CN107060787A - A kind of reinforcement means of duct pieces of shield tunnel - Google Patents

A kind of reinforcement means of duct pieces of shield tunnel Download PDF

Info

Publication number
CN107060787A
CN107060787A CN201710465924.2A CN201710465924A CN107060787A CN 107060787 A CN107060787 A CN 107060787A CN 201710465924 A CN201710465924 A CN 201710465924A CN 107060787 A CN107060787 A CN 107060787A
Authority
CN
China
Prior art keywords
shield tunnel
duct pieces
reinforcement means
reinforcement
tunnel according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710465924.2A
Other languages
Chinese (zh)
Inventor
陈仁朋
鲁立
刘源
孙和美
张品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201710465924.2A priority Critical patent/CN107060787A/en
Publication of CN107060787A publication Critical patent/CN107060787A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering

Abstract

The present invention relates to a kind of construction method, more particularly to a kind of reinforcement means of duct pieces of shield tunnel, this method comprises the following steps:A. poor dabbing processing is carved;B. bar-mat reinforcement is applied;C. clear up;D. installation form and humidify;E. casting concrete;F. conserve.The method construction is fast, cost is low, can guarantee that ruggedized construction and section of jurisdiction compatible deformation, and performance is stable, shield tunnel can be solved in progradation and during operation due to closing on the problem of being reinforced after construction occurrence of large-area fragmentation, it is ensured that tunnel meets operation security requirement.

Description

A kind of reinforcement means of duct pieces of shield tunnel
Technical field
The present invention relates to a kind of construction method, more particularly to a kind of reinforcement means of duct pieces of shield tunnel.
Background technology
Repairing and reinforcing is carried out to damaged tunnel segment structure in tunnel internal at present, for different segment damage situations, generally adopted Use two methods:First method is that the fibre sheet materials such as soft texture, the aramid fabric for being only capable of bearing pulling force are pasted on into impaired shield In the tensile zone of structure tunnel duct piece, the tensile property at section of jurisdiction and seaming position is improved whereby, but this method can not be significantly Degree improves the rigidity of structure, and consolidation effect is influenceed by tunnel deformation degree, i.e., tunnel deformation is smaller, and consolidation effect is just better. Second method is then to be reinforced to being damaged duct pieces of shield tunnel using the method for interior steel plate, with the entirety of riser loop Load-carrying properties, though the rigidity of structure can be increased substantially, but face conduct oneself with dignity excessive, construction complexity, the problems such as reinforcement cost is high
The content of the invention
It is an object of the invention to provide a kind of reinforcement means of duct pieces of shield tunnel, tunnel reinforcement construction is solved multiple It is miscellaneous, the problem of cost is high.
The present invention is achieved in that a kind of reinforcement means of duct pieces of shield tunnel, and this method comprises the following steps:
A. grain processing is carved;
B. reinforced mesh is applied;
C. clear up;
D. humidify;
E. gunite concrete.
The present invention further technical scheme be:The step A is:The section of jurisdiction inwall that section is reinforced to shield tunnel is carried out The processing of cutting dabbing, cuts concrete cover to tunnel segment structure key area, duct pieces of shield tunnel is exposed steel bar stress.
The present invention further technical scheme be:The step B is:Bar-mat reinforcement is set on duct pieces of shield tunnel, and with The steel bar stress exposed is welded as a whole.
The present invention further technical scheme be:The step C is:Scum silica frost is cleared up, holding structure clean surface is dustless.
The present invention further technical scheme be:The step D is:Installation form, fills template and section of jurisdiction by watering Divide moistening, reprocessing remains in the ponding on surface, reaches saturated dry surface.
State.
The present invention further technical scheme be:In the step E:The concrete is ultra-high performance concrete.
The present invention further technical scheme be:The step F is:Form removal (5) after maintenance.
The beneficial effects of the invention are as follows:Method construction is fast, and cost is low, be able to can be solved with section of jurisdiction compatible deformation, performance stabilization Shield tunnel in progradation and operation during due to close on construction occurrence of large-area fragmentation after reinforced the problem of, really Protect tunnel and meet operation security requirement.
Brief description of the drawings
Fig. 1 is a kind of reinforcement means schematic diagram for duct pieces of shield tunnel that the present invention is provided;
Fig. 2 is the model sheetinstallat schematic diagram for the duct pieces of shield tunnel for having railway roadbed;
Fig. 3 is the model sheetinstallat schematic diagram of the duct pieces of shield tunnel of no railway roadbed.
Reference:1st, section of jurisdiction 2, ultra-high performance concrete 3, steel bar stress 4, bar-mat reinforcement 5, template 6, injected hole 7th, steam vent 8, spilled water hole 9, cavity.
Embodiment
Embodiment one:In the case that large deformation occurs based on duct pieces of shield tunnel for the present invention, through waterproofing and leakage-stopping, with reference to ground Slip casting in layer, premised on the stabilization for ensureing shield tunnel and surrounding formation, after being repaired to segment damage fracture area Implement.
A kind of method of cast-in-place ultra-high performance concrete (UHPC) reinforcing shield tunnel duct piece, passes through cast-in-place superelevation coagulation Native (UHPC) applies high performance concrete (UHPC) back-up coat 2, using ultra-high performance concrete (UHPC) itself adhesive property, with Tunnel duct piece 1 is collectively forming carrying system;Ultra-high performance concrete (UHPC) back-up coat 2 is by ultra-high performance concrete (UHPC) 1 Formed with bar-mat reinforcement 4 in template 5 through pouring maintenance;Bar-mat reinforcement 4 is welded with original structure principal rod 3 when applying bar-mat reinforcement 4.
The inwall of section of jurisdiction 1 that section is first reinforced to shield tunnel carries out cutting dabbing processing, and tunnel segment structure key area is dug Except concrete cover, original structure is set to expose steel bar stress 3;Bar-mat reinforcement 4 is applied again, and bar-mat reinforcement 4 is carried out with structure stress muscle 3 Welding, and scum silica frost is cleared up, holding structure clean surface is dustless;Installation form 5 is simultaneously blocked, and forms closed cavity 9, and template 5 is selected Steel plate thick 3-5mm, the net thickness 50-100mm of closed cavity 9;By the water filling into cavity 9 of injected hole 6, it is vented with reference to steam vent 7 Make to be full of water in cavity 9, soak section of jurisdiction internal-wall concrete;Section of jurisdiction inwall was soaked in water after 2-3 days, by the draining of spilled water hole 8, and The ponding remained in cavity 9 is handled, section of jurisdiction inwall is reached saturated dry surface;By injected hole 6 to it is lower and go up, left and right hand over For the symmetrical perfusion ultra-high performance concrete (UHPC) out of two lateral cavities 9, until filling whole cavity;Mould is removed after maintenance Plate 5.
Compared with prior art, the advantage of the invention is that:
(1) in terms of structure stress, the strength and stiffness of section of jurisdiction can not only be improved, segment deformation is controlled and further breaks It is bad, and good toughness can be kept, with section of jurisdiction compatible deformation;
(2) from the aspect of structure durability, ultra-high performance concrete (UHPC) belongs to inorganic material, solves existing reinforcing The problem of aging for the interface agglutination agent that method is used, it is ensured that interface cementing strength and durability;
(3) from structure secure context, compared to affixing steel plate reinforcement section of jurisdiction method, reinforcing body is strong operation stage in later stage Health state is more prone to observe and controlled;
(4) in terms of construction and economic benefit, the whole work progress technique of method system of the present invention is simple, It is time-consuming short, it is small to subway Influence to operation, with very high social effect and economic benefits.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (7)

1. a kind of reinforcement means of duct pieces of shield tunnel, it is characterised in that this method comprises the following steps:
A. poor dabbing processing is carved;
B. bar-mat reinforcement is applied;
C. clear up;
D. installation form and humidify;
E. casting concrete;
F. conserve.
2. a kind of reinforcement means of duct pieces of shield tunnel according to claim 1, it is characterised in that the step A is:It is right Section of jurisdiction (1) inwall that shield tunnel reinforces section carries out cutting dabbing processing, and concrete guarantor is cut to tunnel segment structure key area Sheath, makes duct pieces of shield tunnel expose steel bar stress (3).
3. a kind of reinforcement means of duct pieces of shield tunnel according to claim 2, it is characterised in that the step B is: Bar-mat reinforcement (4) is set on duct pieces of shield tunnel (1), and is welded as a whole with the steel bar stress (3) that exposes.
4. a kind of reinforcement means of duct pieces of shield tunnel according to claim 1, it is characterised in that the step C is:Clearly Scum silica frost is managed, holding structure clean surface is dustless.
5. a kind of reinforcement means of duct pieces of shield tunnel according to claim 1, it is characterised in that the step D is:Peace Decking (5), is sufficiently humidified so as to template (5) and section of jurisdiction (1) by watering, and reprocessing remains in the ponding on surface, reaches saturation Surface dry condition.
6. the reinforcement means of a kind of duct pieces of shield tunnel according to claim 1, it is characterised in that in the step E:Institute Concrete is stated for ultra-high performance concrete.
7. a kind of reinforcement means of duct pieces of shield tunnel according to claim 1, it is characterised in that the step F is:Through Form removal (5) after maintenance.
CN201710465924.2A 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel Pending CN107060787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710465924.2A CN107060787A (en) 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710465924.2A CN107060787A (en) 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel

Publications (1)

Publication Number Publication Date
CN107060787A true CN107060787A (en) 2017-08-18

Family

ID=59594594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710465924.2A Pending CN107060787A (en) 2017-06-19 2017-06-19 A kind of reinforcement means of duct pieces of shield tunnel

Country Status (1)

Country Link
CN (1) CN107060787A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296383A (en) * 2018-10-09 2019-02-01 中建隧道建设有限公司 Reinforcement means is maintained after dehydration outside a kind of tunnel duct piece
CN110295924A (en) * 2019-05-24 2019-10-01 同济大学 A kind of shield tunnel ruggedized construction and construction method based on I-shaped steel plate
CN111911190A (en) * 2020-09-11 2020-11-10 何峰 Improved construction method for caulking shield tunnel segment
CN116792149A (en) * 2023-08-16 2023-09-22 湖南大学 Method and system for recovering deformation of shield tunnel structure
CN116792149B (en) * 2023-08-16 2024-05-14 湖南大学 Method and system for recovering deformation of shield tunnel structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003227296A (en) * 2002-02-05 2003-08-15 Nippon Concrete Ind Co Ltd Tunnel repairing construction method and tunnel repairing plate
WO2004035962A1 (en) * 2002-10-16 2004-04-29 Tekken Construction Co., Ltd. Concrete structure repairing and reinforcing method
CN103643965A (en) * 2013-12-16 2014-03-19 上海市基础工程集团有限公司 Repair and reinforcement construction methods for segments in formed tunnel
CN104652294A (en) * 2015-02-03 2015-05-27 湖南大学 New technology for reinforcing box girder through adhesion of UHPC (Ultra High Performance Concrete) and steel plate
JP2016037793A (en) * 2014-08-08 2016-03-22 株式会社大林組 Repair and reinforcement method for existing tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003227296A (en) * 2002-02-05 2003-08-15 Nippon Concrete Ind Co Ltd Tunnel repairing construction method and tunnel repairing plate
WO2004035962A1 (en) * 2002-10-16 2004-04-29 Tekken Construction Co., Ltd. Concrete structure repairing and reinforcing method
CN103643965A (en) * 2013-12-16 2014-03-19 上海市基础工程集团有限公司 Repair and reinforcement construction methods for segments in formed tunnel
JP2016037793A (en) * 2014-08-08 2016-03-22 株式会社大林組 Repair and reinforcement method for existing tunnel
CN104652294A (en) * 2015-02-03 2015-05-27 湖南大学 New technology for reinforcing box girder through adhesion of UHPC (Ultra High Performance Concrete) and steel plate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘铮: "《建筑结构设计误区与禁忌实例》", 31 July 2015 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296383A (en) * 2018-10-09 2019-02-01 中建隧道建设有限公司 Reinforcement means is maintained after dehydration outside a kind of tunnel duct piece
CN110295924A (en) * 2019-05-24 2019-10-01 同济大学 A kind of shield tunnel ruggedized construction and construction method based on I-shaped steel plate
CN110295924B (en) * 2019-05-24 2023-09-26 同济大学 Shield tunnel reinforcing structure based on H-shaped steel plate and construction method
CN111911190A (en) * 2020-09-11 2020-11-10 何峰 Improved construction method for caulking shield tunnel segment
CN111911190B (en) * 2020-09-11 2022-04-26 何峰 Improved construction method for caulking shield tunnel segment
CN116792149A (en) * 2023-08-16 2023-09-22 湖南大学 Method and system for recovering deformation of shield tunnel structure
CN116792149B (en) * 2023-08-16 2024-05-14 湖南大学 Method and system for recovering deformation of shield tunnel structure

Similar Documents

Publication Publication Date Title
CN107060787A (en) A kind of reinforcement means of duct pieces of shield tunnel
CN107035385A (en) A kind of reinforcement means of duct pieces of shield tunnel
CN102392420B (en) Vertical crack grouting and reinforcing method of prestressed concrete hollow slab bridge bottom plate
CN104809312B (en) Pile In Karst Area supporting course safe thickness computational methods
CN103437791B (en) The mounting method of buried water stop in a kind of tunnel lining trolley termination
CN103498683A (en) Tunnel early-strength quick strengthening method based on quick-set composite mortar and fiber woven mesh
CN204081079U (en) A kind of structure of open pore steel plate shear force
CN206143827U (en) Underground works crack repairing structure
CN107574834A (en) A kind of old basic transformation reinforcement means of power machine
CN110528763A (en) Thin-walled UHPC with perforated panel PBL key and NC superimposed sheet and its construction method
CN105507429A (en) Structure and construction method of aperture steel plate shear keys
CN207608934U (en) A kind of slab muscle cast-in-place structural post-cast strip blocking apparatus
CN104373138B (en) The construction method that waterproof layer is reinvented when a kind of tunnel lining structure is repaired
CN106437197A (en) Static crushing structure for removing concrete and construction method thereof
CN107386676A (en) Brick wall reinforced construction method
Hasan et al. Deformation and crack analysis of tunnel structure subjected to static distributed load using Pseudoshell model
CN103233482A (en) Installation and construction method for embedded bolts of cable trench
CN106906740A (en) The restorative procedure of bridge expanssion joint
CN206816274U (en) A kind of repairing and reinforcement structure of shield duct piece
CN107059909A (en) A kind of bridge foundation and substructure construction method
Wang et al. Technique of temporary undisturbed reinforcement extraction of fragile lacquerware from shipwrecks
CN105002891B (en) A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method
CN206784164U (en) Bridge expansion joint structure
CN104612016B (en) One is town road emergency repair method efficiently
CN106088644B (en) Embedded precast beam anti-corrosion ruggedized construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818

RJ01 Rejection of invention patent application after publication