CN107035385A - A kind of reinforcement means of duct pieces of shield tunnel - Google Patents

A kind of reinforcement means of duct pieces of shield tunnel Download PDF

Info

Publication number
CN107035385A
CN107035385A CN201710465273.7A CN201710465273A CN107035385A CN 107035385 A CN107035385 A CN 107035385A CN 201710465273 A CN201710465273 A CN 201710465273A CN 107035385 A CN107035385 A CN 107035385A
Authority
CN
China
Prior art keywords
shield tunnel
reinforcement
duct pieces
bar
reinforcement means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710465273.7A
Other languages
Chinese (zh)
Inventor
陈仁朋
鲁立
刘源
吴熠文
张品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201710465273.7A priority Critical patent/CN107035385A/en
Publication of CN107035385A publication Critical patent/CN107035385A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of construction method, more particularly to a kind of reinforcement means of duct pieces of shield tunnel, this method comprises the following steps:A. poor dabbing processing is carved;B. steel planting;C. bar-mat reinforcement is applied;D. clear up;E. humidify;F. gunite concrete.The method construction is fast, cost is low, can guarantee that reinforcing body and section of jurisdiction compatible deformation, and performance is stable, shield tunnel can be solved in progradation and during operation due to closing on the problem of being reinforced after construction occurrence of large-area fragmentation, it is ensured that tunnel meets operation security requirement.

Description

A kind of reinforcement means of duct pieces of shield tunnel
Technical field
The present invention relates to a kind of construction method, more particularly to a kind of reinforcement means of duct pieces of shield tunnel.
Background technology
Repairing and reinforcing is carried out to damaged tunnel segment structure in tunnel internal at present, for different segment damage situations, generally adopted Use two methods:First method is that the fibre sheet materials such as soft texture, the aramid fabric for being only capable of bearing pulling force are pasted on into impaired shield In the tensile zone of structure tunnel duct piece, the tensile property at section of jurisdiction and seaming position is improved whereby, but this method can not be significantly Degree improves the rigidity of structure, and consolidation effect is influenceed by tunnel deformation degree, i.e., tunnel deformation is smaller, and consolidation effect is just better. Second method is then to be reinforced to being damaged duct pieces of shield tunnel using the method for interior steel plate, with the entirety of riser loop Load-carrying properties, though the rigidity of structure can be increased substantially, but face conduct oneself with dignity excessive, construction complexity, the problems such as reinforcement cost is high
The content of the invention
It is an object of the invention to provide a kind of reinforcement means of duct pieces of shield tunnel, solve tunnel reinforcement it is complicated, into The problem of this is high.
The present invention is achieved in that a kind of reinforcement means of duct pieces of shield tunnel, and reinforcing scope is impaired section of jurisdiction inwall All-round scope, this method comprises the following steps:
A. poor dabbing processing is carved;
B. steel planting;
C. bar-mat reinforcement is applied;
D. clear up;
E. humidify;
F. gunite concrete.
The present invention further technical scheme be:The step A is:The section of jurisdiction inwall that section is reinforced to shield tunnel is carried out The processing of cutting dabbing, cuts concrete cover to tunnel segment structure affected area, duct pieces of shield tunnel is exposed steel bar stress.
The present invention further technical scheme be:The step B is:Section of jurisdiction cage bar is avoided, is axially bored along section of jurisdiction with ring Hole, and anchoring adhesive is injected into hole, replant into spacer bar, spacer bar end marks for thickness.
The present invention further technical scheme be:The step C is:The good bar-mat reinforcement of colligation is consolidated by way of welding It is scheduled on steel bar stress and spacer bar, bar-mat reinforcement includes axial reinforcement and circumferential reinforcement.
The present invention further technical scheme be:The step D is:Scum silica frost is cleared up, holding structure clean surface is dustless.
The present invention further technical scheme be:The step is:Rinse section of jurisdiction surface repeatedly with water, make it fully wet Profit, then wipes the ponding for remaining in surface off.
The present invention further technical scheme be:The step F is:Concrete is ultra-high performance concrete (UHPC);Spray Ultra-high performance concrete (UHPC) is penetrated to not having spacer bar just.
The beneficial effects of the invention are as follows:Method construction is fast, and cost is low, it is ensured that UHPC back-up coats and section of jurisdiction compatible deformation, property Can be stable, shield tunnel can be solved in progradation and during operation due to being carried out after closing on construction occurrence of large-area fragmentation The problem of reinforcing, it is ensured that tunnel meets operation security requirement.
Brief description of the drawings
Fig. 1 is a kind of reinforcement means scope schematic diagram for duct pieces of shield tunnel that the present invention is provided;
Fig. 2 is a kind of reinforcement means schematic diagram for duct pieces of shield tunnel that the present invention is provided.
Reference:1st, section of jurisdiction 2, ultra-high performance concrete 3, steel bar stress 4, bar-mat reinforcement 41, axial reinforcement, 42, Circumferential reinforcement 5, positioning bar.
Embodiment
Embodiment one:
Fig. 1-Fig. 2 shows a kind of reinforcement means of duct pieces of shield tunnel, reinforces the section of jurisdiction 1 of section to shield tunnel first Inwall carries out cutting dabbing processing, and key area is damaged to tunnel segment structure and is generally and binds block and joint cuts concrete protective Layer, makes duct pieces of shield tunnel expose steel bar stress 3;Section of jurisdiction cage bar is avoided, drilling is axially and radially distributed along section of jurisdiction 1, and to hole Middle injection anchoring adhesive, is replanted into spacer bar 5, and the end of spacer bar 5 is the thickness mark for spraying very-high performance native (UHPC), Thickness 50-100mm;The good bar-mat reinforcement 4 of colligation is fixed on by way of welding on steel bar stress 3 and spacer bar 5 again, steel Muscle net 4 includes axial reinforcement 41 and circumferential reinforcement 42;Scum silica frost is cleared up, holding structure clean surface is dustless;With water flush pipe repeatedly The surface of piece 1, is sufficiently humidified so as to it, then wipes the ponding for remaining in surface off, reaches saturated dry surface;Very-high performance is sprayed to mix Solidifying soil (UHPC) to there be not spacer bar just.The present invention is compared with the advantage of prior art:
(1) in terms of structure stress, the strength and stiffness of section of jurisdiction can not only be improved, segment deformation is controlled and further breaks It is bad, and good toughness can be kept with section of jurisdiction compatible deformation;
(2) from the aspect of structure durability, ultra-high performance concrete (UHPC) belongs to inorganic material, solves and is pasting steel The problem of aging of the interface agglutination agent used when plate is reinforced and aramid fabric is reinforced, it is ensured that the durability of interface cementing strength;
(3) from structure secure context, compared to affixing steel plate reinforcement section of jurisdiction method, reinforcing body is strong operation stage in later stage Health state is more prone to observe and controlled;
(4) in terms of construction and economic benefit, the our whole work progress technique of law system is simple, time-consuming short, right Metro operation influence is small, with very high social effect and economic benefits.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (7)

1. a kind of reinforcement means of duct pieces of shield tunnel, reinforcing scope is the all-round scope of impaired section of jurisdiction inwall, it is characterised in that This method comprises the following steps:
A. poor dabbing processing is carved;
B. steel planting;
C. bar-mat reinforcement is applied;
D. clear up;
E. humidify;
F. gunite concrete.
2. a kind of reinforcement means of duct pieces of shield tunnel according to claim 1, it is characterised in that the step A is:It is right Section of jurisdiction (1) inwall that shield tunnel reinforces section carries out cutting dabbing processing, and concrete guarantor is cut to tunnel segment structure affected area Sheath, makes duct pieces of shield tunnel expose steel bar stress (3).
3. a kind of reinforcement means of duct pieces of shield tunnel according to claim 2, it is characterised in that the step B is:Keep away Open pipe piece cage bar, axially drills along section of jurisdiction (1) with ring, and injects anchoring adhesive into hole, replants into spacer bar (5), described Spacer bar (5) end marks for thickness.
4. a kind of reinforcement means of duct pieces of shield tunnel according to claim 3, it is characterised in that the step C is:Will The good bar-mat reinforcement of colligation (4) is fixed on by way of welding on steel bar stress (3) and spacer bar (5), the bar-mat reinforcement (4) Including axial reinforcement (41) and circumferential reinforcement (42).
5. a kind of reinforcement means of duct pieces of shield tunnel according to claim 4, it is characterised in that the step D is:Clearly Scum silica frost is managed, holding structure clean surface is dustless.
6. a kind of reinforcement means of duct pieces of shield tunnel according to claim 5, it is characterised in that the step E is:With Water rinses section of jurisdiction (1) surface repeatedly, is sufficiently humidified so as to it, then wipes the ponding for remaining in surface off.
7. the reinforcement means of a kind of duct pieces of shield tunnel according to claim 6, it is characterised in that in the step F:Institute Concrete is stated for ultra-high performance concrete;Injection ultra-high performance concrete was not to having spacer bar (5).
CN201710465273.7A 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel Pending CN107035385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710465273.7A CN107035385A (en) 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710465273.7A CN107035385A (en) 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel

Publications (1)

Publication Number Publication Date
CN107035385A true CN107035385A (en) 2017-08-11

Family

ID=59541359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710465273.7A Pending CN107035385A (en) 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel

Country Status (1)

Country Link
CN (1) CN107035385A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296383A (en) * 2018-10-09 2019-02-01 中建隧道建设有限公司 Reinforcement means is maintained after dehydration outside a kind of tunnel duct piece
CN110159312A (en) * 2019-06-26 2019-08-23 洛阳理工学院 A kind of restorative procedure of stalk dome-shaped tunnel-liner
CN111648787A (en) * 2020-04-24 2020-09-11 同济大学 Method for reinforcing shield tunnel lining structure by adopting ultra-high performance concrete
CN112813792A (en) * 2021-02-22 2021-05-18 重庆交通大学 Method for reinforcing arch bridge by combination of UHPC injection and bar planting
CN113503172A (en) * 2021-05-31 2021-10-15 中铁工程服务有限公司 Punching method and device for shield subway tunnel segment and storage medium
CN113642089A (en) * 2021-10-14 2021-11-12 湖南大学 Method for determining deformation and reinforcement range of surrounding stratum in shield tunneling
CN114150877A (en) * 2021-12-08 2022-03-08 湖南人健宝固高新科技发展有限公司 Construction method of ultra-high performance concrete

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56163327A (en) * 1980-05-21 1981-12-15 Nippon Rotsukuraapipe Kk Repairing method for embedded concrete pipe
CN102979536A (en) * 2012-12-11 2013-03-20 上海市基础工程有限公司 Construction method for tunnel segment repair and reinforcement
CN103061780A (en) * 2012-12-25 2013-04-24 上海隧道工程股份有限公司 Operating tunnel structure reinforcement construction method through steel ring
CN103643965A (en) * 2013-12-16 2014-03-19 上海市基础工程集团有限公司 Repair and reinforcement construction methods for segments in formed tunnel
CN104652294A (en) * 2015-02-03 2015-05-27 湖南大学 New technology for reinforcing box girder through adhesion of UHPC (Ultra High Performance Concrete) and steel plate
CN104790970A (en) * 2015-03-31 2015-07-22 同济大学 Method for utilizing combined structure to conduct shield tunnel strengthening
CN105178980A (en) * 2015-09-07 2015-12-23 中南大学 Skylight-forming lining structure repair method for tunnels
CN205714212U (en) * 2016-06-15 2016-11-23 中国电建集团铁路建设有限公司 Tunneling shield segment damage falls block leakage muscle and repairs structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56163327A (en) * 1980-05-21 1981-12-15 Nippon Rotsukuraapipe Kk Repairing method for embedded concrete pipe
CN102979536A (en) * 2012-12-11 2013-03-20 上海市基础工程有限公司 Construction method for tunnel segment repair and reinforcement
CN103061780A (en) * 2012-12-25 2013-04-24 上海隧道工程股份有限公司 Operating tunnel structure reinforcement construction method through steel ring
CN103643965A (en) * 2013-12-16 2014-03-19 上海市基础工程集团有限公司 Repair and reinforcement construction methods for segments in formed tunnel
CN104652294A (en) * 2015-02-03 2015-05-27 湖南大学 New technology for reinforcing box girder through adhesion of UHPC (Ultra High Performance Concrete) and steel plate
CN104790970A (en) * 2015-03-31 2015-07-22 同济大学 Method for utilizing combined structure to conduct shield tunnel strengthening
CN105178980A (en) * 2015-09-07 2015-12-23 中南大学 Skylight-forming lining structure repair method for tunnels
CN205714212U (en) * 2016-06-15 2016-11-23 中国电建集团铁路建设有限公司 Tunneling shield segment damage falls block leakage muscle and repairs structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296383A (en) * 2018-10-09 2019-02-01 中建隧道建设有限公司 Reinforcement means is maintained after dehydration outside a kind of tunnel duct piece
CN110159312A (en) * 2019-06-26 2019-08-23 洛阳理工学院 A kind of restorative procedure of stalk dome-shaped tunnel-liner
CN111648787A (en) * 2020-04-24 2020-09-11 同济大学 Method for reinforcing shield tunnel lining structure by adopting ultra-high performance concrete
CN112813792A (en) * 2021-02-22 2021-05-18 重庆交通大学 Method for reinforcing arch bridge by combination of UHPC injection and bar planting
CN113503172A (en) * 2021-05-31 2021-10-15 中铁工程服务有限公司 Punching method and device for shield subway tunnel segment and storage medium
CN113503172B (en) * 2021-05-31 2023-11-03 中铁工程服务有限公司 Punching method and device for shield subway tunnel segment and storage medium
CN113642089A (en) * 2021-10-14 2021-11-12 湖南大学 Method for determining deformation and reinforcement range of surrounding stratum in shield tunneling
CN114150877A (en) * 2021-12-08 2022-03-08 湖南人健宝固高新科技发展有限公司 Construction method of ultra-high performance concrete

Similar Documents

Publication Publication Date Title
CN107035385A (en) A kind of reinforcement means of duct pieces of shield tunnel
CN107060787A (en) A kind of reinforcement means of duct pieces of shield tunnel
WO2010039547A3 (en) Reinforced internal composite structures
CN107059536A (en) A kind of new-to-old concrete interface bar planting adhesive method
CN103556713A (en) Steel pipe intersecting joint reinforced by carbon fiber composite reinforced material
CN103498683A (en) Tunnel early-strength quick strengthening method based on quick-set composite mortar and fiber woven mesh
CN106223359A (en) A kind of wind power foundation damping energy-dissipating device and construction technique thereof
CN110486041A (en) A kind of tunnel high-performance supporting construction
CN202851009U (en) Tunnel buffering multilayer waterproof-drainage structure
CN107460995A (en) A kind of anti-buckling thin-wall steel tube steel fiber reinforced concrete coupled column and its construction method
CN104373138A (en) Waterproof layer rebuilding construction method in repairing of tunnel lining structure
KR101248088B1 (en) Ground and structure reinforcing method for repair construction of construction structure
CN103866991A (en) Method for preventing basalt fiber cloth and concrete from stripping during repairing shear wall
ATE545764T1 (en) SYSTEM, METHOD AND APPARATUS FOR PASSIVE AND ACTIVE UPWARD DRILLING FEATURES ON ROLL DRILLING BITS
JP2007146546A (en) Concrete structure reinforcing structure and concrete structure reinforcing method
CN105401740B (en) Timber structure and timber structure restorative procedure after reparation
CN205777638U (en) A kind of RC Beam Strengthened with CFRP
CN109681243B (en) Comprehensive restoration method for tunnel lining two-lining concrete waterproof board exposure
WO2006010502A3 (en) Beam control surface and method for the production of a beam control surface
CN106337449A (en) Crack repairing structure for underground engineering and construction method of crack repairing structure
JP2007162233A (en) Repair method for foundation
CN103614990B (en) The ruggedized construction of thin-wall hydraulic structure and reinforcement means
KR20160123407A (en) A repairing method of a pipe
CN206070558U (en) A kind of wind power foundation damping energy-dissipating device
CN206234492U (en) A kind of PCCP pipes pre-stressed carbon fiber reinforcing structure design

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811

RJ01 Rejection of invention patent application after publication