CN106988221A - Unit construction bridge beam construction method based on BIM - Google Patents
Unit construction bridge beam construction method based on BIM Download PDFInfo
- Publication number
- CN106988221A CN106988221A CN201710152358.XA CN201710152358A CN106988221A CN 106988221 A CN106988221 A CN 106988221A CN 201710152358 A CN201710152358 A CN 201710152358A CN 106988221 A CN106988221 A CN 106988221A
- Authority
- CN
- China
- Prior art keywords
- construction
- model
- bim
- project
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of unit construction bridge beam construction method based on BIM, it is characterised in that comprises the following steps:According to Project design drawing and construction parameter, the BIM model of elements of bridge pier, binder, bent cap, box beam, inherent component and the reinforcing bar of packaged type bridges are set up using Revit Modeling Platforms, while assigning time parameter to unit model;After the completion for the treatment of that all model of elements are modeled, the assembling process of whole packaged type bridges is simulated by 4D animation simulations, in verification packaged type bridges each several part modeling during carrying out assembly simulation, built-in fitting position whether there is mistake, and make highlight mark, Project design drawing and construction parameter are checked and changed according to analog result, site operation drawing is edited in advance.The prefabricated and installation accuracy of packaged type bridges is significantly improved, production cost has been saved, while improving efficiency of construction, the duration is shortened.
Description
Technical field
The present invention relates to building field, particularly a kind of unit construction bridge beam construction method based on BIM.
Background technology
At present, packaged type bridges deploy application in each Municipal engineering, will the cast-in-place bridge pier of script, binder, lid
The progress batch production of the components such as beam is prefabricated, and carries out in-site installation by crane.This method can greatly improve bridge pier, bent cap etc.
The construction quality of concrete component, and accelerate engineering construction efficiency.But it is especially various to the element precast such as bridge pier, bent cap precision
The installation accuracy of built-in fitting requires higher, easily occur during construction because preburied component installation accuracy is not enough cause prefabricated components without
The phenomenon that method is installed, and it is the main cause for causing this phenomenon that prefabricating technique, which falls behind,.
BIM technology is wide in developed regions such as America and Europes as a kind of digitization instrument managed applied to engineering-built
It is general to use, at home building trade use also than wide.BIM technology has information completeness, information relevance, information one
Cause property, visualization, harmony, simulation, optimization property and the big feature of figure eight can be gone out, and can be by application platform to job site
Integral construction situation carry out remote monitoring and information transmission, how BIM technology to be combined with traditional packaged type bridges construction and existed
Together, it is the problem of present invention puts forth effort solution.
The content of the invention
It is an object of the invention to provide a kind of unit construction bridge beam construction method based on BIM solved the above problems, show
The prefabricated and installation accuracy for improving packaged type bridges is write, it is cost-effective, while improving efficiency of construction, shorten the duration, promote bridge
The project control objective that becomes more meticulous of " high standard, high-quality, high efficiency, zero error " is realized in construction.
The technical scheme is that:
A kind of unit construction bridge beam construction method based on BIM, it is characterised in that comprise the following steps:
1), according to Project design drawing and construction parameter, using Revit Modeling Platforms set up packaged type bridges bridge pier,
Binder, bent cap, box beam, the BIM model of elements of inherent component and reinforcing bar, while assigning time parameter to unit model;
2), treat after the completion of all model of element modelings, the assembling of whole packaged type bridges is simulated by 4D animation simulations
Journey, in verification packaged type bridges each several part modeling during carrying out assembly simulation, built-in fitting position whether there is mistake, imitate
With the presence or absence of situation about can not install during assembling, and at the position that BIM model of elements have mistake or can not install
Make highlight mark, point out that an error has occurred, Project design drawing and construction parameter check finally according to analog result and
Modification, while changing incorrect model data, edits site operation drawing in advance;
3), according to the 4D of the site operation drawing edited, amended BIM model of elements and simulation assembling work progress
Animation, coordinates project management department to carry out site operation 3-D technology and tells somebody what one's real intentions are, site operation personnel are obtained by being measured to threedimensional model
Take required project data or selected structure is labeled using threedimensional model;
4), construct before, by unit model assign time parameter, realize construction speed 4D simulate, by with meter
The progress of drawing is contrasted and forming curves figure or gunter drawing are analyzed, then according to analysis comparing result establishment section construction
Plan, including general plan of constructing, construction seasonal plan, construction monthly plan and construction daily planning, and by each construction plan and accordingly
Model of element be associated, set up information management database, by three-dimensional artificial show construction speed, to facilitate administrative staff
Grasp the construction mileage and associated construction information in correspondence stage;Simulated, carried according to construction plan by the 4D of construction speed simultaneously
Draw materials quantity, so as to help project management department to carry out stock control;By BIM model datas, investment project overall expenses is estimated,
The cost pipe of finished item and the capital budgeting of each construction plan link;
5), in work progress, actual consumption of materials is attached in information management database, to related construction meter
The extraction material quantity drawn is contrasted, and quantities is counted according to specified template, form and classifies to form statistics knot
Really, help project management department to realize the accounting of engineering quantity, reduce the waste of material.
The above-mentioned unit construction bridge beam construction method based on BIM, special to structure type, complex process work progress,
Show model structure using different colours, different visual angles, site operation personnel is accurately seen the internals of engineering construction,
Observer is facilitated intuitively to see construction speed clearly from internal to external.
The above-mentioned unit construction bridge beam construction method based on BIM, it is common based on each party information of real-time performance project under construction
Enjoy, including construction safety daily record, construction quality daily record, construction technology daily record, construction teams and groups daily record, confide a technological secret, site operation
Equipment situation, workmen's management and the real-time monitoring at scene, each participant of project are carried out engineering and are in harmony by CSCW applications
Business, coordination, realize the management and monitoring of construction quality, safety, cost and progress.
The beneficial effects of the invention are as follows:
1st, BIM technology is combined together with traditional packaged type bridges construction, BIM skills is utilized after being modeled according to design drawing
Art is simulated to the work progress of whole packaged type bridges, and the problem of there may be when finding out construction is simultaneously subject to construction drawing
Modification, so as to improve the precision that unit construction bridge is beam prefabricated and installs, improves operating efficiency and economic value.
2nd, BIM technology is applied in packaged type bridges construction first, realizes design optimization, construction simulation analysis, three-dimensional
The function such as confide a technological secret, effectively increase operating efficiency, saved production cost, shortened the construction period.
3rd, the pipe of science has been carried out to design, safety, quality, material, progress, cost in BIM technology application process
Reason, makes project tentatively realize from visualizing, become more meticulous, dynamic management, the modem management pattern managed to precision.
Brief description of the drawings
Fig. 1 be the present invention step 1) and step 2) FB(flow block).
Embodiment
The unit construction bridge beam construction method based on BIM, comprises the following steps:
1st, according to Project design drawing and construction parameter, set up the bridge pier of packaged type bridges using Revit Modeling Platforms, be
Beam, bent cap, box beam, the BIM model of elements of inherent component and reinforcing bar, while time parameter is assigned to unit model, referring to
Fig. 1.
2nd, treat after the completion of all model of element modelings, the assembling of whole packaged type bridges is simulated by 4D animation simulations
Journey, in verification packaged type bridges each several part modeling during carrying out assembly simulation, built-in fitting position whether there is mistake, imitate
With the presence or absence of situation about can not install during assembling, and at the position that BIM model of elements have mistake or can not install
Make highlight mark, point out that an error has occurred, Project design drawing and construction parameter check finally according to analog result and
Modification, while changing incorrect model data, edits site operation drawing in advance.
3rd, according to the 4D of the site operation drawing edited, amended BIM model of elements and simulation assembling work progress
Animation, coordinates project management department to carry out site operation 3-D technology and tells somebody what one's real intentions are, site operation personnel are obtained by being measured to threedimensional model
Take required project data or selected structure is labeled using threedimensional model.
4th, construct before, by unit model assign time parameter, realize construction speed 4D simulate, by with plan
Progress is contrasted and forming curves figure or gunter drawing are analyzed, and then creates section construction meter according to analysis comparing result
Draw, including general plan of constructing, construction seasonal plan, construction monthly plan and construction daily planning, and by each construction plan and accordingly
Model of element is associated, and sets up information management database, construction speed is shown by three-dimensional artificial, to facilitate administrative staff to slap
Hold the construction mileage and associated construction information in correspondence stage;Simulated, extracted according to construction plan by the 4D of construction speed simultaneously
Material quantity, so as to help project management department to carry out stock control;By BIM model datas, investment project overall expenses is estimated, it is complete
Cost pipe and the capital budgeting of each construction plan link into project.
5th, in work progress, actual consumption of materials is attached in information management database, to related construction meter
The extraction material quantity drawn is contrasted, and quantities is counted according to specified template, form and classifies to form statistics knot
Really, help project management department to realize the accounting of engineering quantity, reduce the waste of material.
In the present embodiment, special to structure type, complex process work progress, using different colours, different visual angles exhibition
Existing model structure, makes site operation personnel accurately see the internals of engineering construction, facilitates observer from internal to external
Intuitively see construction speed clearly.It is shared based on each party information of real-time performance project under construction, including construction safety daily record, construction
Quality log, construction technology daily record, construction teams and groups daily record, confide a technological secret, site operation equipment situation, workmen's management and existing
The real-time monitoring of field, each participant of project is carried out engineering negotiation, coordinated by CSCW applications, realizes construction quality, peace
Entirely, the management and monitoring of cost and progress.
Claims (3)
1. a kind of unit construction bridge beam construction method based on BIM, it is characterised in that comprise the following steps:
1), according to Project design drawing and construction parameter, using Revit Modeling Platforms set up the bridge piers of packaged type bridges, binder,
Bent cap, box beam, the BIM model of elements of inherent component and reinforcing bar, while assigning time parameter to unit model;
2), treat after the completion of all model of element modelings, the assembling process of whole packaged type bridges is simulated by 4D animation simulations,
Built-in fitting position whether there is mistake during the modeling of verification packaged type bridges each several part during progress assembly simulation, imitate what is assembled
During make highlighted with the presence or absence of situation about can not install, and at the position that BIM model of elements have mistake or can not install
Mark, an error has occurred for prompting, and Project design drawing and construction parameter are checked and changed finally according to analog result, together
The incorrect model datas of Shi Xiugai, edit site operation drawing in advance;
3), moved according to the 4D of the site operation drawing edited, amended BIM model of elements and simulation assembling work progress
Draw, coordinate project management department to carry out site operation 3-D technology and tell somebody what one's real intentions are, site operation personnel are by measuring acquisition to threedimensional model
Required project data is labeled using threedimensional model to selected structure;
4), construct before, by unit model assign time parameter, realize construction speed 4D simulate, by with plan into
Degree is contrasted and forming curves figure or gunter drawing are analyzed, and then creates section construction meter according to analysis comparing result
Draw, including general plan of constructing, construction seasonal plan, construction monthly plan and construction daily planning, and by each construction plan and accordingly
Model of element is associated, and sets up information management database, construction speed is shown by three-dimensional artificial, to facilitate administrative staff to slap
Hold the construction mileage and associated construction information in correspondence stage;Simulated, extracted according to construction plan by the 4D of construction speed simultaneously
Material quantity, so as to help project management department to carry out stock control;By BIM model datas, investment project overall expenses is estimated, it is complete
Cost pipe and the capital budgeting of each construction plan link into project;
5), in work progress, actual consumption of materials is attached in information management database, to related construction plan
Extract material quantity to be contrasted, quantities is counted according to specified template, form and classifies to form statistical result, help
Help project management department to realize the accounting of engineering quantity, reduce the waste of material.
2. the unit construction bridge beam construction method according to claim 1 based on BIM, it is characterised in that:It is special to structure type
Very, the work progress of complex process, shows model structure using different colours, different visual angles, makes site operation personnel accurately
See the internals of engineering construction, facilitate observer intuitively to see construction speed clearly from internal to external.
3. the unit construction bridge beam construction method according to claim 1 based on BIM, it is characterised in that:Based on real-time performance
Each party information of project under construction is shared, including construction safety daily record, construction quality daily record, construction technology daily record, construction teams and groups
Daily record, confide a technological secret, site operation equipment situation, workmen's management and the real-time monitoring at scene, each participant of project passes through
CSCW applications, carry out engineering negotiation, coordinate, realize the management and monitoring of construction quality, safety, cost and progress.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710152358.XA CN106988221B (en) | 2017-03-15 | 2017-03-15 | Unit construction bridge beam construction method based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710152358.XA CN106988221B (en) | 2017-03-15 | 2017-03-15 | Unit construction bridge beam construction method based on BIM |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106988221A true CN106988221A (en) | 2017-07-28 |
CN106988221B CN106988221B (en) | 2018-10-19 |
Family
ID=59412186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710152358.XA Active CN106988221B (en) | 2017-03-15 | 2017-03-15 | Unit construction bridge beam construction method based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106988221B (en) |
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107506561A (en) * | 2017-09-18 | 2017-12-22 | 广东星层建筑科技股份有限公司 | A kind of bridge forward design method based on BIM |
CN107563662A (en) * | 2017-09-15 | 2018-01-09 | 中建海峡建设发展有限公司 | A kind of method and computing device of PC components production curves |
CN107862133A (en) * | 2017-11-06 | 2018-03-30 | 中国铁路设计集团有限公司 | A kind of method of Mass production bridge pier BIM models |
CN108280281A (en) * | 2018-01-18 | 2018-07-13 | 宋强 | A kind of construction cost control method and system based on BIM technology |
CN108427815A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of collision detection method and device in engineering project |
CN108427791A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | The design management method and device of erecting yard safety measure based on BIM |
CN108589725A (en) * | 2018-05-15 | 2018-09-28 | 中国十七冶集团有限公司 | A kind of built-in fitting construction method based on BIM technology |
CN108842782A (en) * | 2018-07-17 | 2018-11-20 | 中铁九局集团第七工程有限公司 | Based on BIM technology deep pit digging and construction method for supporting |
CN108846644A (en) * | 2018-06-22 | 2018-11-20 | 中船第九设计研究院工程有限公司 | A kind of integrated emulation technology, collaborative work, information management and project management managing and control system |
CN109117521A (en) * | 2018-07-21 | 2019-01-01 | 中铁十八局集团有限公司 | A kind of steel truss rod piece splice plate bolt auxiliary assembly system |
CN109145481A (en) * | 2018-09-03 | 2019-01-04 | 中铁三局集团有限公司 | Bridge pier shaft based on BIM is template optimized to use arrangement method |
CN109523182A (en) * | 2018-11-27 | 2019-03-26 | 华规软件(上海)有限公司 | A kind of beam field production management method, platform, computer equipment and storage medium |
CN109583852A (en) * | 2018-12-29 | 2019-04-05 | 中铁局集团有限公司第三工程分公司 | A kind of goods and materials for bridge cantilever pouring construction and progress msg management system |
CN109614685A (en) * | 2018-12-04 | 2019-04-12 | 上海宝冶集团有限公司 | Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal |
CN109726445A (en) * | 2018-12-07 | 2019-05-07 | 佛山科学技术学院 | Assembled architecture concrete pouring procedure based on BIM |
CN110055901A (en) * | 2019-05-16 | 2019-07-26 | 中铁十五局集团第五工程有限公司 | A kind of control method for realizing pushing tow steel tube arch rib closure precision based on BIM technology |
CN110080114A (en) * | 2019-05-20 | 2019-08-02 | 上海浦东路桥建设股份有限公司 | A kind of visualization prefabricated stand column construction method based on BIM technology |
CN110119774A (en) * | 2019-05-08 | 2019-08-13 | 中铁八局集团建筑工程有限公司 | A kind of contrast difference's method based on Building Information Model 4D progress Yu outdoor scene progress |
CN110322534A (en) * | 2019-04-08 | 2019-10-11 | 中铁十六局集团第四工程有限公司 | A kind of steel truss girder Support Method assembling construction analogy method based on BIM technology |
CN110348142A (en) * | 2019-07-16 | 2019-10-18 | 龙元建设集团股份有限公司 | Based on the BIM method of gang form bracket technique molding curve bridge |
CN110598260A (en) * | 2019-08-16 | 2019-12-20 | 南京紫城工程设计有限公司 | Municipal engineering design system based on BIM technology |
CN110714416A (en) * | 2019-10-25 | 2020-01-21 | 中国一冶集团有限公司 | BIM-based temporary consolidation construction structure and method for large cantilever bridge body |
CN110795788A (en) * | 2019-10-29 | 2020-02-14 | 中建四局贵州投资建设有限公司 | Application method in road and bridge engineering based on BIM (building information modeling) cooperation technology |
CN110804955A (en) * | 2019-11-27 | 2020-02-18 | 江西省公路桥梁工程有限公司 | Bridge construction method based on BIM |
CN111027123A (en) * | 2019-12-03 | 2020-04-17 | 中交第二公路勘察设计研究院有限公司 | Cable structure bridge design method based on BIM model |
CN111260325A (en) * | 2019-07-23 | 2020-06-09 | 上海建工集团股份有限公司 | Bridge construction progress management system based on BIM |
CN111287091A (en) * | 2020-02-28 | 2020-06-16 | 中国十七冶集团有限公司 | BIM-based fabricated concrete bridge construction method |
CN111625971A (en) * | 2020-03-06 | 2020-09-04 | 中国十七冶集团有限公司 | Assembling method for prefabricated components of assembled concrete bridge |
CN111622110A (en) * | 2020-04-24 | 2020-09-04 | 中交第二航务工程局有限公司 | Intelligent installation and construction method for prefabricated bent cap based on three-dimensional measurement lofting technology |
CN111967081A (en) * | 2020-08-20 | 2020-11-20 | 广西路桥工程集团有限公司 | Bridge construction management system based on BIM |
CN113158303A (en) * | 2021-04-01 | 2021-07-23 | 江苏大学 | BIM-based assembled steel bridge three-dimensional model construction method |
CN114086467A (en) * | 2021-11-24 | 2022-02-25 | 中铁四局集团第五工程有限公司 | Prefabricated installation construction method for steel-concrete composite beam bridge deck |
CN114491757A (en) * | 2022-01-26 | 2022-05-13 | 扬州大学 | Gravity center positioning method for assembly type bridge special-shaped pier stud based on severe mathematical model |
CN115510532A (en) * | 2022-09-27 | 2022-12-23 | 中交第三公路工程局有限公司 | Integrated erection method of assembled steel box arch-connected bridge |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004100026A1 (en) * | 2003-05-06 | 2004-11-18 | Plambeck Neue Energien Solar-Technik Gmbh | Method for the constructional design of solar plants |
KR101151666B1 (en) * | 2012-02-15 | 2012-06-08 | 이형훈 | Beam construction method using represtressing of joint, beam and bridge construction method thereby |
CN103049624A (en) * | 2013-01-04 | 2013-04-17 | 江西省交通设计研究院有限责任公司 | Control method of culvert visual design construction based on virtual reality modeling language (VRML) |
CN104109999A (en) * | 2014-06-26 | 2014-10-22 | 中铁大桥局股份有限公司 | Construction method for bridge tower transverse beams |
CN104404883A (en) * | 2014-11-19 | 2015-03-11 | 中交四航局第三工程有限公司 | Inner working platform for rapid construction of bridge pier and construction method using inner working platform |
CN106012851A (en) * | 2016-06-15 | 2016-10-12 | 中冶南方工程技术有限公司 | Synchronous construction method of steel box girder and concrete pier studs |
-
2017
- 2017-03-15 CN CN201710152358.XA patent/CN106988221B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004100026A1 (en) * | 2003-05-06 | 2004-11-18 | Plambeck Neue Energien Solar-Technik Gmbh | Method for the constructional design of solar plants |
KR101151666B1 (en) * | 2012-02-15 | 2012-06-08 | 이형훈 | Beam construction method using represtressing of joint, beam and bridge construction method thereby |
CN103049624A (en) * | 2013-01-04 | 2013-04-17 | 江西省交通设计研究院有限责任公司 | Control method of culvert visual design construction based on virtual reality modeling language (VRML) |
CN104109999A (en) * | 2014-06-26 | 2014-10-22 | 中铁大桥局股份有限公司 | Construction method for bridge tower transverse beams |
CN104404883A (en) * | 2014-11-19 | 2015-03-11 | 中交四航局第三工程有限公司 | Inner working platform for rapid construction of bridge pier and construction method using inner working platform |
CN106012851A (en) * | 2016-06-15 | 2016-10-12 | 中冶南方工程技术有限公司 | Synchronous construction method of steel box girder and concrete pier studs |
Cited By (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108427815A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of collision detection method and device in engineering project |
CN108427791A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | The design management method and device of erecting yard safety measure based on BIM |
CN107563662A (en) * | 2017-09-15 | 2018-01-09 | 中建海峡建设发展有限公司 | A kind of method and computing device of PC components production curves |
CN107506561A (en) * | 2017-09-18 | 2017-12-22 | 广东星层建筑科技股份有限公司 | A kind of bridge forward design method based on BIM |
CN107862133B (en) * | 2017-11-06 | 2021-06-11 | 中国铁路设计集团有限公司 | Method for generating BIM models of piers in batches |
CN107862133A (en) * | 2017-11-06 | 2018-03-30 | 中国铁路设计集团有限公司 | A kind of method of Mass production bridge pier BIM models |
CN108280281A (en) * | 2018-01-18 | 2018-07-13 | 宋强 | A kind of construction cost control method and system based on BIM technology |
CN108589725A (en) * | 2018-05-15 | 2018-09-28 | 中国十七冶集团有限公司 | A kind of built-in fitting construction method based on BIM technology |
CN108846644A (en) * | 2018-06-22 | 2018-11-20 | 中船第九设计研究院工程有限公司 | A kind of integrated emulation technology, collaborative work, information management and project management managing and control system |
CN108842782A (en) * | 2018-07-17 | 2018-11-20 | 中铁九局集团第七工程有限公司 | Based on BIM technology deep pit digging and construction method for supporting |
CN109117521A (en) * | 2018-07-21 | 2019-01-01 | 中铁十八局集团有限公司 | A kind of steel truss rod piece splice plate bolt auxiliary assembly system |
CN109145481A (en) * | 2018-09-03 | 2019-01-04 | 中铁三局集团有限公司 | Bridge pier shaft based on BIM is template optimized to use arrangement method |
CN109523182A (en) * | 2018-11-27 | 2019-03-26 | 华规软件(上海)有限公司 | A kind of beam field production management method, platform, computer equipment and storage medium |
CN109614685A (en) * | 2018-12-04 | 2019-04-12 | 上海宝冶集团有限公司 | Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal |
CN109726445A (en) * | 2018-12-07 | 2019-05-07 | 佛山科学技术学院 | Assembled architecture concrete pouring procedure based on BIM |
CN109583852B (en) * | 2018-12-29 | 2022-02-25 | 中铁一局集团有限公司第三工程分公司 | Material and progress informatization management system for bridge cantilever pouring construction |
CN109583852A (en) * | 2018-12-29 | 2019-04-05 | 中铁局集团有限公司第三工程分公司 | A kind of goods and materials for bridge cantilever pouring construction and progress msg management system |
CN110322534A (en) * | 2019-04-08 | 2019-10-11 | 中铁十六局集团第四工程有限公司 | A kind of steel truss girder Support Method assembling construction analogy method based on BIM technology |
CN110322534B (en) * | 2019-04-08 | 2022-08-09 | 中铁十六局集团第四工程有限公司 | BIM technology-based steel truss girder support method assembly construction simulation method |
CN110119774A (en) * | 2019-05-08 | 2019-08-13 | 中铁八局集团建筑工程有限公司 | A kind of contrast difference's method based on Building Information Model 4D progress Yu outdoor scene progress |
CN110055901A (en) * | 2019-05-16 | 2019-07-26 | 中铁十五局集团第五工程有限公司 | A kind of control method for realizing pushing tow steel tube arch rib closure precision based on BIM technology |
CN110080114A (en) * | 2019-05-20 | 2019-08-02 | 上海浦东路桥建设股份有限公司 | A kind of visualization prefabricated stand column construction method based on BIM technology |
CN110348142A (en) * | 2019-07-16 | 2019-10-18 | 龙元建设集团股份有限公司 | Based on the BIM method of gang form bracket technique molding curve bridge |
CN110348142B (en) * | 2019-07-16 | 2023-01-17 | 龙元建设集团股份有限公司 | Method for forming curve bridge based on BIM combined template support process |
CN111260325A (en) * | 2019-07-23 | 2020-06-09 | 上海建工集团股份有限公司 | Bridge construction progress management system based on BIM |
CN110598260A (en) * | 2019-08-16 | 2019-12-20 | 南京紫城工程设计有限公司 | Municipal engineering design system based on BIM technology |
CN110714416A (en) * | 2019-10-25 | 2020-01-21 | 中国一冶集团有限公司 | BIM-based temporary consolidation construction structure and method for large cantilever bridge body |
CN110795788A (en) * | 2019-10-29 | 2020-02-14 | 中建四局贵州投资建设有限公司 | Application method in road and bridge engineering based on BIM (building information modeling) cooperation technology |
CN110804955A (en) * | 2019-11-27 | 2020-02-18 | 江西省公路桥梁工程有限公司 | Bridge construction method based on BIM |
CN111027123A (en) * | 2019-12-03 | 2020-04-17 | 中交第二公路勘察设计研究院有限公司 | Cable structure bridge design method based on BIM model |
CN111027123B (en) * | 2019-12-03 | 2023-10-24 | 中交第二公路勘察设计研究院有限公司 | BIM model-based cable structure bridge design method |
CN111287091A (en) * | 2020-02-28 | 2020-06-16 | 中国十七冶集团有限公司 | BIM-based fabricated concrete bridge construction method |
CN111625971B (en) * | 2020-03-06 | 2023-03-10 | 中国十七冶集团有限公司 | Assembling method for prefabricated components of assembled concrete bridge |
CN111625971A (en) * | 2020-03-06 | 2020-09-04 | 中国十七冶集团有限公司 | Assembling method for prefabricated components of assembled concrete bridge |
CN111622110B (en) * | 2020-04-24 | 2021-10-29 | 中交第二航务工程局有限公司 | Intelligent installation and construction method for prefabricated bent cap based on three-dimensional measurement lofting technology |
CN111622110A (en) * | 2020-04-24 | 2020-09-04 | 中交第二航务工程局有限公司 | Intelligent installation and construction method for prefabricated bent cap based on three-dimensional measurement lofting technology |
CN111967081A (en) * | 2020-08-20 | 2020-11-20 | 广西路桥工程集团有限公司 | Bridge construction management system based on BIM |
CN113158303A (en) * | 2021-04-01 | 2021-07-23 | 江苏大学 | BIM-based assembled steel bridge three-dimensional model construction method |
CN114086467A (en) * | 2021-11-24 | 2022-02-25 | 中铁四局集团第五工程有限公司 | Prefabricated installation construction method for steel-concrete composite beam bridge deck |
CN114491757A (en) * | 2022-01-26 | 2022-05-13 | 扬州大学 | Gravity center positioning method for assembly type bridge special-shaped pier stud based on severe mathematical model |
CN114491757B (en) * | 2022-01-26 | 2024-01-23 | 扬州大学 | Gravity center positioning method for special-shaped pier column of assembled bridge based on severe mathematical model |
CN115510532A (en) * | 2022-09-27 | 2022-12-23 | 中交第三公路工程局有限公司 | Integrated erection method of assembled steel box arch-connected bridge |
CN115510532B (en) * | 2022-09-27 | 2024-04-05 | 中交第三公路工程局有限公司 | Integrated erection method for assembled steel box double arch bridge |
Also Published As
Publication number | Publication date |
---|---|
CN106988221B (en) | 2018-10-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106988221B (en) | Unit construction bridge beam construction method based on BIM | |
CN111598379B (en) | Project management method, platform, device, computer equipment and storage medium | |
CN109766581B (en) | Method for establishing bridge BIM (building information modeling) model by adopting Dynamo software | |
Ma et al. | Application of 4D for dynamic site layout and management of construction projects | |
CN109785436B (en) | BIM technology-based reinforcing steel bar information full life cycle management method | |
Kaner et al. | Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms | |
CN111062081A (en) | Underground continuous wall construction method based on BIM technology | |
CN107818198A (en) | A kind of science of bridge building management platform based on BIM technology | |
CN106709660A (en) | BIM-based architectural design method | |
CN110080114A (en) | A kind of visualization prefabricated stand column construction method based on BIM technology | |
Marzouk et al. | Using BIM to identify claims early in the construction industry: Case study | |
CN106096111A (en) | BIM technology application in high-speed railway CRTSIII plate-type Construction of Ballastless Track | |
CN106997511A (en) | Railway beam course management system and railway beam a management method based on BIM technology | |
CN111125814A (en) | BIM-based project supervision and supervision method and system | |
KR20130016620A (en) | 3d process management method for bim(building information modeling) | |
CN110162856A (en) | A kind of beam stirrup intelligent generation method based on dynamo | |
CN106169114A (en) | BIM technology application platform based on high-speed railway CRTS III plate-type Construction of Ballastless Track | |
CN112884290A (en) | BIM-based field construction management method | |
CN115470565A (en) | Bridge construction method and system based on BIM technology | |
Xiaer et al. | Design for safety (DFS) and building information modeling (BIM): A review | |
CN116703127A (en) | Building construction supervision method and system based on BIM | |
Samarasinghe et al. | Innovative digital technologies | |
CN108416076A (en) | A kind of assembled architecture design method based on BIM technology | |
CN114896677B (en) | BIM (building information modeling) -based construction simulation method and system | |
CN110634186A (en) | Arch cover method underground excavation construction method based on BIM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |