CN106522439A - I-steel beam type raw bamboo floor slab - Google Patents

I-steel beam type raw bamboo floor slab Download PDF

Info

Publication number
CN106522439A
CN106522439A CN201611193744.5A CN201611193744A CN106522439A CN 106522439 A CN106522439 A CN 106522439A CN 201611193744 A CN201611193744 A CN 201611193744A CN 106522439 A CN106522439 A CN 106522439A
Authority
CN
China
Prior art keywords
gag lever
lever post
raw bamboo
pad
wall beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611193744.5A
Other languages
Chinese (zh)
Other versions
CN106522439B (en
Inventor
郝际平
寇跃峰
田黎敏
秦梦浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201611193744.5A priority Critical patent/CN106522439B/en
Publication of CN106522439A publication Critical patent/CN106522439A/en
Application granted granted Critical
Publication of CN106522439B publication Critical patent/CN106522439B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/10Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2103/00Material constitution of slabs, sheets or the like
    • E04B2103/04Material constitution of slabs, sheets or the like of plastics, fibrous material or wood

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses an I-steel beam type bamboo floor slab. The I-steel beam type bamboo floor slab comprises a raw bamboo wall beam, a plurality of pieces of I-shaped steel and a plurality of pieces of first raw bamboo, wherein the raw bamboo wall beam is of a rectangular structure, all the pieces of I-shaped steel are sequentially distributed from front to back, one ends of the pieces of I-shaped steel are connected with a left side rod of the raw bamboo wall beam, and the other ends of the pieces of I-shaped steel are connected with a right side rod of the raw bamboo wall beam; and one ends of the pieces of first raw bamboo are fixed to a front side rod of the raw bamboo wall beam, and the other ends of the pieces of first raw bamboo sequentially penetrate through webs of all the pieces of I-shaped steel and then are fixed to a rear side rod of the raw bamboo wall beam. The I-steel beam type bamboo floor slab is high in bearing capacity.

Description

A kind of steel I-beam raw bamboo floor
Technical field
The present invention relates to a kind of floor, and in particular to a kind of steel I-beam raw bamboo floor.
Background technology
In the case where global timber resources lacks, bamboo have breeding easily, growth is fast, the spy such as morning and yield height of becoming a useful person Point, meanwhile, it is a kind of preferable Green environmental-protection building raw material that bamboo wood texture is logical straight, color and luster are simple and elegant, material is tough and tensile, with people The continuous enhancing of environmental consciousness, various places bamboo building are rised sheer from level ground.Due to the flexible restriction of raw bamboo sectional dimension itself and material, Existing raw bamboo floor span less, significantly limit the diversity of raw bamboo building, while the raw bamboo of cylindrical shape causes raw bamboo building Plate and beam there are problems that more with the connection of body of wall, and above problems constrain the development of raw bamboo building and promote.
The content of the invention
It is an object of the invention to overcome the shortcoming of above-mentioned prior art, there is provided a kind of steel I-beam raw bamboo floor, should The span of floor is big, bearing capacity is strong.
To reach above-mentioned purpose, steel I-beam raw bamboo floor of the present invention includes raw bamboo wall beam, some i shaped steels And some first raw bamboos, the raw bamboo wall beam is rectangular configuration, wherein, each i shaped steel is sequentially distributed from front to back, each I-shaped One end of shaped steel is connected with the left side bar of raw bamboo wall beam, and the other end of each i shaped steel is connected with the right-hand rod of raw bamboo wall beam Connect, the antero-lateral rod of raw bamboo wall beam is fixed in one end of each first raw bamboo, and the other end of each first raw bamboo sequentially passes through each I shape It is fixed on after the web of steel on the postero lateral arm of raw bamboo wall beam.
If the raw bamboo wall beam is formed by stacking by the raw bamboo that dried layer is sequentially distributed from top to bottom.
The left end of i shaped steel is connected by the first fixedly connected part with the left side bar of raw bamboo wall beam.
First fixedly connected part includes the first gag lever post, the second gag lever post and the 3rd gag lever post, wherein, first is spacing Bar is located on the left side bar of raw bamboo wall beam, and the second gag lever post and the 3rd gag lever post are positioned at the first gag lever post and the left side of raw bamboo wall beam Between bar, and between the second gag lever post and the 3rd gag lever post, have gap, the first gag lever post, the second gag lever post, the 3rd gag lever post and The first fixed via is formed between the left side bar of raw bamboo wall beam, the left end of i shaped steel passes through first fixed via;
Left side bar in the side of first the first gag lever post of screw bolt passes, the side of the second gag lever post and raw bamboo wall beam The left side bar of the first gag lever post, the second gag lever post and raw bamboo wall beam is fixedly connected by side;
Left side bar in the side of second the first gag lever post of screw bolt passes, the side of the 3rd gag lever post and raw bamboo wall beam The left side bar of the first gag lever post, the 3rd gag lever post and raw bamboo wall beam is connected by side.
The right-hand member of i shaped steel is connected by the second fixedly connected part with the right-hand rod of raw bamboo wall beam.
Second fixedly connected part includes the 4th gag lever post, the 5th gag lever post and the 6th gag lever post, wherein, the 4th is spacing Bar is located on the right-hand rod of raw bamboo wall beam, and the 5th gag lever post and the 6th gag lever post are positioned at the 4th gag lever post and the right side of raw bamboo wall beam Between bar, and between the 5th gag lever post and the 6th gag lever post, have gap, the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and The second fixed via is formed between the right-hand rod of raw bamboo wall beam, the right-hand member of i shaped steel passes through second fixed via;
Right-hand rod in the side of the 4th gag lever post of the 3rd screw bolt passes, the side of the 5th gag lever post and raw bamboo wall beam The right-hand rod of the 4th gag lever post, the 5th gag lever post and raw bamboo wall beam is fixedly connected by side;
Right-hand rod in the side of the 4th gag lever post of the 4th screw bolt passes, the side of the 6th gag lever post and raw bamboo wall beam The right-hand rod of the 4th gag lever post, the 6th gag lever post and raw bamboo wall beam is connected by side.
Also include that the first pad, the second pad, the 3rd pad and the 4th pad, the first pad and the second pad are located at first On gag lever post, the lower section of the 3rd pad and the 4th pad left side bar in raw bamboo wall beam;
First the first pad of screw bolt passes, the side of the first gag lever post, the side of the second gag lever post, in raw bamboo wall beam Left side bar side and the 3rd pad by the first pad, the first gag lever post, the second gag lever post, raw bamboo wall beam left side bar and the 3rd Pad is fixedly connected;
Second the second pad of screw bolt passes, the side of the first gag lever post, the side of the 3rd gag lever post, in raw bamboo wall beam Left side bar side and the 4th pad by the second pad, the first gag lever post, the 3rd gag lever post, raw bamboo wall beam left side bar and the 4th Pad is connected.
Also include that the 5th pad, the 6th pad, the 7th pad and the 8th pad, the 5th pad and the 6th pad are located at the 4th On gag lever post, the 7th pad and the 8th pad are positioned at the lower section of right-hand rod in raw bamboo wall beam;
The 5th pad of 3rd screw bolt passes, the side of the 4th gag lever post, the side of the 5th gag lever post, in raw bamboo wall beam The side of right-hand rod and the 7th pad are by the 5th pad, the 4th gag lever post, the 5th gag lever post, the right-hand rod of raw bamboo wall beam and the 7th Pad is fixedly connected;
The 6th pad of 4th screw bolt passes, the side of the 4th gag lever post, the side of the 6th gag lever post, in raw bamboo wall beam The side of right-hand rod and the 8th pad are by the 6th pad, the 4th gag lever post, the 6th gag lever post, the right-hand rod of raw bamboo wall beam and the 8th Pad is connected.
The bottom surface of the bottom surface of the first pad and the second pad is the cambered surface being engaged with the first gag lever post surface;
The upper surface of the 3rd pad and the upper surface of the 4th pad are and are engaged with the surface of left side bar in raw bamboo wall beam Cambered surface;
The lower surface of the lower surface and the 6th pad of the 5th pad is the cambered surface being engaged with the 4th gag lever post surface;
The upper surface of the 7th pad and the upper surface of the 8th pad are and are engaged with the surface of right-hand rod in raw bamboo wall beam Cambered surface.
Raw bamboo wall beam is formed by stacking by three layers of raw bamboo from top to bottom successively.
The invention has the advantages that:
Steel I-beam raw bamboo floor of the present invention includes raw bamboo wall beam, i shaped steel and the first raw bamboo, using I-shaped Shaped steel builds floor for the mode of skeleton, wherein, the two ends of i shaped steel are connected with the left side bar of raw bamboo wall beam and right-hand rod, The connection of i shaped steel and raw bamboo wall beam is realized, one end of the first raw bamboo is fixed on the antero-lateral rod of raw bamboo wall beam, the first raw bamboo The other end sequentially pass through the web of each i shaped steel after be fixed on the postero lateral arm of raw bamboo wall beam, realize between each i shaped steel Connection so that i shaped steel and raw bamboo wall beam form an integrated member, i shaped steel is fused to into raw bamboo wall preferably In beam, so that floor has stronger bearing capacity and larger span, it is that the application of bamboo building improves strong technical support.
Further, left side rod of the present invention by the first gag lever post, the second gag lever post, the 3rd gag lever post and raw bamboo wall beam Into for fixing the first fixed via of i shaped steel left end, then it is fixed by the first bolt and the second bolt, it is to avoid work The left end of shaped steel is moved on raw bamboo wall beam.
Further, the present invention by the right-hand rod of the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and raw bamboo wall beam it Between formed for being fixed on the second fixed via of i shaped steel right-hand member, then be fixed by the 3rd bolt and the 4th bolt, The right-hand member of i shaped steel is avoided to move on raw bamboo wall beam.
Description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the annexation figure of i shaped steel 2 and raw bamboo wall beam 1 in the present invention.
Wherein, 1 be raw bamboo wall beam, 11 be left side bar, 12 be right-hand rod, 13 be antero-lateral rod, 14 be postero lateral arm, 2 be I-shaped Shaped steel, 3 be the first raw bamboo, 41 be the first gag lever post, 42 be the second gag lever post, 43 be the 3rd gag lever post, 51 be the first bolt, 52 For the second bolt.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is described in further detail:
With reference to Fig. 1, steel I-beam raw bamboo floor of the present invention includes raw bamboo wall beam 1, some i shaped steels 2 and some First raw bamboo 3, the raw bamboo wall beam 1 are rectangular configuration, wherein, each i shaped steel 2 is sequentially distributed from front to back, each i shaped steel 2 one end is connected with the left side bar 11 of raw bamboo wall beam 1, the other end of each i shaped steel 2 and 12 phase of right-hand rod of raw bamboo wall beam 1 The antero-lateral rod 13 of raw bamboo wall beam 1 is fixed in connection, one end of each first raw bamboo 3, and the other end of each first raw bamboo 3 is sequentially passed through respectively It is fixed on after the web of i shaped steel 2 on the postero lateral arm 14 of raw bamboo wall beam 1.
If the raw bamboo wall beam 1 is formed by stacking by the raw bamboo that dried layer is sequentially distributed from top to bottom.
The left end of i shaped steel 2 is connected by the first fixedly connected part with the left side bar 11 of raw bamboo wall beam 1;Described first Fixedly connected part includes the first gag lever post 41, the second gag lever post 42 and the 3rd gag lever post 43, wherein, the first gag lever post 41 is located at original On the left side bar 11 of bamboo walling beam 1, the second gag lever post 42 and the 3rd gag lever post 43 are positioned at the first gag lever post 41 and a left side for raw bamboo wall beam 1 Between side lever 11, and between the second gag lever post 42 and the 3rd gag lever post 43, have gap, the first gag lever post 41, the second gag lever post 42, Form the first fixed via between 3rd gag lever post 43 and the left side bar 11 of raw bamboo wall beam 1, the left end of i shaped steel 2 is through described First fixed via;First bolt 51 sequentially passes through the side of the first gag lever post 41, the side of the second gag lever post 42 and raw bamboo wall In beam 1, the left side bar 11 of the first gag lever post 41, the second gag lever post 42 and raw bamboo wall beam 1 is fixedly connected by the side of left side bar 11; Second bolt 52 sequentially passes through left side bar 11 in side, the side of the 3rd gag lever post 43 and the raw bamboo wall beam 1 of the first gag lever post 41 Side the left side bar 11 of the first gag lever post 41, the 3rd gag lever post 43 and raw bamboo wall beam 1 is connected.
The right-hand member of i shaped steel 2 is connected by the second fixedly connected part with the right-hand rod 12 of raw bamboo wall beam 1;Second fixes Connector includes the 4th gag lever post, the 5th gag lever post and the 6th gag lever post, wherein, the 4th gag lever post is located at the right side of raw bamboo wall beam 1 On side lever 12, the 5th gag lever post and the 6th gag lever post are located between the 4th gag lever post and the right-hand rod 12 of raw bamboo wall beam 1, and the 5th There are gap, the right side of the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and raw bamboo wall beam 1 between gag lever post and the 6th gag lever post The second fixed via is formed between side lever 12, the right-hand member of i shaped steel 2 passes through second fixed via;3rd bolt is worn successively Cross the side of right-hand rod 12 in side, the side of the 5th gag lever post and the raw bamboo wall beam 1 of the 4th gag lever post by the 4th gag lever post, The right-hand rod 12 of five gag lever posts and raw bamboo wall beam 1 is fixedly connected;The side of the 4th gag lever post of the 4th screw bolt passes, the 6th limit The side of position bar and the side of right-hand rod 12 in raw bamboo wall beam 1 are by the right side of the 4th gag lever post, the 6th gag lever post and raw bamboo wall beam 1 Bar 12 is connected.
In addition, present invention additionally comprises the first pad, the second pad, the 3rd pad and the 4th pad, the first pad and second Pad is located on the first gag lever post 41, the lower section of the 3rd pad and the 4th pad left side bar 11 in raw bamboo wall beam 1;First spiral shell Bolt 51 sequentially passes through the first pad, the side of the first gag lever post 41, the side of the second gag lever post 42, left side bar in raw bamboo wall beam 1 11 side and the 3rd pad by the first pad, the first gag lever post 41, the second gag lever post 42, the left side bar 11 of raw bamboo wall beam 1 and 3rd pad is fixedly connected;Second bolt 52 sequentially passes through the second pad, the side of the first gag lever post 41, the 3rd gag lever post 43 In side, raw bamboo wall beam 1 left side bar 11 side and the 4th pad by the second pad, the first gag lever post 41, the 3rd gag lever post 43, The left side bar 11 and the 4th pad of raw bamboo wall beam 1 is connected.Present invention additionally comprises the 5th pad, the 6th pad, the 7th pad and 8th pad, the 5th pad and the 6th pad are located on the 4th gag lever post, and the 7th pad and the 8th pad are located in raw bamboo wall beam 1 The lower section of right-hand rod 12;The 5th pad of 3rd screw bolt passes, the side of the 4th gag lever post, the side of the 5th gag lever post, original In bamboo walling beam 1, the side of right-hand rod 12 and the 7th pad are by the 5th pad, the 4th gag lever post, the 5th gag lever post, raw bamboo wall beam 1 Right-hand rod 12 and the 7th pad are fixedly connected;It is the 6th pad of 4th screw bolt passes, the side of the 4th gag lever post, the 6th spacing In the side of bar, raw bamboo wall beam 1 side of right-hand rod 12 and the 8th pad by the 6th pad, the 4th gag lever post, the 6th gag lever post, The right-hand rod 12 and the 8th pad of raw bamboo wall beam 1 is connected.
The bottom surface of the bottom surface of the first pad and the second pad is the cambered surface being engaged with 41 surface of the first gag lever post;3rd The upper surface of the upper surface of pad and the 4th pad is the cambered surface being engaged with the surface of left side bar 11 in raw bamboo wall beam 1;The The lower surface of the lower surface of five pads and the 6th pad is the cambered surface being engaged with the 4th gag lever post surface;7th pad it is upper The upper surface of surface and the 8th pad is the cambered surface being engaged with the surface of right-hand rod 12 in raw bamboo wall beam 1, the first raw bamboo 3 Side is contacted with the upper surface on 2 edge of a wing of i shaped steel.

Claims (10)

1. a kind of steel I-beam raw bamboo floor, it is characterised in that including raw bamboo wall beam (1), some i shaped steels (2) and some One raw bamboo (3), the raw bamboo wall beam (1) is rectangular configuration, wherein, each i shaped steel (2) is sequentially distributed from front to back, each I-shaped One end of shaped steel (2) is connected with the left side bar (11) of raw bamboo wall beam (1), the other end and the raw bamboo wall beam of each i shaped steel (2) (1) right-hand rod (12) is connected, and the antero-lateral rod (13) of raw bamboo wall beam (1) is fixed in one end of each first raw bamboo (3), and each first The other end of raw bamboo (3) is fixed on the postero lateral arm (14) of raw bamboo wall beam (1) after sequentially passing through the web of each i shaped steel (2).
2. steel I-beam raw bamboo floor according to claim 1, it is characterised in that the raw bamboo wall beam (1) is if by dried layer The raw bamboo being sequentially distributed from top to bottom is formed by stacking.
3. steel I-beam raw bamboo floor according to claim 1, it is characterised in that the left end and raw bamboo of i shaped steel (2) The left side bar (11) of wall beam (1) is connected by the first fixedly connected part.
4. steel I-beam raw bamboo floor according to claim 3, it is characterised in that first fixedly connected part includes One gag lever post (41), the second gag lever post (42) and the 3rd gag lever post (43), wherein, the first gag lever post (41) is positioned at raw bamboo wall beam (1), on left side bar (11), the second gag lever post (42) and the 3rd gag lever post (43) are positioned at the first gag lever post (41) and raw bamboo wall beam (1) between left side bar (11), and between the second gag lever post (42) and the 3rd gag lever post (43), there are gap, the first gag lever post (41) first is formed between the second gag lever post (42), the 3rd gag lever post (43) and the left side bar (11) of raw bamboo wall beam (1), and fixes logical Hole, the left end of i shaped steel (2) pass through first fixed via;
First bolt (51) sequentially passes through the side of the first gag lever post (41), the side of the second gag lever post (42) and raw bamboo wall beam (1) in, the side in left side bar (11) is by the left side bar (11) of the first gag lever post (41), the second gag lever post (42) and raw bamboo wall beam (1) It is fixedly connected;
Second bolt (52) sequentially passes through the side of the first gag lever post (41), the side of the 3rd gag lever post (43) and raw bamboo wall beam (1) in, the side in left side bar (11) is by the left side bar (11) of the first gag lever post (41), the 3rd gag lever post (43) and raw bamboo wall beam (1) It is connected.
5. steel I-beam raw bamboo floor according to claim 4, it is characterised in that the right-hand member and raw bamboo of i shaped steel (2) The right-hand rod (12) of wall beam (1) is connected by the second fixedly connected part.
6. steel I-beam raw bamboo floor according to claim 5, it is characterised in that second fixedly connected part includes Four gag lever posts, the 5th gag lever post and the 6th gag lever post, wherein, the 4th gag lever post is located on the right-hand rod (12) of raw bamboo wall beam (1), 5th gag lever post and the 6th gag lever post are located between the 4th gag lever post and the right-hand rod (12) of raw bamboo wall beam (1), and the 5th spacing There are gap, the right side of the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and raw bamboo wall beam (1) between bar and the 6th gag lever post The second fixed via is formed between bar (12), the right-hand member of i shaped steel (2) passes through second fixed via;
Right-hand rod in the side of the 4th gag lever post of the 3rd screw bolt passes, the side of the 5th gag lever post and raw bamboo wall beam (1) (12) right-hand rod (12) of the 4th gag lever post, the 5th gag lever post and raw bamboo wall beam (1) is fixedly connected by side;
Right-hand rod in the side of the 4th gag lever post of the 4th screw bolt passes, the side of the 6th gag lever post and raw bamboo wall beam (1) (12) right-hand rod (12) of the 4th gag lever post, the 6th gag lever post and raw bamboo wall beam (1) is connected by side.
7. steel I-beam raw bamboo floor according to claim 6, it is characterised in that also including the first pad, the second pad, 3rd pad and the 4th pad, the first pad and the second pad are located on the first gag lever post (41), the 3rd pad and the 4th pad The lower section in left side bar (11) in raw bamboo wall beam (1);
First bolt (51) sequentially passes through the first pad, the side of the first gag lever post (41), the side of the second gag lever post (42), original The side in left side bar (11) and the 3rd pad are by the first pad, the first gag lever post (41), the second gag lever post in bamboo walling beam (1) (42), the left side bar (11) and the 3rd pad of raw bamboo wall beam (1) is fixedly connected;
Second bolt (52) sequentially passes through the second pad, the side of the first gag lever post (41), the side of the 3rd gag lever post (43), original The side in left side bar (11) and the 4th pad are by the second pad, the first gag lever post (41), the 3rd gag lever post in bamboo walling beam (1) (43), the left side bar (11) and the 4th pad of raw bamboo wall beam (1) is connected.
8. steel I-beam raw bamboo floor according to claim 7, it is characterised in that also including the 5th pad, the 6th pad, 7th pad and the 8th pad, the 5th pad and the 6th pad are located on the 4th gag lever post, and the 7th pad and the 8th pad are located at The lower section of right-hand rod (12) in raw bamboo wall beam (1);
The 5th pad of 3rd screw bolt passes, the side of the 4th gag lever post, the side of the 5th gag lever post, in raw bamboo wall beam (1) The side of right-hand rod (12) and the 7th pad by the 5th pad, the 4th gag lever post, the 5th gag lever post, raw bamboo wall beam (1) right side Bar (12) and the 7th pad are fixedly connected;
The 6th pad of 4th screw bolt passes, the side of the 4th gag lever post, the side of the 6th gag lever post, in raw bamboo wall beam (1) The side of right-hand rod (12) and the 8th pad by the 6th pad, the 4th gag lever post, the 6th gag lever post, raw bamboo wall beam (1) right side Bar (12) and the 8th pad are connected.
9. it is according to claim 8 based on steel I-beam raw bamboo floor, it is characterised in that the bottom surface of the first pad and second The bottom surface of pad is the cambered surface being engaged with the first gag lever post (41) surface;
The upper surface of the 3rd pad and the upper surface of the 4th pad are the surface matching with left side bar (11) in raw bamboo wall beam (1) The cambered surface of conjunction;
The lower surface of the lower surface and the 6th pad of the 5th pad is the cambered surface being engaged with the 4th gag lever post surface;
The upper surface of the 7th pad and the upper surface of the 8th pad are the surface matching with right-hand rod (12) in raw bamboo wall beam (1) The cambered surface of conjunction.
10. steel I-beam raw bamboo floor according to claim 2, it is characterised in that raw bamboo wall beam (1) by three layers on to Under be sequentially connected the raw bamboo for connecing and be formed by stacking.
CN201611193744.5A 2016-12-21 2016-12-21 Former bamboo floor of I-steel roof beam Active CN106522439B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611193744.5A CN106522439B (en) 2016-12-21 2016-12-21 Former bamboo floor of I-steel roof beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611193744.5A CN106522439B (en) 2016-12-21 2016-12-21 Former bamboo floor of I-steel roof beam

Publications (2)

Publication Number Publication Date
CN106522439A true CN106522439A (en) 2017-03-22
CN106522439B CN106522439B (en) 2022-04-19

Family

ID=58340303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611193744.5A Active CN106522439B (en) 2016-12-21 2016-12-21 Former bamboo floor of I-steel roof beam

Country Status (1)

Country Link
CN (1) CN106522439B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278300A (en) * 2002-03-25 2003-10-02 Sekisui Chem Co Ltd Floor structure, floor panel and unit building
KR20040043261A (en) * 2002-11-18 2004-05-24 한국건설기술연구원 Hollow Type I Beam Composite Deck and Constructing Method thereof
CN101691785A (en) * 2009-10-09 2010-04-07 李登满 Bamboo structure house with open internal wall
CN101949212A (en) * 2010-09-29 2011-01-19 中冶建筑研究总院有限公司 Slabform detachable support system and construction method thereof
US20120011805A1 (en) * 2010-03-19 2012-01-19 Weihong Yang Steel and wood composite structure with metal jacket wood studs and rods
CN103866863A (en) * 2014-01-22 2014-06-18 西安建筑科技大学 Novel raw bamboo connecting structure of floor, wall, beam
CN103938726A (en) * 2014-01-22 2014-07-23 西安建筑科技大学 Connecting structure of raw-bamboo floor, wall and beam
CN204212392U (en) * 2014-10-16 2015-03-18 中建三局第一建设工程有限责任公司 I iron anchor system
CN206319464U (en) * 2016-12-21 2017-07-11 西安建筑科技大学 A kind of steel I-beam raw bamboo floor

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278300A (en) * 2002-03-25 2003-10-02 Sekisui Chem Co Ltd Floor structure, floor panel and unit building
KR20040043261A (en) * 2002-11-18 2004-05-24 한국건설기술연구원 Hollow Type I Beam Composite Deck and Constructing Method thereof
CN101691785A (en) * 2009-10-09 2010-04-07 李登满 Bamboo structure house with open internal wall
US20120011805A1 (en) * 2010-03-19 2012-01-19 Weihong Yang Steel and wood composite structure with metal jacket wood studs and rods
CN101949212A (en) * 2010-09-29 2011-01-19 中冶建筑研究总院有限公司 Slabform detachable support system and construction method thereof
CN103866863A (en) * 2014-01-22 2014-06-18 西安建筑科技大学 Novel raw bamboo connecting structure of floor, wall, beam
CN103938726A (en) * 2014-01-22 2014-07-23 西安建筑科技大学 Connecting structure of raw-bamboo floor, wall and beam
CN204212392U (en) * 2014-10-16 2015-03-18 中建三局第一建设工程有限责任公司 I iron anchor system
CN206319464U (en) * 2016-12-21 2017-07-11 西安建筑科技大学 A kind of steel I-beam raw bamboo floor

Also Published As

Publication number Publication date
CN106522439B (en) 2022-04-19

Similar Documents

Publication Publication Date Title
Navyashree et al. Use of flat slabs in multi-storey commercial building situated in high seismic zone
CN104831851A (en) Reinforced concrete orthogonal-diagonal space lattice box structure and production method thereof
UA87668C2 (en) Constructional panel and methods of building up of a substantially planar array of a plurality of individual panels
CN106193408A (en) String props up unbonded prestressed concrete arch without beam
CN206319464U (en) A kind of steel I-beam raw bamboo floor
CN106522439A (en) I-steel beam type raw bamboo floor slab
CN204738452U (en) Prefabricated stand
CN108412100A (en) A kind of assembly sunk type floor and its connecting structure entirely
CN104389361A (en) Damping filling wallboard for frame structure
CN204435601U (en) A kind of damping filled-in panel for frame construction
CN203795589U (en) Integrated house based on lightweight steel construction
CN106522471B (en) A kind of lattice rod structure based on raw bamboo
CN106703195A (en) Beam-column rigid connection structure based on bamboo frame
CN104631621A (en) Saddle-shaped cable carrier single-layer latticed shell structure
CN104652680B (en) Rope towing single-layered net shell structure
CN206319488U (en) A kind of lattice rod structure based on raw bamboo
TWM608343U (en) Pre-casting joint and beam column thereof
CN105971279A (en) High-low-stride single-face formwork supporting system
CN207452681U (en) A kind of connecting structure of Wavelike steel webplate and diaphragm
US20160258155A1 (en) Storey ceiling construction and building made of wood
CN206800639U (en) A kind of floor gap resistance to plucking attachment structure
CN202023261U (en) Lower-chord panel point fastening device of cylindrical surface chord support structure
CN109441031A (en) The open spiral stairs structure of the concealed overhanging type of structural beams and its construction method
CN107035043A (en) A kind of square steel tube beam raw bamboo floor
Mills et al. Ternary Shed: An Exemplar Design for Bamboo Construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant