CN106988169A - A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail - Google Patents

A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail Download PDF

Info

Publication number
CN106988169A
CN106988169A CN201710344424.3A CN201710344424A CN106988169A CN 106988169 A CN106988169 A CN 106988169A CN 201710344424 A CN201710344424 A CN 201710344424A CN 106988169 A CN106988169 A CN 106988169A
Authority
CN
China
Prior art keywords
rail
track plates
replaced
plate
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710344424.3A
Other languages
Chinese (zh)
Other versions
CN106988169B (en
Inventor
郑新国
刘竞
谢永江
程冠之
冯仲伟
曾志
李书明
董全霄
翁智财
朱长华
杨德军
刘相会
潘永健
王月华
周骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Beijing Tieke Special Engineering Technology Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201710344424.3A priority Critical patent/CN106988169B/en
Publication of CN106988169A publication Critical patent/CN106988169A/en
Application granted granted Critical
Publication of CN106988169B publication Critical patent/CN106988169B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor

Abstract

The system and method that track plates replacing is carried out after rail is pulled out the invention discloses a kind of transverse direction.The system includes rail actual lock rail temperature and when front rail temperature test equipment, rail stress strain testing equipment, rail lateral pushing equipment, track plate transporting transfer device, track plates hanging device, measurement apparatus, rail return pulling device.Methods described is included in be replaced before and after track plates sets up counter-force link stopper or counterforce device on certain distance circuit, pushing tow point is set up on rail, unclamp certain length fastener, using incremental launching device by rail pushing tow to being replaced on the outside of track plates, using vertical lifting mode carry out old plate removal and new plate it is in place.The stress test equipment overall process measures rail stress;The measurement apparatus new plate plan-position of control on the outside of boatswain chair operation area.The features such as the system and method have that frock is light, to change quick, work efficiency high, small to rail failure, is particularly suitable for high ferro " Window time " operation.

Description

A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail
Technical field
The invention belongs to high speed railway track Structural defect remedial technology field, in particular to a kind of plate-type ballastless track knot The replacing system and method for structure hurt track plates.
Background technology
In recent years, high-speed railway is developed rapidly in China.250km/h circuit is reached for overall trip speed, is adopted Use ballastless track structure.It is used as the main force in ballastless track structure, platy ballastless track structure(The types of CRTS I, the types of CRTS II, The types of CRTS III)Large-scale application has been obtained in China Express Railway construction.Platy ballastless track structure it is main by rail, buckle Part, track plates, mortar(Self-leveling concrete)Packed layer, concrete bed composition.As a kind of reinforced concrete structure, in ring In the presence of border and train load, bad damage, destruction inevitably occur for track plates, and high ferro operating line is faced with " skylight Time " carries out the demand of track plates replacing.In addition, fractional orbital plate bad damage due to quality of production difference is accelerated or due to outer Portion, which hits, causes hurt, the current demand that track plates are changed is shifted to an earlier date significantly.
Because high ferro operating line can only carry out maintenance work in Window time, it is impossible to use large scale equipment, and track plates Length is more than 5m, and thickness is more than 0.20m, and width is more than 2.5m, more than 5 tons of every piece of track plates weight, how in limited skylight Change the disaster for being pendulum in face of work business personnel to bad damage track plates in time, in the case where not using large-scale equipment Topic.Further, since track structure circuit is divided into straightway, curved section, superrelation on curve section, the track structure in different locations carries out rail When guidance tape is changed, the requirement to technique is also different, particularly the track plates of superrelation on curve section, changes difficulty bigger.
The research that at present track plates are changed with technology both at home and abroad is still in conceptual phase.Works department is carried out in Window time It is " cut rail change method " that track plates, which change the method used, i.e., in progress track plates replacing, first by track plates to be replaced and its Front and rear certain length rail cutting, removal, the lifting appliance of second hand rail road car move into the removal of hurt track plates, new-track plate, Then welding locks rail again.This method benefit is that the old plate of track plates is removed and new plate hangs in relatively simple, is existed Greatest problem is rail must to be cut before plate is changed, removed.On the one hand this means change after plate that rail weldering must also be carried out Connect, polish and the special work such as seam inspection, regulation input is considerably increased, in addition, everywhere joint-cutting means steel at one Rail joint, and weld larger to rail failure, new security risk point is formed, in addition, this method work efficiency is low, manpower is put into It is many, it is generally desirable to which three skylights could complete the replacing of one block of plate.It can be said that this is a kind of side done something against one's will Method.
Patent " a kind of plate-type ballastless track track plates more changing device and replacing options(201310108682.3)" provide One kind does not cut off rail and carries out plate-type ballastless track track plates more changing device and replacing options, i.e., rail is carried out after jacking, from The method that side is removed or shift-in track plates carry out track plates replacing.This method avoid " cut rail and change method " to the wound of rail Damage, but the deficiency existed is that frock is heavier, complex procedures, is unsuitable for constructing in Window time, meanwhile, its engineering method is only adapted to directly The replacing of line segment track plates, it is impossible to carry out the replacing of curve freeboard section track plates." a kind of subway changes wooden handcart and comprising the subway to patent That changes wooden handcart changes trigger group(201420251605.3)" there is also equipment enlarging, complicate the problem of, when being not suitable for skylight Between construct.
Research one kind does not cut that rail, frock be simple, process is easy, it is adaptable to which straight line, the track plates of superrelation on curve section are changed Complete set technology is this area urgent problem to be solved.
The content of the invention
It is an object of the invention to solve the above problems there is provided a kind of transverse direction pull out after rail carry out track plates replacing system and Method.Main technical schemes are to carry out the replacing of track plates after rail by laterally pulling out.One side rail transverse direction stiffness is small, laterally pulls out Power needed for rail is much smaller than the power needed for vertical head track, more controllable in force, and is difficult to cause rail damage, completely can be with Carry out lateral pushing;After two aspect rail are unpluged, the space needed for track structure vertical lifting is accordingly discharged, for straight line Section, superrelation on curve Duan Junke removed and changed using the method for vertical lifting to track plates, it is to avoid existing technology is from side A series of problems, such as face changes the big frock weight brought of track plates, complex procedures, is not suitable with superrelation on curve section, also solves and cuts A series of problems that ability vertical lifting is brought after rail;Three be required tooling device miniaturization, and operation work efficiency is fast, is adapted to The requirement of high ferro " Window time " maintenance.
The major technique content of the invention is as follows.
A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail.The system includes rail actual lock rail Temperature and when front rail temperature test equipment, rail stress strain testing equipment, rail lateral pushing equipment, track plate transporting transfer device, rail Guidance tape hanging device, measurement apparatus, rail return pulling device.Methods described, which is included in, is replaced certain distance circuit before and after track plates On set up counter-force link stopper or counterforce device, set up pushing tow point on rail, unclamp certain length fastener, using incremental launching device by steel Rail pushing tow is to being replaced on the outside of track plates, and releasing is replaced the constraint of plate surrounding, and the removal of old plate is carried out using vertical lifting mode And new plate is in place.
The rail actual lock rail temperature and when front rail temperature test equipment precision be 0~2 DEG C;The lateral pushing device by Counter-force link stopper or counterforce device, pushing tow jack, ball-shaped regulating valve, rail chuck composition, the convex blocking platform before and after plate is replaced It is fixed on upper or track plates.
The method that the transverse direction pulls out progress track plates replacing after rail comprises the following steps:(1)Set up pushing reaction block Or counterforce device;(2)The temperature difference of the actual rail temperature of measurement and rail fastening down temperature(t1);(3)Determine that laterally distance is moved on top to rail; (4)Unclamp the anchor bolt for being replaced track plates and its front and rear certain length rail fastener system;(5)Rail is set up in pushing tow point Chuck, thrustor is installed between counterforce device and rail chuck, by rail lateral pushing to being replaced on the outside of track plates;(6) Mark is replaced track plates plane relative position, and releasing is replaced the constraint of plate surrounding, makes it using adjuster jacking track plate Depart from under-filled layer;(7)Vertical lifting is carried out to being replaced track plates, removes, new plate is vertically hung in and is replaced track Board position;(8)Lateral pushing device is unclamped, rail is returned and pulls out, fasten;(9)Recover the spacing of track plates, recover track plates with filling out Fill layers cementing;(10)Accurate adjustment is carried out to circuit, operation is opened.
Pushing reaction shelves and counterforce device are symmetrically set up being replaced the plate left and right sides.
The rail fastener system unclamps the temperature difference of the length according to actual rail temperature and rail fastening down temperature, rail lateral pushing Amount is determined.
During the lateral pushing, rail jacking force is constantly monitored.
The lateral pushing device is hydraulic jack, mechanical push rods;Rail carries out pushing tow respectively during pushing tow or so, independent Control, sustainable pushing tow also can pushing tow stage by stage.
During the lateral pushing, left and right rail carries out pushing tow, independent control, sustainable pushing tow respectively using pushing tow jack Also can pushing tow stage by stage.
It is described to be constrained to the spacing constraint of track plates, the boss resin between such as convex blocking platform and plate, width seam and latch fitting, side To block.
Brief description of the drawings
Fig. 1:Typical ballastless track boards provided by the present invention, which are changed, laterally dials rail schematic diagram;
Description of reference numerals:1- track plates to be replaced;2- track plates adjacent orbit plates to be replaced;3- mechanical push rods;4- jack.
Embodiment
Below by embodiment, technical scheme is further illustrated.
Embodiment 1:The embodiments of the invention provide a kind of track plates replacing side of the plate-type ballastless track structures of CRTS I Method, methods described includes herein below:
(1)"T"-shaped block is fixed by the way of bar planting being replaced on the convex blocking platform of plate both sides.Check that convex is kept off before bar planting Platform steel bar arrangement figure, it is to avoid hurt reinforcing bar during bar planting."T"-shaped block uses the long 30cm in bottom surface, wide 30cm steel plate and long 30cm, High 15cm steel plates are welded, steel plate thickness 1cm;
(2)Measure 31.2 DEG C of rail fastening down temperature, 12.5 DEG C of rail observed temperature.Both 18.7 DEG C of differences;
(3)For the templates of CRTS I, the horizontal amount of pulling out 60cm;
(4)According to the temperature difference and the horizontal amount of pulling out, calculate fastener and unclamp length 50m;
(5)To be replaced plate center line as symmetry axis, the anchor bolt 25m of fastener is respectively unclamped in left and right;
(6)Negative rail pushing tow clamping device is installed fixing the corresponding left and right rail side of "T"-shaped block;
(7)Stress test device is pasted in the corresponding rail side of pushing tow point;
(8)Pushing tow jack is laid between fixed "T"-shaped block and rail clamping device, lateral pushing is carried out to rail.Pushing tow During monitor rail internal stress situation of change;
(9)Lateral pushing 70cm.Survey rail maximum stress 920N.Lock pushing tow jack;
(10)Measurement is replaced the plane relative position of track plates;
(11)The boss resin being replaced in the boss of plate both sides is cut, plate is replaced using track crane vertical lifting, lifted Onto flat car;
(12)New plate is hung in using track crane, the position of new-track plate is controlled using measuring apparatus;
(13)Pushing tow jack is unclamped, rail is returned and pulled out, is locked;
(14)Boss resin is poured, gap of the new-track plate with mortar using the mechanical property elastic poly- ammonia consistent with mortar Ester material is filled;
(15)Accurate adjustment is carried out to circuit, operation is opened.
Embodiment 2:The embodiments of the invention provide a kind of track plates replacing side of the plate-type ballastless track structures of CRTS II Method, methods described includes herein below:
(1)"T"-shaped block is fixed by the way of bar planting being replaced on the track plates of plate both sides.Track slab steel is checked before bar planting Muscle layout drawing, it is to avoid hurt reinforcing bar during bar planting."T"-shaped block uses the long 40cm in bottom surface, wide 30cm steel plate and long 40cm, high 15cm steel plates are welded, steel plate thickness 1cm;
(2)Measure 29.0 DEG C of rail fastening down temperature, 15 DEG C of rail observed temperature.Both 14 DEG C of differences;
(3)For the templates of CRTS II, the horizontal amount of pulling out 80cm;
(4)According to the temperature difference and the horizontal amount of pulling out, calculate fastener and unclamp length 30m;
(5)To be replaced plate center line as symmetry axis, the anchor bolt 15m of fastener is respectively unclamped in left and right;
(6)Negative rail pushing tow clamping device is installed fixing the corresponding left and right rail side of "T"-shaped block;
(7)Stress test device is pasted in the corresponding rail side of pushing tow point;
(8)Pushing tow jack is laid between fixed "T"-shaped block and rail clamping device, lateral pushing is carried out to rail.Pushing tow During monitor rail internal stress situation of change;
(9)Lateral pushing 80cm.Survey rail maximum stress 830N.Lock pushing tow jack;
(10)Measurement is replaced the plane relative position of track plates;
(11)Cut and be replaced plate both sides width joint concrete, grabbed using accurate adjustment by track plates jacking, make it de- with screed From.Plate is replaced using track crane vertical lifting, is lifted on flat car;
(12)New plate is hung in using track crane, the position of new-track plate is controlled using measuring apparatus;
(13)Pushing tow jack is unclamped, rail is returned and pulled out, is locked;
(14)Width joint concrete is poured, gap of the new-track plate with mortar using the mechanical property ring consistent with mortar Oxygen tree ester is filled;
(15)Accurate adjustment is carried out to circuit, operation is opened.
The above-mentioned description to embodiment is it will be appreciated that and using this for ease of those skilled in the art Invention.Person skilled in the art obviously can easily make various modifications to these embodiments, and illustrating herein General Principle be applied in other embodiment without passing through performing creative labour.Therefore, the invention is not restricted to reality here Example is applied, those skilled in the art are according to the announcement of the present invention, and the improvement made for the present invention and modification all should be in the present invention Protection domain within.

Claims (8)

1. a kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail, the system includes rail actual lock rail temperature And when front rail temperature test equipment, rail stress strain testing equipment, rail lateral pushing equipment, track plate transporting transfer device, track Plate hanging device, measurement apparatus, rail return pulling device, and methods described, which is included in, to be replaced before and after track plates on certain distance circuit Counter-force link stopper or counterforce device are set up, pushing tow point is set up on rail, certain length fastener is unclamped, using incremental launching device by rail Pushing tow is to being replaced on the outside of track plates, and releasing is replaced the constraint of plate surrounding, using vertical lifting mode carry out old plate removal and Newly plate is in place.
2. transverse direction according to claim 1 pulls out the system that track plates replacing is carried out after rail, it is characterised in that:The rail Actual lock rail temperature and when front rail temperature test equipment precision be 0~2 DEG C;The lateral pushing device is filled by counter-force link stopper or counter-force Put, pushing tow jack, ball-shaped regulating valve, rail chuck are constituted, be replaced before and after plate on convex blocking platform or fixed on track plates.
3. transverse direction according to claim 1 pulls out the method that track plates replacing is carried out after rail, it is characterised in that including following Step:(1)Set up pushing reaction block or counterforce device;(2)The temperature difference of the actual rail temperature of measurement and rail fastening down temperature(t1); (3)Determine that laterally distance is moved on top to rail;(4)Unclamp the anchoring for being replaced track plates and its front and rear certain length rail fastener system Bolt;(5)Rail chuck is set up in pushing tow point, thrustor is installed between counterforce device and rail chuck, rail is laterally pushed up It is pushed into be replaced on the outside of track plates;(6)Mark is replaced track plates plane relative position, and releasing is replaced the constraint of plate surrounding, profit It is set to depart from under-filled layer with adjuster jacking track plate;(7)Vertical lifting is carried out to being replaced track plates, is removed, New plate is vertically hung in and is replaced track Board position;(8)Lateral pushing device is unclamped, rail is returned and pulls out, fasten;(9)Recover rail Spacing, recovery track plates and the filling layers cementing of guidance tape;(10)Accurate adjustment is carried out to circuit, operation is opened.
4. transverse direction according to claim 3 pulls out the method that track plates replacing is carried out after rail, it is characterised in that:The pushing tow Counter-force shelves and counterforce device are symmetrically set up being replaced the plate left and right sides.
5. transverse direction according to claim 3 pulls out the method that track plates replacing is carried out after rail, it is characterised in that:The rail Fastener system discloses length and determined according to the temperature difference, the rail lateral pushing amount of actual rail temperature and rail fastening down temperature.
6. transverse direction according to claim 3 pulls out the method that track plates replacing is carried out after rail, it is characterised in that:The transverse direction During pushing tow, rail jacking force is constantly monitored.
7. transverse direction according to claim 3 pulls out the method that track plates replacing is carried out after rail, it is characterised in that:The transverse direction Thrustor is hydraulic jack, mechanical push rods, stroke 20cm~80cm;Rail carries out pushing tow respectively during the pushing tow or so, Independent control, sustainable pushing tow also can pushing tow stage by stage.
8. transverse direction according to claim 3 pulls out the method that track plates replacing is carried out after rail, it is characterised in that:The constraint For the spacing constraint of track plates, the boss resin between such as convex blocking platform and plate, width seam and latch fitting, lateral block.
CN201710344424.3A 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail Active CN106988169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710344424.3A CN106988169B (en) 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710344424.3A CN106988169B (en) 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail

Publications (2)

Publication Number Publication Date
CN106988169A true CN106988169A (en) 2017-07-28
CN106988169B CN106988169B (en) 2019-03-29

Family

ID=59420883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710344424.3A Active CN106988169B (en) 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail

Country Status (1)

Country Link
CN (1) CN106988169B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130825A (en) * 2017-12-31 2018-06-08 天津市金荣通核修护工程有限公司 Subgrade of metro concrete replacement technique in special limiting condition
CN108385456A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed
CN108385454A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of railway plate-type ballastless track working drawing review operational method
CN108385451A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 Board-like ballastless track boards replacing options under a kind of special operation condition
CN108385455A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of board-like Construction of Ballastless Track maintenance activity method of cast-in-place railway roadbed

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3644540A1 (en) * 1986-12-24 1988-07-07 Guenter Finke Rail-joint aligning device for aligning the facing ends of railway and tramway rails
EP0715023A1 (en) * 1994-11-30 1996-06-05 Hochtief Aktiengesellschaft Vorm. Gebr. Helfmann Movable machine for concrete work
US20030005850A1 (en) * 2001-03-16 2003-01-09 Nordco Inc. Combined tie extractor and plate remover for rail maintenance
CN202945513U (en) * 2012-12-11 2013-05-22 中铁二十局集团有限公司 Hoisting bracket for replacing plate-type ballastless track reinforced concrete base plate
CN202945512U (en) * 2012-12-11 2013-05-22 中铁二十局集团有限公司 Device for replacing plate-type ballastless track reinforced concrete base plate
CN203188070U (en) * 2013-03-29 2013-09-11 中铁一局集团有限公司 Plate-type ballast-less track plate replacing device
CN203807900U (en) * 2014-04-16 2014-09-03 徐州徐工铁路装备有限公司 Plate changing device for high-speed railway ballastless track
CN105908583A (en) * 2016-04-22 2016-08-31 北京瑞威世纪岩土工程有限公司 System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
CN205741779U (en) * 2016-05-31 2016-11-30 中铁第四勘察设计院集团有限公司 A kind of little beam type for CRTS III plate-type non-fragment orbit repairs structure
CN106436492A (en) * 2015-12-30 2017-02-22 中国铁道科学研究院铁道建筑研究所 Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3644540A1 (en) * 1986-12-24 1988-07-07 Guenter Finke Rail-joint aligning device for aligning the facing ends of railway and tramway rails
EP0715023A1 (en) * 1994-11-30 1996-06-05 Hochtief Aktiengesellschaft Vorm. Gebr. Helfmann Movable machine for concrete work
US20030005850A1 (en) * 2001-03-16 2003-01-09 Nordco Inc. Combined tie extractor and plate remover for rail maintenance
CN202945513U (en) * 2012-12-11 2013-05-22 中铁二十局集团有限公司 Hoisting bracket for replacing plate-type ballastless track reinforced concrete base plate
CN202945512U (en) * 2012-12-11 2013-05-22 中铁二十局集团有限公司 Device for replacing plate-type ballastless track reinforced concrete base plate
CN203188070U (en) * 2013-03-29 2013-09-11 中铁一局集团有限公司 Plate-type ballast-less track plate replacing device
CN203807900U (en) * 2014-04-16 2014-09-03 徐州徐工铁路装备有限公司 Plate changing device for high-speed railway ballastless track
CN106436492A (en) * 2015-12-30 2017-02-22 中国铁道科学研究院铁道建筑研究所 Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks
CN105908583A (en) * 2016-04-22 2016-08-31 北京瑞威世纪岩土工程有限公司 System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
CN205741779U (en) * 2016-05-31 2016-11-30 中铁第四勘察设计院集团有限公司 A kind of little beam type for CRTS III plate-type non-fragment orbit repairs structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张世堂: "CRTSⅡ型板式无砟轨道无缝线路换板施工技术", 《铁道建筑技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130825A (en) * 2017-12-31 2018-06-08 天津市金荣通核修护工程有限公司 Subgrade of metro concrete replacement technique in special limiting condition
CN108130825B (en) * 2017-12-31 2019-03-19 天津市金荣通核修护工程有限公司 Subgrade of metro concrete replacement technique in special limiting condition
CN108385456A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed
CN108385454A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of railway plate-type ballastless track working drawing review operational method
CN108385451A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 Board-like ballastless track boards replacing options under a kind of special operation condition
CN108385455A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of board-like Construction of Ballastless Track maintenance activity method of cast-in-place railway roadbed

Also Published As

Publication number Publication date
CN106988169B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN106988169A (en) A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN106284079A (en) A kind of bridge break post replace classification synchronize integral jacking construction method
CN103266573A (en) Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method
CN102808383B (en) Curved bridge counter-slope jacking construction process
CN105649332A (en) Building beam and slab construction method
CN113802424B (en) Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway
CN101418535A (en) Construction method of monolithic road-bed in rail tunnel
CN106758590A (en) The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
CN106192620B (en) A kind of railway ballastless track supporting layer and substructure change method
CN214271732U (en) Bridge construction that stridees across railway line is with dilatory device
CN107059506A (en) A kind of plate-type ballastless track track plates replacing options
CN106149569B (en) The transforming methods of structural system of self-anchored suspension bridge First cable later girder construction
CN101372231B (en) Technique for drawing, transporting and lifting ground rail type cable railway equipment
CN105888675A (en) Construction method for shield crossing railway line
CN102094393B (en) Construction process of steel-concrete joint for steel and concrete mixed continuous steel structure bridge
CN113622316A (en) Steel truss girder multipoint traction type pushing construction system and construction method thereof
CN206289476U (en) The construction beam of railroad track is changed under the conditions of for not stopping transport
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN107795005A (en) A kind of steel core concrete column and reinforced concrete column concrete core cylinder mixed structure and installation method
CN103590839B (en) Subway station cast-in-place structural portal support construction technology
CN116590967A (en) Method for controlling pushing connection precision of magnetic levitation turnout in overhead section
CN101852066A (en) Device and method for arranging track of drilling machine
CN210174677U (en) Hard crossing for changing electrified railway into moving
CN106245531A (en) Steel structural bridge installation method is hung under bilateral derrick type

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 2, Da Liu Shu Road, Haidian District, Beijing

Applicant after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.

Applicant after: China Railway Scientific Research Institute Group Co., Ltd.

Address before: No. 2, Da Liu Shu Road, Haidian District, Beijing

Applicant before: Railway Construction Institute of China Academy of Railway Sciences

Applicant before: China Academy of Railway Sciences

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191220

Address after: 100081 Beijing city Haidian District Daliushu Road No. 2 district two building 303

Co-patentee after: China Railway Scientific Research Institute Group Co., Ltd.

Patentee after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.

Co-patentee after: Beijing Tieke Special Engineering Technology Co., Ltd.

Address before: 100081 Beijing city Haidian District Daliushu Road No. 2

Co-patentee before: China Railway Scientific Research Institute Group Co., Ltd.

Patentee before: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.