum water-bearing layer production zone in delimit water producing fractures main channel distributed areas, and according to Condition implements slip casting closure on ground or underground construction drilling to water producing fractures main channel.
3. bored grouting blocks the water damage prevention and controls of overlying strata water producing fractures main channel according to claim 2, its feature exists In:The slip casting closure is the mixing slurry using cement mortar or yellow mud or both, is pumped to water producing fractures main channel region, seals Stifled water producing fractures passage.
4. bored grouting blocks the water damage prevention and controls of overlying strata water producing fractures main channel according to claim 2, its feature exists In:Each drill hole key strata of covering rock position is differentiated using Judging key stratum software KSPB in the step a.
5. bored grouting blocks the water damage prevention and controls of overlying strata water producing fractures main channel according to claim 2, its feature exists In:Water producing fractures main channel distributed areas are in the width range of 30-40m within productive limit.
6. bored grouting blocks the water damage prevention and controls of overlying strata water producing fractures main channel according to claim 2, its feature exists In:Slip casting closure drilling is main in the step c bores condition according to underworkings position, coal seam buried depth and ground cloth Depending on, its method for arranging is as follows:
If near productive limit exist can construction drill tunnel, inlet well of being constructed obliquely in the tunnel may be selected; Borehole bottom location drill away from productive limit horizontal range 15-20m, water producing fractures main channel distribution strip region center is placed exactly in, Layer position residing for the whole hole of drilling should be located in the thick hard sand of water-bearing layer bottom;
If be not present near productive limit can construction drill tunnel or coal seam be shallow buried coal seam that buried depth is less than 200m, and open Exploiting field domain correspondence earth's surface possesses drilling construction condition, then may be selected to carry out slip casting closure from ground construction drilling;The whole hole position of drilling Put away from productive limit horizontal range 15-20m, be placed exactly in water producing fractures main channel distribution strip region center, the whole hole institute of drilling Locating layer position should be located in the thick hard sand of water-bearing layer bottom.
7. bored grouting blocks the water damage prevention and controls of overlying strata water producing fractures main channel according to claim 6, its feature exists In:The spacing of construction drill is 20m in tunnel, and the spacing of surface drilling arrangement can reach 150m.
8. bored grouting blocks the water damage prevention and controls of overlying strata water producing fractures main channel according to claim 2, its feature exists In:The slurry uses the mixing slurry of cement mortar, yellow mud or both.
CN201710479391.3A 2017-06-22 2017-06-22 A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel Active CN107044289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710479391.3A CN107044289B (en) 2017-06-22 2017-06-22 A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710479391.3A CN107044289B (en) 2017-06-22 2017-06-22 A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel

Publications (2)

Publication Number Publication Date
CN107044289A true CN107044289A (en) 2017-08-15
CN107044289B CN107044289B (en) 2019-09-03

Family

ID=59546043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710479391.3A Active CN107044289B (en) 2017-06-22 2017-06-22 A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel

Country Status (1)

Country Link
CN (1) CN107044289B (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448214A (en) * 2017-08-18 2017-12-08 天地科技股份有限公司 The large-scale lane pre-pouring grout method of geological structure crack coal and rock superdeep holes high pressure two
CN108104814A (en) * 2017-12-18 2018-06-01 中国矿业大学 High iron content underground reservoir is promoted restorative procedure by the artificial of Surface cracking
CN108104766A (en) * 2017-12-18 2018-06-01 中国矿业大学 Guarantor/the process for purifying water on iron content waste water injection Surface cracking stratum
CN108412453A (en) * 2018-04-24 2018-08-17 淮南矿业(集团)有限责任公司 A kind of coal mining water controls system and construction method altogether with gas
CN108590717A (en) * 2018-05-10 2018-09-28 中国矿业大学 Chemical tendering carbonate rock promotes the water-retaining method of mining induced fissure selfreparing
CN108894727A (en) * 2018-07-05 2018-11-27 中国矿业大学 The water-retaining method of ground level directional drilling slip casting closure overlying strata water producing fractures main channel
CN109139011A (en) * 2018-08-02 2019-01-04 缪协兴 A kind of coal seam is the waterproof coal-mining method of Main aquifer
CN109209481A (en) * 2018-10-10 2019-01-15 中国矿业大学(北京) Crack grouting charge for remittance method is developed around a kind of goaf
CN109441450A (en) * 2018-09-03 2019-03-08 中国矿业大学(北京) A kind of double resource pit mining modes of lower coal water of overlying strata hydrogeologic condition disturbance
CN112377221A (en) * 2020-10-30 2021-02-19 中煤科工集团西安研究院有限公司 Method for inhibiting development of water guide crack belt by grouting before mining and building key layer of structure
CN112576306A (en) * 2020-12-11 2021-03-30 徐州中矿地科岩土工程技术有限公司 Method for controlling water inflow of roof of large water mine in descending mode
CN112761677A (en) * 2020-12-09 2021-05-07 中国矿业大学 Underground coal mine water prevention and control method for grouting water-resisting layer by adopting mechanical digging groove construction
CN113217043A (en) * 2021-05-28 2021-08-06 中煤科工集团西安研究院有限公司 Efficient and rapid plugging method and construction method for water source with water inrush fault water guide zone
CN113378410A (en) * 2021-07-10 2021-09-10 太原理工大学 Method for simulating evolution of mining overburden water guide channel
CN113404484A (en) * 2021-07-27 2021-09-17 中国矿业大学 Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum
CN113605970A (en) * 2021-08-30 2021-11-05 中国矿业大学 Overlying strata isolation grouting filling method for coal gangue underground emission reduction
CN113653510A (en) * 2021-08-31 2021-11-16 中国矿业大学 CO2Method for blocking rock stratum microcrack permeation by mineralized nano silica gel grouting material
CN113895852A (en) * 2021-11-11 2022-01-07 张国建 Atmospheric precipitation storage underground reservoir system and construction method
CN114482994A (en) * 2022-01-27 2022-05-13 冀中能源峰峰集团有限公司 Method for selecting and accurately controlling horizon of water disaster treatment by coal mine exploration
CN114658485A (en) * 2022-03-02 2022-06-24 中煤科工集团西安研究院有限公司 Composite disaster treatment method for water damage and rock burst of thick and hard sandstone roof of coal mine
CN114837608A (en) * 2022-05-31 2022-08-02 中国矿业大学 Method for reconstructing mining overburden rock water barrier by multi-section graded grouting
CN115341902A (en) * 2022-08-17 2022-11-15 中煤科工西安研究院(集团)有限公司 Water-retaining coal mining method for lateral closed curtain of surrounding rock of coal mine working face
CN115853548A (en) * 2023-03-01 2023-03-28 华能煤炭技术研究有限公司 Method for plugging water flowing fractured zone of coal seam roof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8223155B2 (en) * 2007-04-27 2012-07-17 Sony Corporation Method for simulating large numbers of spherical bodies interacting
CN202362466U (en) * 2011-12-08 2012-08-01 山西潞安环保能源开发股份有限公司 Height detecting device for water flowing fracture zone on coal extraction working surface
CN103498696A (en) * 2013-10-02 2014-01-08 中国矿业大学 Method for grouting, filling and compacting goaf filling body from roof roadway
CN103742127A (en) * 2014-01-20 2014-04-23 天地科技股份有限公司 Drill-hole television detection determination method for heights of overlying-strata caving zone and diversion fissure zone
CN104200292A (en) * 2014-09-28 2014-12-10 山东科技大学 Forecasting method for height of water-flowing fractured zone
CN104386409A (en) * 2014-10-21 2015-03-04 中国矿业大学 Water conservancy method using grounding drilling and water source guidance and storage in goaf for coal mine areas
CN104933266A (en) * 2015-07-09 2015-09-23 西安科技大学 Method for determining height of overlying stratum water guiding crack zone

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8223155B2 (en) * 2007-04-27 2012-07-17 Sony Corporation Method for simulating large numbers of spherical bodies interacting
CN202362466U (en) * 2011-12-08 2012-08-01 山西潞安环保能源开发股份有限公司 Height detecting device for water flowing fracture zone on coal extraction working surface
CN103498696A (en) * 2013-10-02 2014-01-08 中国矿业大学 Method for grouting, filling and compacting goaf filling body from roof roadway
CN103742127A (en) * 2014-01-20 2014-04-23 天地科技股份有限公司 Drill-hole television detection determination method for heights of overlying-strata caving zone and diversion fissure zone
CN104200292A (en) * 2014-09-28 2014-12-10 山东科技大学 Forecasting method for height of water-flowing fractured zone
CN104386409A (en) * 2014-10-21 2015-03-04 中国矿业大学 Water conservancy method using grounding drilling and water source guidance and storage in goaf for coal mine areas
CN104933266A (en) * 2015-07-09 2015-09-23 西安科技大学 Method for determining height of overlying stratum water guiding crack zone

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王晓振等: "主关键层结构稳定性对导水裂隙演化的影响研究", 《煤炭学报》 *
许家林等: "基于关键层位置的导水裂隙带高度预计方法", 《煤炭学报》 *

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448214B (en) * 2017-08-18 2019-06-14 天地科技股份有限公司 Large-scale two lane pre-pouring grout method of geological structure crack coal and rock superdeep holes high pressure
CN107448214A (en) * 2017-08-18 2017-12-08 天地科技股份有限公司 The large-scale lane pre-pouring grout method of geological structure crack coal and rock superdeep holes high pressure two
CN108104814A (en) * 2017-12-18 2018-06-01 中国矿业大学 High iron content underground reservoir is promoted restorative procedure by the artificial of Surface cracking
CN108104766A (en) * 2017-12-18 2018-06-01 中国矿业大学 Guarantor/the process for purifying water on iron content waste water injection Surface cracking stratum
RU2730276C1 (en) * 2017-12-18 2020-08-21 Чайна Юниверсити Оф Майнинг Энд Текнолоджи Method of water protection/purification by repeated filling of formation destructed by coal mining, iron-containing waste water
WO2019119933A1 (en) * 2017-12-18 2019-06-27 中国矿业大学 Method for protecting/purifying water by recharging iron-containing sewage into stratum destroyed by coal mining
CN108412453A (en) * 2018-04-24 2018-08-17 淮南矿业(集团)有限责任公司 A kind of coal mining water controls system and construction method altogether with gas
CN108590717A (en) * 2018-05-10 2018-09-28 中国矿业大学 Chemical tendering carbonate rock promotes the water-retaining method of mining induced fissure selfreparing
CN108590717B (en) * 2018-05-10 2019-11-26 中国矿业大学 The water-retaining method of chemical tendering carbonate rock promotion mining induced fissure selfreparing
CN108894727A (en) * 2018-07-05 2018-11-27 中国矿业大学 The water-retaining method of ground level directional drilling slip casting closure overlying strata water producing fractures main channel
CN108894727B (en) * 2018-07-05 2021-01-19 中国矿业大学 Water retention method for plugging main channel of overburden rock water flowing fracture by grouting in ground horizontal directional drilling
CN109139011A (en) * 2018-08-02 2019-01-04 缪协兴 A kind of coal seam is the waterproof coal-mining method of Main aquifer
CN109441450A (en) * 2018-09-03 2019-03-08 中国矿业大学(北京) A kind of double resource pit mining modes of lower coal water of overlying strata hydrogeologic condition disturbance
CN109209481A (en) * 2018-10-10 2019-01-15 中国矿业大学(北京) Crack grouting charge for remittance method is developed around a kind of goaf
CN112377221A (en) * 2020-10-30 2021-02-19 中煤科工集团西安研究院有限公司 Method for inhibiting development of water guide crack belt by grouting before mining and building key layer of structure
CN112377221B (en) * 2020-10-30 2022-09-23 中煤科工集团西安研究院有限公司 Method for inhibiting development of water guide crack belt by grouting before mining and building key layer of structure
CN112761677A (en) * 2020-12-09 2021-05-07 中国矿业大学 Underground coal mine water prevention and control method for grouting water-resisting layer by adopting mechanical digging groove construction
CN112576306A (en) * 2020-12-11 2021-03-30 徐州中矿地科岩土工程技术有限公司 Method for controlling water inflow of roof of large water mine in descending mode
CN112576306B (en) * 2020-12-11 2023-10-31 徐州中矿地科岩土工程技术有限公司 Method for controlling water inflow of large water mine roof in descending mode
CN113217043A (en) * 2021-05-28 2021-08-06 中煤科工集团西安研究院有限公司 Efficient and rapid plugging method and construction method for water source with water inrush fault water guide zone
CN113378410A (en) * 2021-07-10 2021-09-10 太原理工大学 Method for simulating evolution of mining overburden water guide channel
CN113378410B (en) * 2021-07-10 2023-06-16 太原理工大学 Simulation method for evolution of mining overburden water guide channel
CN113404484A (en) * 2021-07-27 2021-09-17 中国矿业大学 Ground double-bare-hole combined monitoring method for internal movement of water-rich stratum mining rock stratum
CN113605970B (en) * 2021-08-30 2022-06-07 中国矿业大学 Overlying strata isolation grouting filling method for coal gangue underground emission reduction
CN113605970A (en) * 2021-08-30 2021-11-05 中国矿业大学 Overlying strata isolation grouting filling method for coal gangue underground emission reduction
CN113653510B (en) * 2021-08-31 2022-04-22 中国矿业大学 CO2Method for blocking rock stratum microcrack permeation by mineralized nano silica gel grouting material
CN113653510A (en) * 2021-08-31 2021-11-16 中国矿业大学 CO2Method for blocking rock stratum microcrack permeation by mineralized nano silica gel grouting material
CN113895852A (en) * 2021-11-11 2022-01-07 张国建 Atmospheric precipitation storage underground reservoir system and construction method
CN114482994A (en) * 2022-01-27 2022-05-13 冀中能源峰峰集团有限公司 Method for selecting and accurately controlling horizon of water disaster treatment by coal mine exploration
CN114658485B (en) * 2022-03-02 2023-05-16 中煤科工集团西安研究院有限公司 Composite disaster treatment method for water damage and rock burst of thick and hard sandstone roof of coal mine
CN114658485A (en) * 2022-03-02 2022-06-24 中煤科工集团西安研究院有限公司 Composite disaster treatment method for water damage and rock burst of thick and hard sandstone roof of coal mine
CN114837608A (en) * 2022-05-31 2022-08-02 中国矿业大学 Method for reconstructing mining overburden rock water barrier by multi-section graded grouting
CN114837608B (en) * 2022-05-31 2022-12-23 中国矿业大学 Method for reconstructing mining overburden rock water barrier by multi-section graded grouting
CN115341902B (en) * 2022-08-17 2023-06-13 中煤科工西安研究院(集团)有限公司 Coal mine working face surrounding rock lateral closed curtain water-retaining coal mining method
CN115341902A (en) * 2022-08-17 2022-11-15 中煤科工西安研究院(集团)有限公司 Water-retaining coal mining method for lateral closed curtain of surrounding rock of coal mine working face
CN115853548A (en) * 2023-03-01 2023-03-28 华能煤炭技术研究有限公司 Method for plugging water flowing fractured zone of coal seam roof

Also Published As

Publication number Publication date
CN107044289B (en) 2019-09-03

Similar Documents

Publication Publication Date Title
CN107044289B (en) A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel
CN108894727B (en) Water retention method for plugging main channel of overburden rock water flowing fracture by grouting in ground horizontal directional drilling
CN106907175B (en) The efficient extraction coal roadway stripe gas of bottom plate concordant long drilled holes staged fracturing and region outburst elimination method
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
CN101581231B (en) Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture
CN106761902B (en) A kind of stereo synthesis pressure relief gas pumping mining method suitable for soft rock protective coat extracted
CN104847379B (en) The method of a kind of Austria grey top grouting and reinforcing floor undulation
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
CN104314610A (en) Coal road stripe region burst-preventing method
CN107339105B (en) A method of stop adopting line coal column in the layering residual exploiting field of paste body filling second mining super high seam
CN107740707A (en) Thick coal-layer mining water damage prevention and controls under a kind of deep high artesian
CN107044280A (en) A kind of bored grouting detection method of mining overburden absciss layer distribution characteristics
CN107165626A (en) A kind of coal-face floods prevention method with cranny development country rock top plate
CN106089291A (en) A kind of collaborative extraction is caving the old dead zone of formula and the method for lower coal seam coal bed gas
CN108412453A (en) A kind of coal mining water controls system and construction method altogether with gas
CN106014407A (en) Method for controlling disasters by utilizing roof crevice water to weaken main control coal seams and rock strata in situ
CN109162731A (en) Iron producing area deep mining gushing water grouting treatment method
CN107227959B (en) A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture
CN108590717A (en) Chemical tendering carbonate rock promotes the water-retaining method of mining induced fissure selfreparing
CN114278372B (en) Diversion arrangement method for underground directional drilling area of huge thick water-rich layer
CN109736876A (en) It adopts kinetoplast and gushes out gas top plate major diameter directional long borehole pumping method
CN112302715B (en) Soft sandstone aquifer dredging and lowering method
CN112502775B (en) Semi-solid sandstone aquifer drainage depressurization method
CN115467639A (en) Water interception and emission reduction method for directionally exploring and blocking ground
CN111894672B (en) Method for advanced treatment of roof separation water damage of stope by adopting ground drainage drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant