Pre-casting joint and beam column thereof Download PDFInfo
- Publication number
- TWM608343U TWM608343U TW109211457U TW109211457U TWM608343U TW M608343 U TWM608343 U TW M608343U TW 109211457 U TW109211457 U TW 109211457U TW 109211457 U TW109211457 U TW 109211457U TW M608343 U TWM608343 U TW M608343U
- Authority
- TW
- Taiwan
- Prior art keywords
- section
- joint
- extension
- wing plate
- column structure
- Prior art date
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
本創作係涉及建築技術,尤指一種用於鋼筋鋼骨接合構造的預鑄接頭及其樑柱結構。This creation is related to construction technology, especially a type of joint and its beam-column structure used for the joint structure of steel bars and steel frames.
住家建物之耐震強度主要是由鋼筋混凝土牆版與柱樑的鋼筋結構所決定的,然而,現今常用的鋼筋混擬土(RC)結構,由於鋼筋結構會被混凝土所覆蓋,因此難以檢驗其耐震強度。由此可知,在實務上,消費者很難確保其所住的建物之安全耐震品質。The seismic strength of residential buildings is mainly determined by the reinforced concrete wall plate and column beam steel structure. However, the commonly used reinforced concrete (RC) structure nowadays is difficult to test its earthquake resistance because the reinforced concrete structure will be covered by concrete. strength. It can be seen from this that, in practice, it is difficult for consumers to ensure the safety and seismic quality of the buildings they live in.
再者,傳統的鋼筋混擬土結構性質較為剛硬且自重較重,當應用於高樓層的建築時,在載重層層累積的情況下,需要使用較粗的梁柱來支撐整體建築,不但不易施工更導致室內可利用的空間縮減,故通常僅用鋼筋混擬土結構的建築最蓋的樓層數不會超過30層。因此,為改善其缺點,現今係發展出適用於高樓層建築的鋼骨鋼筋混擬土(SRC)結構或是鋼骨(SC)結構,而在住宅用建築中,又以鋼骨鋼筋混擬土結構最為普及。In addition, the traditional reinforced concrete structure is relatively rigid and has a heavier weight. When applied to a high-rise building, when the load is accumulated in layers, thicker beams and columns are required to support the overall building, which is not easy to construct. It also leads to a reduction in the available indoor space, so the number of floors covered by a building usually only made of reinforced concrete structures will not exceed 30. Therefore, in order to improve its shortcomings, the department has developed steel-reinforced concrete (SRC) structures or steel-reinforced (SC) structures suitable for high-rise buildings. In residential buildings, steel-reinforced concrete (SRC) structures or steel-reinforced concrete (SC) structures have been developed. The soil structure is the most popular.
鋼骨鋼筋混擬土結構結合了鋼骨及鋼筋混擬土的結構形式,是在鋼骨的外層再另外配置鋼筋並灌漿形成保護層,因此同時具有兩種結構之特點,利用鋼骨可以不需加粗柱體就能夠使柱體的強度提高,而及鋼筋混擬土的結構特性可以減少純鋼骨結構建築受到側向力作用時形變過大的問題,能夠降低地震來時的搖晃程度。The steel-reinforced concrete structure combines the structural form of steel-reinforced concrete and steel-reinforced concrete. The outer layer of the steel-reinforced concrete is additionally equipped with steel bars and grouted to form a protective layer. Therefore, it has the characteristics of two structures at the same time. The need to thicken the column can increase the strength of the column, and the structural characteristics of reinforced concrete can reduce the problem of excessive deformation when the pure steel structure is subjected to lateral force, and can reduce the degree of shaking when an earthquake comes.
雖鋼骨鋼筋混擬土結構可有效改善鋼筋混擬土結構的問題,但在施工方面,卻是大大增加了材料、人工及施工時間上的成本。Although the steel-reinforced reinforced concrete structure can effectively improve the problems of the reinforced concrete structure, in terms of construction, it greatly increases the cost of materials, labor and construction time.
因此,現今技術上可改善傳統鋼筋混擬土結構的問題,又可解決鋼骨鋼筋混擬土結構在材料、人工及施工時間上增加成本的技術,進而改善先前技術所存在的問題。Therefore, the current technology can improve the problems of the traditional reinforced concrete structure, and can also solve the technology that increases the cost of materials, labor and construction time for the steel reinforced concrete structure, thereby improving the problems existing in the prior art.
本創作之目的在於提供一種預鑄接頭,其主要是利用一連接段、一第一延伸段及一第二延伸段,該連接段係包括有提供一主鋼筋穿透連接的複數個穿設部,該第一延伸段則是從該連接段之一第一端面向外延伸,以與一第一接合段連接,該第二延伸段則是從該連接段之一第二端面向外延伸,以與一第二接合段連接。藉此便於各樑柱結構之間的連接,且提供一種鋼筋混凝土(Reinforced Concrete,RC)、鋼骨鋼筋混凝土(Steel Reinforced Concrete,SRC)、鋼骨結構(steel structure,SS)之複合式樑柱結構。The purpose of this creation is to provide a joint, which mainly utilizes a connecting section, a first extension section and a second extension section. The connecting section includes a plurality of penetration parts that provide a main steel bar penetrating connection. , The first extension section extends outward from a first end surface of the connecting section to connect with a first joint section, and the second extension section extends outward from a second end surface of the connecting section, To connect with a second joint section. This facilitates the connection between the beam and column structures, and provides a composite beam and column of reinforced concrete (RC), steel reinforced concrete (SRC), and steel structure (SS) structure.
為達上揭之目的者,本創作係提供一種預鑄接頭,其係應用於一建築領域,包括:一連接段,其包括從該連接段之一面穿設至另一面的複數個穿設部,該些穿設部係個別與一主鋼筋穿透連接;一第一延伸段,其與該連接段之一第一端面相連接,以從該連接段之該第一端面向外延伸,該第一延伸段之一面上設有複數個第一定位體,該些第一定位體係與一第一接合段上的複數個第一固定部連接,以固定該第一接合段;以及一第二延伸段,其與該連接段之一第二端面相連接,以從該連接段之該第二端面向外延伸,該第二延伸段之一面上設有複數個第二定位體,該些第二定位體係與一第二接合段上的複數個第二固定部連接,以固定該第二接合段。In order to achieve the purpose of the above-mentioned, this creative department provides a kind of 預鑄 joint, which is applied to a construction field, including: a connecting section, which includes a plurality of penetration parts that penetrate from one side of the connecting section to the other side , The penetration portions are individually connected to a main reinforcing steel bar; a first extension section is connected with a first end surface of the connecting section so as to extend outward from the first end surface of the connecting section, the A plurality of first positioning bodies are provided on one surface of the first extension section, and the first positioning systems are connected with a plurality of first fixing portions on a first joint section to fix the first joint section; and a second The extension section is connected with a second end surface of the connecting section to extend outward from the second end surface of the connecting section. A plurality of second positioning bodies are provided on one surface of the second extension section. The two positioning systems are connected with a plurality of second fixing parts on a second joint section to fix the second joint section.
較佳地,該連接段係包括有:一第一翼板;一腹板,其一面係與該第一翼板的中段或中段相鄰處的位置相連接;及一第二翼板,其中段或中段相鄰處的位置係與該腹板的另面相連接,使得該腹板被夾設於該第一翼板及該第二翼板之間;其中,該些穿設部係從該第一翼板穿設至該第二翼板。Preferably, the connecting section includes: a first wing plate; a web plate, one surface of which is connected to the middle section of the first wing plate or a position adjacent to the middle section; and a second wing plate, wherein The adjacent position of the section or the middle section is connected with the other side of the web, so that the web is sandwiched between the first wing and the second wing; wherein, the penetration parts are from the The first wing plate penetrates to the second wing plate.
較佳地,該腹板係設有複數個腹孔,該些腹孔係個別與一箍筋穿透連接。Preferably, the web is provided with a plurality of abdominal holes, and the abdominal holes are individually penetratingly connected with a stirrup.
較佳地,該連接段進一步設有至少一貫穿部,其係依序從該第一翼板、該腹板穿透至該第二翼板,該貫穿部係與該主鋼筋穿透連接。Preferably, the connecting section is further provided with at least one through part, which penetrates from the first wing plate and the web to the second wing plate in sequence, and the through part is penetrated and connected with the main steel bar.
較佳地,該第一延伸段或該第二延伸段與該連接段的連接處設有一連接板,該連接板係與該第一延伸段與該連接段或是該第二延伸段與該連接段連接;其中,該些第一定位體與該第一接合段連接的位置或是該些第二定位體與該第二接合段連接的位置係相鄰於該連接板的設置位置。Preferably, a connecting plate is provided at the connection between the first extension section or the second extension section and the connecting section, and the connecting plate is connected to the first extension section and the connecting section or the second extension section and the connecting section. The connecting section is connected; wherein the positions where the first positioning bodies are connected with the first joint section or the positions where the second positioning bodies are connected with the second joint section are adjacent to the setting position of the connecting plate.
較佳地,所述之預鑄接頭進一步包括:一第三延伸段,其與該連接段之一第三端面相連接,以從該連接段之該第三端面向外延伸,該第三延伸段之一面上設有複數個第三定位體,該些第三定位體係與一第三接合段上的複數個第三固定部連接,以固定該第三接合段;及一第四延伸段,其與該連接段之一第四端面相連接,以從該連接段之該第四端面向外延伸,該第四延伸段之一面上設有複數個第四定位體,該些第四定位體係與一第四接合段上的複數個第四固定部連接,以固定該第四接合段。Preferably, the rim joint further includes: a third extension section connected to a third end surface of the connecting section so as to extend outward from the third end surface of the connecting section, the third extension A plurality of third positioning bodies are provided on one surface of the section, and the third positioning systems are connected with a plurality of third fixing parts on a third joint section to fix the third joint section; and a fourth extension section, It is connected with a fourth end surface of the connecting section so as to extend outward from the fourth end surface of the connecting section. A plurality of fourth positioning bodies are provided on one surface of the fourth extension section, and the fourth positioning systems It is connected with a plurality of fourth fixing parts on a fourth joint section to fix the fourth joint section.
本創作之另一目的在於提供一種預鑄接頭的樑柱結構,其主要是利用複數個主鋼筋間隔排列以形成框形的一樑柱結構,再由複數個箍筋固定該樑柱結構的框形結構後,一預鑄接頭則設於該樑柱結構上。以便於各樑柱結構之間的連接,且提供一種鋼筋混凝土、鋼骨鋼筋混凝土、鋼骨結構之複合式樑柱結構。Another purpose of this creation is to provide a beam-column structure of the 鑄鑄joint, which mainly uses a plurality of main steel bars arranged at intervals to form a frame-shaped beam-column structure, and a plurality of stirrups fix the frame of the beam-column structure. After forming the structure, a joint is placed on the beam-column structure. In order to facilitate the connection between the beam and column structures, and provide a composite beam and column structure of reinforced concrete, steel reinforced concrete, and steel frame.
為達上揭之另一目的者,本創作係提供一種預鑄接頭的樑柱結構,其係應用於一建築領域,包括:複數個主鋼筋,其個別規則或不規則的間隔排列以形成框形的一樑柱結構;複數個箍筋,該些箍筋間隔連接於該樑柱結構上,以固定該樑柱結構的框形結構;以及一預鑄接頭,其係設於該樑柱結構上,且該預鑄接頭係與部分之該些主鋼筋連接,該預鑄接頭包括:一連接段,其包括從該連接段之一面穿設至另一面的複數個穿設部,該些穿設部係個別與該主鋼筋穿透連接;一第一延伸段,其與該連接段之一第一端面相連接,以從該連接段之一端向外延伸;及一第二延伸段,其與該連接段之一第二端面相連接,以從該連接段之另一端向外延伸。In order to achieve another purpose of the above disclosure, this creation department provides a beam-column structure with 預鑄joint, which is applied to an architectural field, including: a plurality of main steel bars, which are individually arranged at regular or irregular intervals to form a frame A beam-column structure in the shape of a beam; a plurality of stirrups connected to the beam-column structure at intervals to fix the frame-shaped structure of the beam-column structure; and a joint, which is attached to the beam-column structure And the joint is connected with part of the main steel bars. The joint includes: a connecting section, which includes a plurality of penetration parts that penetrate from one side of the connecting section to the other side, and the piercing The set portion is individually connected to the main steel bar through penetration; a first extension section connected with a first end surface of the connecting section to extend outward from one end of the connecting section; and a second extension section, which It is connected with a second end surface of the connecting section to extend outward from the other end of the connecting section.
較佳地,所述之預鑄接頭的樑柱結構進一步包括:一第一接合段,其與該第一延伸段相連接,且該第一接合段的一端還延伸與另一該預鑄接頭上的該第一延伸段連接;及一第二接合段,其與該第二延伸段相連接,且該第二接合段的一端還延伸與另一該預鑄接頭上的該第二延伸段連接。Preferably, the beam-to-column structure of the 預鑄 joint further comprises: a first joint section which is connected to the first extension section, and one end of the first joint section also extends to another 預鑄 joint Connected to the first extension section; and a second joint section connected to the second extension section, and one end of the second joint section also extends with the second extension section on the other joint connection.
較佳地,該第一延伸段之一面上設有複數個第一定位體,該些第一定位體係與該第一接合段上的複數個第一固定部連接,以固定該第一接合段;該些第二定位體係與一第二接合段上的複數個第二固定部連接,以固定該第二接合段。Preferably, a plurality of first positioning bodies are provided on one surface of the first extension section, and the first positioning systems are connected with a plurality of first fixing portions on the first joint section to fix the first joint section ; The second positioning systems are connected with a plurality of second fixing portions on a second joint section to fix the second joint section.
較佳地,該連接段係包括有:一第一翼板;一腹板,其一面係與該第一翼板的中段或中段相鄰處的位置相連接;及一第二翼板,其中段或中段相鄰處的位置係與該腹板的另面相連接,使得該腹板被夾設於該第一翼板及該第二翼板之間;其中,該些穿設部係從該第一翼板穿設至該第二翼板。Preferably, the connecting section includes: a first wing plate; a web plate, one surface of which is connected to the middle section of the first wing plate or a position adjacent to the middle section; and a second wing plate, wherein The adjacent position of the section or the middle section is connected with the other side of the web, so that the web is sandwiched between the first wing and the second wing; wherein, the penetration parts are from the The first wing plate penetrates to the second wing plate.
較佳地,該腹板係設有複數個腹孔,該些腹孔係個別與該箍筋穿透連接。Preferably, the web is provided with a plurality of abdominal holes, and the abdominal holes are individually penetratingly connected with the stirrup.
為使本創作之上述目的、特徵和優點能更明顯易懂,下文茲配合各圖式所列舉之具體實施例詳加說明。In order to make the above-mentioned purpose, features and advantages of this creation more obvious and understandable, detailed descriptions are given below in conjunction with the specific embodiments listed in the drawings.
本創作之優點、特徵以及達到之技術方法將參照例示性實施例及所附圖式進行更詳細地描述而更容易理解,且本創作可以不同形式來實現,故不應被理解為其本創作僅限於此處所陳述的實施例,相反地,對所屬技術領域具有通常知識者而言,所提供的實施例將使本揭露更加透徹與全面且完整地傳達本創作的範疇,且本創作將僅為所附加的申請專利範圍所為定義。The advantages, features, and technical methods of this creation will be described in more detail with reference to the exemplary embodiments and the accompanying drawings to make it easier to understand, and this creation can be realized in different forms, so it should not be understood as the original creation It is limited to the embodiments stated here. On the contrary, for those with ordinary knowledge in the technical field, the provided embodiments will make this disclosure more thorough, comprehensive and complete to convey the scope of this creation, and this creation will only It is defined by the scope of the attached patent application.
使 貴審查委員方便瞭解本創作之內容,以及所能達成之功效,茲配合圖式列舉之各項具體實施例以詳細說明如下:To make it easier for your reviewer to understand the content of this creation and the effects that can be achieved, the specific embodiments listed in the diagram are described in detail as follows:
請參閱圖1至圖3,其係為本創作之第一實施例之預鑄接頭結構示意圖、預鑄接頭設置於樑柱結構內的結構示意圖、以及預鑄接頭設置於樑柱結構內的腹孔局部結構示意圖。如圖所示,本創作之預鑄接頭100主要是由一連接段10、一第一延伸段11以及一第二延伸段12所構成。該連接段10係為用於與樑柱結構200連接的該預鑄接頭100,因此,該預鑄接頭100係包括從該連接段10之一面穿設至另一面的複數個穿設部101,以藉由該些穿設部101個別與一主鋼筋20穿透連接,再者,該連接段10的形狀應不被限定,其無論是正方形、長方形甚至是圓形,皆應屬本創作所界定之該連接段10的範圍內。更具體來說,該連接段10本身因可由例如部分之鋼骨結構加工後所製成,因此,該連接段10係可包括有一第一翼板102、一腹板103及一第二翼板104,該第一翼板102係為位於頂部的鋼板,該第二翼板104則為位於底部的鋼板,而該腹板103則為位於該第一翼板102及該第二翼板104的鋼板,如此,該連接段10的剖面則會形成如H形狀的結構。Please refer to Figures 1 to 3, which are the first embodiment of the creation of the schematic diagram of the joint structure, the schematic diagram of the structure of the joint in the beam-column structure, and the diagram of the joint in the belly of the beam-column structure Schematic diagram of the local structure of the hole. As shown in the figure, the
而上述之該些穿設部101係具體為上下穿設的洞孔,在此實施例中若未設有一貫穿部105時,該些穿設部101係可代表為從該第一翼板102穿設至該第二翼板104或是依序從該第一翼板102、該腹板103穿透至該第二翼板104的洞孔,但當該連接段10上進一步設有至少一該貫穿部105時,為區分該穿設部101與該貫穿部105之間的區別,在此則可界定該穿設部101為從該第一翼板102穿設至該第二翼板104的洞孔,而該貫穿部105則為依序從該第一翼板102、該腹板103穿透至該第二翼板104的洞孔,使得該些主鋼筋20除了可經由從該第一翼板102穿設至該第二翼板104的方式連接該連接段10外,還可經由從該第一翼板102、該腹板103穿設至該第二翼板104的方式連接該連接段10。由於該腹板103可更進一步的固定該主鋼筋20,故本創作之該貫穿部105與該主鋼筋20連接的方式,係可提供該連接段10與該主鋼筋20之間更穩固的連接方式。The above-mentioned
該第一延伸段11具體亦可由部分之鋼骨結構加工後所製成,其係與該連接段10之一第一端面(即該連接段10的任一端面)相連接,以從該連接段10之該第一端面向外延伸,該第一延伸段11之一面上設有複數個第一定位體111,該些第一定位體111係與一第一接合段21上的複數個第一固定部211連接,以固定該第一接合段21。The
該第二延伸段12具體亦可由部分之鋼骨結構加工後所製成,其係與該連接段10之一第二端面(即除了該連接段10與該第一延伸段11連接的端面以外的其他端面)相連接,以從該連接段10之該第二端面向外延伸,該第二延伸段12之一面上設有複數個第二定位體121,該些第二定位體121係與一第二接合段22上的複數個第二固定部221連接,以固定該第二接合段22。The
而在該第一延伸段11與該連接段10的連接處或是該第二延伸段12與該連接段10的連接處之係設有一連接板30,該連接板30主要的目的在於加強二個構件之間的連接強度,又或是主要是利用該連接板30進行相關的連接動作,例如利用該連接板30放置於該第一延伸段11及該連接段10的連接處的上面,再用鋼釘或螺絲打入該第一延伸段11及該連接段10上,使得該連接板30被固定至該第一延伸段11及該連接段10的一面上外,藉以亦直接固定了該第一延伸段11及該連接段10,以使該第一延伸段11及該連接段10連接。A connecting
如圖2所示,當上述之該預鑄接頭100被設置於該樑柱結構200上時,由於該樑柱結構200係至少由複數個主鋼筋20及複數個箍筋23所構成,值得注意的是,由普遍習知的鋼筋混凝土來說,其除了主鋼筋20及箍筋23的設置外,應當還具有複數個繫筋24設置於該些主鋼筋上,但是,由於該些繫筋24的設置係為習知技術,且在本創作中的創作重點並未改變該些繫筋24的結構或其連接關係,故在此則省略該些繫筋24的說明。該些主鋼筋20係個別地由規則或不規則的間隔排列以形成框形的該樑柱結構200後,而該些箍筋23則是間隔(亦可為規則或不規則地)地連接於該樑柱結構200上,進而固定該樑柱結構200的框形結構。As shown in FIG. 2, when the above-mentioned joint 100 is installed on the beam-
如此,當該預鑄接頭100被設置在該樑柱結構200上時,為了設置橫樑或是進行各該樑柱結構200之間的連接,該預鑄接頭100通常可被設置於該樑柱結構200的中段或中段相鄰處的位置上,且當然的,在此係非限制該預鑄接頭100的設置位置,而僅需該預鑄接頭100被設置在該樑柱結構200上時,皆應屬本創作欲保護的專利範圍。該預鑄接頭100所包括的該連接段10則會藉由所包括有的該些穿設部101提供該些主鋼筋20穿透連接,更進一步地,為增強該連接段10與該樑柱結構200之間的連接強度,該連接段10的該腹板103上還可設有複數個腹孔1031(如圖3所示),以個別地與該樑柱結構200上的一該或該些箍筋23穿透連接,如此,當該連接段10與該樑柱結構200連接且位於該樑柱結構200內部時,與該連接段10連接的該第一延伸段11及該第二延伸段12則是從該樑柱結構200的內部位置向外延伸,即該第一延伸段11是從該樑柱結構200的一面向外延伸,而該第二延伸段12則是從與該第一延伸段11不同的該樑柱結構200的一面向外延伸。In this way, when the ray joint 100 is installed on the beam-
而該樑柱結構200除了該樑柱結構200本體外,還可包括用於接合另一該樑柱結構200、用於形成一橫樑、或是其他相關用途的該第一接合段21及該第二接合段22,該第一接合段21及該第二接合段22具體亦可由該些主鋼筋20、該些箍筋23甚至該些繫筋24所構成,然而,在此為區別接合段(21、22)與該樑柱結構200,故關於接合段描述主要是用根據其所設置的結構關係或連結關係進行說明。In addition to the beam-
該第一接合段21經由該些第一固定部211與該第一延伸段11上設有的該些第一定位體111相卡固,使得該第一接合段21可穩固的與該一延伸段11連接後,還可由該第一接合段22的一端(即非與該第一延伸段11連接的端面)延伸與另一該預鑄接頭100上的該第一延伸段11連接。該第二接合段22亦可透過該些第二固定部221與該第二延伸段12上設有的該些第二定位體121相卡固,使得該第二接合段22可穩固的與該一延伸段11連接後,再由該第二接合段22的一端(即非與該第二延伸段12連接的端面)延伸與另一該預鑄接頭100上的該第二延伸段12連接,而該些第一定位體121與該第一接合段21連接的位置或是該些第二定位體121與該第二接合段22連接的位置則是相鄰於該連接板30的設置位置,舉例來說,該第一接合段21是被設置以包覆於部分之該第一延伸段11,但並未包覆於該連接板30的設置位置上,因此,該第一接合段21僅是位於相鄰於該連接板30的位置上,使得該連接板30及位於該連接板30上的部分之該連接段30及該第一延伸段11皆是裸露在外(裸露在外的部分即形成鋼骨結構段(SS段))。藉以達成如上所述之用於接合另一該樑柱結構200、用於形成一橫樑、或是其他相關用途等功效。The first joining
因此,根據本創作之該預鑄接頭100及該樑柱結構200所形成的結構可知,位與該預鑄接頭100連接的該樑柱結構200之部分即可為鋼筋混凝土段(RC段),而該樑柱結構200、該第一或第二接合段(21、22)與該預鑄接頭100連接的部分則為鋼骨鋼筋混凝土段(SRC段),由未與該樑柱結構200、該第一或第二接合段(21、22)連接的部分(即該連接板30的部分)則是形成為鋼骨結構段(SS段)。藉此,本創作即可提供一種鋼筋混凝土、鋼骨鋼筋混凝土及鋼骨結構之複合式樑柱結構,進而改善傳統鋼筋混擬土結構的問題,又可解決鋼骨鋼筋混擬土結構在材料、人工及施工時間上增加成本。Therefore, according to the structure formed by the joint 100 and the beam-
請再參閱圖4及圖5,其係為本創作之第二實施例之預鑄接頭結構示意圖、以及預鑄接頭設置於樑柱結構內的結構示意圖。如圖所示,本創作之預鑄接頭除了可設有該第一延伸段11及該第二延伸段12之外,在此第二實施例中,該連接段10之一第三端面上(即除了該連接段10與該第一延伸段11及該第二延伸段12連接的端面以外的其他端面)亦可再與一第三延伸段13相連接,而該第三延伸段13係與上述之該第一延伸段11及該第二延伸段12相似或相同,故該第三延伸段13被連接至該連接段10時,亦是從該第三端面向外延伸(若該預鑄接頭100已被設置於該樑柱結構200內時,該第三延伸段13則可從與該第一延伸段11及該第二延伸段12不同的該樑柱結構200的一面向外延伸),且於該第三延伸段13之一面上設有複數個第三定位體131,以利用該些第三定位體131與一第三接合段25上的複數個第三固定部251連接,進而固定該第三接合段13。Please refer to FIG. 4 and FIG. 5 again, which are a schematic diagram of the structure of the screw joint of the second embodiment of the present creation, and a schematic diagram of the structure of the screw joint disposed in the beam-column structure. As shown in the figure, in addition to the
請再參閱圖5及圖6,其係為本創作之另一實施例的結構示意圖、以及再一實施例的結構示意圖。如圖所示,本創作之預鑄接頭100除了可設有該第一延伸段11、該第二延伸段12及該第三延伸段13之外,在此第三實施例中,該連接段14之一第四端面上(即除了該連接段10與該第一延伸段11、該第二延伸段12及該第三延伸段13連接的端面以外的其他端面)還可再與一第四延伸段14相連接,而該第四延伸段14係與上述之該第一延伸段11、該第二延伸段12及該第三延伸段13相似或相同,故該第四延伸段14被連接至該連接段10時,也是從該第四端面向外延伸(若該預鑄接頭100已被設置於該樑柱結構200內時,該第四延伸段14則可從與該第一延伸段11、該第二延伸段12及該第三延伸段13不同的該樑柱結構200的一面向外延伸),且該第四延伸段14之一面上亦是設有複數個第四定位體,以利用該些第四定位體141與一第四接合段26上的複數個第四固定部261連接,進而固定該第四接合段26。以此類推,本創作之該樑柱結構200或該預鑄接頭100係可設置有多個延伸段以對應連接多個接合體或其他相似物,進而便於建築者變化建築本身的造型。Please refer to FIGS. 5 and 6 again, which are a schematic structural diagram of another embodiment of the present creation and a schematic structural diagram of another embodiment. As shown in the figure, in addition to the
藉此,本創作即可便於各樑柱結構之間的連接,且提供一種鋼筋混凝土、鋼骨鋼筋混凝土及鋼骨結構之複合式樑柱結構。In this way, this creation can facilitate the connection between the beam-column structures and provide a composite beam-column structure of reinforced concrete, steel-reinforced concrete, and steel-frame structure.
惟,以上所述者,僅為本創作之最佳實施例,當不能以此限定本創作實施之範圍;故,凡依本創作申請專利範圍及新型說明書內容所做之簡單的等效變化與修飾,皆應仍屬本創作專利涵蓋之範圍內。However, the above are only the best embodiments of this creation, and should not be used to limit the scope of implementation of this creation; therefore, all simple equivalent changes and changes made in accordance with the scope of the patent application for this creation and the content of the new specification Modifications should still fall within the scope of this creation patent.
100:預鑄接頭 10:連接段 101:穿設部 102:第一翼板 103:腹板 1031:腹孔 104:第二翼板 105:貫穿部 11:第一延伸段 111:第一定位體 12:第二延伸段 121:第二定位體 13:第三延伸段 131:第三定位體 14:第四延伸段 141:第四定位體 200:樑柱結構 20:主鋼筋 21:第一接合段 211:第一固定部 22:第二接合段 221:第二固定部 23:箍筋 24:繫筋 25:第三接合段 251:第三固定部 26:第四接合段 261:第四固定部 30:連接板 100: 預鑄 joint 10: Connection section 101: Wearing Department 102: The first wing board 103: Web 1031: ventral hole 104: second wing board 105: Penetration 11: The first extension 111: first positioning body 12: Second extension 121: second positioning body 13: The third extension 131: Third positioning body 14: The fourth extension 141: The fourth positioning body 200: beam and column structure 20: Main reinforcement 21: The first joint 211: The first fixed part 22: The second joint section 221: second fixed part 23: Stirrups 24: tie the tendons 25: The third junction 251: third fixed part 26: fourth joint 261: The fourth fixed part 30: connecting plate
圖1係為本創作之第一實施例之預鑄接頭結構示意圖; 圖2係為本創作之第一實施例之預鑄接頭設置於樑柱結構內的結構示意圖; 圖3係為本創作之第一實施例之預鑄接頭設置於樑柱結構內的腹孔局部結構示意圖; 圖4係為本創作之第二實施例之預鑄接頭結構示意圖; 圖5係為本創作之第二實施例之預鑄接頭設置於樑柱結構內的結構示意圖; 圖6係為本創作之第三實施例之預鑄接頭結構示意圖; 圖7係為本創作之第三實施例之預鑄接頭設置於樑柱結構內的結構示意圖。 Fig. 1 is a schematic diagram of the structure of the joint of the first embodiment of this creation; Fig. 2 is a schematic diagram of the structure of the first embodiment of the creation in which the joints are arranged in the beam-column structure; Figure 3 is a schematic diagram of the partial structure of the web hole in the beam-column structure of the first embodiment of the creation; Figure 4 is a schematic diagram of the structure of the joint of the second embodiment of the creation; Fig. 5 is a schematic structural diagram of the second embodiment of the creation of the 預鑄 joint set in the beam-column structure; Fig. 6 is a schematic diagram of the structure of the joint of the third embodiment of the present creation; FIG. 7 is a schematic diagram of the structure of the third embodiment of the creation of the 預鑄 joint set in the beam-column structure.
100:預鑄接頭 100: 預鑄 joint
10:連接段 10: Connection section
101:穿設部 101: Wearing Department
102:第一翼板 102: The first wing board
103:腹板 103: Web
104:第二翼板 104: second wing board
105:貫穿部 105: Penetration
11:第一延伸段 11: The first extension
111:第一定位體 111: first positioning body
12:第二延伸段 12: Second extension
121:第二定位體 121: second positioning body
30:連接板 30: connecting plate
Claims (12)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US202063059346P | 2020-07-31 | 2020-07-31 | |
US63/059,346 | 2020-07-31 |
Publications (1)
Publication Number | Publication Date |
---|---|
TWM608343U true TWM608343U (en) | 2021-03-01 |
Family
ID=76036467
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW109129941A TWI758842B (en) | 2020-07-31 | 2020-09-01 | Pre-casting joint and beam column thereof |
TW109211457U TWM608343U (en) | 2020-07-31 | 2020-09-01 | Pre-casting joint and beam column thereof |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW109129941A TWI758842B (en) | 2020-07-31 | 2020-09-01 | Pre-casting joint and beam column thereof |
Country Status (1)
Country | Link |
---|---|
TW (2) | TWI758842B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI758842B (en) * | 2020-07-31 | 2022-03-21 | 銘榮元實業股份有限公司 | Pre-casting joint and beam column thereof |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW517741U (en) * | 2002-03-08 | 2003-01-11 | Runhorn Pretech Eng Co Ltd | Joint structure used in connecting reinforced concrete beam and column |
JP4376088B2 (en) * | 2003-02-28 | 2009-12-02 | 新日本製鐵株式会社 | Beam joint structure |
TWI758842B (en) * | 2020-07-31 | 2022-03-21 | 銘榮元實業股份有限公司 | Pre-casting joint and beam column thereof |
-
2020
- 2020-09-01 TW TW109129941A patent/TWI758842B/en active
- 2020-09-01 TW TW109211457U patent/TWM608343U/en unknown
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI758842B (en) * | 2020-07-31 | 2022-03-21 | 銘榮元實業股份有限公司 | Pre-casting joint and beam column thereof |
Also Published As
Publication number | Publication date |
---|---|
TWI758842B (en) | 2022-03-21 |
TW202206682A (en) | 2022-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10323402B1 (en) | Beam-column connection structure | |
US20210189726A1 (en) | Method of introducing prestress to beam-column joint of pc structure in triaxial compression | |
CN110805144A (en) | Full-assembly type high-rise/super high-rise concrete frame support structure system and construction method thereof | |
Cowie et al. | Seismic design of composite metal deck and concrete-filled diaphragms–A discussion paper | |
TWM608343U (en) | Pre-casting joint and beam column thereof | |
JP4614151B1 (en) | Wooden truss beam structure | |
Winter et al. | Development of prefabricated timber-steel-concrete ribbed decks | |
Motra et al. | Structural condition assessment and retrofitting of Shital Niwas building (presidential palace) | |
Chourasia et al. | Confined masonry construction for India | |
JP2002317498A (en) | Framework structure of multistory building | |
CN211006310U (en) | Stainless steel core plate truss composite beam | |
Paton-Cole et al. | Understanding the benefits of constructing a residential house with a heart of cold-formed steel | |
JP3787813B2 (en) | Large span structure building | |
JP2007224586A (en) | Composite structural building and method of constructing composite structural building | |
CN110468957A (en) | A kind of two-way open-web truss structure system in space and its construction method | |
JP4654674B2 (en) | How to install seismic reinforcement brackets for wooden buildings | |
CHAUBEY | Seismic evaluation of large span steel roof structures of industrial building using circular and rectangular steel pipes | |
JPH09264050A (en) | Building structure | |
RU2382154C1 (en) | Girderless ceiling | |
CN110805186B (en) | Assembled light floor connected node structure | |
JP3217718U (en) | Wooden structure | |
Degenkolb | Structural Observations of the Kern County Earthquake | |
JP2821546B2 (en) | Truss composite beam structure | |
JP2024031721A (en) | Crimp joint connector method for columns and beams in column-priority configuration of wooden building | |
Izzi et al. | Experimental tests on a hybrid timber-frame wall system |