CN107010575A - A kind of fast-assembling cage and its making and application - Google Patents
A kind of fast-assembling cage and its making and application Download PDFInfo
- Publication number
- CN107010575A CN107010575A CN201610057496.5A CN201610057496A CN107010575A CN 107010575 A CN107010575 A CN 107010575A CN 201610057496 A CN201610057496 A CN 201610057496A CN 107010575 A CN107010575 A CN 107010575A
- Authority
- CN
- China
- Prior art keywords
- fast
- cage
- shroud
- suspension ring
- assembling cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F13/00—Common constructional features or accessories
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
A kind of fast-assembling cage, including shroud and shroud base and two pressure pins, it is characterised in that:Described to shroud the frame structure surrounded for each side wall of surrounding, the base that shrouds is provided with bottom plate(4), two pressure pins(6)For length 1100mm φ 60*4mm steel pipe, wherein:Fast-assembling cage is in a state of use:Shroud to cover on and shroud on base, two pressure pins(6)The suspension ring of the corresponding two piece side wall lower ends of base bottom are shrouded in insertion respectively(3)It is interior.The fast-assembling cage of the present invention and its making and application have fast-assembling cage device simple in construction, easy to make, fast-assembling cage is safe and reliable, handling article is quick, safe, fast-assembling cage alternately loads and unloads article in high-altitude and ground, eliminate the off time of wait, efficiency can be greatly improved, the advantage of engineering cost is reduced.
Description
Technical field
It is a kind of fast-assembling cage and its making and application specifically the present invention relates to the cage that a kind of construction is used for loading.
Background technology
Often there is article fragmentary, in bulk to need to be transported to high-altitude in construction, not only slowly but also be inconvenient to operate with conventional hanging method.
Chinese patent CN104098019A disclosed a kind of construction loading cage on October 15th, 2014, the cage body surrounded including each side wall of surrounding, fixed or hook lifting rope on the upside of cage body, the cage bottom plate of lower end, two each sides of the cage body phase pair are engaged by rotating shaft with rotating cylinder to be movably arranged on another lateral wall.Although the cross bar of the movable side wall lower end of cage body and the vertical pole of bottom plate both sides, which coordinate, no longer needs locking mechanism, but its rotating shaft is engaged with rotating cylinder and still to lean on cumbersome mechanism to be aligned to gather effect, wherein the making of rotating shaft and rotating cylinder requires high, seeming on busy construction site wastes time and energy, and lifting safety is poor.
Chinese patent CN201321717 disclosed construction loading cage on October 7th, 2009, the cage body surrounded including each side wall of surrounding, fixed or hook lifting rope on the upside of cage body, the cage bottom plate of lower end, the two side upper end of the cage body phase pair is fixed together by both sides shaft parallel, the upper side edge of other two side is fixed with rotating cylinder and movable installation is engaged with rotating shaft, " L " type connecting lever is at least respectively fixed with below the inner side horizontal line of the rotating cylinder, and be fixed with its end and hang circle, clamping body is provided between movable side wall and adjacent fixed sidewall, and it is provided with inside reinforcement flange in movable side wall lower end.Its structure provided with clamping body between movable side wall and adjacent fixed sidewall using realizing that side wall interlocks with bottom plate, but this structure equally exists that rotating shaft manufacturing cost is high, and also seeming on busy construction site wastes time and energy, and lifting safety is poor.
Therefore known construction with loading cage be all using two offsides fix with the cage structure of two offsides activity there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, is the fast-assembling cage for proposing that a kind of fixed frame posture is safe and reliable.
It is another object of the present invention to propose a kind of preparation method of the safe and reliable fast-assembling cage of fixed frame posture.
A further object of the present invention, is to propose a kind of application of the safe and reliable fast-assembling cage of fixed frame posture in fragmentary, the in bulk article handling of construction.
To achieve the above object, technical solution of the invention is:
A kind of fast-assembling cage, including shroud and shroud base and two pressure pins, it is characterised in that:
It is described to shroud the frame structure surrounded for each side wall of surrounding, rectangular frame is welded into by long 1000mm vertical rods and width 800mm cross bars admittedly per side wall, some vertical rods are welded in rectangular frame admittedly in parallel;Two suspension ring are respectively set in the top and bottom of the cross bar of the wherein corresponding two piece side wall of frame structure, and suspension ring protrude cross bar 100mm, and suspension ring are in long circular arc, a diameter of 80mm of its circular portion;
The base that shrouds is provided with bottom plate, and base plate size is that 3 support beams are fixed below 790*790mm, bottom plate, and 3 support beams two ends and centre arranged in parallel below bottom plate, support beam size is 790*100*100mm;
Two pressure pins are length 1100mm φ 60*4mm steel pipe;
Wherein:Fast-assembling cage is in a state of use:Shroud to cover on and shroud on base, two pressure pins are inserted in the suspension ring for the corresponding two piece side wall lower ends for shrouding base bottom respectively.
The fast-assembling cage of the present invention can also be further achieved by the following technical measures.
Foregoing fast-assembling cage, wherein the vertical rod material is steel pipe.
Foregoing fast-assembling cage, wherein the vertical rod material is reinforcing bar.
Foregoing fast-assembling cage, wherein the cross bar material is steel pipe.
Foregoing fast-assembling cage, wherein the cross bar material is reinforcing bar.
Foregoing fast-assembling cage, wherein the spacing of each vertical rod is 100mm.
A kind of preparation method of fast-assembling cage, it is characterised in that comprise the following steps:
A, making are shrouded, and do vertical rod and cross bar with φ 20mm reinforcing bars, suspension ring are made with φ 30mm reinforcing bar cold bendings;Suspension ring are in long circular arc, and a diameter of 80mm of suspension ring rounded portions, suspension ring protrude cross bar 100mm;Vertical rod, cross bar, the whole firm weldings of suspension ring pad;The long 1000mm of vertical rod, the wide 800mm of cross bar;
B, it is spliced into bottom plate with 40*100mm flitch, base plate size is that 3 support beams are fixed below 790*790mm, bottom plate, and support beam is 100*100mm flitch, and support beam flitch installation direction is vertical with bottom plate splicing seams;
C, 2 pressure pins of steel pipe manufacturing with φ 60*4mm, length are respectively 1100mm;
Wherein:Fast-assembling cage is in a state of use:Shroud to cover on and shroud on base, two pressure pins are inserted in the suspension ring for the corresponding two piece side wall lower ends for shrouding base bottom respectively.
The preparation method of the fast-assembling cage of the present invention can also be further achieved by the following technical measures.
Foregoing method, wherein the material of the vertical rod and cross bar is steel pipe.
A kind of application of fast-assembling cage as claimed in claim 1 in fragmentary, the in bulk article handling of construction.
After adopting the above technical scheme, the fast-assembling cage of the present invention and its making and application have advantages below:
1st, fast-assembling cage device is simple in construction, easy to make;
2nd, fast-assembling cage is safe and reliable, it is quick, safe to load and unload article;
3rd, fast-assembling cage alternately loads and unloads article in high-altitude and ground, eliminates the off time of wait, and efficiency can be greatly improved, and reduces engineering cost.
Brief description of the drawings
Fig. 1 is the side wall construction schematic diagram with suspension ring in the fast-assembling cage of the embodiment of the present invention;
Fig. 2 is the base arrangement schematic diagram of the fast-assembling cage of the embodiment of the present invention;
Fig. 3 is the bottom plate top view of the fast-assembling cage of the embodiment of the present invention;
Fig. 4 is the pressure pin structural representation of the fast-assembling cage of the embodiment of the present invention;
Fig. 5 is the goods handling schematic diagram of the fast-assembling cage of the embodiment of the present invention;
Fig. 6 is the empty cage handling schematic diagram unsnatched after article of the fast-assembling cage of the embodiment of the present invention.
In figure:1 vertical rod, 2 cross bars, 3 suspension ring, 4 bottom plates, 5 support beams, 6 pressure pins, 7 hoist cables.
Embodiment
With reference to embodiments and its accompanying drawing to the present invention illustrate further.
Embodiment 1
The fast-assembling cage of the present invention, including shroud and shroud base and two pressure pins.
Referring now to Fig. 1, Fig. 1 is the side wall construction schematic diagram with suspension ring in the fast-assembling cage of the embodiment of the present invention.As illustrated, described shroud the frame structure surrounded for each side wall of surrounding, rectangular frame is welded into by long 1000mm vertical rods 1 and wide 800mm cross bars 2 admittedly per side wall, some vertical rods 1 are welded in rectangular frame admittedly in parallel, the spacing of each vertical rod 1 is 100mm.Two suspension ring 3 are respectively set in the top and bottom of the cross bar 2 of the wherein corresponding two piece side wall of frame structure, and suspension ring protrude cross bar 100mm, and suspension ring are in long circular arc, a diameter of 80mm of its circular portion.
Fig. 2 is the base arrangement schematic diagram of the fast-assembling cage of the embodiment of the present invention, and Fig. 3 is the bottom plate top view of the fast-assembling cage of the embodiment of the present invention.
The base that shrouds is provided with bottom plate 4, and base plate size is that 3 support beams, 5,3 support beam two ends and centre arranged in parallel below bottom plate are fixed below 790*790mm, bottom plate, and support beam size is 790*100*100mm.
Fig. 4 is the pressure pin structural representation of the fast-assembling cage of the embodiment of the present invention.Two pressure pins 6 are length 1100mm φ 60*4mm steel pipe;
Wherein:Fast-assembling cage is in a state of use:Shroud to cover on and shroud on base, two pressure pins 6 are inserted in the suspension ring 3 for the corresponding two piece side wall lower ends for shrouding base bottom respectively.
The material of vertical rod in the present embodiment, cross bar and suspension ring is reinforcing bar, can also use the steel pipe of respective strengths.
Embodiment 2
The preparation method of the fast-assembling cage of the present invention, comprises the following steps:
A, making are shrouded, and do vertical rod 1 and cross bar 2 with φ 20mm reinforcing bars, suspension ring are made with φ 30mm reinforcing bar cold bendings;Suspension ring are in long circular arc, and a diameter of 80mm of suspension ring rounded portions, suspension ring protrude cross bar 100mm;Vertical rod, cross bar, the whole firm weldings of suspension ring pad;The long 1000mm of vertical rod, the wide 800mm of cross bar;
B, it is spliced into bottom plate 4 with 40*100mm flitch, base plate size is that 3 support beams 5 are fixed below 790*790mm, bottom plate, and support beam is 100*100mm flitch, and support beam flitch installation direction is vertical with bottom plate splicing seams;
C, 2 pressure pins of steel pipe manufacturing with φ 60*4mm, length are respectively 1100mm;
Wherein:Fast-assembling cage is in a state of use:Shroud to cover on and shroud on base, two pressure pins 6 are inserted in the suspension ring 3 for the corresponding two piece side wall lower ends for shrouding base bottom respectively.
Embodiment 3
Application of the fast-assembling cage of the present invention in fragmentary, the in bulk article handling of construction.
The application method of the fast-assembling cage of the present invention:
(1)The base of fast-assembling cage, which need to make 3, to be shrouded with one and supports the use, and could meet the continuous handling of crane.
Article first is filled on first cage base, is covered shrouding, two pressure pins are separately inserted in 4 suspension ring for shrouding bottom, crane rope, which is respectively fitted over, to be shrouded on the suspension ring of 4, top, and being then lifted to needs place.Fig. 5 is the goods handling schematic diagram of the fast-assembling cage of the embodiment of the present invention.
(2)Two pressure pins are extracted during unloading, opens and shrouds, and pressure pin reeve is shrouded in the suspension ring of 4, top, crane, which will only shroud, is hung to ground, at the same time, ground loading hire fills second cage bottom seat, waits handling.
(3)Same method, article in second cage is allocated and transported to destination, extract pressure pin, it need to will this time shroud and cover on first cage bottom soared seat, then pressure pin insertion is shrouded in the suspension ring of bottom, and empty cage is integrally hung into ground, at the same time, ground loading hire fills the 3rd cage bottom seat, and such cycle alternation is shrouded using one can continuously work with three bases, crane.Fig. 6 is the empty cage handling schematic diagram unsnatched after article of the fast-assembling cage of the embodiment of the present invention.
The present invention has substantive distinguishing features and significant technological progress, each side wall of fast-assembling cage surrounding of the present invention surrounds fixed frame structure, the structure safety and reliability that its and two side more movable than the two side of known technology is fixed, and it is easy to make, the base that shrouds and shroud of fast-assembling cage is designed to dismountable type structure, as long as inserting or pull out the assembling that can complete fast-assembling cage and the handling of article with pressure pin.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes should also belong to scope of the invention, should be limited by each claim.
Claims (9)
1. a kind of fast-assembling cage, including shroud and shroud base and two pressure pins, it is characterised in that:
It is described to shroud the frame structure surrounded for each side wall of surrounding, per side wall by long 1000mm vertical rods(1)With wide 800mm cross bars(2)Admittedly rectangular frame is welded into, some vertical rods(1)It is welded in admittedly in rectangular frame in parallel;In the cross bar of the wherein corresponding two piece side wall of frame structure(2)Top and bottom respectively set two suspension ring(3), suspension ring protrusion cross bar 100mm, suspension ring are in long circular arc, a diameter of 80mm of its circular portion;
The base that shrouds is provided with bottom plate(4), base plate size is to fix 3 support beams below 790*790mm, bottom plate(5), 3 support beams two ends and centre arranged in parallel below bottom plate, support beam size is 790*100*100mm;
Two pressure pins(6)For length 1100mm φ 60*4mm steel pipe;
Wherein:Fast-assembling cage is in a state of use:Shroud to cover on and shroud on base, two pressure pins(6)The suspension ring of the corresponding two piece side wall lower ends of base bottom are shrouded in insertion respectively(3)It is interior.
2. fast-assembling cage as claimed in claim 1, it is characterised in that the vertical rod(1)Material is steel pipe.
3. fast-assembling cage as claimed in claim 1, it is characterised in that the vertical rod(1)Material is reinforcing bar.
4. fast-assembling cage as claimed in claim 1, it is characterised in that the cross bar(2)Material is steel pipe.
5. fast-assembling cage as claimed in claim 1, it is characterised in that the cross bar(2)Material is reinforcing bar.
6. fast-assembling cage as claimed in claim 1, it is characterised in that each vertical rod(1)Spacing be 100mm.
7. a kind of preparation method of fast-assembling cage as claimed in claim 1, it is characterised in that comprise the following steps:
A, making are shrouded, and vertical rod is done with φ 20mm reinforcing bars(1)And cross bar(2), suspension ring are made with φ 30mm reinforcing bar cold bendings;Suspension ring are in long circular arc, and a diameter of 80mm of suspension ring rounded portions, suspension ring protrude cross bar 100mm;Vertical rod, cross bar, the whole firm weldings of suspension ring pad;The long 1000mm of vertical rod, the wide 800mm of cross bar;
B, with 40*100mm flitch it is spliced into bottom plate(4), base plate size is to fix 3 support beams below 790*790mm, bottom plate(5), support beam is 100*100mm flitch, and support beam flitch installation direction is vertical with bottom plate splicing seams;
C, 2 pressure pins of steel pipe manufacturing with φ 60*4mm, length are respectively 1100mm;
Wherein:Fast-assembling cage is in a state of use:Shroud to cover on and shroud on base, two pressure pins(6)The suspension ring of the corresponding two piece side wall lower ends of base bottom are shrouded in insertion respectively(3)It is interior.
8. the preparation method of fast-assembling cage as claimed in claim 7, it is characterised in that the vertical rod(1)And cross bar(2)Material be steel pipe.
9. a kind of application of fast-assembling cage as claimed in claim 1 in fragmentary, the in bulk article handling of construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610057496.5A CN107010575A (en) | 2016-01-28 | 2016-01-28 | A kind of fast-assembling cage and its making and application |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610057496.5A CN107010575A (en) | 2016-01-28 | 2016-01-28 | A kind of fast-assembling cage and its making and application |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107010575A true CN107010575A (en) | 2017-08-04 |
Family
ID=59438589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610057496.5A Pending CN107010575A (en) | 2016-01-28 | 2016-01-28 | A kind of fast-assembling cage and its making and application |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107010575A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115321339A (en) * | 2022-07-26 | 2022-11-11 | 共享智能装备有限公司 | Quick overhead hoist of varistructure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06170344A (en) * | 1992-12-11 | 1994-06-21 | Brother Ind Ltd | Washing cage holding device of washing device |
CN201598088U (en) * | 2009-12-14 | 2010-10-06 | 广西建工集团第五建筑工程有限责任公司 | Container type cage for building construction |
CN202687760U (en) * | 2012-08-10 | 2013-01-23 | 烟台市红旗置业有限公司 | Engineering lifting hoisting cage |
CN203247004U (en) * | 2013-04-18 | 2013-10-23 | 中国化学工程第三建设有限公司 | Brick suspending cage quick to demount |
CN203889877U (en) * | 2014-06-19 | 2014-10-22 | 国家电网公司 | Cage for overhead operation construction |
-
2016
- 2016-01-28 CN CN201610057496.5A patent/CN107010575A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06170344A (en) * | 1992-12-11 | 1994-06-21 | Brother Ind Ltd | Washing cage holding device of washing device |
CN201598088U (en) * | 2009-12-14 | 2010-10-06 | 广西建工集团第五建筑工程有限责任公司 | Container type cage for building construction |
CN202687760U (en) * | 2012-08-10 | 2013-01-23 | 烟台市红旗置业有限公司 | Engineering lifting hoisting cage |
CN203247004U (en) * | 2013-04-18 | 2013-10-23 | 中国化学工程第三建设有限公司 | Brick suspending cage quick to demount |
CN203889877U (en) * | 2014-06-19 | 2014-10-22 | 国家电网公司 | Cage for overhead operation construction |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115321339A (en) * | 2022-07-26 | 2022-11-11 | 共享智能装备有限公司 | Quick overhead hoist of varistructure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206940230U (en) | A kind of steel-pipe pile turns over tongs | |
CN203269315U (en) | Chain connecting rod type rectangular suspension cable and auxiliary tool thereof | |
CN107010575A (en) | A kind of fast-assembling cage and its making and application | |
CN203333143U (en) | Building construction basket | |
CN209835423U (en) | Umbrella-shaped hook for quickly assembling and disassembling ton bag | |
CN218465317U (en) | Construction cage device for integral hoisting of tower crane | |
CN214692858U (en) | Floor transportation frock | |
CN206538093U (en) | A kind of suspender for being applicable large-sized object | |
CN216512349U (en) | Pipe gallery hoist | |
CN101402435B (en) | Special sling for inner bore of step and its use method | |
CN210163792U (en) | High mound pier stud reinforcing bar mounting platform | |
CN210313118U (en) | Suspension cage | |
CN207792499U (en) | A kind of motor stator handling suspender | |
CN214459651U (en) | Steel platform construction hanging flower basket on water | |
CN215592534U (en) | Auxiliary reverse transportation device for forklift | |
CN107826961A (en) | Cable steel band roller tool special for hoisting | |
CN217600191U (en) | Graphite rod hoisting tool | |
CN216190307U (en) | Suspension cage for cardboard building blocks | |
CN208531391U (en) | A kind of medium-and-large-sized equipment transfer tool | |
CN217627434U (en) | Small-size goods and materials fork truck transport fixing device of ground is wall project even | |
CN220928420U (en) | Prefabricated superposed beam convenient for hoisting and transporting | |
CN204873599U (en) | Efficient hoisting machine | |
CN215594582U (en) | Double-skin wall with lifting hook | |
CN215711088U (en) | Steel pipe lifting and drop-adjusting lifting cage | |
CN219314327U (en) | Hanging beam structure for hoisting ship section bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170804 |
|
RJ01 | Rejection of invention patent application after publication |