CN107035043A - A kind of square steel tube beam raw bamboo floor - Google Patents

A kind of square steel tube beam raw bamboo floor Download PDF

Info

Publication number
CN107035043A
CN107035043A CN201611195722.2A CN201611195722A CN107035043A CN 107035043 A CN107035043 A CN 107035043A CN 201611195722 A CN201611195722 A CN 201611195722A CN 107035043 A CN107035043 A CN 107035043A
Authority
CN
China
Prior art keywords
raw bamboo
limited block
square steel
steel tube
wall beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611195722.2A
Other languages
Chinese (zh)
Other versions
CN107035043B (en
Inventor
郝际平
田黎敏
寇跃峰
秦梦浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201611195722.2A priority Critical patent/CN107035043B/en
Publication of CN107035043A publication Critical patent/CN107035043A/en
Application granted granted Critical
Publication of CN107035043B publication Critical patent/CN107035043B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/14Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of square steel tube beam raw bamboo floor, including raw bamboo wall beam body, some square steel tubes, the raw bamboo wall beam body includes being sequentially connected the left side raw bamboo wall beam connect, right side raw bamboo wall beam, front side raw bamboo wall beam and rear side raw bamboo wall beam, wherein, each square steel tube is sequentially distributed from front to back, one end of each square steel tube is connected with left side raw bamboo wall beam, the other end of each square steel tube is connected with right side raw bamboo wall beam, some first raw bamboos are overlapped between adjacent square steel tube, most some second raw bamboos are overlapped between front side square steel tube and front side raw bamboo wall beam, some 3rd raw bamboos are finally overlapped between side steel pipe and rear side raw bamboo wall beam, the span of the floor is big, bearing capacity is strong.

Description

A kind of square steel tube beam raw bamboo floor
Technical field
The present invention relates to a kind of floor, and in particular to a kind of square steel tube beam raw bamboo floor.
Background technology
In the case where global timber resources lacks, bamboo is with breeding is easy, growth is fast, the spy such as morning and yield height of becoming a useful person Point, meanwhile, bamboo wood texture straight, color and luster are simple and elegant, tough and tensile material is a kind of preferable Green environmental-protection building raw material, with people The continuous enhancing of environmental consciousness, various regions bamboo building is rised sheer from level ground.Due to raw bamboo sectional dimension itself and the flexible limitation of material, Less, bearing capacity is poor for existing raw bamboo floor span, significantly limit the diversity of raw bamboo building, the restriction of above problems The development and popularization of raw bamboo building.
The content of the invention
It is an object of the invention to the shortcoming for overcoming above-mentioned prior art there is provided a kind of square steel tube beam raw bamboo floor, it is somebody's turn to do The span of floor is big, and bearing capacity is strong.
To reach above-mentioned purpose, square steel tube raw bamboo floor of the present invention includes raw bamboo wall beam body, some square steel tubes, The raw bamboo wall beam body includes being sequentially connected the left side raw bamboo wall beam connect, right side raw bamboo wall beam, front side raw bamboo wall beam and rear side Raw bamboo wall beam, wherein, each square steel tube is sequentially distributed from front to back, and one end of each square steel tube is connected with left side raw bamboo wall beam, respectively The other end of square steel tube is connected with right side raw bamboo wall beam, and some first raw bamboos are overlapped between adjacent square steel tube, most front side square steel Some second raw bamboos are overlapped between pipe and front side raw bamboo wall beam, if being overlapped between last side steel pipe and rear side raw bamboo wall beam Dry 3rd raw bamboo.
The left end of square steel tube is connected with left side raw bamboo wall beam by the first fixedly connected part.
First fixedly connected part includes the first gag lever post, the first limited block and the second limited block, wherein, first is spacing Bar is located on the raw bamboo wall beam of left side, and the first limited block and the second limited block are located between the first gag lever post and left side raw bamboo wall beam, And first have gap, the first gag lever post, the first limited block, the second limited block and left side raw bamboo between limited block and the second limited block The first fixed via is formed between wall beam, the left end of square steel tube passes through first fixed via;
The side of the side of first the first gag lever post of screw bolt passes, the side of the first limited block and left side raw bamboo wall beam First gag lever post, the first limited block and left side raw bamboo wall beam are fixedly connected;
The side of the side of second the first gag lever post of screw bolt passes, the side of the second limited block and left side raw bamboo wall beam First gag lever post, the second limited block and left side raw bamboo wall beam are connected;
3rd the first limited block of screw bolt passes, the side of square steel tube left end and the second limited block by the first limited block, Square steel tube and the second limited block are connected.
The right-hand member of square steel tube is connected with right side raw bamboo wall beam by the second fixedly connected part.
Second fixedly connected part includes the second gag lever post, the 3rd limited block and the 4th limited block, wherein, second is spacing Bar is located on the raw bamboo wall beam of right side, and the 3rd limited block and the 4th limited block are located between the second gag lever post and right side raw bamboo wall beam, And the 3rd have gap, the second gag lever post, the 3rd limited block, the 4th limited block and right side raw bamboo between limited block and the 4th limited block The second fixed via is formed between wall beam, the right-hand member of square steel tube passes through second fixed via;
The side of the side of 4th the second gag lever post of screw bolt passes, the side of the 3rd limited block and right side raw bamboo wall beam Second gag lever post, the 3rd limited block and right side raw bamboo wall beam are fixedly connected;
The side of the side of 5th the second gag lever post of screw bolt passes, the side of the 4th limited block and right side raw bamboo wall beam Second gag lever post, the 4th limited block and right side raw bamboo wall beam are connected;
The limited block of 6th screw bolt passes the 3rd, the side of square steel tube right-hand member and the 4th limited block by the 3rd limited block, Square steel tube and the 4th limited block are connected.
The leading flank of each square steel tube is provided with the first attachment strap, and the trailing flank of each square steel tube is provided with the second attachment strap, and first takes Stopper slot, the end difference of the end of the first raw bamboo, the end of the second raw bamboo and the 3rd raw bamboo are equipped with plate and the second attachment strap It is fixed in correspondence stopper slot.
The invention has the advantages that:
Square steel tube beam raw bamboo floor of the present invention includes raw bamboo wall beam and some square steel tubes, uses square steel tube for skeleton Mode build floor, wherein, the two ends of square steel tube are connected with the left side bar and right-hand rod of raw bamboo wall beam, realize square steel tube with It is connected between the connection of raw bamboo wall beam, adjacent square steel tube by some first raw bamboos, most front side square steel tube and raw bamboo wall beam It is connected between antero-lateral rod by some second raw bamboos, passes through some between the postero lateral arm of last side steel pipe and raw bamboo wall beam Three raw bamboos are connected, so that square steel tube and raw bamboo wall beam one integrated member of formation, are preferably fused to raw bamboo by square steel tube In wall beam, so that floor has stronger bearing capacity, the effective span for improving floor is that the application of bamboo building improves strong Technical support.
Further, the first gag lever post, the first limited block, second are limited by the first bolt, the second bolt and the 3rd bolt The left side bar of position block, the left end of square steel tube and raw bamboo wall beam is connected, it is to avoid the left end of square steel tube is moved on raw bamboo wall beam.
Further, the second gag lever post, the 3rd gag lever post, the 4th limited block, the right-hand member of square steel tube and raw bamboo wall beam are passed through Right-hand rod is connected, it is to avoid the right-hand member of square steel tube is moved on raw bamboo wall beam.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the annexation figure of square steel tube 3 and raw bamboo wall beam 1 in the present invention.
Wherein, 11 it is left side raw bamboo wall beam, 12 be right side raw bamboo wall beam, 13 be front side raw bamboo wall beam, 14 is rear side raw bamboo Wall beam, 21 be the first raw bamboo, 22 be the second raw bamboo, 23 be the 3rd raw bamboo, 3 be square steel tube, 41 be the first attachment strap, 42 be second to take Plate, 51 be the first bolt, 52 be the second bolt, 53 be the 3rd bolt, 6 be the first gag lever post, 71 be the first limited block, 72 be Two limited blocks.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings:
With reference to Fig. 1, square steel tube beam raw bamboo floor of the present invention includes raw bamboo wall beam body, some square steel tubes 3, described Raw bamboo wall beam body include be sequentially connected the left side raw bamboo wall beam 11 connect, right side raw bamboo wall beam 12, front side raw bamboo wall beam 13 and after Side raw bamboo wall beam 14, wherein, each square steel tube 3 is sequentially distributed from front to back, one end and the phase of left side raw bamboo wall beam 11 of each square steel tube 3 Connection, the other end of each square steel tube 3 is connected with right side raw bamboo wall beam 12, and some first raw bamboos are overlapped between adjacent square steel tube 3 21, most it is overlapped with some second raw bamboos 22, last side steel pipe 3 and rear side between front side square steel tube 3 and front side raw bamboo wall beam 13 Some 3rd raw bamboos 23 are overlapped between raw bamboo wall beam 14.
The left end of square steel tube 3 is connected with left side raw bamboo wall beam 11 by the first fixedly connected part;First fixedly connected part Including the first gag lever post 6, the first limited block 71 and the second limited block 72, wherein, the first gag lever post 6 is located at left side raw bamboo wall beam 11 On, the first limited block 71 and the second limited block 72 are located between the first gag lever post 6 and left side raw bamboo wall beam 11, and the first limited block 71 and second have gap, the first gag lever post 6, the first limited block 71, the second limited block 72 and left side raw bamboo wall between limited block 72 The first fixed via is formed between beam 11, the left end of square steel tube 3 passes through first fixed via;First bolt 51 is sequentially passed through The side of the side of first gag lever post 6, the side of the first limited block 71 and left side raw bamboo wall beam 11 is by the first gag lever post 6, first Limited block 71 and left side raw bamboo wall beam 11 are fixedly connected;Second bolt 52 sequentially passes through the side of the first gag lever post 6, second spacing The side of block 72 and the side of left side raw bamboo wall beam 11 are by the first gag lever post 6, the second limited block 72 and the phase of left side raw bamboo wall beam 11 Connection;It is spacing by first that 3rd bolt 53 sequentially passes through the first limited block 71, the side of the left end of square steel tube 3 and the second limited block 72 Block 71, the limited block 72 of square steel tube 3 and second are connected.
The right-hand member of square steel tube 3 is connected with right side raw bamboo wall beam 12 by the second fixedly connected part;Second fixedly connected part Including the second gag lever post, the 3rd limited block and the 4th limited block, wherein, the second gag lever post is located on right side raw bamboo wall beam 12, the Three limited blocks and the 4th limited block are located between the second gag lever post and right side raw bamboo wall beam 12, and the 3rd limited block and the 4th spacing There is gap between block, second is formed between the second gag lever post, the 3rd limited block, the 4th limited block and right side raw bamboo wall beam 12 and is fixed Through hole, the right-hand member of square steel tube 3 passes through second fixed via;The side of 4th the second gag lever post of screw bolt passes, the 3rd The second gag lever post, the 3rd limited block and right side raw bamboo wall beam 12 are fixed in the side of limited block and the side of right side raw bamboo wall beam 12 Connection;The side of the side of 5th the second gag lever post of screw bolt passes, the side of the 4th limited block and right side raw bamboo wall beam 12 Second gag lever post, the 4th limited block and right side raw bamboo wall beam 12 are connected;The limited block of 6th screw bolt passes the 3rd, square steel 3rd limited block, the limited block of square steel tube 3 and the 4th are connected by the side of the right-hand member of pipe 3 and the 4th limited block.
The leading flank of each square steel tube 3 is provided with the first attachment strap 41, and the trailing flank of each square steel tube 3 is provided with the second attachment strap 42, Stopper slot, the end of the first raw bamboo 21, the end and the 3rd of the second raw bamboo 22 are equipped with first attachment strap 41 and the second attachment strap 42 The end of raw bamboo 23 is individually fixed in correspondence stopper slot.

Claims (6)

1. a kind of square steel tube beam raw bamboo floor, it is characterised in that including raw bamboo wall beam body, some square steel tubes (3), the raw bamboo Wall beam body include be sequentially connected the left side raw bamboo wall beam (11) connect, right side raw bamboo wall beam (12), front side raw bamboo wall beam (13) and Rear side raw bamboo wall beam (14), wherein, each square steel tube (3) is sequentially distributed from front to back, one end and the left side raw bamboo of each square steel tube (3) Wall beam (11) is connected, and the other end of each square steel tube (3) is connected with right side raw bamboo wall beam (12), between adjacent square steel tube (3) Some first raw bamboos (21) are overlapped with, some second are most overlapped between front side square steel tube (3) and front side raw bamboo wall beam (13) former Bamboo (22), some 3rd raw bamboos (23) are overlapped between last side steel pipe (3) and rear side raw bamboo wall beam (14).
2. square steel tube beam raw bamboo floor according to claim 1, it is characterised in that the left end of square steel tube (3) is former with left side Bamboo walling beam (11) is connected by the first fixedly connected part.
3. square steel tube beam raw bamboo floor according to claim 2, it is characterised in that first fixedly connected part includes the One gag lever post (6), the first limited block (71) and the second limited block (72), wherein, the first gag lever post (6) is located at left side raw bamboo wall beam (11) on, the first limited block (71) and the second limited block (72) be respectively positioned on the first gag lever post (6) and left side raw bamboo wall beam (11) it Between, and have gap, the first gag lever post (6), the first limited block (71), between the first limited block (71) and the second limited block (72) Form the first fixed via between two limited blocks (72) and left side raw bamboo wall beam (11), the left end of square steel tube (3) is through described the One fixed via;
First bolt (51) sequentially passes through the side of the first gag lever post (6), the side of the first limited block (71) and left side raw bamboo wall First gag lever post (6), the first limited block (71) and left side raw bamboo wall beam (11) are fixedly connected by the side of beam (11);
Second bolt (52) sequentially passes through the side of the first gag lever post (6), the side of the second limited block (72) and left side raw bamboo wall First gag lever post (6), the second limited block (72) and left side raw bamboo wall beam (11) are connected by the side of beam (11);
3rd bolt (53) sequentially passes through the first limited block (71), the side of square steel tube (3) left end and the second limited block (72) will First limited block (71), square steel tube (3) and the second limited block (72) are connected.
4. square steel tube beam raw bamboo floor according to claim 3, it is characterised in that the right-hand member of square steel tube (3) is former with right side Bamboo walling beam (12) is connected by the second fixedly connected part.
5. square steel tube beam raw bamboo floor according to claim 4, it is characterised in that second fixedly connected part includes the Two gag lever posts, the 3rd limited block and the 4th limited block, wherein, the second gag lever post is located on right side raw bamboo wall beam (12), the 3rd limit Position block and the 4th limited block are located between the second gag lever post and right side raw bamboo wall beam (12), and the 3rd limited block and the 4th limited block Between have gap, between the second gag lever post, the 3rd limited block, the 4th limited block and right side raw bamboo wall beam (12) formed second fix Through hole, the right-hand member of square steel tube (3) passes through second fixed via;
The side of the side of 4th the second gag lever post of screw bolt passes, the side of the 3rd limited block and right side raw bamboo wall beam (12) Second gag lever post, the 3rd limited block and right side raw bamboo wall beam (12) are fixedly connected;
The side of the side of 5th the second gag lever post of screw bolt passes, the side of the 4th limited block and right side raw bamboo wall beam (12) Second gag lever post, the 4th limited block and right side raw bamboo wall beam (12) are connected;
The limited block of 6th screw bolt passes the 3rd, the side of square steel tube (3) right-hand member and the 4th limited block are by the 3rd limited block, side Steel pipe (3) and the 4th limited block are connected.
6. square steel tube beam raw bamboo floor according to claim 1, it is characterised in that set on the leading flank of each square steel tube (3) There is the first attachment strap (41), the trailing flank of each square steel tube (3) is provided with the second attachment strap (42), the first attachment strap (41) and the second attachment strap (42) it is equipped with stopper slot on, the end of the end of the first raw bamboo (21), the end of the second raw bamboo (22) and the 3rd raw bamboo (23) It is individually fixed in correspondence stopper slot.
CN201611195722.2A 2016-12-21 2016-12-21 Square steel tube beam raw bamboo floor Active CN107035043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611195722.2A CN107035043B (en) 2016-12-21 2016-12-21 Square steel tube beam raw bamboo floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611195722.2A CN107035043B (en) 2016-12-21 2016-12-21 Square steel tube beam raw bamboo floor

Publications (2)

Publication Number Publication Date
CN107035043A true CN107035043A (en) 2017-08-11
CN107035043B CN107035043B (en) 2022-11-04

Family

ID=59530793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611195722.2A Active CN107035043B (en) 2016-12-21 2016-12-21 Square steel tube beam raw bamboo floor

Country Status (1)

Country Link
CN (1) CN107035043B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242351A (en) * 2001-02-22 2002-08-28 Sekisui Chem Co Ltd Upstair floor structure of building
CN101775863A (en) * 2009-06-03 2010-07-14 柳俊哲 Box type steel-bamboo or steel-wood composite floor slab
CN201695561U (en) * 2010-05-06 2011-01-05 张俊昌 Bamboo steel keel sandwich foamed composite wall plate
CN203878807U (en) * 2014-03-28 2014-10-15 西安建筑科技大学 Original bamboo wall
CN204212392U (en) * 2014-10-16 2015-03-18 中建三局第一建设工程有限责任公司 I iron anchor system
WO2016122302A1 (en) * 2015-01-28 2016-08-04 Kaltia Consultoria Y Proyectos, S.A. De C.V. Prefabricated system for floor slabs and roofs with structural bamboo
CN206299011U (en) * 2016-12-21 2017-07-04 西安建筑科技大学 A kind of square steel tube beam raw bamboo floor

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242351A (en) * 2001-02-22 2002-08-28 Sekisui Chem Co Ltd Upstair floor structure of building
CN101775863A (en) * 2009-06-03 2010-07-14 柳俊哲 Box type steel-bamboo or steel-wood composite floor slab
CN201695561U (en) * 2010-05-06 2011-01-05 张俊昌 Bamboo steel keel sandwich foamed composite wall plate
CN203878807U (en) * 2014-03-28 2014-10-15 西安建筑科技大学 Original bamboo wall
CN204212392U (en) * 2014-10-16 2015-03-18 中建三局第一建设工程有限责任公司 I iron anchor system
WO2016122302A1 (en) * 2015-01-28 2016-08-04 Kaltia Consultoria Y Proyectos, S.A. De C.V. Prefabricated system for floor slabs and roofs with structural bamboo
CN206299011U (en) * 2016-12-21 2017-07-04 西安建筑科技大学 A kind of square steel tube beam raw bamboo floor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许昆等: "竹材在建筑结构中的应用发展与研究现状", 《竹子研究汇刊》 *

Also Published As

Publication number Publication date
CN107035043B (en) 2022-11-04

Similar Documents

Publication Publication Date Title
CN205224363U (en) Connection structure of floor and girder steel
DE102006036988B4 (en) Bar frame to form a frame comprising a plurality of nodes and the bars connecting the nodes
CN206299011U (en) A kind of square steel tube beam raw bamboo floor
CN107035043A (en) A kind of square steel tube beam raw bamboo floor
CN211369535U (en) Template reinforcing apparatus for civil engineering
CN204826317U (en) Compound strip inboard partition wall
CN205637139U (en) Support flat push formula multicavity steel pipe -concrete composite post braced frame system
CN206319464U (en) A kind of steel I-beam raw bamboo floor
CN209145313U (en) A kind of means for mounting coupling parts of all bamboo structure column root
CN205530820U (en) Steel construction wall body component with brace of putting more energy into
CN204703381U (en) Steel structure column
CN105971279A (en) High-low-stride single-face formwork supporting system
CN208267410U (en) A kind of reconstruction structure of old building
CN204212304U (en) A kind of fan-shaped imitative shell roofing
CN106121219A (en) Stiff giant column screw-free aluminum alloy template system
CN202124934U (en) Connecting device for reinforced concrete beam and shear wall
CN206090336U (en) Multi -functional suspension platform girder supporting mechanism of ecological environment -friendly
CN211438736U (en) Reinforcing bar cage welded fastening device for building
CN104652680A (en) Rope towing single-layered net shell structure
CN106522439A (en) I-steel beam type raw bamboo floor slab
CN205637725U (en) Rickshaw removes storehouse with combination plug -in type
CN205296525U (en) Lower hanging steel bar truss structure
CN109235421A (en) A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk
CN201771087U (en) Stretching rope type shed
CN203977701U (en) A kind of structural column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant