CN106988221A - Unit construction bridge beam construction method based on BIM - Google Patents

Unit construction bridge beam construction method based on BIM Download PDF

Info

Publication number
CN106988221A
CN106988221A CN201710152358.XA CN201710152358A CN106988221A CN 106988221 A CN106988221 A CN 106988221A CN 201710152358 A CN201710152358 A CN 201710152358A CN 106988221 A CN106988221 A CN 106988221A
Authority
CN
China
Prior art keywords
construction
model
bim
project
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710152358.XA
Other languages
Chinese (zh)
Other versions
CN106988221B (en
Inventor
李�昊
梁金桥
唐宏亮
李泽鹏
辛大权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Northen Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Northen Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Northen Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201710152358.XA priority Critical patent/CN106988221B/en
Publication of CN106988221A publication Critical patent/CN106988221A/en
Application granted granted Critical
Publication of CN106988221B publication Critical patent/CN106988221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of unit construction bridge beam construction method based on BIM, it is characterised in that comprises the following steps:According to Project design drawing and construction parameter, the BIM model of elements of bridge pier, binder, bent cap, box beam, inherent component and the reinforcing bar of packaged type bridges are set up using Revit Modeling Platforms, while assigning time parameter to unit model;After the completion for the treatment of that all model of elements are modeled, the assembling process of whole packaged type bridges is simulated by 4D animation simulations, in verification packaged type bridges each several part modeling during carrying out assembly simulation, built-in fitting position whether there is mistake, and make highlight mark, Project design drawing and construction parameter are checked and changed according to analog result, site operation drawing is edited in advance.The prefabricated and installation accuracy of packaged type bridges is significantly improved, production cost has been saved, while improving efficiency of construction, the duration is shortened.

Description

Unit construction bridge beam construction method based on BIM
Technical field
The present invention relates to building field, particularly a kind of unit construction bridge beam construction method based on BIM.
Background technology
At present, packaged type bridges deploy application in each Municipal engineering, will the cast-in-place bridge pier of script, binder, lid The progress batch production of the components such as beam is prefabricated, and carries out in-site installation by crane.This method can greatly improve bridge pier, bent cap etc. The construction quality of concrete component, and accelerate engineering construction efficiency.But it is especially various to the element precast such as bridge pier, bent cap precision The installation accuracy of built-in fitting requires higher, easily occur during construction because preburied component installation accuracy is not enough cause prefabricated components without The phenomenon that method is installed, and it is the main cause for causing this phenomenon that prefabricating technique, which falls behind,.
BIM technology is wide in developed regions such as America and Europes as a kind of digitization instrument managed applied to engineering-built It is general to use, at home building trade use also than wide.BIM technology has information completeness, information relevance, information one Cause property, visualization, harmony, simulation, optimization property and the big feature of figure eight can be gone out, and can be by application platform to job site Integral construction situation carry out remote monitoring and information transmission, how BIM technology to be combined with traditional packaged type bridges construction and existed Together, it is the problem of present invention puts forth effort solution.
The content of the invention
It is an object of the invention to provide a kind of unit construction bridge beam construction method based on BIM solved the above problems, show The prefabricated and installation accuracy for improving packaged type bridges is write, it is cost-effective, while improving efficiency of construction, shorten the duration, promote bridge The project control objective that becomes more meticulous of " high standard, high-quality, high efficiency, zero error " is realized in construction.
The technical scheme is that:
A kind of unit construction bridge beam construction method based on BIM, it is characterised in that comprise the following steps:
1), according to Project design drawing and construction parameter, using Revit Modeling Platforms set up packaged type bridges bridge pier, Binder, bent cap, box beam, the BIM model of elements of inherent component and reinforcing bar, while assigning time parameter to unit model;
2), treat after the completion of all model of element modelings, the assembling of whole packaged type bridges is simulated by 4D animation simulations Journey, in verification packaged type bridges each several part modeling during carrying out assembly simulation, built-in fitting position whether there is mistake, imitate With the presence or absence of situation about can not install during assembling, and at the position that BIM model of elements have mistake or can not install Make highlight mark, point out that an error has occurred, Project design drawing and construction parameter check finally according to analog result and Modification, while changing incorrect model data, edits site operation drawing in advance;
3), according to the 4D of the site operation drawing edited, amended BIM model of elements and simulation assembling work progress Animation, coordinates project management department to carry out site operation 3-D technology and tells somebody what one's real intentions are, site operation personnel are obtained by being measured to threedimensional model Take required project data or selected structure is labeled using threedimensional model;
4), construct before, by unit model assign time parameter, realize construction speed 4D simulate, by with meter The progress of drawing is contrasted and forming curves figure or gunter drawing are analyzed, then according to analysis comparing result establishment section construction Plan, including general plan of constructing, construction seasonal plan, construction monthly plan and construction daily planning, and by each construction plan and accordingly Model of element be associated, set up information management database, by three-dimensional artificial show construction speed, to facilitate administrative staff Grasp the construction mileage and associated construction information in correspondence stage;Simulated, carried according to construction plan by the 4D of construction speed simultaneously Draw materials quantity, so as to help project management department to carry out stock control;By BIM model datas, investment project overall expenses is estimated, The cost pipe of finished item and the capital budgeting of each construction plan link;
5), in work progress, actual consumption of materials is attached in information management database, to related construction meter The extraction material quantity drawn is contrasted, and quantities is counted according to specified template, form and classifies to form statistics knot Really, help project management department to realize the accounting of engineering quantity, reduce the waste of material.
The above-mentioned unit construction bridge beam construction method based on BIM, special to structure type, complex process work progress, Show model structure using different colours, different visual angles, site operation personnel is accurately seen the internals of engineering construction, Observer is facilitated intuitively to see construction speed clearly from internal to external.
The above-mentioned unit construction bridge beam construction method based on BIM, it is common based on each party information of real-time performance project under construction Enjoy, including construction safety daily record, construction quality daily record, construction technology daily record, construction teams and groups daily record, confide a technological secret, site operation Equipment situation, workmen's management and the real-time monitoring at scene, each participant of project are carried out engineering and are in harmony by CSCW applications Business, coordination, realize the management and monitoring of construction quality, safety, cost and progress.
The beneficial effects of the invention are as follows:
1st, BIM technology is combined together with traditional packaged type bridges construction, BIM skills is utilized after being modeled according to design drawing Art is simulated to the work progress of whole packaged type bridges, and the problem of there may be when finding out construction is simultaneously subject to construction drawing Modification, so as to improve the precision that unit construction bridge is beam prefabricated and installs, improves operating efficiency and economic value.
2nd, BIM technology is applied in packaged type bridges construction first, realizes design optimization, construction simulation analysis, three-dimensional The function such as confide a technological secret, effectively increase operating efficiency, saved production cost, shortened the construction period.
3rd, the pipe of science has been carried out to design, safety, quality, material, progress, cost in BIM technology application process Reason, makes project tentatively realize from visualizing, become more meticulous, dynamic management, the modem management pattern managed to precision.
Brief description of the drawings
Fig. 1 be the present invention step 1) and step 2) FB(flow block).
Embodiment
The unit construction bridge beam construction method based on BIM, comprises the following steps:
1st, according to Project design drawing and construction parameter, set up the bridge pier of packaged type bridges using Revit Modeling Platforms, be Beam, bent cap, box beam, the BIM model of elements of inherent component and reinforcing bar, while time parameter is assigned to unit model, referring to Fig. 1.
2nd, treat after the completion of all model of element modelings, the assembling of whole packaged type bridges is simulated by 4D animation simulations Journey, in verification packaged type bridges each several part modeling during carrying out assembly simulation, built-in fitting position whether there is mistake, imitate With the presence or absence of situation about can not install during assembling, and at the position that BIM model of elements have mistake or can not install Make highlight mark, point out that an error has occurred, Project design drawing and construction parameter check finally according to analog result and Modification, while changing incorrect model data, edits site operation drawing in advance.
3rd, according to the 4D of the site operation drawing edited, amended BIM model of elements and simulation assembling work progress Animation, coordinates project management department to carry out site operation 3-D technology and tells somebody what one's real intentions are, site operation personnel are obtained by being measured to threedimensional model Take required project data or selected structure is labeled using threedimensional model.
4th, construct before, by unit model assign time parameter, realize construction speed 4D simulate, by with plan Progress is contrasted and forming curves figure or gunter drawing are analyzed, and then creates section construction meter according to analysis comparing result Draw, including general plan of constructing, construction seasonal plan, construction monthly plan and construction daily planning, and by each construction plan and accordingly Model of element is associated, and sets up information management database, construction speed is shown by three-dimensional artificial, to facilitate administrative staff to slap Hold the construction mileage and associated construction information in correspondence stage;Simulated, extracted according to construction plan by the 4D of construction speed simultaneously Material quantity, so as to help project management department to carry out stock control;By BIM model datas, investment project overall expenses is estimated, it is complete Cost pipe and the capital budgeting of each construction plan link into project.
5th, in work progress, actual consumption of materials is attached in information management database, to related construction meter The extraction material quantity drawn is contrasted, and quantities is counted according to specified template, form and classifies to form statistics knot Really, help project management department to realize the accounting of engineering quantity, reduce the waste of material.
In the present embodiment, special to structure type, complex process work progress, using different colours, different visual angles exhibition Existing model structure, makes site operation personnel accurately see the internals of engineering construction, facilitates observer from internal to external Intuitively see construction speed clearly.It is shared based on each party information of real-time performance project under construction, including construction safety daily record, construction Quality log, construction technology daily record, construction teams and groups daily record, confide a technological secret, site operation equipment situation, workmen's management and existing The real-time monitoring of field, each participant of project is carried out engineering negotiation, coordinated by CSCW applications, realizes construction quality, peace Entirely, the management and monitoring of cost and progress.

Claims (3)

1. a kind of unit construction bridge beam construction method based on BIM, it is characterised in that comprise the following steps:
1), according to Project design drawing and construction parameter, using Revit Modeling Platforms set up the bridge piers of packaged type bridges, binder, Bent cap, box beam, the BIM model of elements of inherent component and reinforcing bar, while assigning time parameter to unit model;
2), treat after the completion of all model of element modelings, the assembling process of whole packaged type bridges is simulated by 4D animation simulations, Built-in fitting position whether there is mistake during the modeling of verification packaged type bridges each several part during progress assembly simulation, imitate what is assembled During make highlighted with the presence or absence of situation about can not install, and at the position that BIM model of elements have mistake or can not install Mark, an error has occurred for prompting, and Project design drawing and construction parameter are checked and changed finally according to analog result, together The incorrect model datas of Shi Xiugai, edit site operation drawing in advance;
3), moved according to the 4D of the site operation drawing edited, amended BIM model of elements and simulation assembling work progress Draw, coordinate project management department to carry out site operation 3-D technology and tell somebody what one's real intentions are, site operation personnel are by measuring acquisition to threedimensional model Required project data is labeled using threedimensional model to selected structure;
4), construct before, by unit model assign time parameter, realize construction speed 4D simulate, by with plan into Degree is contrasted and forming curves figure or gunter drawing are analyzed, and then creates section construction meter according to analysis comparing result Draw, including general plan of constructing, construction seasonal plan, construction monthly plan and construction daily planning, and by each construction plan and accordingly Model of element is associated, and sets up information management database, construction speed is shown by three-dimensional artificial, to facilitate administrative staff to slap Hold the construction mileage and associated construction information in correspondence stage;Simulated, extracted according to construction plan by the 4D of construction speed simultaneously Material quantity, so as to help project management department to carry out stock control;By BIM model datas, investment project overall expenses is estimated, it is complete Cost pipe and the capital budgeting of each construction plan link into project;
5), in work progress, actual consumption of materials is attached in information management database, to related construction plan Extract material quantity to be contrasted, quantities is counted according to specified template, form and classifies to form statistical result, help Help project management department to realize the accounting of engineering quantity, reduce the waste of material.
2. the unit construction bridge beam construction method according to claim 1 based on BIM, it is characterised in that:It is special to structure type Very, the work progress of complex process, shows model structure using different colours, different visual angles, makes site operation personnel accurately See the internals of engineering construction, facilitate observer intuitively to see construction speed clearly from internal to external.
3. the unit construction bridge beam construction method according to claim 1 based on BIM, it is characterised in that:Based on real-time performance Each party information of project under construction is shared, including construction safety daily record, construction quality daily record, construction technology daily record, construction teams and groups Daily record, confide a technological secret, site operation equipment situation, workmen's management and the real-time monitoring at scene, each participant of project passes through CSCW applications, carry out engineering negotiation, coordinate, realize the management and monitoring of construction quality, safety, cost and progress.
CN201710152358.XA 2017-03-15 2017-03-15 Unit construction bridge beam construction method based on BIM Active CN106988221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710152358.XA CN106988221B (en) 2017-03-15 2017-03-15 Unit construction bridge beam construction method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710152358.XA CN106988221B (en) 2017-03-15 2017-03-15 Unit construction bridge beam construction method based on BIM

Publications (2)

Publication Number Publication Date
CN106988221A true CN106988221A (en) 2017-07-28
CN106988221B CN106988221B (en) 2018-10-19

Family

ID=59412186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710152358.XA Active CN106988221B (en) 2017-03-15 2017-03-15 Unit construction bridge beam construction method based on BIM

Country Status (1)

Country Link
CN (1) CN106988221B (en)

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107506561A (en) * 2017-09-18 2017-12-22 广东星层建筑科技股份有限公司 A kind of bridge forward design method based on BIM
CN107563662A (en) * 2017-09-15 2018-01-09 中建海峡建设发展有限公司 A kind of method and computing device of PC components production curves
CN107862133A (en) * 2017-11-06 2018-03-30 中国铁路设计集团有限公司 A kind of method of Mass production bridge pier BIM models
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology
CN108427815A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of collision detection method and device in engineering project
CN108427791A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 The design management method and device of erecting yard safety measure based on BIM
CN108589725A (en) * 2018-05-15 2018-09-28 中国十七冶集团有限公司 A kind of built-in fitting construction method based on BIM technology
CN108842782A (en) * 2018-07-17 2018-11-20 中铁九局集团第七工程有限公司 Based on BIM technology deep pit digging and construction method for supporting
CN108846644A (en) * 2018-06-22 2018-11-20 中船第九设计研究院工程有限公司 A kind of integrated emulation technology, collaborative work, information management and project management managing and control system
CN109117521A (en) * 2018-07-21 2019-01-01 中铁十八局集团有限公司 A kind of steel truss rod piece splice plate bolt auxiliary assembly system
CN109145481A (en) * 2018-09-03 2019-01-04 中铁三局集团有限公司 Bridge pier shaft based on BIM is template optimized to use arrangement method
CN109523182A (en) * 2018-11-27 2019-03-26 华规软件(上海)有限公司 A kind of beam field production management method, platform, computer equipment and storage medium
CN109583852A (en) * 2018-12-29 2019-04-05 中铁局集团有限公司第三工程分公司 A kind of goods and materials for bridge cantilever pouring construction and progress msg management system
CN109614685A (en) * 2018-12-04 2019-04-12 上海宝冶集团有限公司 Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal
CN109726445A (en) * 2018-12-07 2019-05-07 佛山科学技术学院 Assembled architecture concrete pouring procedure based on BIM
CN110055901A (en) * 2019-05-16 2019-07-26 中铁十五局集团第五工程有限公司 A kind of control method for realizing pushing tow steel tube arch rib closure precision based on BIM technology
CN110080114A (en) * 2019-05-20 2019-08-02 上海浦东路桥建设股份有限公司 A kind of visualization prefabricated stand column construction method based on BIM technology
CN110119774A (en) * 2019-05-08 2019-08-13 中铁八局集团建筑工程有限公司 A kind of contrast difference's method based on Building Information Model 4D progress Yu outdoor scene progress
CN110322534A (en) * 2019-04-08 2019-10-11 中铁十六局集团第四工程有限公司 A kind of steel truss girder Support Method assembling construction analogy method based on BIM technology
CN110348142A (en) * 2019-07-16 2019-10-18 龙元建设集团股份有限公司 Based on the BIM method of gang form bracket technique molding curve bridge
CN110598260A (en) * 2019-08-16 2019-12-20 南京紫城工程设计有限公司 Municipal engineering design system based on BIM technology
CN110714416A (en) * 2019-10-25 2020-01-21 中国一冶集团有限公司 BIM-based temporary consolidation construction structure and method for large cantilever bridge body
CN110795788A (en) * 2019-10-29 2020-02-14 中建四局贵州投资建设有限公司 Application method in road and bridge engineering based on BIM (building information modeling) cooperation technology
CN110804955A (en) * 2019-11-27 2020-02-18 江西省公路桥梁工程有限公司 Bridge construction method based on BIM
CN111027123A (en) * 2019-12-03 2020-04-17 中交第二公路勘察设计研究院有限公司 Cable structure bridge design method based on BIM model
CN111260325A (en) * 2019-07-23 2020-06-09 上海建工集团股份有限公司 Bridge construction progress management system based on BIM
CN111287091A (en) * 2020-02-28 2020-06-16 中国十七冶集团有限公司 BIM-based fabricated concrete bridge construction method
CN111625971A (en) * 2020-03-06 2020-09-04 中国十七冶集团有限公司 Assembling method for prefabricated components of assembled concrete bridge
CN111622110A (en) * 2020-04-24 2020-09-04 中交第二航务工程局有限公司 Intelligent installation and construction method for prefabricated bent cap based on three-dimensional measurement lofting technology
CN111967081A (en) * 2020-08-20 2020-11-20 广西路桥工程集团有限公司 Bridge construction management system based on BIM
CN113158303A (en) * 2021-04-01 2021-07-23 江苏大学 BIM-based assembled steel bridge three-dimensional model construction method
CN114086467A (en) * 2021-11-24 2022-02-25 中铁四局集团第五工程有限公司 Prefabricated installation construction method for steel-concrete composite beam bridge deck
CN114491757A (en) * 2022-01-26 2022-05-13 扬州大学 Gravity center positioning method for assembly type bridge special-shaped pier stud based on severe mathematical model
CN115510532A (en) * 2022-09-27 2022-12-23 中交第三公路工程局有限公司 Integrated erection method of assembled steel box arch-connected bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004100026A1 (en) * 2003-05-06 2004-11-18 Plambeck Neue Energien Solar-Technik Gmbh Method for the constructional design of solar plants
KR101151666B1 (en) * 2012-02-15 2012-06-08 이형훈 Beam construction method using represtressing of joint, beam and bridge construction method thereby
CN103049624A (en) * 2013-01-04 2013-04-17 江西省交通设计研究院有限责任公司 Control method of culvert visual design construction based on virtual reality modeling language (VRML)
CN104109999A (en) * 2014-06-26 2014-10-22 中铁大桥局股份有限公司 Construction method for bridge tower transverse beams
CN104404883A (en) * 2014-11-19 2015-03-11 中交四航局第三工程有限公司 Inner working platform for rapid construction of bridge pier and construction method using inner working platform
CN106012851A (en) * 2016-06-15 2016-10-12 中冶南方工程技术有限公司 Synchronous construction method of steel box girder and concrete pier studs

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004100026A1 (en) * 2003-05-06 2004-11-18 Plambeck Neue Energien Solar-Technik Gmbh Method for the constructional design of solar plants
KR101151666B1 (en) * 2012-02-15 2012-06-08 이형훈 Beam construction method using represtressing of joint, beam and bridge construction method thereby
CN103049624A (en) * 2013-01-04 2013-04-17 江西省交通设计研究院有限责任公司 Control method of culvert visual design construction based on virtual reality modeling language (VRML)
CN104109999A (en) * 2014-06-26 2014-10-22 中铁大桥局股份有限公司 Construction method for bridge tower transverse beams
CN104404883A (en) * 2014-11-19 2015-03-11 中交四航局第三工程有限公司 Inner working platform for rapid construction of bridge pier and construction method using inner working platform
CN106012851A (en) * 2016-06-15 2016-10-12 中冶南方工程技术有限公司 Synchronous construction method of steel box girder and concrete pier studs

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108427815A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of collision detection method and device in engineering project
CN108427791A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 The design management method and device of erecting yard safety measure based on BIM
CN107563662A (en) * 2017-09-15 2018-01-09 中建海峡建设发展有限公司 A kind of method and computing device of PC components production curves
CN107506561A (en) * 2017-09-18 2017-12-22 广东星层建筑科技股份有限公司 A kind of bridge forward design method based on BIM
CN107862133B (en) * 2017-11-06 2021-06-11 中国铁路设计集团有限公司 Method for generating BIM models of piers in batches
CN107862133A (en) * 2017-11-06 2018-03-30 中国铁路设计集团有限公司 A kind of method of Mass production bridge pier BIM models
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology
CN108589725A (en) * 2018-05-15 2018-09-28 中国十七冶集团有限公司 A kind of built-in fitting construction method based on BIM technology
CN108846644A (en) * 2018-06-22 2018-11-20 中船第九设计研究院工程有限公司 A kind of integrated emulation technology, collaborative work, information management and project management managing and control system
CN108842782A (en) * 2018-07-17 2018-11-20 中铁九局集团第七工程有限公司 Based on BIM technology deep pit digging and construction method for supporting
CN109117521A (en) * 2018-07-21 2019-01-01 中铁十八局集团有限公司 A kind of steel truss rod piece splice plate bolt auxiliary assembly system
CN109145481A (en) * 2018-09-03 2019-01-04 中铁三局集团有限公司 Bridge pier shaft based on BIM is template optimized to use arrangement method
CN109523182A (en) * 2018-11-27 2019-03-26 华规软件(上海)有限公司 A kind of beam field production management method, platform, computer equipment and storage medium
CN109614685A (en) * 2018-12-04 2019-04-12 上海宝冶集团有限公司 Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal
CN109726445A (en) * 2018-12-07 2019-05-07 佛山科学技术学院 Assembled architecture concrete pouring procedure based on BIM
CN109583852B (en) * 2018-12-29 2022-02-25 中铁一局集团有限公司第三工程分公司 Material and progress informatization management system for bridge cantilever pouring construction
CN109583852A (en) * 2018-12-29 2019-04-05 中铁局集团有限公司第三工程分公司 A kind of goods and materials for bridge cantilever pouring construction and progress msg management system
CN110322534A (en) * 2019-04-08 2019-10-11 中铁十六局集团第四工程有限公司 A kind of steel truss girder Support Method assembling construction analogy method based on BIM technology
CN110322534B (en) * 2019-04-08 2022-08-09 中铁十六局集团第四工程有限公司 BIM technology-based steel truss girder support method assembly construction simulation method
CN110119774A (en) * 2019-05-08 2019-08-13 中铁八局集团建筑工程有限公司 A kind of contrast difference's method based on Building Information Model 4D progress Yu outdoor scene progress
CN110055901A (en) * 2019-05-16 2019-07-26 中铁十五局集团第五工程有限公司 A kind of control method for realizing pushing tow steel tube arch rib closure precision based on BIM technology
CN110080114A (en) * 2019-05-20 2019-08-02 上海浦东路桥建设股份有限公司 A kind of visualization prefabricated stand column construction method based on BIM technology
CN110348142A (en) * 2019-07-16 2019-10-18 龙元建设集团股份有限公司 Based on the BIM method of gang form bracket technique molding curve bridge
CN110348142B (en) * 2019-07-16 2023-01-17 龙元建设集团股份有限公司 Method for forming curve bridge based on BIM combined template support process
CN111260325A (en) * 2019-07-23 2020-06-09 上海建工集团股份有限公司 Bridge construction progress management system based on BIM
CN110598260A (en) * 2019-08-16 2019-12-20 南京紫城工程设计有限公司 Municipal engineering design system based on BIM technology
CN110714416A (en) * 2019-10-25 2020-01-21 中国一冶集团有限公司 BIM-based temporary consolidation construction structure and method for large cantilever bridge body
CN110795788A (en) * 2019-10-29 2020-02-14 中建四局贵州投资建设有限公司 Application method in road and bridge engineering based on BIM (building information modeling) cooperation technology
CN110804955A (en) * 2019-11-27 2020-02-18 江西省公路桥梁工程有限公司 Bridge construction method based on BIM
CN111027123A (en) * 2019-12-03 2020-04-17 中交第二公路勘察设计研究院有限公司 Cable structure bridge design method based on BIM model
CN111027123B (en) * 2019-12-03 2023-10-24 中交第二公路勘察设计研究院有限公司 BIM model-based cable structure bridge design method
CN111287091A (en) * 2020-02-28 2020-06-16 中国十七冶集团有限公司 BIM-based fabricated concrete bridge construction method
CN111625971B (en) * 2020-03-06 2023-03-10 中国十七冶集团有限公司 Assembling method for prefabricated components of assembled concrete bridge
CN111625971A (en) * 2020-03-06 2020-09-04 中国十七冶集团有限公司 Assembling method for prefabricated components of assembled concrete bridge
CN111622110B (en) * 2020-04-24 2021-10-29 中交第二航务工程局有限公司 Intelligent installation and construction method for prefabricated bent cap based on three-dimensional measurement lofting technology
CN111622110A (en) * 2020-04-24 2020-09-04 中交第二航务工程局有限公司 Intelligent installation and construction method for prefabricated bent cap based on three-dimensional measurement lofting technology
CN111967081A (en) * 2020-08-20 2020-11-20 广西路桥工程集团有限公司 Bridge construction management system based on BIM
CN113158303A (en) * 2021-04-01 2021-07-23 江苏大学 BIM-based assembled steel bridge three-dimensional model construction method
CN114086467A (en) * 2021-11-24 2022-02-25 中铁四局集团第五工程有限公司 Prefabricated installation construction method for steel-concrete composite beam bridge deck
CN114491757A (en) * 2022-01-26 2022-05-13 扬州大学 Gravity center positioning method for assembly type bridge special-shaped pier stud based on severe mathematical model
CN114491757B (en) * 2022-01-26 2024-01-23 扬州大学 Gravity center positioning method for special-shaped pier column of assembled bridge based on severe mathematical model
CN115510532A (en) * 2022-09-27 2022-12-23 中交第三公路工程局有限公司 Integrated erection method of assembled steel box arch-connected bridge
CN115510532B (en) * 2022-09-27 2024-04-05 中交第三公路工程局有限公司 Integrated erection method for assembled steel box double arch bridge

Also Published As

Publication number Publication date
CN106988221B (en) 2018-10-19

Similar Documents

Publication Publication Date Title
CN106988221B (en) Unit construction bridge beam construction method based on BIM
CN111598379B (en) Project management method, platform, device, computer equipment and storage medium
CN109766581B (en) Method for establishing bridge BIM (building information modeling) model by adopting Dynamo software
Ma et al. Application of 4D for dynamic site layout and management of construction projects
CN109785436B (en) BIM technology-based reinforcing steel bar information full life cycle management method
Kaner et al. Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms
CN111062081A (en) Underground continuous wall construction method based on BIM technology
CN107818198A (en) A kind of science of bridge building management platform based on BIM technology
CN106709660A (en) BIM-based architectural design method
CN110080114A (en) A kind of visualization prefabricated stand column construction method based on BIM technology
Marzouk et al. Using BIM to identify claims early in the construction industry: Case study
CN106096111A (en) BIM technology application in high-speed railway CRTSIII plate-type Construction of Ballastless Track
CN106997511A (en) Railway beam course management system and railway beam a management method based on BIM technology
CN111125814A (en) BIM-based project supervision and supervision method and system
KR20130016620A (en) 3d process management method for bim(building information modeling)
CN110162856A (en) A kind of beam stirrup intelligent generation method based on dynamo
CN106169114A (en) BIM technology application platform based on high-speed railway CRTS III plate-type Construction of Ballastless Track
CN112884290A (en) BIM-based field construction management method
CN115470565A (en) Bridge construction method and system based on BIM technology
Xiaer et al. Design for safety (DFS) and building information modeling (BIM): A review
CN116703127A (en) Building construction supervision method and system based on BIM
Samarasinghe et al. Innovative digital technologies
CN108416076A (en) A kind of assembled architecture design method based on BIM technology
CN114896677B (en) BIM (building information modeling) -based construction simulation method and system
CN110634186A (en) Arch cover method underground excavation construction method based on BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant