CN107035150B CN201710432609.XA CN201710432609A CN107035150B CN 107035150 B CN107035150 B CN 107035150B CN 201710432609 A CN201710432609 A CN 201710432609A CN 107035150 B CN107035150 B CN 107035150B
Authority
CN
China
Prior art keywords
plate
lower plate
upper plate
supporting plates
inclined supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710432609.XA
Other languages
English (en)
Other versions
CN107035150A (zh
Inventor
李海洋
乔景彬
董路
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201710432609.XA priority Critical patent/CN107035150B/zh
Publication of CN107035150A publication Critical patent/CN107035150A/zh
Application granted granted Critical
Publication of CN107035150B publication Critical patent/CN107035150B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/10Devices for levelling, e.g. templates or boards
    • AHUMAN NECESSITIES
    • A43FOOTWEAR
    • A43BCHARACTERISTIC FEATURES OF FOOTWEAR; PARTS OF FOOTWEAR
    • A43B3/00Footwear characterised by the shape or the use

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Holders For Apparel And Elements Relating To Apparel (AREA)

Abstract

本发明公开了一种用于楼面混凝土终凝前二次抹面的脚踏板,包括板面和鞋扣带,板面的上层板和下层板的各外翻边上分布设置固定孔和滑孔,固定孔和滑孔内分别安装有固定轴和滑动轴,位于上层板和下层板两侧各设置一对交叉的斜撑板,交叉的斜撑板的中部通过中轴铰接在一起,端部分别安装在对应的固定轴和滑动轴上。本发明能尽量小地影响混凝土表面状态。能够实现上层板和下层板始终处于水平升级的状态下运动,下层板都能实现逐渐与混凝土表面脱离和逐渐接触的特点,保持下层板平稳慢行。

Description

用于楼面混凝土终凝前二次抹面的脚踏板
技术领域
本发明涉及建筑混凝土施工技术领域的辅助工具,具体涉及一种用于楼面混凝土终凝前二次抹面的脚踏板。
背景技术
混凝土施工过程中,特别是大面积浇筑混凝土表面进行平整、收浆工序中,经常需要操作人员在施工面上作业、行走。一般操作人员直接穿套鞋进入,由于接触面积小压强大,套鞋容易在施工面上形成脚坑,明显增加工作量,甚至在行走时将新浇筑的混凝土内部钢筋踩压变形,影响到整个施工的质量。
针对这一问题,操作人员施工时,有的通过垫块支撑木板站在木板上作业。减小甚至避免了对施工面的影响,但是垫块、木板铺设费事,移动不便,而且在木板上操作人员活动不灵活劳动强度大以致工作效率低。有的择使用混凝土减压鞋,由于减压鞋底面面积大于套鞋,因此操作人员对施工面的压强大为减小。但是目前的减压鞋结构复杂、穿脱繁琐不便、不轻便、耐用易用性都比较差。
发明内容
针对传统混凝土施工过程中存在操作人员施工不便的问题和和现有垫板存在不合理问题,提供一种用于楼面混凝土终凝前二次抹面的脚踏板。
本发明的目的是这样实现的:一种用于楼面混凝土终凝前二次抹面的脚踏板,包括板面和鞋扣带,所述板面包括平行设置的上层板和下层板,上层板设置向下的外翻边,下层板设置向上的外翻边;在上层板和下层板的各外翻边上分布设置固定孔和滑孔,固定孔和滑孔内分别安装有固定轴和滑动轴,位于上层板和下层板两侧各设置一对交叉的斜撑板,交叉的斜撑板的中部通过中轴铰接在一起,端部分别安装在对应的固定轴和滑动轴上。
在所述上层板和下层板之间分别设置位置对应的弹簧座,并在对应弹簧座之间连接有压力弹簧。
积极有益效果:本发明利用上层板和下层板不同步移动的关系来实现楼面混凝土终凝前二次抹面操作,尽量小地影响混凝土表面状态。利用设计的交叉斜撑板与上层板和下层板之间的关系,能够实现上层板和下层板始终处于水平状态下的升降运动,而且无论上层板运动速度多块,下层板都能实现逐渐与混凝土表面脱离和逐渐接触的特点。而且,通过设置弹簧能够进一步延缓两者之间的速度,保持下层板平稳慢行。
附图说明
图1是本发明的侧面结构示意图。
图2是图1的左视图的局部结构示意图。
图中标号:1为上层板,2为下层板,3为固定孔,4为滑孔,5为斜撑板一,6为斜撑板二,7为中轴,8为固定轴,9为滑动轴,10为弹簧座,11为弹簧,12为鞋扣带,13为外翻边。
具体实施方式
下面结合附图,对本发明做进一步的说明:
实施例:如图1所示的脚踏板,用于楼面混凝土终凝前二次抹面时操作非常方便。
该脚踏板包括板面和鞋扣带12,其中板面包括平行设置的上层板1和下层板2,上层板1设置向下的外翻边13,下层板2设置向上的外翻边13。
在上层板1和下层板2的各外翻边上分布设置固定孔3和滑孔4,固定孔3和滑孔4内分别安装有固定轴8和滑动轴9,位于上层板1和下层板2两侧各设置一对交叉的斜撑板,交叉的斜撑板的中部通过中轴7铰接在一起,端部分别安装在对应的固定轴8和滑动轴9上。
在上层板1和下层板2之间分别设置位置对应的弹簧11座10,并在对应弹簧座10之间连接有压力弹簧11。

Claims (1)

1.一种用于楼面混凝土终凝前二次抹面的脚踏板,包括板面和鞋扣带,其特征是:所述板面包括平行设置的上层板和下层板,上层板设置向下的外翻边,下层板设置向上的外翻边;在上层板和下层板的各外翻边上分布设置固定孔和滑孔,固定孔和滑孔内分别安装有固定轴和滑动轴,位于上层板和下层板两侧各设置一对交叉的斜撑板,交叉的斜撑板的中部通过中轴铰接在一起,端部分别安装在对应的固定轴和滑动轴上,交叉斜撑板与上层板和下层板之间的关系能够实现上层板和下层板始终处于水平状态下的升降运动,而且下层板都能实现逐渐与混凝土表面脱离和逐渐接触,在所述上层板和下层板之间分别设置位置对应的弹簧座,并在对应弹簧座之间连接有压力弹簧,通过设置的压力弹簧能够进一步延缓两者之间的速度,保持下层板平稳慢行。
CN201710432609.XA 2017-06-09 2017-06-09 用于楼面混凝土终凝前二次抹面的脚踏板 Active CN107035150B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710432609.XA CN107035150B (zh) 2017-06-09 2017-06-09 用于楼面混凝土终凝前二次抹面的脚踏板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710432609.XA CN107035150B (zh) 2017-06-09 2017-06-09 用于楼面混凝土终凝前二次抹面的脚踏板

Publications (2)

Publication Number Publication Date
CN107035150A CN107035150A (zh) 2017-08-11
CN107035150B true CN107035150B (zh) 2022-12-09

Family

ID=59542081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710432609.XA Active CN107035150B (zh) 2017-06-09 2017-06-09 用于楼面混凝土终凝前二次抹面的脚踏板

Country Status (1)

Country Link
CN (1) CN107035150B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335578B (zh) * 2020-03-30 2021-10-26 四川华远建设工程有限公司 一种水泥豆石楼地面施工工艺

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1154818A (zh) * 1996-01-17 1997-07-23 郭纪文 可升高的鞋
JPH11159148A (ja) * 1997-11-26 1999-06-15 Yoshinori Higa 歩行装置
CN2549778Y (zh) * 2002-06-11 2003-05-14 杨松蔚 健身按摩弹簧鞋
US7163518B1 (en) * 2003-10-20 2007-01-16 Rgpartnership Llp Walking leg support
WO2007121527A1 (en) * 2006-04-24 2007-11-01 Leslie Francis Ryan Method and footwear for preparing a concrete floor
CN201175016Y (zh) * 2008-04-17 2009-01-07 河南泰宏房屋营造有限公司 混凝土施工减压鞋
CN202722681U (zh) * 2012-07-16 2013-02-13 徐书晗 一种升降鞋
CN104018686A (zh) * 2014-05-28 2014-09-03 郭明 一种瓦工靴
CN104544727A (zh) * 2014-10-20 2015-04-29 邹继明 隐形增高鞋垫
CN204754228U (zh) * 2015-04-20 2015-11-11 中国建筑第二工程局有限公司 一种混凝土浇筑保护鞋套
CN204861399U (zh) * 2015-06-19 2015-12-16 中建八局第一建设有限公司 一种无痕收光鞋
CN204983674U (zh) * 2015-04-15 2016-01-20 中天建设集团有限公司第五建设公司 一种混凝土收面用鞋
CN106418885A (zh) * 2016-12-09 2017-02-22 枣庄度秘信息科技有限公司 一种方便脚垫
CN206220541U (zh) * 2016-10-26 2017-06-06 中铁一局集团天津建设工程有限公司 混凝土收光鞋
CN206844673U (zh) * 2017-06-09 2018-01-05 中建八局第三建设有限公司 用于楼面混凝土终凝前二次抹面的脚踏板

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1154818A (zh) * 1996-01-17 1997-07-23 郭纪文 可升高的鞋
JPH11159148A (ja) * 1997-11-26 1999-06-15 Yoshinori Higa 歩行装置
CN2549778Y (zh) * 2002-06-11 2003-05-14 杨松蔚 健身按摩弹簧鞋
US7163518B1 (en) * 2003-10-20 2007-01-16 Rgpartnership Llp Walking leg support
WO2007121527A1 (en) * 2006-04-24 2007-11-01 Leslie Francis Ryan Method and footwear for preparing a concrete floor
CN201175016Y (zh) * 2008-04-17 2009-01-07 河南泰宏房屋营造有限公司 混凝土施工减压鞋
CN202722681U (zh) * 2012-07-16 2013-02-13 徐书晗 一种升降鞋
CN104018686A (zh) * 2014-05-28 2014-09-03 郭明 一种瓦工靴
CN104544727A (zh) * 2014-10-20 2015-04-29 邹继明 隐形增高鞋垫
CN204983674U (zh) * 2015-04-15 2016-01-20 中天建设集团有限公司第五建设公司 一种混凝土收面用鞋
CN204754228U (zh) * 2015-04-20 2015-11-11 中国建筑第二工程局有限公司 一种混凝土浇筑保护鞋套
CN204861399U (zh) * 2015-06-19 2015-12-16 中建八局第一建设有限公司 一种无痕收光鞋
CN206220541U (zh) * 2016-10-26 2017-06-06 中铁一局集团天津建设工程有限公司 混凝土收光鞋
CN106418885A (zh) * 2016-12-09 2017-02-22 枣庄度秘信息科技有限公司 一种方便脚垫
CN206844673U (zh) * 2017-06-09 2018-01-05 中建八局第三建设有限公司 用于楼面混凝土终凝前二次抹面的脚踏板

Also Published As

Publication number Publication date
CN107035150A (zh) 2017-08-11

Similar Documents

Publication Publication Date Title
CN109531782B (zh) 一种预制墙板的加工模台
CN107035150B (zh) 用于楼面混凝土终凝前二次抹面的脚踏板
CN107792818B (zh) 一种大吨位液压翻转台
CN203383484U (zh) 内墙抹灰机
CN111794061B (zh) 一种石材铺装用试铺装置及石材铺装方法
CN205243537U (zh) 一种管片快速卸载装置
CN109577201A (zh) 一种用于钢桁梁顶推的步履式施工装置及其施工方法
CN202559302U (zh) 水渠坡面混凝土衬砌抹光机
CN206844673U (zh) 用于楼面混凝土终凝前二次抹面的脚踏板
CN210524636U (zh) 一种大型建筑混凝土板平整打磨装置
CN214786091U (zh) 一种混凝土摊铺收面工具
CN208454381U (zh) 一种自动升降装置
CN203290309U (zh) 一种可调节鞋跟高度的鞋
CN206986683U (zh) 一种透水混凝土路面振动碾压机
CN210563430U (zh) 一种建筑模板表面建筑修复装置
CN105081912A (zh) 磨头自动升降旋转地坪研磨机
CN204552042U (zh) 一种建筑支撑架
CN105672629B (zh) 一种抹灰机及其操作方法
CN204700691U (zh) 升降移动式屋顶打磨机座
CN219650171U (zh) 通体砖压砖装置
CN202348126U (zh) 井架升降调节装置
CN218726293U (zh) 一种混凝土路面材料硬度测试装置
CN217760059U (zh) 一种城市下穿地道钢木组合式单边支模结构
CN214993189U (zh) 一种拱桥钢拱肋悬臂拼装监测用辅助装置
CN210313345U (zh) 机械设备支撑检修装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant