- CN106522439A CN106522439A CN201611193744.5A CN201611193744A CN106522439A CN 106522439 A CN106522439 A CN 106522439A CN 201611193744 A CN201611193744 A CN 201611193744A CN 106522439 A CN106522439 A CN 106522439A
- Authority
- CN
- China
- Prior art keywords
- gag lever
- lever post
- raw bamboo
- pad
- wall beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/10—Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2103/00—Material constitution of slabs, sheets or the like
- E04B2103/04—Material constitution of slabs, sheets or the like of plastics, fibrous material or wood
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The invention discloses an I-steel beam type bamboo floor slab. The I-steel beam type bamboo floor slab comprises a raw bamboo wall beam, a plurality of pieces of I-shaped steel and a plurality of pieces of first raw bamboo, wherein the raw bamboo wall beam is of a rectangular structure, all the pieces of I-shaped steel are sequentially distributed from front to back, one ends of the pieces of I-shaped steel are connected with a left side rod of the raw bamboo wall beam, and the other ends of the pieces of I-shaped steel are connected with a right side rod of the raw bamboo wall beam; and one ends of the pieces of first raw bamboo are fixed to a front side rod of the raw bamboo wall beam, and the other ends of the pieces of first raw bamboo sequentially penetrate through webs of all the pieces of I-shaped steel and then are fixed to a rear side rod of the raw bamboo wall beam. The I-steel beam type bamboo floor slab is high in bearing capacity.
Description
Technical field
The present invention relates to a kind of floor, and in particular to a kind of steel I-beam raw bamboo floor.
Background technology
In the case where global timber resources lacks, bamboo have breeding easily, growth is fast, the spy such as morning and yield height of becoming a useful person
Point, meanwhile, it is a kind of preferable Green environmental-protection building raw material that bamboo wood texture is logical straight, color and luster are simple and elegant, material is tough and tensile, with people
The continuous enhancing of environmental consciousness, various places bamboo building are rised sheer from level ground.Due to the flexible restriction of raw bamboo sectional dimension itself and material,
Existing raw bamboo floor span less, significantly limit the diversity of raw bamboo building, while the raw bamboo of cylindrical shape causes raw bamboo building
Plate and beam there are problems that more with the connection of body of wall, and above problems constrain the development of raw bamboo building and promote.
The content of the invention
It is an object of the invention to overcome the shortcoming of above-mentioned prior art, there is provided a kind of steel I-beam raw bamboo floor, should
The span of floor is big, bearing capacity is strong.
To reach above-mentioned purpose, steel I-beam raw bamboo floor of the present invention includes raw bamboo wall beam, some i shaped steels
And some first raw bamboos, the raw bamboo wall beam is rectangular configuration, wherein, each i shaped steel is sequentially distributed from front to back, each I-shaped
One end of shaped steel is connected with the left side bar of raw bamboo wall beam, and the other end of each i shaped steel is connected with the right-hand rod of raw bamboo wall beam
Connect, the antero-lateral rod of raw bamboo wall beam is fixed in one end of each first raw bamboo, and the other end of each first raw bamboo sequentially passes through each I shape
It is fixed on after the web of steel on the postero lateral arm of raw bamboo wall beam.
If the raw bamboo wall beam is formed by stacking by the raw bamboo that dried layer is sequentially distributed from top to bottom.
The left end of i shaped steel is connected by the first fixedly connected part with the left side bar of raw bamboo wall beam.
First fixedly connected part includes the first gag lever post, the second gag lever post and the 3rd gag lever post, wherein, first is spacing
Bar is located on the left side bar of raw bamboo wall beam, and the second gag lever post and the 3rd gag lever post are positioned at the first gag lever post and the left side of raw bamboo wall beam
Between bar, and between the second gag lever post and the 3rd gag lever post, have gap, the first gag lever post, the second gag lever post, the 3rd gag lever post and
The first fixed via is formed between the left side bar of raw bamboo wall beam, the left end of i shaped steel passes through first fixed via;
Left side bar in the side of first the first gag lever post of screw bolt passes, the side of the second gag lever post and raw bamboo wall beam
The left side bar of the first gag lever post, the second gag lever post and raw bamboo wall beam is fixedly connected by side;
Left side bar in the side of second the first gag lever post of screw bolt passes, the side of the 3rd gag lever post and raw bamboo wall beam
The left side bar of the first gag lever post, the 3rd gag lever post and raw bamboo wall beam is connected by side.
The right-hand member of i shaped steel is connected by the second fixedly connected part with the right-hand rod of raw bamboo wall beam.
Second fixedly connected part includes the 4th gag lever post, the 5th gag lever post and the 6th gag lever post, wherein, the 4th is spacing
Bar is located on the right-hand rod of raw bamboo wall beam, and the 5th gag lever post and the 6th gag lever post are positioned at the 4th gag lever post and the right side of raw bamboo wall beam
Between bar, and between the 5th gag lever post and the 6th gag lever post, have gap, the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and
The second fixed via is formed between the right-hand rod of raw bamboo wall beam, the right-hand member of i shaped steel passes through second fixed via;
Right-hand rod in the side of the 4th gag lever post of the 3rd screw bolt passes, the side of the 5th gag lever post and raw bamboo wall beam
The right-hand rod of the 4th gag lever post, the 5th gag lever post and raw bamboo wall beam is fixedly connected by side;
Right-hand rod in the side of the 4th gag lever post of the 4th screw bolt passes, the side of the 6th gag lever post and raw bamboo wall beam
The right-hand rod of the 4th gag lever post, the 6th gag lever post and raw bamboo wall beam is connected by side.
Also include that the first pad, the second pad, the 3rd pad and the 4th pad, the first pad and the second pad are located at first
On gag lever post, the lower section of the 3rd pad and the 4th pad left side bar in raw bamboo wall beam;
First the first pad of screw bolt passes, the side of the first gag lever post, the side of the second gag lever post, in raw bamboo wall beam
Left side bar side and the 3rd pad by the first pad, the first gag lever post, the second gag lever post, raw bamboo wall beam left side bar and the 3rd
Pad is fixedly connected;
Second the second pad of screw bolt passes, the side of the first gag lever post, the side of the 3rd gag lever post, in raw bamboo wall beam
Left side bar side and the 4th pad by the second pad, the first gag lever post, the 3rd gag lever post, raw bamboo wall beam left side bar and the 4th
Pad is connected.
Also include that the 5th pad, the 6th pad, the 7th pad and the 8th pad, the 5th pad and the 6th pad are located at the 4th
On gag lever post, the 7th pad and the 8th pad are positioned at the lower section of right-hand rod in raw bamboo wall beam;
The 5th pad of 3rd screw bolt passes, the side of the 4th gag lever post, the side of the 5th gag lever post, in raw bamboo wall beam
The side of right-hand rod and the 7th pad are by the 5th pad, the 4th gag lever post, the 5th gag lever post, the right-hand rod of raw bamboo wall beam and the 7th
Pad is fixedly connected;
The 6th pad of 4th screw bolt passes, the side of the 4th gag lever post, the side of the 6th gag lever post, in raw bamboo wall beam
The side of right-hand rod and the 8th pad are by the 6th pad, the 4th gag lever post, the 6th gag lever post, the right-hand rod of raw bamboo wall beam and the 8th
Pad is connected.
The bottom surface of the bottom surface of the first pad and the second pad is the cambered surface being engaged with the first gag lever post surface;
The upper surface of the 3rd pad and the upper surface of the 4th pad are and are engaged with the surface of left side bar in raw bamboo wall beam
Cambered surface;
The lower surface of the lower surface and the 6th pad of the 5th pad is the cambered surface being engaged with the 4th gag lever post surface;
The upper surface of the 7th pad and the upper surface of the 8th pad are and are engaged with the surface of right-hand rod in raw bamboo wall beam
Cambered surface.
Raw bamboo wall beam is formed by stacking by three layers of raw bamboo from top to bottom successively.
The invention has the advantages that:
Steel I-beam raw bamboo floor of the present invention includes raw bamboo wall beam, i shaped steel and the first raw bamboo, using I-shaped
Shaped steel builds floor for the mode of skeleton, wherein, the two ends of i shaped steel are connected with the left side bar of raw bamboo wall beam and right-hand rod,
The connection of i shaped steel and raw bamboo wall beam is realized, one end of the first raw bamboo is fixed on the antero-lateral rod of raw bamboo wall beam, the first raw bamboo
The other end sequentially pass through the web of each i shaped steel after be fixed on the postero lateral arm of raw bamboo wall beam, realize between each i shaped steel
Connection so that i shaped steel and raw bamboo wall beam form an integrated member, i shaped steel is fused to into raw bamboo wall preferably
In beam, so that floor has stronger bearing capacity and larger span, it is that the application of bamboo building improves strong technical support.
Further, left side rod of the present invention by the first gag lever post, the second gag lever post, the 3rd gag lever post and raw bamboo wall beam
Into for fixing the first fixed via of i shaped steel left end, then it is fixed by the first bolt and the second bolt, it is to avoid work
The left end of shaped steel is moved on raw bamboo wall beam.
Further, the present invention by the right-hand rod of the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and raw bamboo wall beam it
Between formed for being fixed on the second fixed via of i shaped steel right-hand member, then be fixed by the 3rd bolt and the 4th bolt,
The right-hand member of i shaped steel is avoided to move on raw bamboo wall beam.
Description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the annexation figure of i shaped steel 2 and raw bamboo wall beam 1 in the present invention.
Wherein, 1 be raw bamboo wall beam, 11 be left side bar, 12 be right-hand rod, 13 be antero-lateral rod, 14 be postero lateral arm, 2 be I-shaped
Shaped steel, 3 be the first raw bamboo, 41 be the first gag lever post, 42 be the second gag lever post, 43 be the 3rd gag lever post, 51 be the first bolt, 52
For the second bolt.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is described in further detail:
With reference to Fig. 1, steel I-beam raw bamboo floor of the present invention includes raw bamboo wall beam 1, some i shaped steels 2 and some
First raw bamboo 3, the raw bamboo wall beam 1 are rectangular configuration, wherein, each i shaped steel 2 is sequentially distributed from front to back, each i shaped steel
2 one end is connected with the left side bar 11 of raw bamboo wall beam 1, the other end of each i shaped steel 2 and 12 phase of right-hand rod of raw bamboo wall beam 1
The antero-lateral rod 13 of raw bamboo wall beam 1 is fixed in connection, one end of each first raw bamboo 3, and the other end of each first raw bamboo 3 is sequentially passed through respectively
It is fixed on after the web of i shaped steel 2 on the postero lateral arm 14 of raw bamboo wall beam 1.
If the raw bamboo wall beam 1 is formed by stacking by the raw bamboo that dried layer is sequentially distributed from top to bottom.
The left end of i shaped steel 2 is connected by the first fixedly connected part with the left side bar 11 of raw bamboo wall beam 1;Described first
Fixedly connected part includes the first gag lever post 41, the second gag lever post 42 and the 3rd gag lever post 43, wherein, the first gag lever post 41 is located at original
On the left side bar 11 of bamboo walling beam 1, the second gag lever post 42 and the 3rd gag lever post 43 are positioned at the first gag lever post 41 and a left side for raw bamboo wall beam 1
Between side lever 11, and between the second gag lever post 42 and the 3rd gag lever post 43, have gap, the first gag lever post 41, the second gag lever post 42,
Form the first fixed via between 3rd gag lever post 43 and the left side bar 11 of raw bamboo wall beam 1, the left end of i shaped steel 2 is through described
First fixed via;First bolt 51 sequentially passes through the side of the first gag lever post 41, the side of the second gag lever post 42 and raw bamboo wall
In beam 1, the left side bar 11 of the first gag lever post 41, the second gag lever post 42 and raw bamboo wall beam 1 is fixedly connected by the side of left side bar 11;
Second bolt 52 sequentially passes through left side bar 11 in side, the side of the 3rd gag lever post 43 and the raw bamboo wall beam 1 of the first gag lever post 41
Side the left side bar 11 of the first gag lever post 41, the 3rd gag lever post 43 and raw bamboo wall beam 1 is connected.
The right-hand member of i shaped steel 2 is connected by the second fixedly connected part with the right-hand rod 12 of raw bamboo wall beam 1;Second fixes
Connector includes the 4th gag lever post, the 5th gag lever post and the 6th gag lever post, wherein, the 4th gag lever post is located at the right side of raw bamboo wall beam 1
On side lever 12, the 5th gag lever post and the 6th gag lever post are located between the 4th gag lever post and the right-hand rod 12 of raw bamboo wall beam 1, and the 5th
There are gap, the right side of the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and raw bamboo wall beam 1 between gag lever post and the 6th gag lever post
The second fixed via is formed between side lever 12, the right-hand member of i shaped steel 2 passes through second fixed via;3rd bolt is worn successively
Cross the side of right-hand rod 12 in side, the side of the 5th gag lever post and the raw bamboo wall beam 1 of the 4th gag lever post by the 4th gag lever post,
The right-hand rod 12 of five gag lever posts and raw bamboo wall beam 1 is fixedly connected;The side of the 4th gag lever post of the 4th screw bolt passes, the 6th limit
The side of position bar and the side of right-hand rod 12 in raw bamboo wall beam 1 are by the right side of the 4th gag lever post, the 6th gag lever post and raw bamboo wall beam 1
Bar 12 is connected.
In addition, present invention additionally comprises the first pad, the second pad, the 3rd pad and the 4th pad, the first pad and second
Pad is located on the first gag lever post 41, the lower section of the 3rd pad and the 4th pad left side bar 11 in raw bamboo wall beam 1;First spiral shell
Bolt 51 sequentially passes through the first pad, the side of the first gag lever post 41, the side of the second gag lever post 42, left side bar in raw bamboo wall beam 1
11 side and the 3rd pad by the first pad, the first gag lever post 41, the second gag lever post 42, the left side bar 11 of raw bamboo wall beam 1 and
3rd pad is fixedly connected;Second bolt 52 sequentially passes through the second pad, the side of the first gag lever post 41, the 3rd gag lever post 43
In side, raw bamboo wall beam 1 left side bar 11 side and the 4th pad by the second pad, the first gag lever post 41, the 3rd gag lever post 43,
The left side bar 11 and the 4th pad of raw bamboo wall beam 1 is connected.Present invention additionally comprises the 5th pad, the 6th pad, the 7th pad and
8th pad, the 5th pad and the 6th pad are located on the 4th gag lever post, and the 7th pad and the 8th pad are located in raw bamboo wall beam 1
The lower section of right-hand rod 12;The 5th pad of 3rd screw bolt passes, the side of the 4th gag lever post, the side of the 5th gag lever post, original
In bamboo walling beam 1, the side of right-hand rod 12 and the 7th pad are by the 5th pad, the 4th gag lever post, the 5th gag lever post, raw bamboo wall beam 1
Right-hand rod 12 and the 7th pad are fixedly connected;It is the 6th pad of 4th screw bolt passes, the side of the 4th gag lever post, the 6th spacing
In the side of bar, raw bamboo wall beam 1 side of right-hand rod 12 and the 8th pad by the 6th pad, the 4th gag lever post, the 6th gag lever post,
The right-hand rod 12 and the 8th pad of raw bamboo wall beam 1 is connected.
The bottom surface of the bottom surface of the first pad and the second pad is the cambered surface being engaged with 41 surface of the first gag lever post;3rd
The upper surface of the upper surface of pad and the 4th pad is the cambered surface being engaged with the surface of left side bar 11 in raw bamboo wall beam 1;The
The lower surface of the lower surface of five pads and the 6th pad is the cambered surface being engaged with the 4th gag lever post surface;7th pad it is upper
The upper surface of surface and the 8th pad is the cambered surface being engaged with the surface of right-hand rod 12 in raw bamboo wall beam 1, the first raw bamboo 3
Side is contacted with the upper surface on 2 edge of a wing of i shaped steel.
Claims (10)
1. a kind of steel I-beam raw bamboo floor, it is characterised in that including raw bamboo wall beam (1), some i shaped steels (2) and some
One raw bamboo (3), the raw bamboo wall beam (1) is rectangular configuration, wherein, each i shaped steel (2) is sequentially distributed from front to back, each I-shaped
One end of shaped steel (2) is connected with the left side bar (11) of raw bamboo wall beam (1), the other end and the raw bamboo wall beam of each i shaped steel (2)
(1) right-hand rod (12) is connected, and the antero-lateral rod (13) of raw bamboo wall beam (1) is fixed in one end of each first raw bamboo (3), and each first
The other end of raw bamboo (3) is fixed on the postero lateral arm (14) of raw bamboo wall beam (1) after sequentially passing through the web of each i shaped steel (2).
2. steel I-beam raw bamboo floor according to claim 1, it is characterised in that the raw bamboo wall beam (1) is if by dried layer
The raw bamboo being sequentially distributed from top to bottom is formed by stacking.
3. steel I-beam raw bamboo floor according to claim 1, it is characterised in that the left end and raw bamboo of i shaped steel (2)
The left side bar (11) of wall beam (1) is connected by the first fixedly connected part.
4. steel I-beam raw bamboo floor according to claim 3, it is characterised in that first fixedly connected part includes
One gag lever post (41), the second gag lever post (42) and the 3rd gag lever post (43), wherein, the first gag lever post (41) is positioned at raw bamboo wall beam
(1), on left side bar (11), the second gag lever post (42) and the 3rd gag lever post (43) are positioned at the first gag lever post (41) and raw bamboo wall beam
(1) between left side bar (11), and between the second gag lever post (42) and the 3rd gag lever post (43), there are gap, the first gag lever post
(41) first is formed between the second gag lever post (42), the 3rd gag lever post (43) and the left side bar (11) of raw bamboo wall beam (1), and fixes logical
Hole, the left end of i shaped steel (2) pass through first fixed via;
First bolt (51) sequentially passes through the side of the first gag lever post (41), the side of the second gag lever post (42) and raw bamboo wall beam
(1) in, the side in left side bar (11) is by the left side bar (11) of the first gag lever post (41), the second gag lever post (42) and raw bamboo wall beam (1)
It is fixedly connected;
Second bolt (52) sequentially passes through the side of the first gag lever post (41), the side of the 3rd gag lever post (43) and raw bamboo wall beam
(1) in, the side in left side bar (11) is by the left side bar (11) of the first gag lever post (41), the 3rd gag lever post (43) and raw bamboo wall beam (1)
It is connected.
5. steel I-beam raw bamboo floor according to claim 4, it is characterised in that the right-hand member and raw bamboo of i shaped steel (2)
The right-hand rod (12) of wall beam (1) is connected by the second fixedly connected part.
6. steel I-beam raw bamboo floor according to claim 5, it is characterised in that second fixedly connected part includes
Four gag lever posts, the 5th gag lever post and the 6th gag lever post, wherein, the 4th gag lever post is located on the right-hand rod (12) of raw bamboo wall beam (1),
5th gag lever post and the 6th gag lever post are located between the 4th gag lever post and the right-hand rod (12) of raw bamboo wall beam (1), and the 5th spacing
There are gap, the right side of the 4th gag lever post, the 5th gag lever post, the 6th gag lever post and raw bamboo wall beam (1) between bar and the 6th gag lever post
The second fixed via is formed between bar (12), the right-hand member of i shaped steel (2) passes through second fixed via;
Right-hand rod in the side of the 4th gag lever post of the 3rd screw bolt passes, the side of the 5th gag lever post and raw bamboo wall beam (1)
(12) right-hand rod (12) of the 4th gag lever post, the 5th gag lever post and raw bamboo wall beam (1) is fixedly connected by side;
Right-hand rod in the side of the 4th gag lever post of the 4th screw bolt passes, the side of the 6th gag lever post and raw bamboo wall beam (1)
(12) right-hand rod (12) of the 4th gag lever post, the 6th gag lever post and raw bamboo wall beam (1) is connected by side.
7. steel I-beam raw bamboo floor according to claim 6, it is characterised in that also including the first pad, the second pad,
3rd pad and the 4th pad, the first pad and the second pad are located on the first gag lever post (41), the 3rd pad and the 4th pad
The lower section in left side bar (11) in raw bamboo wall beam (1);
First bolt (51) sequentially passes through the first pad, the side of the first gag lever post (41), the side of the second gag lever post (42), original
The side in left side bar (11) and the 3rd pad are by the first pad, the first gag lever post (41), the second gag lever post in bamboo walling beam (1)
(42), the left side bar (11) and the 3rd pad of raw bamboo wall beam (1) is fixedly connected;
Second bolt (52) sequentially passes through the second pad, the side of the first gag lever post (41), the side of the 3rd gag lever post (43), original
The side in left side bar (11) and the 4th pad are by the second pad, the first gag lever post (41), the 3rd gag lever post in bamboo walling beam (1)
(43), the left side bar (11) and the 4th pad of raw bamboo wall beam (1) is connected.
8. steel I-beam raw bamboo floor according to claim 7, it is characterised in that also including the 5th pad, the 6th pad,
7th pad and the 8th pad, the 5th pad and the 6th pad are located on the 4th gag lever post, and the 7th pad and the 8th pad are located at
The lower section of right-hand rod (12) in raw bamboo wall beam (1);
The 5th pad of 3rd screw bolt passes, the side of the 4th gag lever post, the side of the 5th gag lever post, in raw bamboo wall beam (1)
The side of right-hand rod (12) and the 7th pad by the 5th pad, the 4th gag lever post, the 5th gag lever post, raw bamboo wall beam (1) right side
Bar (12) and the 7th pad are fixedly connected;
The 6th pad of 4th screw bolt passes, the side of the 4th gag lever post, the side of the 6th gag lever post, in raw bamboo wall beam (1)
The side of right-hand rod (12) and the 8th pad by the 6th pad, the 4th gag lever post, the 6th gag lever post, raw bamboo wall beam (1) right side
Bar (12) and the 8th pad are connected.
9. it is according to claim 8 based on steel I-beam raw bamboo floor, it is characterised in that the bottom surface of the first pad and second
The bottom surface of pad is the cambered surface being engaged with the first gag lever post (41) surface;
The upper surface of the 3rd pad and the upper surface of the 4th pad are the surface matching with left side bar (11) in raw bamboo wall beam (1)
The cambered surface of conjunction;
The lower surface of the lower surface and the 6th pad of the 5th pad is the cambered surface being engaged with the 4th gag lever post surface;
The upper surface of the 7th pad and the upper surface of the 8th pad are the surface matching with right-hand rod (12) in raw bamboo wall beam (1)
The cambered surface of conjunction.
10. steel I-beam raw bamboo floor according to claim 2, it is characterised in that raw bamboo wall beam (1) by three layers on to
Under be sequentially connected the raw bamboo for connecing and be formed by stacking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611193744.5A CN106522439B (en) | 2016-12-21 | 2016-12-21 | Former bamboo floor of I-steel roof beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611193744.5A CN106522439B (en) | 2016-12-21 | 2016-12-21 | Former bamboo floor of I-steel roof beam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106522439A true CN106522439A (en) | 2017-03-22 |
CN106522439B CN106522439B (en) | 2022-04-19 |
Family
ID=58340303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611193744.5A Active CN106522439B (en) | 2016-12-21 | 2016-12-21 | Former bamboo floor of I-steel roof beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522439B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003278300A (en) * | 2002-03-25 | 2003-10-02 | Sekisui Chem Co Ltd | Floor structure, floor panel and unit building |
KR20040043261A (en) * | 2002-11-18 | 2004-05-24 | 한국건설기술연구원 | Hollow Type I Beam Composite Deck and Constructing Method thereof |
CN101691785A (en) * | 2009-10-09 | 2010-04-07 | 李登满 | Bamboo structure house with open internal wall |
CN101949212A (en) * | 2010-09-29 | 2011-01-19 | 中冶建筑研究总院有限公司 | Slabform detachable support system and construction method thereof |
US20120011805A1 (en) * | 2010-03-19 | 2012-01-19 | Weihong Yang | Steel and wood composite structure with metal jacket wood studs and rods |
CN103866863A (en) * | 2014-01-22 | 2014-06-18 | 西安建筑科技大学 | Novel raw bamboo connecting structure of floor, wall, beam |
CN103938726A (en) * | 2014-01-22 | 2014-07-23 | 西安建筑科技大学 | Connecting structure of raw-bamboo floor, wall and beam |
CN204212392U (en) * | 2014-10-16 | 2015-03-18 | 中建三局第一建设工程有限责任公司 | I iron anchor system |
CN206319464U (en) * | 2016-12-21 | 2017-07-11 | 西安建筑科技大学 | A kind of steel I-beam raw bamboo floor |
-
2016
- 2016-12-21 CN CN201611193744.5A patent/CN106522439B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003278300A (en) * | 2002-03-25 | 2003-10-02 | Sekisui Chem Co Ltd | Floor structure, floor panel and unit building |
KR20040043261A (en) * | 2002-11-18 | 2004-05-24 | 한국건설기술연구원 | Hollow Type I Beam Composite Deck and Constructing Method thereof |
CN101691785A (en) * | 2009-10-09 | 2010-04-07 | 李登满 | Bamboo structure house with open internal wall |
US20120011805A1 (en) * | 2010-03-19 | 2012-01-19 | Weihong Yang | Steel and wood composite structure with metal jacket wood studs and rods |
CN101949212A (en) * | 2010-09-29 | 2011-01-19 | 中冶建筑研究总院有限公司 | Slabform detachable support system and construction method thereof |
CN103866863A (en) * | 2014-01-22 | 2014-06-18 | 西安建筑科技大学 | Novel raw bamboo connecting structure of floor, wall, beam |
CN103938726A (en) * | 2014-01-22 | 2014-07-23 | 西安建筑科技大学 | Connecting structure of raw-bamboo floor, wall and beam |
CN204212392U (en) * | 2014-10-16 | 2015-03-18 | 中建三局第一建设工程有限责任公司 | I iron anchor system |
CN206319464U (en) * | 2016-12-21 | 2017-07-11 | 西安建筑科技大学 | A kind of steel I-beam raw bamboo floor |
Also Published As
Publication number | Publication date |
---|---|
CN106522439B (en) | 2022-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Navyashree et al. | Use of flat slabs in multi-storey commercial building situated in high seismic zone | |
CN104831851A (en) | Reinforced concrete orthogonal-diagonal space lattice box structure and production method thereof | |
UA87668C2 (en) | Constructional panel and methods of building up of a substantially planar array of a plurality of individual panels | |
CN106193408A (en) | String props up unbonded prestressed concrete arch without beam | |
CN206319464U (en) | A kind of steel I-beam raw bamboo floor | |
CN106522439A (en) | I-steel beam type raw bamboo floor slab | |
CN204738452U (en) | Prefabricated stand | |
CN108412100A (en) | A kind of assembly sunk type floor and its connecting structure entirely | |
CN104389361A (en) | Damping filling wallboard for frame structure | |
CN204435601U (en) | A kind of damping filled-in panel for frame construction | |
CN203795589U (en) | Integrated house based on lightweight steel construction | |
CN106522471B (en) | A kind of lattice rod structure based on raw bamboo | |
CN106703195A (en) | Beam-column rigid connection structure based on bamboo frame | |
CN104631621A (en) | Saddle-shaped cable carrier single-layer latticed shell structure | |
CN104652680B (en) | Rope towing single-layered net shell structure | |
CN206319488U (en) | A kind of lattice rod structure based on raw bamboo | |
TWM608343U (en) | Pre-casting joint and beam column thereof | |
CN105971279A (en) | High-low-stride single-face formwork supporting system | |
CN207452681U (en) | A kind of connecting structure of Wavelike steel webplate and diaphragm | |
US20160258155A1 (en) | Storey ceiling construction and building made of wood | |
CN206800639U (en) | A kind of floor gap resistance to plucking attachment structure | |
CN202023261U (en) | Lower-chord panel point fastening device of cylindrical surface chord support structure | |
CN109441031A (en) | The open spiral stairs structure of the concealed overhanging type of structural beams and its construction method | |
CN107035043A (en) | A kind of square steel tube beam raw bamboo floor | |
Mills et al. | Ternary Shed: An Exemplar Design for Bamboo Construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |