CN106996186A - A kind of floor tile is mated formation leveling unit - Google Patents
A kind of floor tile is mated formation leveling unit Download PDFInfo
- Publication number
- CN106996186A CN106996186A CN201710359718.3A CN201710359718A CN106996186A CN 106996186 A CN106996186 A CN 106996186A CN 201710359718 A CN201710359718 A CN 201710359718A CN 106996186 A CN106996186 A CN 106996186A
- Authority
- CN
- China
- Prior art keywords
- pieces
- support blocks
- sliding groove
- support
- floor tile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/20—Implements for finishing work on buildings for laying flooring
- E04F21/22—Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
Mat formation leveling unit the invention discloses a kind of floor tile, it includes four pieces of identical support blocks, elastic light thin film and lightweight bead;Four pieces of support blocks are symmetrical two-by-two, are connected and fixed with can moving up and down, it is two neighboring between have more than laying adjacent two pieces of floor tiles between gap gap;Elastic lightweight thin-film covering is placed in the center of the upper surface of four pieces of support blocks in the upper outer end face of four pieces of support blocks, lightweight bead.During floor tile, accurate degree control is carried out by the present invention, skilled worker can be helped to reduce the levelling number of times during ground tile paving, tile work speed and tile work quality is improved, the labor intensity of skilled worker is reduced.
Description
Technical field
Mat formation leveling unit the present invention relates to a kind of floor tile.
Background technology
Floor tile flatness of mating formation is to examine the leading indicator of ground surface finishing construction quality, and key problem in technology is levelling, is mated formation every
Block floor tile all try to put for several times in installation site, by adjusting bedding and padding thickness to reach levelling requirement.In traditional handicraft, paving
Floor tile is arduous work, is typically passed through following technique:Paving siccative → wet feed → tile work → floor tile beats out → brick turning → secondary stop-off
Ash → secondary tile work → secondary floor tile is beaten out, if secondary can't be levelling, must be continued three times, or even four operations.At this
In a little processes, how it is levelling be technology key, existing leveling method is complete with observing, for veteran skilled worker,
Materials are more accurate, and levelling number of times is few, and tile work efficiency high, flatness is good, and quality is high, but for the poor skilled worker of technology, it is levelling
Often, tile work efficiency is low, and poor flatness is of poor quality.And tile work skilled worker be required for going down on one's knees bend over could complete tile work work, labor
Fatigue resistance is big, and leg knee acid is swollen, and the defect such as lumbar muscle strain just can hardly be avoided.So, labor intensity how is reduced, level error how is allowed
Skilled worker quickly also to complete floor tile be people's urgent problem.
The content of the invention
The purpose of the present invention is exactly to solve the above-mentioned problems in the prior art there is provided a kind of floor tile to mat formation levelling dress
Put, during floor tile, by the leveling unit carry out accurate degree control, can help skilled worker reduce ground tile paving during it is levelling
Number of times, improves tile work speed and tile work quality, reduces the labor intensity of skilled worker.
To achieve the above object, technical solution of the invention is:A kind of floor tile is mated formation leveling unit, and it includes four pieces
Identical support block, elastic light thin film and lightweight bead;Four pieces of support blocks are symmetrical two-by-two, upper and lower can slidably connect
It is connected together, there is the gap in the gap between adjacent two pieces of floor tiles more than laying between two neighboring support block;Elastomeric light
Matter thin-film covering is placed in the center of the upper surface of four pieces of support blocks in the outer face of four pieces of support blocks, lightweight bead.
The structure that four pieces of support blocks described above are connected and fixed in which can move up and down is:Adjacent two support
The strip sliding groove that there is a length corresponding position respectively on the corresponding face of block and depth identical section is ball-and-socket type,
It is spherical that the two ends of support column respectively match with the sliding groove of ball-and-socket type;The two ends of support column it is spherical positioned at ball-and-socket type
In sliding groove, two adjacent support blocks are slidably connected together.
The structure that four pieces of support blocks described above are connected and fixed in which can move up and down is:In each support
There is the strip sliding groove that a section is ball-and-socket type at the outer wall center of block, and a clips are cased with the outer wall of four pieces of support blocks;Gu
There is the hemisphere jut that the ball-and-socket type with strip sliding groove matches the fixed hoop position corresponding with the strip sliding groove of support block, Gu
Surely the hemisphere jut bound round is located in the strip sliding groove of support block.
In flooring brick, completed as long as the present invention is placed on into adjacent four pieces on the angle with the floor tile not spread, only
Want one of floor tile uneven, the upper surfaces of four pieces of support blocks would not level again, elastic light thin film be driven it is recessed, and then
The movement of lightweight bead is driven, untill being transferred to lightweight bead positioned at home position, just enough levels of four pieces of floor tile pavings.Therefore
In tile work, completed as long as the present invention is placed into adjacent four pieces on the angle with the floor tile not spread, referred to tile work skilled worker
The height for the floor tile not spread that the present invention illustrates the floor tile not spread can just be spread with the floor tile identical levelness completed.Floor file
During brick, accurate degree control is carried out by the present invention, skilled worker can be helped to reduce the levelling number of times during ground tile paving, paving is improved
Brick speed and tile work quality, reduce the labor intensity of skilled worker, and the low skilled worker of technical merit high-quality can be also rapidly completed paving
Brickwork is made.
Brief description of the drawings
Fig. 1 removes the top view of elastic light thin film for the first embodiment of the present invention;
Fig. 2 is that Fig. 1 adds the AA sectional views after elastic light thin film;
Fig. 3 is the top view of second of embodiment of the present invention;
Fig. 4 is Fig. 3 BB sectional views.
Embodiment
The present invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
There is the gap in the gap between adjacent two pieces of floor tiles more than laying between two neighboring;Elastic lightweight thin-film covering
In the upper outer end face of four pieces of support blocks, lightweight bead is placed in the center of the upper surface of four pieces of support blocks.Four pieces of described supports
The height of block is 2-3cm.
Embodiment 1 as depicted in figs. 1 and 2, the present embodiment includes four pieces of identical support blocks 1, elastic lightweight thin
Film 6 and lightweight bead 3.Four pieces of support blocks 1 are symmetrical two-by-two, upper and lower can be slidingly connected together, it is connected and fixed
Structure be:There are a length and depth identical section in corresponding position respectively on the corresponding face of adjacent two support block 1
For the strip sliding groove 7 of ball-and-socket type, the two ends of support column 5 be respectively with the sliding groove 7 of ball-and-socket type match it is spherical;Support column
In the spherical sliding groove 7 positioned at ball-and-socket type at 5 two ends, two adjacent support blocks 1 are slidably connected together.Adjacent two
There is the gap 2 in the gap between adjacent two pieces of floor tiles more than laying between individual support block 1.Elastic light thin film 6 is enclosed on four
The outer face of block support block 1, lightweight bead 3 is placed in the center of the upper surface of four pieces of support blocks 1.
Embodiment 2 as shown in Figure 3 and Figure 4, the present embodiment is identical with the other structures of embodiment 1, simply four pieces of supports
The structure that block 1 is connected and fixed in which can move up and down is:It is ball to have a section at the outer wall center of each support block 1
The strip sliding groove 10 of nest shape, is cased with a clips 8 on the outer wall of four pieces of support blocks 1.Clips 8 and the strip of support block 1
There are the hemisphere jut 9 that the ball-and-socket type with strip sliding groove 10 matches, the spherical male of clips 8 in the corresponding position of sliding groove 10
9 are played to be located in the strip sliding groove 10 of support block 1.
Above-described embodiment be only it is preferred and exemplary, those skilled in the art can also according to the description of this patent,
Selection uses other equivalent technologies, and these are all covered by the protection domain of this patent.
Claims (3)
- The leveling unit 1. a kind of floor tile is mated formation, it is characterised in that:It includes four pieces of identical support blocks, elastic light thin film With lightweight bead;Four pieces of support blocks are symmetrical two-by-two, upper and lower can be slidingly connected together, and have between two neighboring support block More than the gap in the gap between adjacent two pieces of floor tiles of laying;Elastic lightweight thin-film covering in the outer face of four pieces of support blocks, Lightweight bead is placed in the center of the upper surface of four pieces of support blocks.
- The leveling unit 2. floor tile according to claim 1 is mated formation, it is characterised in that:Four pieces of described support blocks can go up, Under the structure that is movably connected and fixed be:Corresponding position has one respectively on the corresponding face of adjacent two support block Length and the strip sliding groove that depth identical section is ball-and-socket type, the two ends of support column are respectively the sliding groove phase with ball-and-socket type What is matched is spherical;The two ends of support column it is spherical in the sliding groove of ball-and-socket type, two adjacent support blocks are slideably connected It is connected together.
- The leveling unit 3. floor tile according to claim 1 is mated formation, it is characterised in that:Four pieces of described support blocks can go up, Under the structure that is movably connected and fixed be:There is the strip that a section is ball-and-socket type to slide at the outer wall center of each support block Dynamic groove, is cased with a clips on the outer wall of four pieces of support blocks;The clips position corresponding with the strip sliding groove of support block There is the hemisphere jut that the ball-and-socket type with strip sliding groove matches, the hemisphere jut of clips is located at the strip sliding groove of support block It is interior.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710359718.3A CN106996186A (en) | 2017-05-20 | 2017-05-20 | A kind of floor tile is mated formation leveling unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710359718.3A CN106996186A (en) | 2017-05-20 | 2017-05-20 | A kind of floor tile is mated formation leveling unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106996186A true CN106996186A (en) | 2017-08-01 |
Family
ID=59434922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710359718.3A Pending CN106996186A (en) | 2017-05-20 | 2017-05-20 | A kind of floor tile is mated formation leveling unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106996186A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201261938Y (en) * | 2008-07-24 | 2009-06-24 | 陈美璇 | Tile laying instrument |
CN205296756U (en) * | 2016-01-05 | 2016-06-08 | 江苏红蚂蚁装饰设计工程有限公司 | Auxiliary device that tiling was used |
CN207032808U (en) * | 2017-05-20 | 2018-02-23 | 河北中儒软件科技股份有限公司 | A kind of floor tile is mated formation leveling unit |
-
2017
- 2017-05-20 CN CN201710359718.3A patent/CN106996186A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201261938Y (en) * | 2008-07-24 | 2009-06-24 | 陈美璇 | Tile laying instrument |
CN205296756U (en) * | 2016-01-05 | 2016-06-08 | 江苏红蚂蚁装饰设计工程有限公司 | Auxiliary device that tiling was used |
CN207032808U (en) * | 2017-05-20 | 2018-02-23 | 河北中儒软件科技股份有限公司 | A kind of floor tile is mated formation leveling unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3148482A (en) | Composite floor structure and reinforcing, aligning and mortar gaging mat assembly therefor | |
CN204662910U (en) | Rail mounted brick paving machine | |
CN105256973B (en) | The ground tile paving construction method of preset absolute altitude cushion block | |
CN207032808U (en) | A kind of floor tile is mated formation leveling unit | |
JP5120954B2 (en) | Paving paving stone, paving paving method and paving paving method | |
Rostoker et al. | The reproduction of rooftiles for the Archaic temple of Poseidon at Isthmia, Greece | |
US11332945B2 (en) | Tiling system for decking | |
CN106996186A (en) | A kind of floor tile is mated formation leveling unit | |
CN113957998A (en) | Archaized building construction method | |
CN110821181A (en) | Ground leveling method | |
Mohammadifar et al. | A Preliminary Report on Four Seasons of Excavation at Moush Tepe, Hamedan, Iran | |
CN107366207B (en) | It is a kind of to have acclive blacktop and its construction method | |
CN103726604B (en) | Building element | |
CN107489255A (en) | A kind of big specification stone floor paving structure and construction method | |
CN110374300A (en) | Stone floor system and its construction method | |
CN212336747U (en) | Ground heat-insulating and sound-insulating system for large-span building | |
EP1266734A3 (en) | Method and apparatus for the making of tiles, in particular for venetian floor tiles and the like | |
CN204326481U (en) | The sand-lime tiling device of paving brick | |
CN207332209U (en) | A kind of Integral floor system | |
CN206189815U (en) | Floating screed isolation joint molding sleeve spare | |
RU128205U1 (en) | PAVING COVERING "AVF" | |
CN107816202A (en) | A kind of construction external member for being easy to paving square tile | |
RU2779685C1 (en) | Method for laying paving slabs | |
CN202899562U (en) | Paving structure of thin-type floor decorative materials | |
CN207017587U (en) | A kind of big specification stone floor paving structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |