CN205714212U - Tunneling shield segment damage falls block leakage muscle and repairs structure - Google Patents

Tunneling shield segment damage falls block leakage muscle and repairs structure Download PDF

Info

Publication number
CN205714212U
CN205714212U CN201620580754.3U CN201620580754U CN205714212U CN 205714212 U CN205714212 U CN 205714212U CN 201620580754 U CN201620580754 U CN 201620580754U CN 205714212 U CN205714212 U CN 205714212U
Authority
CN
China
Prior art keywords
leakage muscle
duct piece
shield duct
material packed
muscle position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620580754.3U
Other languages
Chinese (zh)
Inventor
索晓华
徐铁汉
郭强
唐堃
史春阳
李元坤
赵志民
张雄伟
李爱家
李春利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
PowerChina Railway Construction Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
PowerChina Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd, PowerChina Railway Construction Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201620580754.3U priority Critical patent/CN205714212U/en
Application granted granted Critical
Publication of CN205714212U publication Critical patent/CN205714212U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Tunneling shield segment damage falls block leakage muscle and repairs structure, falls block position with repairing shield duct piece breakage in time, is effectively improved the useful life of section of jurisdiction, it is ensured that the durability that operation safety in period and section of jurisdiction use.It includes: fixing component, and in shield duct piece breakage leakage muscle position, interval is arranged, and its underpart vertically penetrates this connection internal and fixed thereto of shield duct piece;Metal mesh sheet, fixes with each fixing component in breakage leakage muscle position and is connected;Patching material packed layer, layering filling is fixed in damaged leakage muscle position, until shield duct piece face, coats bonding interface agent between orlop material packed layer with damaged leakage muscle position inner surface and between adjacent two material packed layers.

Description

Tunneling shield segment damage falls block leakage muscle and repairs structure
Technical field
This utility model relates to shield tunnel, falls block leakage muscle particularly to a kind of tunneling shield segment damage and repairs structure.
Background technology
Shield Tunneling, when section of jurisdiction transport, lifting or shield attitude are abnormal, all may cause section of jurisdiction to go out Block is fallen in existing breakage, occurs leakage muscle phenomenon under serious conditions.Section of jurisdiction occurs that block leakage muscle is fallen in breakage, can give shield duct piece structure durability Impacting, repairing treatment is not in place simultaneously brings potential safety hazard to operation.
Occurring that to section of jurisdiction the process of block leakage muscle is fallen in breakage, conventional processing method is first breakage to be fallen block leakage muscle position float Slurry is removed, and carries out dust cleaning, moistens with water, then uses the polymer slurries of mixing to carry out smearing slurry and repairs, finally supports Protect.Owing to, during operation, dynamic load is relatively big, runs process for a long time, easily occurs again to fall block phenomenon, to train operation safety Cause dangerous, and the useful life longevity of section of jurisdiction is caused certain impact.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of tunneling shield segment damage and falls the benefit knot of block leakage muscle Structure, falls block position repairing in time shield duct piece breakage, is effectively improved the useful life of section of jurisdiction, it is ensured that operation safety in period and The durability that section of jurisdiction uses.
The technical scheme that the above-mentioned technical problem of this utility model solution is taked is as follows:
Tunneling shield segment damage of the present utility model falls block leakage muscle and repairs structure, it is characterized in that it includes: fixing component, In shield duct piece breakage leakage muscle position, interval is arranged, and its underpart vertically penetrates this connection internal and fixed thereto of shield duct piece; Metal mesh sheet, fixes with each fixing component in breakage leakage muscle position and is connected;Patching material packed layer, layering filling is fixed on brokenly Damage in leakage muscle position, until shield duct piece face, between orlop material packed layer with damaged leakage muscle position inner surface and adjacent two Bonding interface agent is coated between material packed layer.
The beneficial effects of the utility model are, use the process mould of " (crab-bolt) bar planting+linked network+Polymer-Modified Mortar " Formula, does not affect construction speed, safe operation process, efficiently, simple, put into personnel few, difficult drop-off after repairing, service life is relatively Long, on section of jurisdiction durability substantially without impact, meet operation functional requirements, it is ensured that operation security.
This utility model can also be used for segment damage and falls block without leaking the repairing at muscle position.
Accompanying drawing explanation
This specification includes following two width accompanying drawings:
Fig. 1 is the plane graph that this utility model tunneling shield segment damage falls the repairing structure of block leakage muscle;
Fig. 2 is the elevation that this utility model tunneling shield segment damage falls the repairing structure of block leakage muscle.
Component name shown in figure and corresponding labelling: shield duct piece 1, damaged leakage muscle position 2, fixing component 3, metal Mesh sheet 4, pipe sheet assembling seam 5, thin elastic plate material 6, patching material packed layer 7.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further illustrated.
Seeing figures.1.and.2, tunneling shield segment damage of the present utility model falls block leakage muscle repairing structure and includes: fixing structure Part 3, in shield duct piece 1 damaged leakage muscle position 2, interval is arranged, and it is internal and solid therewith that its underpart vertically penetrates shield duct piece 1 Fixed connection;Metal mesh sheet 4, fixes with each fixing component 3 in breakage leakage muscle position 2 and is connected;Patching material packed layer 7, layering Filling is fixed in damaged leakage muscle position 2, until shield duct piece 1 surface, orlop material packed layer 7 and damaged leakage muscle position 2 Bonding interface agent is coated between inner surface and between adjacent two material packed layers 7.Material packed layer 7 generally can use polymer to change Property mortar, described metal mesh sheet 4 is adopted as reinforced mesh or steel fabric sheet.
This utility model use " (crab-bolt) bar planting+linked network+Polymer-Modified Mortar " tupe, do not affect construct into Degree, safe operation process, efficiently, simple, put into personnel few, difficult drop-off after repairing, service life is longer, to section of jurisdiction durability Substantially without impact, operation functional requirements is met, it is ensured that operation security.
The thickness of described patching material packed layer 7 should be less than 20mm, smears bonding interface agent between layers, before smearing Need to keep being dried of interface with Hairdryer.
Seeing figures.1.and.2, tunneling shield segment damage of the present utility model falls the benefit structure of block leakage muscle, as follows The reparation at block position is fallen for tunneling shield segment damage:
1, damaged leakage muscle position 2 (including hollowing part or rift portion) of shield duct piece 1 is thoroughly dug out;
2, rinse well with pressure clean water, and be sufficiently humidified so as to repair position, be allowed to be in the dry saturation state of saturation plane;
3, in breakage leakage muscle position 2, fixing component 3 is installed;
4, after breakage leakage muscle position 2 inner surface is anhydrous, bonding interface agent is coated;
5, in breakage leakage muscle position 2, metal mesh sheet 4 is fixedly mounted on fixing component 3;
6, insertion thin elastic plate material 6 at 5 is stitched at pipe sheet assembling;
7, by premixing through the satisfactory patching material of trial, it is layered repeatedly dense packing effect breakage leakage muscle position 2 until shield Surface, structure section of jurisdiction 1, forms multilayer repair material packed layer 7 in breakage leakage muscle position 2;
8, moisture-keeping maintaining or cover film maintenance;
9, after material packed layer 7 to be repaired is stiff, extract out thin elastic plate material 6, with polisher flattened surface and polishing corner angle, It is allowed to smooth out with other positions of shield duct piece 1.
The above this utility model tunneling shield segment damage that simply explains through diagrams falls block leakage muscle and repairs structure Some principles, are not intended to be confined to by this utility model in shown and described concrete structure and the scope of application, therefore every institute The corresponding amendment being likely utilized and equivalent, belong to the apllied the scope of the claims of this utility model.

Claims (3)

1. tunneling shield segment damage falls block leakage muscle repairing structure, it is characterized in that it includes: fixing component (3), at shield duct piece (1) in damaged leakage muscle position (2), interval is arranged, and its underpart vertically penetrates this connection internal and fixed thereto of shield duct piece (1);Gold Belong to mesh sheet (4), fix with each fixing component (3) in breakage leakage muscle position (2) and be connected;Patching material packed layer (7), layering is filled out Fill and be fixed in damaged leakage muscle position (2), until shield duct piece (1) surface, orlop material packed layer (7) and damaged leakage muscle portion Bonding interface agent is coated between (2) inner surface of position and between adjacent two material packed layers (7).
2. tunneling shield segment damage as claimed in claim 1 falls block leakage muscle repairing structure, it is characterized in that: described metal mesh sheet (4) it is reinforced mesh or steel fabric sheet.
3. tunneling shield segment damage as claimed in claim 1 falls block leakage muscle repairing structure, it is characterized in that: described patching material The thickness of packed layer (7) is less than 20mm.
CN201620580754.3U 2016-06-15 2016-06-15 Tunneling shield segment damage falls block leakage muscle and repairs structure Expired - Fee Related CN205714212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620580754.3U CN205714212U (en) 2016-06-15 2016-06-15 Tunneling shield segment damage falls block leakage muscle and repairs structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620580754.3U CN205714212U (en) 2016-06-15 2016-06-15 Tunneling shield segment damage falls block leakage muscle and repairs structure

Publications (1)

Publication Number Publication Date
CN205714212U true CN205714212U (en) 2016-11-23

Family

ID=57305242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620580754.3U Expired - Fee Related CN205714212U (en) 2016-06-15 2016-06-15 Tunneling shield segment damage falls block leakage muscle and repairs structure

Country Status (1)

Country Link
CN (1) CN205714212U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035385A (en) * 2017-06-19 2017-08-11 湖南大学 A kind of reinforcement means of duct pieces of shield tunnel
CN107701200A (en) * 2017-10-16 2018-02-16 广州地铁设计研究院有限公司 A kind of section of jurisdiction crack restorative procedure
CN109058648A (en) * 2018-06-29 2018-12-21 中国石油天然气集团有限公司 A method of with composite material to the continuous pipe reinforcement recovery of surface damage
CN109594787A (en) * 2018-12-04 2019-04-09 六合峰(天津)科技股份有限公司 Filler, the construction technology of filler and filler consolidated structures
CN112593973A (en) * 2020-11-17 2021-04-02 广东省水利电力勘测设计研究院有限公司 Hydraulic tunnel composite lining structure and manufacturing method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035385A (en) * 2017-06-19 2017-08-11 湖南大学 A kind of reinforcement means of duct pieces of shield tunnel
CN107701200A (en) * 2017-10-16 2018-02-16 广州地铁设计研究院有限公司 A kind of section of jurisdiction crack restorative procedure
CN109058648A (en) * 2018-06-29 2018-12-21 中国石油天然气集团有限公司 A method of with composite material to the continuous pipe reinforcement recovery of surface damage
CN109594787A (en) * 2018-12-04 2019-04-09 六合峰(天津)科技股份有限公司 Filler, the construction technology of filler and filler consolidated structures
CN109594787B (en) * 2018-12-04 2023-12-01 六合峰(天津)科技股份有限公司 Filler, construction process of filler and filler curing structure
CN112593973A (en) * 2020-11-17 2021-04-02 广东省水利电力勘测设计研究院有限公司 Hydraulic tunnel composite lining structure and manufacturing method thereof
CN112593973B (en) * 2020-11-17 2022-08-19 广东省水利电力勘测设计研究院有限公司 Hydraulic tunnel composite lining structure and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN205714212U (en) Tunneling shield segment damage falls block leakage muscle and repairs structure
CN104534221A (en) Method for repairing and reinforcing pipeline by means of composite materials
US20200318774A1 (en) Local repair method combining internally bonded CFRP and polymer grouting for cracks in drainage pipe
JP2017524875A (en) Pipe repair
CN109058648B (en) Method for reinforcing and repairing surface damage continuous pipe by using composite material
CN103510965A (en) Highway tunnel lining surface sticky steel strip strengthening method and device
CN104373138B (en) The construction method that waterproof layer is reinvented when a kind of tunnel lining structure is repaired
CN104358240B (en) A kind of gate sill leakage plugging device and constructional method thereof
CN201963318U (en) Water leakage-proof device during tunnel construction
CN103321187A (en) Overflow face protection method
CN204254140U (en) The seal clamp of pipe fitting
CN105839522B (en) A kind of sealant of bridge extension joint saves construction method from damage
CN103452081A (en) Construction method for flexible composite impermeable layer of upstream face of high arch dam
CN208133744U (en) A kind of oil tank Internal Lining Method transformation laminate structures
CN107876478A (en) A kind of iron rust cleaning plant for mining machinery
CN207229905U (en) A kind of water conservancy construction pipeline protection device
CN207203726U (en) A kind of construction site dust cooling device
CN203258066U (en) Main shaft working sealing device of horizontal water turbine
CN205269981U (en) Anti -rust device
CN109319320A (en) Steel oil tank inner lining structure and liner reforming technology
CN102966049B (en) Method for treating vertical crack of reinforced concrete bridge abutment
CN207749607U (en) Structure and pipeline for PCCP pipe bell and spigot seams
CN205276280U (en) Building site mud and superficial half grey automatic collection device
CN105065008A (en) Method for preventing sand gushing in shield tunneling construction
CN205235746U (en) Desulfurization absorption tower thick liquid spray set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123