CN210163792U - High mound pier stud reinforcing bar mounting platform - Google Patents

High mound pier stud reinforcing bar mounting platform Download PDF

Info

Publication number
CN210163792U
CN210163792U CN201920886100.7U CN201920886100U CN210163792U CN 210163792 U CN210163792 U CN 210163792U CN 201920886100 U CN201920886100 U CN 201920886100U CN 210163792 U CN210163792 U CN 210163792U
Authority
CN
China
Prior art keywords
installation
hoisting
platform
crossbeam
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920886100.7U
Other languages
Chinese (zh)
Inventor
杨建明
徐贤德
孙长德
邓涛
张勇
王啸
白欢
熊思平
崔永
高谊东
汪瑶
王学兵
黄金林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority to CN201920886100.7U priority Critical patent/CN210163792U/en
Application granted granted Critical
Publication of CN210163792U publication Critical patent/CN210163792U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a high pier column reinforcing steel bar installation platform, which comprises an installation frame body and a plurality of construction platforms arranged on the installation frame body; the support body includes inlayer stand, outer stand, inlayer crossbeam and outer crossbeam, the support body is whole to be the cuboid structure, be provided with the hoisting support that is used for lifting by crane the installation support body on the outer crossbeam, still be provided with on the outer crossbeam and cooperate a plurality of hoist and mount pulleys that use with the hoisting support, this technical scheme's high mound pier stud steel bar mounting platform pours the completion back at the pier shaft construction, and the convenience is in lifting by crane another layer with mounting platform and continue to carry out the pier shaft construction, simple structure conveniently lifts by crane, guarantees to lift by crane the in-process and operates steadily.

Description

High mound pier stud reinforcing bar mounting platform
Technical Field
The utility model relates to a bridge construction field, concretely relates to high mound pier stud steel bar mounting platform.
Background
Pier stud construction usually adopts the turnover formwork construction, pier stud reinforcement usually sets up the scaffold frame and constructs, 4.5m are pour at every turn in pier shaft construction, if adopt conventional scaffold frame to construct, the dismouting of scaffold frame is loaded down with trivial details, need install and remove again at interval, wastes time and energy.
Therefore, generally adopt among the prior art to build mounting platform and build, mounting platform builds the back, all constructions of constructor are all accomplished on the platform, no longer scramble the reinforcing bar, depend on the reinforcing bar construction, both guaranteed safety and improved work efficiency, but one section pier stud construction back is accomplished to mounting platform just need lift by crane the last one deck again and carry out new installation, because the platform generally is two-layer structure, underlying structure weight is heavier, traditional lifting process generally is the upper strata that the hoist and mount platform was hoisted to the hook, can make the platform hoist the atress uneven easily like this, make it receive destruction, traditional lifting by crane generally is with hanging rope or couple direct action on mounting platform simultaneously, strain the platform structure easily.
Therefore, the high pier column reinforcing steel bar mounting platform is needed, the structure is simple, the lifting is convenient, the whole stress of the platform is balanced in the lifting process, the shaking is reduced, and the platform is prevented from being damaged.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a high mound pier stud reinforcing bar mounting platform, simple structure conveniently lifts by crane, lifts by crane the in-process simultaneously and makes its whole atress balanced, reduces to rock, ensures that the platform can not receive destruction.
A high pier column steel bar installation platform comprises an installation frame body and a plurality of construction platforms arranged on the installation frame body; the support body includes inlayer stand, outer stand, inlayer crossbeam and outer crossbeam, the support body is whole to be the cuboid structure, be provided with the hoisting support who is used for lifting by crane the installation support body on the outer crossbeam, still be provided with on the outer crossbeam with a plurality of hoist and mount pulleys that the hoisting support cooperation was used.
Further, the hoisting support comprises a hoisting part and installation parts, the hoisting support is integrally inverted V-shaped, and the installation parts are symmetrically arranged relative to the hoisting part.
Furthermore, the hoisting part is provided with a hoisting hole, and the installation part is of a groove structure with an arc structure.
Furthermore, a reinforcing rib plate is arranged between the two mounting parts.
Furthermore, every two liang of a set of total four of hoist and mount pulley, outer crossbeam includes outer entablature and outer bottom end rail, arbitrary a set of hoist and mount pulley all arranges respectively in outer entablature and outer bottom end rail along the axis direction of outer stand.
Furthermore, a ladder stand is arranged between the outer-layer cross beams.
Further, a protective net is arranged on the installation frame body.
The utility model has the advantages that: this technical scheme's high mound pier stud reinforcing bar mounting platform, simple structure conveniently lifts by crane, lifts by crane the in-process simultaneously and makes its whole atress balanced, reduces to rock, ensures that the platform can not receive destruction.
Drawings
The invention will be further described with reference to the following figures and examples:
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the installation platform and pier stud of the present invention;
FIG. 3 is a schematic view of the structure of the hoisting bracket of the present invention;
FIG. 4 is an enlarged schematic view of the utility model at B;
fig. 5 is the schematic diagram of the lifting process of the present invention.
Reference numerals
An outer layer upright column 1; an outer layer beam 2; an inner layer beam 3; an inner layer upright column 4; hoisting a bracket 5; hoisting holes 6; a groove structure 7; a reinforcing rib plate 8; a pulley yoke 9; a pulley 10; pier stud 11.
Detailed Description
FIG. 1 is a schematic view of the overall structure of the present invention; FIG. 2 is a schematic view of the structure of the installation platform and pier stud of the present invention; FIG. 3 is a schematic view of the structure of the hoisting bracket of the present invention; FIG. 4 is an enlarged schematic view of the utility model at B; FIG. 5 is a schematic view of the lifting process of the present invention; as shown in the figure, the high pier column reinforcing steel bar installation platform comprises an installation frame body and a plurality of construction platforms arranged on the installation frame body; the frame body comprises an inner-layer upright post 4, an outer-layer upright post 1, an inner-layer cross beam 3 and an outer-layer cross beam 2, the frame body is integrally of a cuboid structure, a hoisting support 5 used for hoisting and installing the frame body is arranged on the outer-layer cross beam, a plurality of hoisting pulleys matched with the hoisting support for use are further arranged on the outer-layer cross beam, a two-layer operating platform is built between the upright posts and the cross beam in the technical scheme, a plurality of construction platforms are fixedly arranged on the installing frame body to form a plurality of installing stations, the operation of workers is facilitated, the hoisting supports 5 are arranged on the outer cross beam on the upper layer, (only one schematic diagram of one installing support is shown in figure 1, the hoisting supports 5 are arranged at four corners of the operating platform on the upper layer during use), and the installing platform adopting the technical scheme has a simple structure, is convenient to hoist, and enables the whole stress to, the shaking is reduced, and the platform is ensured not to be damaged.
In this embodiment, hoisting support is including lifting portion and installation department, hoisting support is whole to be "lambda" type, and the installation department sets up for lifting portion symmetry, lifting portion is last to have seted up hoisting hole 6, the installation department is arc structure's groove structure 7, and two installation departments that the symmetry set up are installed with two outer crossbeams 2 that link to each other respectively, and groove structure 7 makes things convenient for and welds in 2 with pipy outer crossbeam, makes it have better stress structure, as in figure 1, the department of meeting of four upper strata outer crossbeams all connects and is provided with hoisting support 5, when making whole hoist and mount, overall structure's atress is more balanced, and the removal process is also more steady, and the design of hoisting hole 6 is convenient to be connected in lifting rope or jib rather than, and easy dismounting is swift.
In this embodiment, a reinforcing rib plate 8 is arranged between the two installation parts, and the arrangement of the reinforcing rib plate 8 enables the hoisting bracket 5 to have stronger bearing capacity, so that the service life of the hoisting bracket is prolonged.
In the embodiment, every two hoisting pulleys are combined into a group and the outer crossbeam comprises an outer upper crossbeam and an outer lower crossbeam, any group of hoisting pulleys are respectively arranged on the outer upper crossbeam and the outer lower crossbeam along the axis direction of the outer upright, as shown in figure 1, the straight line of any group of pulleys is parallel to the outer upright 1, preferably, the technical scheme adopts eight pulleys in total, when in use, a hoisting rope sequentially passes through the pulleys of the outer upper crossbeam, the pulleys of the outer lower crossbeam and finally passes through the pulleys of the outer upper crossbeam, and the acting force of the hoisting rope during hoisting directly acts on the lower operating platform, so that the phenomenon that the upper operating platform is damaged due to heavier weight of the lower operating platform is avoided, the hoisting process is more convenient by adopting a pulley structure, and other complex operations such as bolt fastening and the like are not needed, as shown in fig. 5, the lifting rope passes through the pulleys on the two sides of the mounting platform and is hung on the lifting hook together with the lifting rope of the hoisting bracket, so that the overall stress is more balanced.
In this embodiment, be provided with the cat ladder between the outer crossbeam, the cat ladder sets up and conveniently goes on platform about the workman.
In this embodiment, be provided with the protection network on the installation support body, the protection network is arranged and is guaranteed workman's safety between each stand and crossbeam.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.

Claims (7)

1. The utility model provides a high mound pier stud reinforcing bar mounting platform which characterized in that: the construction platform comprises an installation frame body and a plurality of construction platforms arranged on the installation frame body; the support body includes inlayer stand, outer stand, inlayer crossbeam and outer crossbeam, the support body is whole to be the cuboid structure, be provided with the hoisting support who is used for lifting by crane the installation support body on the outer crossbeam, still be provided with on the outer crossbeam with a plurality of hoist and mount pulleys that the hoisting support cooperation was used.
2. The high pier column rebar installation platform of claim 1, wherein: the hoisting support comprises a hoisting part and installation parts, the hoisting support is integrally inverted V-shaped, and the installation parts are symmetrically arranged relative to the hoisting part.
3. The high pier column rebar installation platform of claim 2, wherein: the lifting part is provided with a lifting hole, and the mounting part is of a groove structure with an arc structure.
4. The high pier column rebar installation platform of claim 3, wherein: and a reinforcing rib plate is arranged between the two mounting parts.
5. The high pier column rebar installation platform of claim 4, wherein: every two liang of a set of total four of hoist and mount pulley, outer crossbeam includes outer entablature and outer bottom end rail, and arbitrary a set of hoist and mount pulley all arranges respectively in outer entablature and outer bottom end rail along the axis direction of outer stand.
6. The high pier column rebar installation platform of claim 5, wherein: a ladder stand is arranged between the outer-layer cross beams.
7. The high pier column rebar installation platform of claim 6, wherein: and a protective net is arranged on the mounting frame body.
CN201920886100.7U 2019-06-12 2019-06-12 High mound pier stud reinforcing bar mounting platform Active CN210163792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920886100.7U CN210163792U (en) 2019-06-12 2019-06-12 High mound pier stud reinforcing bar mounting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920886100.7U CN210163792U (en) 2019-06-12 2019-06-12 High mound pier stud reinforcing bar mounting platform

Publications (1)

Publication Number Publication Date
CN210163792U true CN210163792U (en) 2020-03-20

Family

ID=70170639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920886100.7U Active CN210163792U (en) 2019-06-12 2019-06-12 High mound pier stud reinforcing bar mounting platform

Country Status (1)

Country Link
CN (1) CN210163792U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833263A (en) * 2021-09-26 2021-12-24 中铁七局集团有限公司 Integral lantern type support circulating hoisting construction method for frame column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833263A (en) * 2021-09-26 2021-12-24 中铁七局集团有限公司 Integral lantern type support circulating hoisting construction method for frame column

Similar Documents

Publication Publication Date Title
CN104652807B (en) Certainly turnover construction system and the method for climbing tower support steel beam in hydraulic climbing die block system
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN210163792U (en) High mound pier stud reinforcing bar mounting platform
CN106988299B (en) The pay-off method of assembled steel reinforced cage descending frame and steel reinforcement cage
CN212270712U (en) Construction device for mounting and dismounting steel box girder by suspension of bridge girder erection machine
CN210505222U (en) Horizontal precast concrete board lifting device of prefabricated building
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN110285952A (en) A kind of lifeboat hanger test tool
CN205932883U (en) Pitshaft driving cage
CN215055466U (en) Discharging platform for high-rise building
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
CN208294101U (en) A kind of large-span steel girder mounting slip and promote coupling apparatus
CN112030786A (en) Portable bailey frame cradle
CN216445795U (en) Bridge formwork support convenient to dismantle fast
KR100850766B1 (en) Base structure of a tower crane
JP2536395B2 (en) Construction method of steel pipe / concrete composite structure pier
CN214879986U (en) Construction platform for deep shaft lining and track installation
CN205023729U (en) Gallows frame
CN219840354U (en) Aerial work platform for installing suspended ceiling in ultra-high steel structure
CN217458500U (en) Lifting device for hanger
CN215798145U (en) Movable support for hook head pulley block of crane
CN113800408B (en) Ring rail crane, ring rail crane assembling method and disassembling method
CN218373367U (en) Bent cap construction platform hangs tears construction structures open
CN218058163U (en) Construction operation platform convenient to waste material handling
CN219259347U (en) Cabin entering and exiting lifting appliance of loader

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant