CN210507403U CN201921075349.6U CN201921075349U CN210507403U CN 210507403 U CN210507403 U CN 210507403U CN 201921075349 U CN201921075349 U CN 201921075349U CN 210507403 U CN210507403 U CN 210507403U
Authority
CN
China
Prior art keywords
soil body
soil
construction
drainage plate
cfg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921075349.6U
Other languages
Chinese (zh)
Inventor
王永亮
冯君
肖朝乾
张晓英
孙文彬
张勇
杜守宁
席茂
苟吉虎
赵杰
朱玺
贾生平
何宇航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju 1st Engineering Co Ltd
Original Assignee
China Railway Erju 1st Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju 1st Engineering Co Ltd filed Critical China Railway Erju 1st Engineering Co Ltd
Priority to CN201921075349.6U priority Critical patent/CN210507403U/en
Application granted granted Critical
Publication of CN210507403U publication Critical patent/CN210507403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a construction structures of changeover portion is handled with soft base of CFG stake is beaten in the soil layer and is established completion plastics drain bar and CFG stake back, adopts the mode of filling in grades to fill the soil body of two kind at least heights in transition region top, keeps certain pre-compaction time after filling the completion, unloads the overload soil body after the foundation soil body reaches consolidation degree and the intensity that satisfies the requirement, then carries out the construction of road bed and road surface structure layer again. So as to reduce or even eliminate differential settlement between the two processing modes, thereby ensuring the safety of road operation. Belongs to the field of soft foundation construction of roadbed engineering.

Description

Construction structure of soft foundation treatment transition section of plastic drainage plate and CFG pile
Technical Field
The utility model relates to a construction structures of changeover portion is handled with soft base of CFG stake to plastics drain bar belongs to road bed engineering field.
Background
In China, the soft soil is widely distributed and is distributed in inland areas, coastal areas, plain areas and the like. Because the soft soil has the characteristics of high water content, low bearing capacity and the like, the phenomena of insufficient bearing capacity, large post-construction settlement and the like often occur when a project is built on the soft soil ground, and the soft soil needs to be reinforced when the soil layer is a soft soil layer. In actual engineering treatment, due to the limitation of conditions such as soil layer properties, geological landforms, construction period and the like, two or more foundation treatment methods are often adopted to jointly reinforce a soft foundation, a common treatment method is to drive plastic drainage plates or CFG piles into the soil layer, and at the moment, the rigidity difference of the composite foundation formed after treatment is large, so that large differential settlement can occur during construction and after completion. If the embankment is constructed directly on the transition area of the two reinforcement modes without treatment, the driving safety is possibly endangered. In engineering, an overload preloading method is commonly used for processing, and during processing, the two sides of the transition section are symmetrically piled, but the processing mode does not fully consider the rigidity difference between the two composite foundations, and the transition section can generate large differential settlement during construction and after completion. Therefore, it is necessary to provide a reasonable treatment method for the characteristics of the two reinforcement modes to reduce the settlement of the two reinforcement modes during construction and the settlement after construction.
Disclosure of Invention
The utility model provides a construction structures of changeover portion is handled with soft base of CFG stake to reduce or even eliminate the difference between two kinds of processing methods and subside, thereby guarantee the security of road operation.
In order to solve the problems, the construction structure for the transition section of the plastic drainage plate and the CFG pile soft foundation treatment is planned to be adopted, and comprises a first soil body and a second soil body, wherein the first soil body and the second soil body are filled above the transition section of the plastic drainage plate reinforcing area and the transition section of the CFG pile reinforcing area, the first soil body is filled right above the plastic drainage plate reinforcing area, the second soil body is filled right above the CFG pile reinforcing area, and the height of the first soil body is three to five times that of the second soil body.
In the construction structure, the first soil body and the second soil body are of an integrated structure, the height of the first soil body is four times that of the second soil body, and the widths of the first soil body and the second soil body above the plastic drainage plate reinforcing area and the CFG pile reinforcing area are the same.
Compared with the prior art, the method of the utility model can discharge the pore water in the soft soil through pre-pressing for a certain time, so that the soft soil is consolidated and completed before the roadbed is constructed, the strength of the soft soil foundation is improved, the settlement after construction is reduced or even eliminated, and the safety of road operation is ensured; meanwhile, the method considers that the rigidity of the composite foundation of the plastic drainage plate reinforcing area is smaller than that of the composite foundation of the CFG pile reinforcing area, and adopts an asymmetric pre-pressing mode, so that the rigidity difference between transition sections can be better reduced, the settlement difference during construction and after construction is reduced, and the normal use requirement of a road is met.
Drawings
Fig. 1 is a schematic sectional structure of the present invention.
Detailed Description
To further clarify the objects, technical solutions and advantages of the present invention, a more particular description of the invention will be rendered by reference to the appended drawings, which are illustrated in the appended drawings.
Examples
Referring to fig. 1, the present embodiment provides a construction structure of a transition section is handled with soft base of CFG pile, including first soil mass 1 and second soil mass 2, first soil mass 1 and second soil mass 2 formula structure as an organic whole, first soil mass 1 and second soil mass 2 are all filled in the top of plastic drainage plate reinforced area 3 and CFG pile reinforced area 4 transition section, and first soil mass 1 is filled in directly over plastic drainage plate reinforced area 3, second soil mass 2 is filled in directly over CFG pile reinforced area 4, the height of first soil mass 1 is four times the height of second soil mass 2, the width of first soil mass 1 and second soil mass 2 is the same in plastic drainage plate reinforced area 3 and CFG pile reinforced area 4 top.
The construction method comprises the following steps: after the plastic drainage plates and the CFG piles are arranged in the soil layer, soil bodies with two heights are filled above the transition area in a graded filling mode, a certain prepressing time is kept after filling is finished, the overload soil body is removed after the foundation soil body reaches the consolidation degree and the strength meeting the requirements, then the construction of a roadbed and a pavement structure layer is carried out, the overload prepressing soil body is consistent with the roadbed body filler, the slope ratio of the side slopes on the two sides of the prepressing soil body is 1:1.5, 4 percent herringbone slopes are transversely arranged at the top outwards, the width b and the height h of the loading soil body are1Determined by the overload ratio and the design usage load,the overload ratio is 1.4-1.6, soil bodies with two heights are filled above the transition area in a graded filling mode, and the soil bodies with the two heights are filled right above the plastic drainage plate reinforcing area 3 and the CFG pile reinforcing area 4 respectively.
The method mainly comprises the following steps:
1) according to design requirements, obtaining a designed using load and an overload ratio, and determining the weight of the stacked soil body;
2) calculating the width and height of the stacked soil body according to the weight of the stacked soil body;
3) after the construction of the plastic drainage plate and the CFG pile is completed, soil mass is filled in a grading manner, soil is piled while the soil is flattened during filling, and the top surface is kept flat;
4) after the stacking is finished, the preloading is kept, the overloaded soil body is unloaded after the consolidation degree of the soil body meets the requirement, and then the construction of the pavement is carried out.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (2)

1. The utility model provides a construction structures of changeover portion is handled with soft base of CFG stake to plastics drain bar, its characterized in that: including first soil body (1) and second soil body (2), first soil body (1) and second soil body (2) are all filled in the top of plastics drain bar reinforced area (3) and CFG stake reinforced area (4) changeover portion, and just first soil body (1) is filled directly over plastics drain bar reinforced area (3), and second soil body (2) is filled directly over CFG stake reinforced area (4), and the height of first soil body (1) is three to five times the height of second soil body (2).
2. The construction structure of the transition section for soft foundation treatment of the plastic drainage plate and the CFG pile according to claim 1, wherein: the first soil body (1) and the second soil body (2) are of an integrated structure, the height of the first soil body (1) is four times that of the second soil body (2), and the widths of the first soil body (1) and the second soil body (2) above the plastic drainage plate reinforcing area (3) and the CFG pile reinforcing area (4) are the same.
CN201921075349.6U 2019-07-10 2019-07-10 Construction structure of soft foundation treatment transition section of plastic drainage plate and CFG pile Active CN210507403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921075349.6U CN210507403U (en) 2019-07-10 2019-07-10 Construction structure of soft foundation treatment transition section of plastic drainage plate and CFG pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921075349.6U CN210507403U (en) 2019-07-10 2019-07-10 Construction structure of soft foundation treatment transition section of plastic drainage plate and CFG pile

Publications (1)

Publication Number Publication Date
CN210507403U true CN210507403U (en) 2020-05-12

Family

ID=70582133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921075349.6U Active CN210507403U (en) 2019-07-10 2019-07-10 Construction structure of soft foundation treatment transition section of plastic drainage plate and CFG pile

Country Status (1)

Country Link
CN (1) CN210507403U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185022A (en) * 2019-07-10 2019-08-30 中铁二局第一工程有限公司 A kind of constructing structure and method of plastic draining board and CFG treatment of soft foundation changeover portions
CN111501722A (en) * 2020-05-21 2020-08-07 中铁工程设计咨询集团有限公司 Vacuum preloading and CFG (cement fly-ash gravel) long and short combined pile foundation treatment method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185022A (en) * 2019-07-10 2019-08-30 中铁二局第一工程有限公司 A kind of constructing structure and method of plastic draining board and CFG treatment of soft foundation changeover portions
CN111501722A (en) * 2020-05-21 2020-08-07 中铁工程设计咨询集团有限公司 Vacuum preloading and CFG (cement fly-ash gravel) long and short combined pile foundation treatment method
CN111501722B (en) * 2020-05-21 2022-06-03 中铁工程设计咨询集团有限公司 Vacuum preloading and CFG (cement fly-ash gravel) long and short combined pile foundation treatment method

Similar Documents

Publication Publication Date Title
CN101368383B (en) Method for treating soft soil roadbed by artificial composite crust layer
CN203795465U (en) Counterfort retaining wall structure suitable for deep and yielding ground foundation
CN203174453U (en) Light-mass embankment structure for managing bump at bridge head
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN210507403U (en) Construction structure of soft foundation treatment transition section of plastic drainage plate and CFG pile
CN107034789B (en) Abutment Back combination backfill construction method
CN110185022A (en) A kind of constructing structure and method of plastic draining board and CFG treatment of soft foundation changeover portions
CN111090829B (en) Method for determining settlement after slant reinforcement of roadbed by grouting spiral steel pile on existing railway line
CN210238180U (en) Soft roadbed processing device with unit type gravel pile composite foundation combined with overload prepressing
CN201254728Y (en) Pile and earthwork cellular chamber composite foundation
CN110952388B (en) Design method of high-speed railway wide-roadbed compacted pile combined pile-network foundation structure
CN203795260U (en) New roadbed and old roadbed combined road structure
CN215906482U (en) High embankment highway structure in deep soft soil layer
CN212128697U (en) Soft soil roadbed structure of pin-connected panel binge grid structure body
CN213389548U (en) Settlement-preventing roadbed for deep soft soil high fill
CN212506207U (en) Soft soil foundation reinforcing structure combining moso bamboo reinforced sand stone piles and moso bamboo reinforced sand cushion layer
CN205775811U (en) A kind of structure being applied to abutment roadbed
CN212611699U (en) Be used for high-speed railway reinforced structure, road bed subassembly and road bed system
CN113073639A (en) Stepped loess foundation reinforcing method and built variable-rigidity combined pile composite foundation
CN210481896U (en) Cutting tooth rail railway enhancement mode railway roadbed structure
CN108193574B (en) Structure for filling anti-seismic roadbed by utilizing uneven layering of sand filling roadbed
CN207017092U (en) A kind of high-speed railway transition segment structure
CN113481966A (en) Soft soil foundation drainage consolidation structure and method
CN208685585U (en) A kind of storage terrace settlement Control system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant