CN105256973B - The ground tile paving construction method of preset absolute altitude cushion block - Google Patents
The ground tile paving construction method of preset absolute altitude cushion block Download PDFInfo
- Publication number
- CN105256973B CN105256973B CN201510576154.XA CN201510576154A CN105256973B CN 105256973 B CN105256973 B CN 105256973B CN 201510576154 A CN201510576154 A CN 201510576154A CN 105256973 B CN105256973 B CN 105256973B
- Authority
- CN
- China
- Prior art keywords
- cushion block
- ground
- absolute altitude
- floor tile
- slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a kind of ground tile paving construction method of preset absolute altitude cushion block, comprise the following steps:1)Ground snap the line setting-out;2)Absolute altitude cushion block it is preset;3)Absolute altitude cushion block posts;4)Criticize slurry;5)Laying.The ground tile paving construction method of the preset absolute altitude cushion block of the present invention, the technical requirements to laying floor tile can be reduced, labor and materials dosage is reduced, and labor intensity reduces, while lays labor and materials by saving, and reduces finishing load, moreover it is possible to effectively control ground brick flooring integral smoothness.
Description
Technical field
The present invention relates to the ground tile paving construction method of preset absolute altitude cushion block.
Background technology
The construction technology of ground tile paving is to paste slurry with floor tile in building decoration engineering at present, criticizes and scrapes in the floor tile back side,
Building ground is directly adhered to, or using the cement dry mortar of 3cm~5cm thickness as bed course, then the back side back side is criticized and scrapes upper glue
Patch slurry is laid, and the control of both the above ground tile paving construction flatness is to adjust paved surface when laying floor tile
Flatness.Each piece of ground tile paving will often pass through the amount of stickup slurry for several times and the thickness of cement dry mortar bed course is overlay, its
Formal laying again, the fine setting for making flatness in compacting process is beaten with rubber hammer after amount is suitable.The ground tile paving of technology is applied at present
Work method, requires relevant art worker high, difficulty of construction is big, low construction efficiency, and the ground tile paving of large area requires more high-quality
The flatness of amount hardly results in effectively control and labor and materials expend big, the finishing increase load to original building body.
The content of the invention
It is an object of the invention to provide a kind of ground tile paving construction method of preset absolute altitude cushion block, reduces to laying floor tile
Technical requirements, labor and materials dosage reduce, labor intensity reduce, while pass through save laying labor and materials, reduce finishing load, moreover it is possible to have
Effect control ground brick flooring integral smoothness.
To achieve the above object, the technical scheme is that a kind of ground tile paving construction party of preset absolute altitude cushion block of design
Method, comprise the following steps:
1)Ground snap the line setting-out:Spliced according to the breadth specification and ground tile paving of floor tile and required, on the ground on original building ground
Brick laying work area snap the line setting-out;
2)Absolute altitude cushion block it is preset:The ground starched and the bonding of polylith cement fibrolite plate is made to predetermined thickness is pasted using floor tile
Absolute altitude cushion block;
3)Absolute altitude cushion block posts:Each right-angled intersection point of ground tile paving splicing suture sample has been drawn on original building ground
Position, slurry is pasted using floor tile and pastes absolute altitude cushion block, is aided in by level meter, the top surface of each adjacent absolute altitude cushion block is adjusted same
It is to be pasted firm on one horizontal plane;
4)Criticize slurry:The region of laying floor tile is needed on original building ground, with groove scraper plate, laterally batch floor tile pastes slurry,
The concavo-convex race laterally moved towards is formed, the height and absolute altitude cushion block top surface on slurry convex surface are contour;Used at the floor tile back side to be laid
Groove scraper plate batch goes out 2mm thickness and pastes slurry with the floor tile for being longitudinally oriented concavo-convex race;
5)Laying:By the above-mentioned floor tile to be laid for having criticized good stickup slurry, the good ground for pasting slurry has been criticized by being placed on, and
The transverse direction that slurry is pasted on ground is moved towards into be longitudinally oriented concavo-convex race orthogonal, adhesion of the concavo-convex race with stickup slurry on floor tile
Gluing, by floor tile quadrupod on corresponding four absolute altitude cushion blocks, then gently struck and shaken with rubber hammer, be to the fine setting of floor tile flatness
Can.
Preferably, the size of the cement fibrolite plate is 50mm × 50mm × 3mm.
Preferably, can be in absolute altitude cushion block because building original place surface construction flatness regional area has larger drop
Flat band mortar repairing is carried out after posting construction, final adjustment building ground absolute altitude is consistent.
Preferably, in step 3)During the posting of absolute altitude cushion block, by the top plane of absolute altitude cushion block and original building ground
Difference in height is controlled in 5mm.
The advantages of the present invention are:A kind of ground tile paving construction method of preset absolute altitude cushion block is provided, dropped
The low technical requirements to laying floor tile, labor and materials dosage are reduced, and labor intensity reduces, while lays labor and materials by saving, and reduces dress
Repair load, moreover it is possible to effectively control ground brick flooring integral smoothness.
The present invention also has following features:
1st, ground tile paving has the support of absolute altitude cushion block, can effectively facilitate adjustment flatness requirement, construction by vibrating fine setting
Technical difficulty is reduced.
2nd, reduce dry mortar laying depth and pad the examination paving of slurry amount, come and go examination paving several times without each piece of floor tile, reduce
Working strength, improve operating efficiency.
3rd, dry mortar bed course is reduced, construction and decoration is used and thereby resulted in the flat cost that can save ground tile paving to building
The increased heavy burden of body.
4th, the construction of ground elevation cushion block has obtained effective reduction relative to the construction for spreading dry mortar bed course, its labor intensity.
5th, there are laying height and the spacing support of flatness, need to only lay height and finely tune, work efficiency has obtained larger
Improve.
Embodiment
With reference to embodiment, the embodiment of the present invention is further described.Following examples are only used for more
Add and clearly demonstrate technical scheme, and can not be limited the scope of the invention with this.
The technical scheme that the present invention is embodied is:
A kind of ground tile paving construction method of preset absolute altitude cushion block, comprises the following steps:
1)Ground snap the line setting-out:Spliced according to the breadth specification and ground tile paving of floor tile and required, on the ground on original building ground
Brick laying work area snap the line setting-out;
2)Absolute altitude cushion block it is preset:The ground starched and the bonding of polylith cement fibrolite plate is made to predetermined thickness is pasted using floor tile
Absolute altitude cushion block;
3)Absolute altitude cushion block posts:Each right-angled intersection point of ground tile paving splicing suture sample has been drawn on original building ground
Position, slurry is pasted using floor tile and pastes absolute altitude cushion block, is aided in by level meter, the top surface of each adjacent absolute altitude cushion block is adjusted same
It is to be pasted firm on one horizontal plane;
4)Criticize slurry:The region of laying floor tile is needed on original building ground, with groove scraper plate, laterally batch floor tile pastes slurry,
The concavo-convex race laterally moved towards is formed, the height and absolute altitude cushion block top surface on slurry convex surface are contour;Used at the floor tile back side to be laid
Groove scraper plate batch goes out 2mm thickness and pastes slurry with the floor tile for being longitudinally oriented concavo-convex race;
5)Laying:By the above-mentioned floor tile to be laid for having criticized good stickup slurry, the good ground for pasting slurry has been criticized by being placed on, and
The transverse direction that slurry is pasted on ground is moved towards into be longitudinally oriented concavo-convex race orthogonal, adhesion of the concavo-convex race with stickup slurry on floor tile
Gluing, by floor tile quadrupod on corresponding four absolute altitude cushion blocks, then gently struck and shaken with rubber hammer, be to the fine setting of floor tile flatness
Can.
The size of the cement fibrolite plate is 50mm × 50mm × 3mm.
Because building original place surface construction flatness regional area has larger drop, construction can be posted in absolute altitude cushion block
Flat band mortar repairing is carried out afterwards, and final adjustment building ground absolute altitude is consistent.
In step 3)During the posting of absolute altitude cushion block, by the difference in height control on the top plane of absolute altitude cushion block and original building ground
System is in 5mm.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the technical principles of the invention, some improvements and modifications can also be made, these improvements and modifications
Also it should be regarded as protection scope of the present invention.
Claims (4)
1. the ground tile paving construction method of preset absolute altitude cushion block, it is characterised in that comprise the following steps:
1)Ground snap the line setting-out:Spliced according to the breadth specification and ground tile paving of floor tile and required, the floor tile on original building ground is spread
If region snap the line setting-out;
2)Absolute altitude cushion block it is preset:The ground elevation starched and the bonding of polylith cement fibrolite plate is made to predetermined thickness is pasted using floor tile
Cushion block;
3)Absolute altitude cushion block posts:Each right-angled intersection point position of ground tile paving splicing suture sample has been drawn on original building ground
Put, slurry is pasted using floor tile and pastes absolute altitude cushion block, is aided in by level meter, the top surface of each adjacent absolute altitude cushion block is adjusted same
It is to be pasted firm on horizontal plane;
4)Criticize slurry:The region of laying floor tile is needed on original building ground, laterally batch floor tile pastes slurry with groove scraper plate, is formed
The concavo-convex race laterally moved towards, the height and absolute altitude cushion block top surface on slurry convex surface are contour;In floor tile back side groove to be laid
Scraper plate batch goes out 2mm thickness and pastes slurry with the floor tile for being longitudinally oriented concavo-convex race;
5)Laying:By the above-mentioned floor tile to be laid for having criticized good stickup slurry, by being placed on the ground of having criticized good stickup slurry, and by ground
The transverse direction that slurry is pasted on face moves towards be longitudinally oriented concavo-convex race orthogonal, adhesion glue of the concavo-convex race with stickup slurry on floor tile
Close, by floor tile quadrupod on corresponding four absolute altitude cushion blocks, then gently struck and shaken with rubber hammer, be to the fine setting of floor tile flatness
Can.
2. the ground tile paving construction method of preset absolute altitude cushion block according to claim 1, it is characterised in that the cement is fine
The size for tieing up plate is 50mm × 50mm × 3mm.
3. the ground tile paving construction method of preset absolute altitude cushion block according to claim 2, it is characterised in that in absolute altitude cushion block
Post construction after carry out flat band mortar repairing, final adjustment building ground absolute altitude is consistent.
4. the ground tile paving construction method of preset absolute altitude cushion block according to claim 3, it is characterised in that in step 3)Mark
During the posting of high cushion block, the top plane of absolute altitude cushion block and the difference in height on original building ground are controlled in 5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510576154.XA CN105256973B (en) | 2015-09-11 | 2015-09-11 | The ground tile paving construction method of preset absolute altitude cushion block |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510576154.XA CN105256973B (en) | 2015-09-11 | 2015-09-11 | The ground tile paving construction method of preset absolute altitude cushion block |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105256973A CN105256973A (en) | 2016-01-20 |
CN105256973B true CN105256973B (en) | 2018-03-30 |
Family
ID=55096875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510576154.XA Active CN105256973B (en) | 2015-09-11 | 2015-09-11 | The ground tile paving construction method of preset absolute altitude cushion block |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105256973B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193245B (en) * | 2016-07-14 | 2019-04-09 | 浙江景昌建设有限公司 | A kind of paddy field underground reservoir and its construction method for sponge city |
CN106639239B (en) * | 2016-07-29 | 2019-04-09 | 上海市建筑装饰工程集团有限公司 | The aerial prepackage slip casting curing method of stone material terrace |
CN106639238B (en) * | 2016-07-29 | 2019-04-09 | 上海市建筑装饰工程集团有限公司 | Stone material terrace makes somebody a mere figurehead prepackage method |
CN106592920B (en) * | 2016-07-29 | 2022-07-29 | 上海市建筑装饰工程集团有限公司 | Stone terrace is built on stilts pre-installation slip casting solidification structure |
CN111608389A (en) * | 2019-06-21 | 2020-09-01 | 中建材创新科技研究院有限公司 | Stair floor tile paving construction method |
CN110965745A (en) * | 2019-11-05 | 2020-04-07 | 张军 | Paving method of floor tiles and wall tiles |
CN111472524B (en) * | 2020-04-15 | 2021-05-04 | 广州市第二装修有限公司 | Anti-hollowing floor construction method capable of achieving precise leveling |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1073270A (en) * | 1996-08-30 | 1998-03-17 | Morita Denko Kk | Floor heating device |
CN101713250A (en) * | 2009-10-29 | 2010-05-26 | 孙清海 | Process for pasting construction of floor tiles |
CN103255903B (en) * | 2013-05-23 | 2015-07-08 | 贵州正业工程技术投资有限公司 | Workshop indoor steel plate concrete composite floor structure and manufacturing method thereof |
CN104264953A (en) * | 2014-08-27 | 2015-01-07 | 陈友坤 | Support, paving method for ground stone and cement mortar stirring and conveying all-in-one machine |
CN104533093B (en) * | 2015-01-08 | 2016-06-22 | 王玲 | Floor tile paving ground structure and laying method thereof |
-
2015
- 2015-09-11 CN CN201510576154.XA patent/CN105256973B/en active Active
Non-Patent Citations (1)
Title |
---|
其他材料地面装饰;魏文彪;《装饰装修工程造价员》;江苏科学技术出版社;20130131;第40-42页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105256973A (en) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256973B (en) | The ground tile paving construction method of preset absolute altitude cushion block | |
CN105587102B (en) | A kind of wet construction method to the wet type high abrasion terrace that paves | |
CN104712085A (en) | Large-area wear-resistant concrete ground construction method | |
CN106381980B (en) | A kind of ground tile paving technique | |
CN204662910U (en) | Rail mounted brick paving machine | |
CN203856178U (en) | Self-leveling and separation structure for ground bricks | |
CN102605938B (en) | Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs | |
US20230373860A1 (en) | Paver adhesive and method of laying pavers using same | |
CN207829423U (en) | Cement mortar tooth harrow | |
CN204590550U (en) | Nail and rake type wood floor bolck cement bonded sand bed course chipping darby | |
CN108166736A (en) | The method of cement mortar tooth harrow and paving floor ceramic tile | |
CN107489255A (en) | A kind of big specification stone floor paving structure and construction method | |
CN206071011U (en) | A kind of spreading device for floor tile paving | |
CN108612289A (en) | A kind of slurry spreading device and its application method for large area paving floor tile | |
CN206071012U (en) | A kind of spreading device of paving floor tile | |
CN208618730U (en) | Floor tile dry construction bracket | |
CN207829425U (en) | Cement mortar lying device | |
CN205875651U (en) | Applied ceramic tile is spread tooth of taking that pastes and is spliced trowel | |
WO2015142203A1 (en) | Paving slab, paving slabs production method and paving slab obtained using the method | |
CN110318522A (en) | A kind of quick paving structure of compound ceramic tile | |
CN218292687U (en) | Quick quality control device for paving and pasting floor tiles | |
CN102518018A (en) | Stacked structure of road pavement and construction method for stacked structure | |
CN202369884U (en) | Laminating structure of road pavement | |
JP2001164508A (en) | Method of repairing paving surface and sport ground | |
CN215484377U (en) | Piece setting piece and contain ground stone material structure of this setting piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 215000 No. 77 Nantian Cheng Road, Suzhou high speed railway, Jiangsu Patentee after: Company limited is built in Suzhou The Land Of Woods And Waters design Address before: No. 98 Nurturing Lane, Canglang District, Suzhou City, Jiangsu Province Patentee before: Company limited is built in Suzhou The Land Of Woods And Waters design |