CN107034789A - Abutment Back combination backfill construction method - Google Patents

Abutment Back combination backfill construction method Download PDF

Info

Publication number
CN107034789A
CN107034789A CN201710358010.6A CN201710358010A CN107034789A CN 107034789 A CN107034789 A CN 107034789A CN 201710358010 A CN201710358010 A CN 201710358010A CN 107034789 A CN107034789 A CN 107034789A
Authority
CN
China
Prior art keywords
backfill
soil
construction method
abutment
lightweight foam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710358010.6A
Other languages
Chinese (zh)
Other versions
CN107034789B (en
Inventor
黄祥国
朱红西
邱宏胜
王俊丰
于永龙
蔡大鹏
李天祥
徐平
覃明勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Municipal Construction Group Co Ltd
Original Assignee
Wuhan Municipal Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Municipal Construction Group Co Ltd filed Critical Wuhan Municipal Construction Group Co Ltd
Priority to CN201710358010.6A priority Critical patent/CN107034789B/en
Publication of CN107034789A publication Critical patent/CN107034789A/en
Application granted granted Critical
Publication of CN107034789B publication Critical patent/CN107034789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Abstract

The invention discloses a kind of Abutment Back combination backfill construction method, comprise the following steps:Platform is carried on the back to the region surrounded with retaining wall and uses good earthen backfill;The backfill that platform is carried on the back into the U-shaped region formed with retaining wall excavates and cleared up to form the step-like white space of inverted triangle;Backfilled in the step-like white space of inverted triangle using lightweight foam soil.Abutment Back combination backfill construction method proposed by the present invention, improves back filling behind abutment region construction quality, enhances backfill Regional carrying capacity, the occurrence of reducing jump car probability.

Description

Abutment Back combination backfill construction method
Technical field
The present invention relates to technical field of bridge construction, more particularly to a kind of Abutment Back combination backfill construction method.
Background technology
Due to the bridge platform back of the body within the specific limits, especially on the inside of platform parados, compacting operation face is narrow and small and can not use strong Press equipment so that be relatively inaccessible at regulation compaction requirement, the platform back of the body Subgrade Compaction Quality compared with open section of roadbed filling quality Compared with congenital to there is inferior position, load repeated action easily causes the Compression Settlement of roadbed at the platform back of the body after being open to traffic.Roadbed is carried on the back with platform simultaneously Joining place is tempered toughness with gentleness, and abutment is rigidity, and roadbed is flexibility, and two kinds of structures are also different to the bearing capacity and settling amount of substrate, will Aggravate differential settlement situation.
Back filling behind abutment always is the common fault of science of bridge building, and differential settlement will cause jump car phenomenon, and what influence was driven a vehicle relaxes Adaptive, the infringement on accelerating structure thing and road surface.
The content of the invention
It is a primary object of the present invention to provide a kind of Abutment Back combination backfill construction method, it is intended to improve back filling behind abutment Region construction quality, enhancing backfill Regional carrying capacity, reduces the occurrence of jumping car probability.
To achieve the above object, the present invention provides a kind of Abutment Back combination backfill construction method, comprises the following steps:
Platform is carried on the back to the region surrounded with retaining wall and uses good earthen backfill;
The backfill that platform is carried on the back into the U-shaped region formed with retaining wall excavates and cleared up to form the step-like white space of inverted triangle;
Backfilled in the step-like white space of inverted triangle using lightweight foam soil.
Preferably, the step of region that the platform back of the body and retaining wall are surrounded uses good earthen backfill specifically includes:
Cleaning substrate simultaneously carries out surveying and locating;
During using backfill earthen backfill, place Min layers soil and compaction in layers are carried out.
Preferably, during the earthen backfill using backfill, carry out place Min layers soil and the step of compaction in layers in, using often filling out one Layer, is compacted one layer, detects one layer, checks that frequency sets multiple check points for every layer per side, compactness is qualified after testing to fill again Next layer.
Preferably, to backfill carry out compaction in layers when, using vibrated roller carry out voltage stabilizing and it is low shake repeatedly after, pass through Road roller carries out static pressure until using the compacting of compacting equipment to prevent without obvious wheelmark, and for abutment and both sides retaining wall periphery Damage to periphery wall.
Preferably, the backfill that platform is carried on the back into the U-shaped region formed with retaining wall excavates and cleared up to form inverted triangle The step of step-like white space, specifically includes:
The backfill for carrying on the back the U-shaped region formed with retaining wall to platform using excavator is excavated, and is carried on the back until digging to retaining wall and platform Footing bottom, excavation region bottom width is 80-100cm, and white space side is retaining wall or abutment, and opposite side presses 1:1 puts Slope is to form inverted trapezoidal excavation face;
Slope inclined-plane is trimmed to step-like, the wide 30-50cm of every grade of step, high 30-50cm, so that it is step-like to form an inverted triangle Region.
Preferably, it is described the step of backfilled in the step-like white space of inverted triangle using lightweight foam soil in, adopt Lightweight foam soil is filled with hierarchical block mode, lift height is consistent with backfill shoulder height.
Preferably, it is described the step of backfilled in the step-like white space of inverted triangle using lightweight foam soil in, from Bottom is started at, in lightweight foam soil back filled region, is set layer of steel wire net every the first preset height, is set every the second preset height One of movement joint is put, the movement joint is using pitch deals and through whole Foam lightweight soil back filled region.
Preferably, using pump line conveying when pouring lightweight foam soil, and pump line discharging opening and surface of filling keep level with Reduce and uncured lightweight foam soil is disturbed.
Preferably, when lightweight foam soil is backfilled, the slamp value, cement mortar and light soil of lightweight foam soil are mixed and stirred Thing unit weight is detected and measured to adjust filling for lightweight foam soil in real time.
Preferably, when lightweight foam soil is backfilled, after the top layer for having poured lightweight foam soil, to pouring building body top-level list Face plastic covering film or geotextiles are conserved.
Abutment Back combination backfill construction method proposed by the present invention, the U-shaped region that the platform back of the body is formed with retaining wall Backfill is excavated and filled with lightweight foam soil, solves the problem of traditional construction compactness does not reach requirement, is reduced uneven Sedimentation, efficiently solves problem of bumping at bridge-head, improves driving comfort level.In addition, this Abutment Back combination backfill construction method Relative to the method all filled using lightweight foam soil, its cost can be substantially reduced.
Brief description of the drawings
Fig. 1 is the plan that Abutment Back of the present invention combines U-shaped region grooving in backfill construction method;
Fig. 2 is the sectional view that Abutment Back of the present invention combines U-shaped region grooving in backfill construction method;
Fig. 3 is the schematic flow sheet that Abutment Back of the present invention combines backfill construction method;
Fig. 4 is the refinement schematic flow sheet that Abutment Back of the present invention combines step S10 in backfill construction method;
Fig. 5 is the refinement schematic flow sheet that Abutment Back of the present invention combines step S20 in backfill construction method.
In figure, the 1- bridges platform back of the body, 2- retaining walls, the step-like U-lags of 3-, 4- backfills, 5- lightweight foam soils.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
Referring to figs. 1 to Fig. 3, in this preferred embodiment, a kind of Abutment Back combination backfill construction method, including following step Suddenly:
Step S10, platform is carried on the back the region surrounded with retaining wall and uses good earthen backfill;
Step S20, the backfill that platform is carried on the back into the U-shaped region formed with retaining wall excavates and cleared up to form the step-like sky of inverted triangle White region;
Step S30, is backfilled in the step-like white space of inverted triangle using lightweight foam soil.
Specifically, reference picture 4, step S10 is specifically included:
Step S101, clears up substrate and carries out surveying and locating;
When clearing up substrate, cleaning depth is controlled with earth-retaining footing of wall bottom, need to be changed and filled out if any overly moist situation.Put with total powerstation Go out center line and side slope line, and measure substrate away from the roadbed top surface discrepancy in elevation, mark is carried out every 10m.
Step S102, during using backfill earthen backfill, carries out place Min layers soil and compaction in layers.
Specific using often filling out one layer, one layer of compacting detects one layer, and it is per every layer of the side multiple check points of setting to check frequency (Per side in no less than three points, the present embodiment, check that frequency respectively examines three points per every layer of side left, center, right, U-shaped is referred to per side Three sides), compactness is qualified after testing to fill next layer again.So as to ensure that the intensity of each layer of backfill.Backfill is selected Internal friction angle is big, granule strength is higher 4% is choked dirt.When large area paving is banketed, paving fills out section length for 20m every time, and width is 6m, paving soil, which is layered, to be carried out, and every layer of paving soil thickness is 30cm, and after every layer of paving is native, empty wagons strikes off ground surface when returning, in favor of row Preliminary consolidation when sailing.
To backfill carry out compaction in layers when, using vibrated roller carry out voltage stabilizing and it is low shake repeatedly after, pass through road roller Static pressure is carried out until using the compacting of compacting equipment to prevent to periphery without obvious wheelmark, and for abutment and both sides retaining wall periphery The damage of wall.In the present embodiment, voltage stabilizing is first carried out using vibrated roller, it is then low to shake 2 times, finally with 18t road roller Static pressure is carried out, 1/3 wheel that staggers when rolling every time is wide, until without obvious wheelmark.Detect compactness, it is ensured that nucleus compactness is not Less than 96%.Have compacting using small rammer for abutment and both sides retaining wall periphery, and prevent the damage to periphery wall.
Good earthen backfill should carry out deflection testing after finishing.
Specifically, reference picture 5, step S20 is specifically included:
Step S201, the backfill for carrying on the back the U-shaped region formed with retaining wall to platform using excavator is excavated, and earth-retaining is arrived until digging Wall and platform back of the body footing bottom, excavation region bottom width is 80-100cm, and white space side is retaining wall or abutment, opposite side By 1:1 slope is to form inverted trapezoidal excavation face;
Mechanical equivalent of light excavation should reduce the disturbance to Core Soil, and excavation must not damage wall.
Step S202, slope inclined-plane is trimmed to step-like(Manual cleaning can be taken), the wide 30-50cm of every grade of step, height 30-50cm, so as to form an inverted triangle stepped regions.
In step S30, lightweight foam soil, lift height and backfill shoulder height one are filled using hierarchical block mode Cause.Lightweight foam soil backfill region side is wall, opposite side position Core Soil, it is therefore not necessary to set template.Using hierarchical block Mode fills lightweight foam soil, strengthens conscientiously refill quality, reduces backfill region differential settlement, reduces later stage disease Occur.
In step S30, started at from bottom, in lightweight foam soil back filled region, every the first preset height(Set in the present embodiment Put at interval of 2 meters)Layer of steel wire net is set, every the second preset height(Set in the present embodiment at interval of 20 meters)Set together Movement joint.Movement joint is using pitch deals and through whole Foam lightweight soil back filled region.
Further, conveyed when pouring lightweight foam soil using pump line, and the discharging opening of pump line keeps level with surface of filling To reduce to uncured lightweight foam soil disturbance.Conveyed when lightweight foam soil is poured using pump line, it may be achieved long distance delivery Pour.The discharging opening of pump line and surface of filling are kept into level, reduces and uncured lightweight foam soil is disturbed, make bubble froth breaking amount It is minimized, it is ensured that filled soils.
Further, when lightweight foam soil is backfilled, the slamp value, cement mortar and light soil of lightweight foam soil are mixed Detected and measured with thing unit weight to adjust filling for lightweight foam soil in real time.
In step S30, when lightweight foam soil is backfilled, after the top layer for having poured lightweight foam soil, to pouring building body top Layer surface plastic covering film or geotextiles are conserved(Curing time is no less than 7d, forbids upper people and machinery during maintenance).
Abutment Back combination backfill construction method proposed by the present invention, the U-shaped region that the platform back of the body is formed with retaining wall Backfill is excavated and filled with lightweight foam soil, solves the problem of traditional construction compactness does not reach requirement, is reduced uneven Sedimentation, efficiently solves problem of bumping at bridge-head, improves driving comfort level.In addition, this Abutment Back combination backfill construction method Relative to the method all filled using lightweight foam soil, its cost can also be substantially reduced.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure transformation that bright specification and accompanying drawing content are made, or other related technical fields are directly or indirectly used in, Similarly it is included within the scope of the present invention.

Claims (10)

1. a kind of Abutment Back combination backfill construction method, it is characterised in that comprise the following steps:
Platform is carried on the back to the region surrounded with retaining wall and uses good earthen backfill;
The backfill that platform is carried on the back into the U-shaped region formed with retaining wall excavates and cleared up to form the step-like white space of inverted triangle;
Backfilled in the step-like white space of inverted triangle using lightweight foam soil.
2. Abutment Back combination backfill construction method as claimed in claim 1, it is characterised in that described by the platform back of the body and retaining wall The step of region surrounded uses good earthen backfill specifically includes:
Cleaning substrate simultaneously carries out surveying and locating;
During using backfill earthen backfill, place Min layers soil and compaction in layers are carried out.
3. Abutment Back combination backfill construction method as claimed in claim 2, it is characterised in that described using backfill earthen backfill When, carry out in the step of place Min layers soil and compaction in layers, using often filling out one layer, be compacted one layer, detect one layer, check that frequency is every Every layer of side sets multiple check points, and compactness is qualified after testing to fill next layer again.
4. Abutment Back combination backfill construction method as claimed in claim 3, it is characterised in that layering pressure is carried out to backfill In real time, using vibrated roller carry out voltage stabilizing and it is low shake repeatedly after, static pressure is carried out by road roller until without obvious wheelmark, and right The compacting of compacting equipment is used to prevent the damage to periphery wall in abutment and both sides retaining wall periphery.
5. Abutment Back combination backfill construction method as claimed in claim 1, it is characterised in that described by the platform back of the body and retaining wall The backfill in the U-shaped region formed, which is excavated and clears up the step of forming inverted triangle step-like white space, to be specifically included:
The backfill for carrying on the back the U-shaped region formed with retaining wall to platform using excavator is excavated, and is carried on the back until digging to retaining wall and platform Footing bottom, excavation region bottom width is 80-100cm, and white space side is retaining wall or abutment, and opposite side presses 1:1 puts Slope is to form inverted trapezoidal excavation face;
Slope inclined-plane is trimmed to step-like, the wide 30-50cm of every grade of step, high 30-50cm, so that it is step-like to form an inverted triangle Region.
6. Abutment Back combination backfill construction method as claimed in claim 1, it is characterised in that described step-like in inverted triangle In the step of being backfilled in white space using lightweight foam soil, lightweight foam soil is filled using hierarchical block mode, is layered Thickness is consistent with backfill shoulder height.
7. Abutment Back combination backfill construction method as claimed in claim 1, it is characterised in that described step-like in inverted triangle In the step of being backfilled in white space using lightweight foam soil, started at from bottom, in lightweight foam soil back filled region, Mei Ge One preset height sets layer of steel wire net, and one of movement joint is set every the second preset height, and the movement joint uses pitch China fir Plate and through whole Foam lightweight soil back filled region.
8. Abutment Back combination backfill construction method as claimed in claim 1, it is characterised in that adopted when pouring lightweight foam soil Conveyed with pump line, and the discharging opening of pump line is disturbed with surface of filling holding level with reducing to uncured lightweight foam soil.
9. Abutment Back combination backfill construction method as claimed in claim 1, it is characterised in that returned in lightweight foam soil When filling out, the slamp value of lightweight foam soil, cement mortar and light soil mix unit weight are detected and measured with to light foam Filling for soil is adjusted in real time.
10. Abutment Back combination backfill construction method as in one of claimed in any of claims 1 to 9, it is characterised in that light When matter foam soil is backfilled, after the top layer for having poured lightweight foam soil, to pouring building body topsheet surface plastic covering film or soil Work cloth is conserved.
CN201710358010.6A 2017-05-19 2017-05-19 Abutment Back combination backfill construction method Active CN107034789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710358010.6A CN107034789B (en) 2017-05-19 2017-05-19 Abutment Back combination backfill construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710358010.6A CN107034789B (en) 2017-05-19 2017-05-19 Abutment Back combination backfill construction method

Publications (2)

Publication Number Publication Date
CN107034789A true CN107034789A (en) 2017-08-11
CN107034789B CN107034789B (en) 2019-08-23

Family

ID=59538836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710358010.6A Active CN107034789B (en) 2017-05-19 2017-05-19 Abutment Back combination backfill construction method

Country Status (1)

Country Link
CN (1) CN107034789B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108863194A (en) * 2018-08-14 2018-11-23 中国十七冶集团有限公司 A kind of backfilling materials behind abutments liquid cinder and its construction method
CN109930476A (en) * 2019-03-01 2019-06-25 刘鹏 A kind of method that abutment subgrade construction is filled using bubble lightweight material in subway top
CN110158481A (en) * 2019-06-20 2019-08-23 中国五冶集团有限公司 A kind of method and structure of back filling behind abutment construction
CN114439018A (en) * 2022-02-23 2022-05-06 中交二公局萌兴工程有限公司 Bridge and culvert abutment hanging plate support type foam light soil backfill construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669291A (en) * 2013-12-06 2014-03-26 浙江水利水电学院 Method for constructing slope through connected slope bricks
CN103912001A (en) * 2014-04-01 2014-07-09 中铁六局集团有限公司 Roadbed piping trench backfill soil 'hierarchal overlapping' construction method
CN104912097A (en) * 2015-06-08 2015-09-16 四川睿铁科技有限责任公司 Novel retaining wall reverse-filtering drainage system and construction method
CN105000845A (en) * 2015-06-29 2015-10-28 河南华泰建材开发有限公司 Light foamed soil for abutment back backfilling and construction method
CN205223869U (en) * 2015-12-18 2016-05-11 江苏兆通工程技术有限公司 Structural layer of abutment platform back of body

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669291A (en) * 2013-12-06 2014-03-26 浙江水利水电学院 Method for constructing slope through connected slope bricks
CN103912001A (en) * 2014-04-01 2014-07-09 中铁六局集团有限公司 Roadbed piping trench backfill soil 'hierarchal overlapping' construction method
CN104912097A (en) * 2015-06-08 2015-09-16 四川睿铁科技有限责任公司 Novel retaining wall reverse-filtering drainage system and construction method
CN105000845A (en) * 2015-06-29 2015-10-28 河南华泰建材开发有限公司 Light foamed soil for abutment back backfilling and construction method
CN205223869U (en) * 2015-12-18 2016-05-11 江苏兆通工程技术有限公司 Structural layer of abutment platform back of body

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108863194A (en) * 2018-08-14 2018-11-23 中国十七冶集团有限公司 A kind of backfilling materials behind abutments liquid cinder and its construction method
CN109930476A (en) * 2019-03-01 2019-06-25 刘鹏 A kind of method that abutment subgrade construction is filled using bubble lightweight material in subway top
CN110158481A (en) * 2019-06-20 2019-08-23 中国五冶集团有限公司 A kind of method and structure of back filling behind abutment construction
CN114439018A (en) * 2022-02-23 2022-05-06 中交二公局萌兴工程有限公司 Bridge and culvert abutment hanging plate support type foam light soil backfill construction method

Also Published As

Publication number Publication date
CN107034789B (en) 2019-08-23

Similar Documents

Publication Publication Date Title
CN204401447U (en) A kind of structure preventing bumping at bridge-head
CN107034789B (en) Abutment Back combination backfill construction method
CN203174453U (en) Light-mass embankment structure for managing bump at bridge head
CN103614961B (en) Stepped reinforced concrete slab capable of preventing abutment vehicle skips and construction method
CN106192646B (en) Vcehicular tunnel car-driving shock-absorbing denoising structure and its construction method
CN102359046A (en) High fill subgrade connection method
CN102561132B (en) Plate supporting type embankment structure for post-construction settlement controlling of deep soft soil foundation on high-grade highway
CN101591880B (en) Variable rigidity treatment system for vehicle jumping at bridge head of highway
CN105113386A (en) Stage back suitable for preventing bridgehead bump on high filling subgrade
CN109853381A (en) A kind of transition structure and its construction method preventing and treating bumping at bridge-head
CN109914173A (en) Foam lightweight soil pours platform back structure and its construction method in Expressway Extension Project
CN107724189A (en) A kind of box road structure of railway engineering thin-walled
CN100436713C (en) Water-utilization vibration construction method and device
CN103572679B (en) A kind of embankment structure and dam filling construction reducing bumping at bridge-head incidence
CN105220620A (en) The bumping at bridge-head processing method of darker mud soft soil foundation after platform
CN104818658B (en) Road widening method for collapsible yellow earth foundation layer
CN106192652A (en) A kind of high steep embankment ruggedized construction preventing differential settlement
CN210507403U (en) Construction structure of soft foundation treatment transition section of plastic drainage plate and CFG pile
CN110804939A (en) Reinforced structure of abutment jump car
CN106284283A (en) A kind for the treatment of of soft foundation is changed and is filled out natural soft-clay control debulking methods
CN110792010A (en) Roadbed reinforcing structure for preventing vehicle bump at bridge head and construction method thereof
CN212742020U (en) Transition section structure of overhead pile plate structure and embankment
CN112681022B (en) Construction method for roadbed structure with existing operation railway side width and elevated track
CN211113188U (en) Structure of back of a platform construction of backfilling
CN102979031B (en) A kind of processing method of vehicle jumping at bridge head of highway and process structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant