CN105256973B - The ground tile paving construction method of preset absolute altitude cushion block - Google Patents

The ground tile paving construction method of preset absolute altitude cushion block Download PDF

Info

Publication number
CN105256973B
CN105256973B CN201510576154.XA CN201510576154A CN105256973B CN 105256973 B CN105256973 B CN 105256973B CN 201510576154 A CN201510576154 A CN 201510576154A CN 105256973 B CN105256973 B CN 105256973B
Authority
CN
China
Prior art keywords
cushion block
ground
absolute altitude
floor tile
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510576154.XA
Other languages
Chinese (zh)
Other versions
CN105256973A (en
Inventor
刘建
王晴霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Is Built In Suzhou Land Of Woods And Waters Design
Original Assignee
Co Ltd Is Built In Suzhou Land Of Woods And Waters Design
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Is Built In Suzhou Land Of Woods And Waters Design filed Critical Co Ltd Is Built In Suzhou Land Of Woods And Waters Design
Priority to CN201510576154.XA priority Critical patent/CN105256973B/en
Publication of CN105256973A publication Critical patent/CN105256973A/en
Application granted granted Critical
Publication of CN105256973B publication Critical patent/CN105256973B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of ground tile paving construction method of preset absolute altitude cushion block, comprise the following steps:1)Ground snap the line setting-out;2)Absolute altitude cushion block it is preset;3)Absolute altitude cushion block posts;4)Criticize slurry;5)Laying.The ground tile paving construction method of the preset absolute altitude cushion block of the present invention, the technical requirements to laying floor tile can be reduced, labor and materials dosage is reduced, and labor intensity reduces, while lays labor and materials by saving, and reduces finishing load, moreover it is possible to effectively control ground brick flooring integral smoothness.

Description

The ground tile paving construction method of preset absolute altitude cushion block
Technical field
The present invention relates to the ground tile paving construction method of preset absolute altitude cushion block.
Background technology
The construction technology of ground tile paving is to paste slurry with floor tile in building decoration engineering at present, criticizes and scrapes in the floor tile back side, Building ground is directly adhered to, or using the cement dry mortar of 3cm~5cm thickness as bed course, then the back side back side is criticized and scrapes upper glue Patch slurry is laid, and the control of both the above ground tile paving construction flatness is to adjust paved surface when laying floor tile Flatness.Each piece of ground tile paving will often pass through the amount of stickup slurry for several times and the thickness of cement dry mortar bed course is overlay, its Formal laying again, the fine setting for making flatness in compacting process is beaten with rubber hammer after amount is suitable.The ground tile paving of technology is applied at present Work method, requires relevant art worker high, difficulty of construction is big, low construction efficiency, and the ground tile paving of large area requires more high-quality The flatness of amount hardly results in effectively control and labor and materials expend big, the finishing increase load to original building body.
The content of the invention
It is an object of the invention to provide a kind of ground tile paving construction method of preset absolute altitude cushion block, reduces to laying floor tile Technical requirements, labor and materials dosage reduce, labor intensity reduce, while pass through save laying labor and materials, reduce finishing load, moreover it is possible to have Effect control ground brick flooring integral smoothness.
To achieve the above object, the technical scheme is that a kind of ground tile paving construction party of preset absolute altitude cushion block of design Method, comprise the following steps:
1)Ground snap the line setting-out:Spliced according to the breadth specification and ground tile paving of floor tile and required, on the ground on original building ground Brick laying work area snap the line setting-out;
2)Absolute altitude cushion block it is preset:The ground starched and the bonding of polylith cement fibrolite plate is made to predetermined thickness is pasted using floor tile Absolute altitude cushion block;
3)Absolute altitude cushion block posts:Each right-angled intersection point of ground tile paving splicing suture sample has been drawn on original building ground Position, slurry is pasted using floor tile and pastes absolute altitude cushion block, is aided in by level meter, the top surface of each adjacent absolute altitude cushion block is adjusted same It is to be pasted firm on one horizontal plane;
4)Criticize slurry:The region of laying floor tile is needed on original building ground, with groove scraper plate, laterally batch floor tile pastes slurry, The concavo-convex race laterally moved towards is formed, the height and absolute altitude cushion block top surface on slurry convex surface are contour;Used at the floor tile back side to be laid Groove scraper plate batch goes out 2mm thickness and pastes slurry with the floor tile for being longitudinally oriented concavo-convex race;
5)Laying:By the above-mentioned floor tile to be laid for having criticized good stickup slurry, the good ground for pasting slurry has been criticized by being placed on, and The transverse direction that slurry is pasted on ground is moved towards into be longitudinally oriented concavo-convex race orthogonal, adhesion of the concavo-convex race with stickup slurry on floor tile Gluing, by floor tile quadrupod on corresponding four absolute altitude cushion blocks, then gently struck and shaken with rubber hammer, be to the fine setting of floor tile flatness Can.
Preferably, the size of the cement fibrolite plate is 50mm × 50mm × 3mm.
Preferably, can be in absolute altitude cushion block because building original place surface construction flatness regional area has larger drop Flat band mortar repairing is carried out after posting construction, final adjustment building ground absolute altitude is consistent.
Preferably, in step 3)During the posting of absolute altitude cushion block, by the top plane of absolute altitude cushion block and original building ground Difference in height is controlled in 5mm.
The advantages of the present invention are:A kind of ground tile paving construction method of preset absolute altitude cushion block is provided, dropped The low technical requirements to laying floor tile, labor and materials dosage are reduced, and labor intensity reduces, while lays labor and materials by saving, and reduces dress Repair load, moreover it is possible to effectively control ground brick flooring integral smoothness.
The present invention also has following features:
1st, ground tile paving has the support of absolute altitude cushion block, can effectively facilitate adjustment flatness requirement, construction by vibrating fine setting Technical difficulty is reduced.
2nd, reduce dry mortar laying depth and pad the examination paving of slurry amount, come and go examination paving several times without each piece of floor tile, reduce Working strength, improve operating efficiency.
3rd, dry mortar bed course is reduced, construction and decoration is used and thereby resulted in the flat cost that can save ground tile paving to building The increased heavy burden of body.
4th, the construction of ground elevation cushion block has obtained effective reduction relative to the construction for spreading dry mortar bed course, its labor intensity.
5th, there are laying height and the spacing support of flatness, need to only lay height and finely tune, work efficiency has obtained larger Improve.
Embodiment
With reference to embodiment, the embodiment of the present invention is further described.Following examples are only used for more Add and clearly demonstrate technical scheme, and can not be limited the scope of the invention with this.
The technical scheme that the present invention is embodied is:
A kind of ground tile paving construction method of preset absolute altitude cushion block, comprises the following steps:
1)Ground snap the line setting-out:Spliced according to the breadth specification and ground tile paving of floor tile and required, on the ground on original building ground Brick laying work area snap the line setting-out;
2)Absolute altitude cushion block it is preset:The ground starched and the bonding of polylith cement fibrolite plate is made to predetermined thickness is pasted using floor tile Absolute altitude cushion block;
3)Absolute altitude cushion block posts:Each right-angled intersection point of ground tile paving splicing suture sample has been drawn on original building ground Position, slurry is pasted using floor tile and pastes absolute altitude cushion block, is aided in by level meter, the top surface of each adjacent absolute altitude cushion block is adjusted same It is to be pasted firm on one horizontal plane;
4)Criticize slurry:The region of laying floor tile is needed on original building ground, with groove scraper plate, laterally batch floor tile pastes slurry, The concavo-convex race laterally moved towards is formed, the height and absolute altitude cushion block top surface on slurry convex surface are contour;Used at the floor tile back side to be laid Groove scraper plate batch goes out 2mm thickness and pastes slurry with the floor tile for being longitudinally oriented concavo-convex race;
5)Laying:By the above-mentioned floor tile to be laid for having criticized good stickup slurry, the good ground for pasting slurry has been criticized by being placed on, and The transverse direction that slurry is pasted on ground is moved towards into be longitudinally oriented concavo-convex race orthogonal, adhesion of the concavo-convex race with stickup slurry on floor tile Gluing, by floor tile quadrupod on corresponding four absolute altitude cushion blocks, then gently struck and shaken with rubber hammer, be to the fine setting of floor tile flatness Can.
The size of the cement fibrolite plate is 50mm × 50mm × 3mm.
Because building original place surface construction flatness regional area has larger drop, construction can be posted in absolute altitude cushion block Flat band mortar repairing is carried out afterwards, and final adjustment building ground absolute altitude is consistent.
In step 3)During the posting of absolute altitude cushion block, by the difference in height control on the top plane of absolute altitude cushion block and original building ground System is in 5mm.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvements and modifications can also be made, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (4)

1. the ground tile paving construction method of preset absolute altitude cushion block, it is characterised in that comprise the following steps:
1)Ground snap the line setting-out:Spliced according to the breadth specification and ground tile paving of floor tile and required, the floor tile on original building ground is spread If region snap the line setting-out;
2)Absolute altitude cushion block it is preset:The ground elevation starched and the bonding of polylith cement fibrolite plate is made to predetermined thickness is pasted using floor tile Cushion block;
3)Absolute altitude cushion block posts:Each right-angled intersection point position of ground tile paving splicing suture sample has been drawn on original building ground Put, slurry is pasted using floor tile and pastes absolute altitude cushion block, is aided in by level meter, the top surface of each adjacent absolute altitude cushion block is adjusted same It is to be pasted firm on horizontal plane;
4)Criticize slurry:The region of laying floor tile is needed on original building ground, laterally batch floor tile pastes slurry with groove scraper plate, is formed The concavo-convex race laterally moved towards, the height and absolute altitude cushion block top surface on slurry convex surface are contour;In floor tile back side groove to be laid Scraper plate batch goes out 2mm thickness and pastes slurry with the floor tile for being longitudinally oriented concavo-convex race;
5)Laying:By the above-mentioned floor tile to be laid for having criticized good stickup slurry, by being placed on the ground of having criticized good stickup slurry, and by ground The transverse direction that slurry is pasted on face moves towards be longitudinally oriented concavo-convex race orthogonal, adhesion glue of the concavo-convex race with stickup slurry on floor tile Close, by floor tile quadrupod on corresponding four absolute altitude cushion blocks, then gently struck and shaken with rubber hammer, be to the fine setting of floor tile flatness Can.
2. the ground tile paving construction method of preset absolute altitude cushion block according to claim 1, it is characterised in that the cement is fine The size for tieing up plate is 50mm × 50mm × 3mm.
3. the ground tile paving construction method of preset absolute altitude cushion block according to claim 2, it is characterised in that in absolute altitude cushion block Post construction after carry out flat band mortar repairing, final adjustment building ground absolute altitude is consistent.
4. the ground tile paving construction method of preset absolute altitude cushion block according to claim 3, it is characterised in that in step 3)Mark During the posting of high cushion block, the top plane of absolute altitude cushion block and the difference in height on original building ground are controlled in 5mm.
CN201510576154.XA 2015-09-11 2015-09-11 The ground tile paving construction method of preset absolute altitude cushion block Active CN105256973B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510576154.XA CN105256973B (en) 2015-09-11 2015-09-11 The ground tile paving construction method of preset absolute altitude cushion block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510576154.XA CN105256973B (en) 2015-09-11 2015-09-11 The ground tile paving construction method of preset absolute altitude cushion block

Publications (2)

Publication Number Publication Date
CN105256973A CN105256973A (en) 2016-01-20
CN105256973B true CN105256973B (en) 2018-03-30

Family

ID=55096875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510576154.XA Active CN105256973B (en) 2015-09-11 2015-09-11 The ground tile paving construction method of preset absolute altitude cushion block

Country Status (1)

Country Link
CN (1) CN105256973B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193245B (en) * 2016-07-14 2019-04-09 浙江景昌建设有限公司 A kind of paddy field underground reservoir and its construction method for sponge city
CN106639239B (en) * 2016-07-29 2019-04-09 上海市建筑装饰工程集团有限公司 The aerial prepackage slip casting curing method of stone material terrace
CN106639238B (en) * 2016-07-29 2019-04-09 上海市建筑装饰工程集团有限公司 Stone material terrace makes somebody a mere figurehead prepackage method
CN106592920B (en) * 2016-07-29 2022-07-29 上海市建筑装饰工程集团有限公司 Stone terrace is built on stilts pre-installation slip casting solidification structure
CN111608389A (en) * 2019-06-21 2020-09-01 中建材创新科技研究院有限公司 Stair floor tile paving construction method
CN110965745A (en) * 2019-11-05 2020-04-07 张军 Paving method of floor tiles and wall tiles
CN111472524B (en) * 2020-04-15 2021-05-04 广州市第二装修有限公司 Anti-hollowing floor construction method capable of achieving precise leveling

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1073270A (en) * 1996-08-30 1998-03-17 Morita Denko Kk Floor heating device
CN101713250A (en) * 2009-10-29 2010-05-26 孙清海 Process for pasting construction of floor tiles
CN103255903B (en) * 2013-05-23 2015-07-08 贵州正业工程技术投资有限公司 Workshop indoor steel plate concrete composite floor structure and manufacturing method thereof
CN104264953A (en) * 2014-08-27 2015-01-07 陈友坤 Support, paving method for ground stone and cement mortar stirring and conveying all-in-one machine
CN104533093B (en) * 2015-01-08 2016-06-22 王玲 Floor tile paving ground structure and laying method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
其他材料地面装饰;魏文彪;《装饰装修工程造价员》;江苏科学技术出版社;20130131;第40-42页 *

Also Published As

Publication number Publication date
CN105256973A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN105256973B (en) The ground tile paving construction method of preset absolute altitude cushion block
CN105587102B (en) A kind of wet construction method to the wet type high abrasion terrace that paves
CN104712085A (en) Large-area wear-resistant concrete ground construction method
CN106381980B (en) A kind of ground tile paving technique
CN204662910U (en) Rail mounted brick paving machine
CN203856178U (en) Self-leveling and separation structure for ground bricks
CN102605938B (en) Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs
US20230373860A1 (en) Paver adhesive and method of laying pavers using same
CN207829423U (en) Cement mortar tooth harrow
CN204590550U (en) Nail and rake type wood floor bolck cement bonded sand bed course chipping darby
CN108166736A (en) The method of cement mortar tooth harrow and paving floor ceramic tile
CN107489255A (en) A kind of big specification stone floor paving structure and construction method
CN206071011U (en) A kind of spreading device for floor tile paving
CN108612289A (en) A kind of slurry spreading device and its application method for large area paving floor tile
CN206071012U (en) A kind of spreading device of paving floor tile
CN208618730U (en) Floor tile dry construction bracket
CN207829425U (en) Cement mortar lying device
CN205875651U (en) Applied ceramic tile is spread tooth of taking that pastes and is spliced trowel
WO2015142203A1 (en) Paving slab, paving slabs production method and paving slab obtained using the method
CN110318522A (en) A kind of quick paving structure of compound ceramic tile
CN218292687U (en) Quick quality control device for paving and pasting floor tiles
CN102518018A (en) Stacked structure of road pavement and construction method for stacked structure
CN202369884U (en) Laminating structure of road pavement
JP2001164508A (en) Method of repairing paving surface and sport ground
CN215484377U (en) Piece setting piece and contain ground stone material structure of this setting piece

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 215000 No. 77 Nantian Cheng Road, Suzhou high speed railway, Jiangsu

Patentee after: Company limited is built in Suzhou The Land Of Woods And Waters design

Address before: No. 98 Nurturing Lane, Canglang District, Suzhou City, Jiangsu Province

Patentee before: Company limited is built in Suzhou The Land Of Woods And Waters design