CN106988169A - A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail - Google Patents
A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail Download PDFInfo
- Publication number
- CN106988169A CN106988169A CN201710344424.3A CN201710344424A CN106988169A CN 106988169 A CN106988169 A CN 106988169A CN 201710344424 A CN201710344424 A CN 201710344424A CN 106988169 A CN106988169 A CN 106988169A
- Authority
- CN
- China
- Prior art keywords
- rail
- track plates
- replaced
- plate
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710344424.3A CN106988169B (en) | 2017-05-16 | 2017-05-16 | A kind of method that transverse direction pulls out progress track plates replacement after rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710344424.3A CN106988169B (en) | 2017-05-16 | 2017-05-16 | A kind of method that transverse direction pulls out progress track plates replacement after rail |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106988169A true CN106988169A (en) | 2017-07-28 |
CN106988169B CN106988169B (en) | 2019-03-29 |
Family
ID=59420883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710344424.3A Active CN106988169B (en) | 2017-05-16 | 2017-05-16 | A kind of method that transverse direction pulls out progress track plates replacement after rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106988169B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108130825A (en) * | 2017-12-31 | 2018-06-08 | 天津市金荣通核修护工程有限公司 | Subgrade of metro concrete replacement technique in special limiting condition |
CN108385456A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed |
CN108385454A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of railway plate-type ballastless track working drawing review operational method |
CN108385451A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | Board-like ballastless track boards replacing options under a kind of special operation condition |
CN108385455A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of board-like Construction of Ballastless Track maintenance activity method of cast-in-place railway roadbed |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3644540A1 (en) * | 1986-12-24 | 1988-07-07 | Guenter Finke | Rail-joint aligning device for aligning the facing ends of railway and tramway rails |
EP0715023A1 (en) * | 1994-11-30 | 1996-06-05 | Hochtief Aktiengesellschaft Vorm. Gebr. Helfmann | Movable machine for concrete work |
US20030005850A1 (en) * | 2001-03-16 | 2003-01-09 | Nordco Inc. | Combined tie extractor and plate remover for rail maintenance |
CN202945513U (en) * | 2012-12-11 | 2013-05-22 | 中铁二十局集团有限公司 | Hoisting bracket for replacing plate-type ballastless track reinforced concrete base plate |
CN202945512U (en) * | 2012-12-11 | 2013-05-22 | 中铁二十局集团有限公司 | Device for replacing plate-type ballastless track reinforced concrete base plate |
CN203188070U (en) * | 2013-03-29 | 2013-09-11 | 中铁一局集团有限公司 | Plate-type ballast-less track plate replacing device |
CN203807900U (en) * | 2014-04-16 | 2014-09-03 | 徐州徐工铁路装备有限公司 | Plate changing device for high-speed railway ballastless track |
CN105908583A (en) * | 2016-04-22 | 2016-08-31 | 北京瑞威世纪岩土工程有限公司 | System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition |
CN205741779U (en) * | 2016-05-31 | 2016-11-30 | 中铁第四勘察设计院集团有限公司 | A kind of little beam type for CRTS III plate-type non-fragment orbit repairs structure |
CN106436492A (en) * | 2015-12-30 | 2017-02-22 | 中国铁道科学研究院铁道建筑研究所 | Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks |
-
2017
- 2017-05-16 CN CN201710344424.3A patent/CN106988169B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3644540A1 (en) * | 1986-12-24 | 1988-07-07 | Guenter Finke | Rail-joint aligning device for aligning the facing ends of railway and tramway rails |
EP0715023A1 (en) * | 1994-11-30 | 1996-06-05 | Hochtief Aktiengesellschaft Vorm. Gebr. Helfmann | Movable machine for concrete work |
US20030005850A1 (en) * | 2001-03-16 | 2003-01-09 | Nordco Inc. | Combined tie extractor and plate remover for rail maintenance |
CN202945513U (en) * | 2012-12-11 | 2013-05-22 | 中铁二十局集团有限公司 | Hoisting bracket for replacing plate-type ballastless track reinforced concrete base plate |
CN202945512U (en) * | 2012-12-11 | 2013-05-22 | 中铁二十局集团有限公司 | Device for replacing plate-type ballastless track reinforced concrete base plate |
CN203188070U (en) * | 2013-03-29 | 2013-09-11 | 中铁一局集团有限公司 | Plate-type ballast-less track plate replacing device |
CN203807900U (en) * | 2014-04-16 | 2014-09-03 | 徐州徐工铁路装备有限公司 | Plate changing device for high-speed railway ballastless track |
CN106436492A (en) * | 2015-12-30 | 2017-02-22 | 中国铁道科学研究院铁道建筑研究所 | Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks |
CN105908583A (en) * | 2016-04-22 | 2016-08-31 | 北京瑞威世纪岩土工程有限公司 | System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition |
CN205741779U (en) * | 2016-05-31 | 2016-11-30 | 中铁第四勘察设计院集团有限公司 | A kind of little beam type for CRTS III plate-type non-fragment orbit repairs structure |
Non-Patent Citations (1)
Title |
---|
张世堂: "CRTSⅡ型板式无砟轨道无缝线路换板施工技术", 《铁道建筑技术》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108130825A (en) * | 2017-12-31 | 2018-06-08 | 天津市金荣通核修护工程有限公司 | Subgrade of metro concrete replacement technique in special limiting condition |
CN108130825B (en) * | 2017-12-31 | 2019-03-19 | 天津市金荣通核修护工程有限公司 | Subgrade of metro concrete replacement technique in special limiting condition |
CN108385456A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed |
CN108385454A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of railway plate-type ballastless track working drawing review operational method |
CN108385451A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | Board-like ballastless track boards replacing options under a kind of special operation condition |
CN108385455A (en) * | 2018-03-07 | 2018-08-10 | 中国铁道科学研究院铁道建筑研究所 | A kind of board-like Construction of Ballastless Track maintenance activity method of cast-in-place railway roadbed |
Also Published As
Publication number | Publication date |
---|---|
CN106988169B (en) | 2019-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106988169A (en) | A kind of transverse direction pulls out the system and method that track plates replacing is carried out after rail | |
CN101781879B (en) | Construction method of single-pylon cable-stayed bridge without dorsal cables | |
CN106284079A (en) | A kind of bridge break post replace classification synchronize integral jacking construction method | |
CN103266573A (en) | Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method | |
CN102808383B (en) | Curved bridge counter-slope jacking construction process | |
CN105649332A (en) | Building beam and slab construction method | |
CN113802424B (en) | Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway | |
CN101418535A (en) | Construction method of monolithic road-bed in rail tunnel | |
CN106758590A (en) | The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport | |
CN106192620B (en) | A kind of railway ballastless track supporting layer and substructure change method | |
CN214271732U (en) | Bridge construction that stridees across railway line is with dilatory device | |
CN107059506A (en) | A kind of plate-type ballastless track track plates replacing options | |
CN106149569B (en) | The transforming methods of structural system of self-anchored suspension bridge First cable later girder construction | |
CN101372231B (en) | Technique for drawing, transporting and lifting ground rail type cable railway equipment | |
CN105888675A (en) | Construction method for shield crossing railway line | |
CN102094393B (en) | Construction process of steel-concrete joint for steel and concrete mixed continuous steel structure bridge | |
CN113622316A (en) | Steel truss girder multipoint traction type pushing construction system and construction method thereof | |
CN206289476U (en) | The construction beam of railroad track is changed under the conditions of for not stopping transport | |
CN105735228B (en) | High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method | |
CN107795005A (en) | A kind of steel core concrete column and reinforced concrete column concrete core cylinder mixed structure and installation method | |
CN103590839B (en) | Subway station cast-in-place structural portal support construction technology | |
CN116590967A (en) | Method for controlling pushing connection precision of magnetic levitation turnout in overhead section | |
CN101852066A (en) | Device and method for arranging track of drilling machine | |
CN210174677U (en) | Hard crossing for changing electrified railway into moving | |
CN106245531A (en) | Steel structural bridge installation method is hung under bilateral derrick type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: No. 2, Da Liu Shu Road, Haidian District, Beijing Applicant after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd. Applicant after: China Railway Scientific Research Institute Group Co., Ltd. Address before: No. 2, Da Liu Shu Road, Haidian District, Beijing Applicant before: Railway Construction Institute of China Academy of Railway Sciences Applicant before: China Academy of Railway Sciences |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191220 Address after: 100081 Beijing city Haidian District Daliushu Road No. 2 district two building 303 Co-patentee after: China Railway Scientific Research Institute Group Co., Ltd. Patentee after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd. Co-patentee after: Beijing Tieke Special Engineering Technology Co., Ltd. Address before: 100081 Beijing city Haidian District Daliushu Road No. 2 Co-patentee before: China Railway Scientific Research Institute Group Co., Ltd. Patentee before: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd. |