CN106971273A - The transformer station's checking and accepting process control system and control method of intelligent alarm prompting - Google Patents

The transformer station's checking and accepting process control system and control method of intelligent alarm prompting Download PDF

Info

Publication number
CN106971273A
CN106971273A CN201710207904.5A CN201710207904A CN106971273A CN 106971273 A CN106971273 A CN 106971273A CN 201710207904 A CN201710207904 A CN 201710207904A CN 106971273 A CN106971273 A CN 106971273A
Authority
CN
China
Prior art keywords
examination
transformer station
acceptance
information
checking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710207904.5A
Other languages
Chinese (zh)
Other versions
CN106971273B (en
Inventor
韩少晓
王勇
刘远龙
石增辉
潘向华
张永新
尚力
吕晓平
吴翠娟
孔海波
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Anxinyuan Information Technology Co Ltd
State Grid Shandong Electric Power Co Ltd
Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Shandong Anxinyuan Information Technology Co Ltd
State Grid Shandong Electric Power Co Ltd
Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Anxinyuan Information Technology Co Ltd, State Grid Shandong Electric Power Co Ltd, Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Shandong Anxinyuan Information Technology Co Ltd
Priority to CN201710207904.5A priority Critical patent/CN106971273B/en
Publication of CN106971273A publication Critical patent/CN106971273A/en
Application granted granted Critical
Publication of CN106971273B publication Critical patent/CN106971273B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses transformer station's checking and accepting process control system of intelligent alarm prompting and control method, including intelligent alarm device, rule judgment module, workflow module, master controller, timer, memory, data processing module and automatic examination module;By the final acceptance report of the system configuration that the checking and accepting of transformer station is divided into transformer station's Acceptance application, the importing of point table information and relaying configuration table, the pretreatment of information point table and the examination & verification of Acceptance application, the artwork of main website is drawn and boss stands, the importing of monitoring information table, the examination of transformer station, the examination of main website, examination & verification acceptance report, the sampling observation of check and acceptance result, formation and examination report.The present invention avoids the omission of information in the course of receiving, coordinates the work of all departments, it is to avoid the error that department's handshaking is produced, and improves operating efficiency, it is ensured that the good high efficiency of the accuracy of transformer station's checking and accepting;The examination pattern of standardization improves the accuracy of power equipment examination, it is ensured that the safe and stable operation of power network.

Description

The transformer station's checking and accepting process control system and control method of intelligent alarm prompting
Technical field
The present invention relates to transformer station's checking and accepting stream in transformer station's checking and accepting technology field, specifically intelligent alarm prompting Process control system and control method.
Background technology
With the fast development of national grid, the input amount of transformer station is more and more, and speed is more and more faster.In newly-built power transformation , it is necessary to which involving multiple departments coordinates checking and accepting before station is put into operation.Because the department that checking and accepting is involved is more, it is related to before examination Substation side, main website side and unit in charge of construction etc. are each in the configuration and examination & verification of the data messages such as information point table, artwork information, the course of receiving Department can all participate in the modification of these information.It is unavoidable during interagency coordination department's interruption section occur, certain department due to The reason such as be busy with one's work causes omission to task etc., causes the situation of whole examination task delay.There is presently no a row Effective management and control flow.Artwork information, the accuracy of information point table of transformer station are directly connected to the safe operation of power network, institute It is very crucial with the management and control of the course of receiving.
So far national grid does not also carry out standard criterion management and control to newly-built transformer station's acceptance process.The change newly built at present The co-ordination of power station all departments before putting into operation is mainly by telephonic communication and verbal communication, and this mode has very big disadvantage End.Phone and oral reception and registration and problem coordinate all can not timely be recorded and work is supervised.Also some areas are testing Time receiving just carries out the writing task of quick-reading flow sheets, without unified and standard Row control means, when causing transformer station's checking and accepting Between it is longer, there is very big hidden danger to the safe and stable operation of grid equipment.
The content of the invention
To overcome the shortcomings of that above-mentioned prior art is present, it is an object of the invention to provide standardization based on intelligence The transformer station's checking and accepting process control system and control method of alarm prompt, the regulatory level that lifting transformer station checks and accepts, are formed New standard criterion.
The technical solution adopted for the present invention to solve the technical problems is:Transformer station's checking and accepting stream of intelligent alarm prompting Process control system, it is characterized in that:Including intelligent alarm device, rule judgment module, workflow module, master controller, timer, Memory, data processing module and automatic examination module;The intelligent alarm device concatenate rule judge module, the rule judgment Module difference connection timer, workflow module and master controller, the master controller are also respectively connected with timer, flow stream Revolving die block, memory and data processing module, the memory are also connected with data processing module and automatic examination module;
The intelligent alarm device is used to carry out alarm prompting to the mission bit stream that rule judgment module is sent;The rule is sentenced Disconnected module is used to set working rules, and the implementation status of work at present task is judged;The workflow Module is used to receive the execution task requests that master controller is sent, and the request of the execution task is sent into rule sentences Disconnected module, according to the judged result of rule judgment module, task of arranging work;The master controller is used for the control to workflow System, triggers, calls the module being connected with master controller;The timer provides the time standard of the course of receiving and logger task Time used;The memory, which is used for artwork data, information point table, acceptance report, problem log and appraisal result, to be carried out Storage;The data processing module is used to standardize to information point table, primary connection figure and the model data that user submits Processing, comparison check is done to monitoring information table and information point table;The automatic examination module is used for the execution feelings to each task Condition carries out examination scoring.
Further, the alarm prompting that the intelligent alarm device is sent includes indicative prompting, suggestiveness and reminded and serious Property warning.
Further, setting of the rule judgment module to working rules includes the rule of responsible department in acceptance process Setting, the rule settings for checking and accepting task time and the setting for examining code of points.
Further, responsible department's rule settings of the acceptance process include the submission of transformer station's Acceptance application, information Put the importing of importing, the modification of information point table, point table and the artwork information of table and protection information allocation list, use simulation main website pair The work of the examination of transformer station etc., setting is responsible for by engineering management/unit in charge of construction;Examination & verification, monitoring to transformer station's Acceptance application The work of issue after information table examination & verification etc., setting adjusts monitoring of tools management specific responsibility to be responsible for by ground;Drafting, master to main website artwork The system configuration of substation, the work using simulation substation to the examination of main website etc., setting are responsible for by Automation Specialty personnel;It is right The sampling observation work of main and sub station end check and acceptance result, setting is responsible for by monitoring of tools personnel;It is true to the end check and acceptance result examination & verification of boss station Recognize, formed the work of final acceptance report and examination report, setting is responsible for by monitoring of tools management specific responsibility.
Further, the task time rule settings of checking and accepting include the examination & verification to power station Acceptance application, monitoring information table Issue after examination & verification is set as 10 working days;The modification of information point table is set as 2 working days;The making of main website artwork data And the work of the system configuration at boss station, it is set as 10 working days;Information point table, the authorization of artwork information and it imported into this Work in control system, is set as 5 working days;Using checking and accepting of the simulation main website to transformer station, it is set as 5 work Day;Using simulation substation to the checking and accepting of main website, it is set as 5 working days;Sampling observation work to main and sub station end check and acceptance result It is set as 5 working days.
Further, the form of the memory stores information includes the form of Word, Excel, PDF and TXT document.
Transformer station's checking and accepting flow control method of intelligent alarm prompting, including check and accept preparatory stage and monitoring information Acceptance phase, it is characterized in that:Comprise the following steps:
Step 1, transformer station's Acceptance application and information are imported:After construction of transformer substation is finished, transformer station's Acceptance application is submitted;This Control system points out user to submit material by intelligent alarm device;
Step 2, the pretreatment of information point table:Data processing module submits the standardization of material to pre-process user;
Step 3, Acceptance application is audited:Result to pretreatment is checked, and audits Acceptance application;
Step 4, the artwork drafting of main website and the system configuration at main and sub station:According to the prompting of intelligent alarm device, main website is carried out The drawing of artwork, and drawn primary connection figure and main website artwork data are imported into this control system;Data processing Module carries out standardization processing to primary connection figure;After standardization processing, carry out simulation main website and simulate the system configuration of substation Work;
Step 5, the importing of monitoring information table:Monitoring information table is imported into this control system, data processing module will be imported Monitoring information table and information point table in information carry out comparison check;
Step 6, the examination of transformer station:Examination of the simulation main website to transformer station is carried out, station end acceptance report is formed;
Step 7, the examination of main website is simulated:Examination of the simulation substation to simulation main website is carried out, main website acceptance report is formed;
Step 8, examination & verification station end, main website acceptance report:Rule judgment module detects that main website and transformer station are completed after checking and accepting, from Whether dynamic examination & verification station end, the acceptance report of main website meet requirement;
Step 9, spot sampling check is checked and accepted:Rule judgment module classification extracts signaling point, and the signaling point of extraction is rechecked;
Step 10, form final acceptance report and examination is reported:After the completion of reinspection, this control system generates final examination Report and examination report.
Further, the examination task of the examination of step 6 transformer station and step 7 simulation main website can be carried out simultaneously.
Further, the step 1 information importing, step 3 examination & verification Acceptance application, step 4 are recorded respectively using timer The artwork drafting of main website and the system configuration at main and sub station, the importing of step 5 table and artwork information, the examination of step 6 transformer station The examination task for simulating main website with step 7 completes the time used.
Further, the pretreatment of the step 2 information point table includes checking whether sequence number has repetition, checks signal name Whether Standardization Requirement is met.
Beneficial effects of the present invention are:Compared with prior art, transformer station is checked and accepted the invention provides set of system The process control system of work and corresponding control method, when transformer station checks and accepts, staff only need to according to system prompting Worked accordingly, it is to avoid the omission of information in the course of receiving, it is to avoid the error that department's handshaking is produced, automatic association The work of all departments is adjusted, operating efficiency is improved, it is ensured that the Accuracy and high efficiency of transformer station's checking and accepting;The examination mould of standardization Formula improves the accuracy of power equipment examination, improves the managerial skills of company, it is ensured that the safe and stable operation of power network.
Rule judgment module carries out the rule settings of each flow key link according to the requirement of the task of examination, with reference to flow stream The prompting of revolving die block flow tasks and timer, condition is flexibly set according to different situations, and reasonable arrangement work makes checking and accepting Progress without any confusion, improves work quality and operating efficiency;
Intelligent alarm device can remind related director's task time and content in time, prevent from causing due to working heavy Work omit, intelligent alarm device can automatic sorting alarm type, the various forms of alarm modes of different alarm types correspondence, Each flow is reminded for different alarms, purposefully Perfect the work, improves operating efficiency;
Automatic examination module carries out examination scoring to the working condition of all departments, improves the work incentive of each department, To ensure that the completion that checking and accepting is guaranteed both quality and quantity adds one layer of catch net, responsibility is clear, task-aware, improves examination effect Rate, improves examination regulatory level, and examination process is automatic examination, and the enthusiasm for promoting everybody to work, no personnel intervene, public It is flat just;
Workflow module automatic switchover working condition, reduce slip of the tongue of all departments' liaison mode and mutually notify when Between, improve work efficiency and management level.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the schematic flow sheet of the present invention.
Embodiment
For the technical characterstic for illustrating this programme can be understood, below by embodiment, and its accompanying drawing is combined, to this hair It is bright to be described in detail.Present invention omits the description to common knowledge to avoid being unnecessarily limiting the present invention.
As shown in figure 1, a kind of transformer station's checking and accepting process control system of intelligent alarm prompting, including intelligent alarm Device, rule judgment module, workflow module, master controller, timer, memory, data processing module, automatic examination mould Block.The rule judgment module is connected with intelligent alarm device, workflow module, master controller, timer respectively;The master Controller is connected with timer, memory, data processing module, workflow module and rule judgment module respectively;It is described Workflow module is connected with master controller and rule judgment module respectively;The timer respectively with master controller and rule Judge module is connected;The memory is connected with master controller, data processing module and automatic examination module respectively;It is described Data processing module is connected respectively at master controller with memory.
Wherein, the workflow module implements the circulation to transformer station's checking and accepting flow, enables each task reasonable Effectively circulated.When transformer station's checking and accepting flow starts, master controller can be sent to workflow module to be started to hold Row task requests.Receive and start to perform after task requests, whether workflow module can be initiated carry out to rule judgment module The request of the task.When rule judgment module judges that the task is allowed to execution, then the circulation of the task is carried out;If do not allowed Perform, rule judgment module can be information transmission to intelligent alarm device, and the intelligent alarm device carries out alarm prompt, while flow Circulation module terminates the execution of the task.
The master controller is used for transformer station's checking and accepting Row control, and triggering, calling system and the master controller connect The module connect.Master controller triggers regular judge module while initiating to perform task requests to workflow module and carries out condition Judge the renewal of data, triggering memory carries out the record of process, and at the end of checking and accepting acceptance report formation.
The intelligent alarm device is responsible for the warning message that rule judgment module is passed over sending alarm prompt, for not Same alert type and rank sends various forms of alarms.Transmitter built in intelligent alarm device, can be direct by warning information It is sent to the mobile phone or other-end of director.The alarm level of initiation has indicative prompting, it is proposed that property is reminded, and seriousness is accused It is alert.For example, being sent when monocyclic section task is overtime, task time-out is indicative to remind;Triggering suggestion when submitting task definition inaccurate Property remind;Flowchart process is wrong or examination task definition is wrong, can send seriousness warning.
The timer is used to provide time standard unified in the whole transformer station course of receiving, for checking and accepting flow The time of each task of middle record, it is ensured that accurate.Transformer station's checking and accepting flow is sent when timer receives main controller In a certain task when starting, at the beginning of record this mission between, it is and time set in binding rule judge module, anti-in time Rule judgment of feeding module;At the end of task, the end time of this mission is recorded.Timer can also be according to rule judgment mould The task time of block setting judges whether current task is overtime, if there is time-out, can send alarm by intelligent alarm device and carry Show.
The information point table, primary connection figure, model data that the data processing module is used to submit user do and standardized Processing.Data processing module receives the data processing request of master controller transmission, and being taken out from memory needs data to be processed, Standardization processing is done to the information that user submits.After data processing is complete, by result storage into memory, while to master control Device feedback processing result processed.The master controller sends result to rule judgment module, and rule judgment module is according in advance Whether the rule judgment of setting needs intelligent alarm.
The memory is used to store the information such as artwork data information, acceptance report, problem log.Wherein, check and accept and prepare Information point table, the relaying configuration table of stage importing can be stored in memory;Process record in acceptance phase, transformer station's artwork Data, director, operating time, examination task, produced problem;Acceptance report that examination is formed after terminating etc. all can be by master The order that controller is sent, makes memory record these information one by one., can be by the letter of memory storage after the completion of examination Breath and appraisal result are exported in the form of Word, Excel, PDF and TXT document;
The automatic examination module is after the completion of examination, according to the information recorded in this whole course of receiving, automatic right Each department's tasks carrying situation carries out automatic examination scoring.The department include engineering management/unit in charge of construction, adjust Supervision Keyholed back plate reason specific responsibility, Automation Specialty personnel, adjust monitoring of tools personnel.
The rule judgment module is used for the setting of transformer station's checking and accepting flow, includes responsible department's rule of acceptance process Then set, check and accept task time rule settings and examine the setting of code of points.It is specific to have flow order, each task corresponding Department, the time restriction of each task, all departments' weight score value, examination rule settings.Start carrying out transformer station's checking and accepting The setting of line discipline is entered according to the setting of flow in workflow module in each link by preceding elder generation.In the course of receiving, judge to work as Whether preceding task is legal to require, for undesirable part, is given a warning information to intelligent alarm device.
Further, responsible department's rule settings of the acceptance process:The submission of transformer station's Acceptance application and according to meeting The work of opinion modification information point table is examined, setting is responsible for by engineering management/unit in charge of construction;Joint examination to transformer station's Acceptance application and Meet the issue work of the final monitoring information table after acceptance scheme, setting is by the negative tissue of monitoring of tools management specific responsibility;Main website number According to maintenance, the making of picture and the work that main website artwork data is imported into this control system, setting born by automation personnel Duty;The work for implementing to check and accept to transformer station using simulation main station system, sets by being responsible for by engineering management/unit in charge of construction;Use The work that substation system is implemented to check and accept to main website is simulated, setting is responsible for by automation personnel;Main and sub station end check and acceptance result is examined Core confirmation work, setting adjusts monitoring of tools management specific responsibility to be responsible for by ground;The sampling observation work of check and acceptance result;Setting is by monitoring of tools people Member is responsible for;Whether transformer station's checking and accepting is qualified, and setting is responsible for final review by monitoring of tools management specific responsibility.
Check and accept task time rule settings:The each cycle set of modification of information point table is completed within 2 working days;Transformer station The issue operation setup of the examination & verification of Acceptance application and final information point table is completed within 10 working days;The maintenance of main website data, picture The making in face and the work that main website artwork data is imported into this control system, are completed within 10 working days of setting;Monitoring letter The authorization of breath table and the work importeding into this control system, are completed within 5 working days of setting;Main station system is simulated to transformer station Checking and accepting, completed in 5 working days of setting;Checking and accepting of the substation system to main website is simulated, it is complete in 5 working days of setting Into.
Examine the setting of code of points:Each acceptance process task, completes and is judged by auditing, then give at the appointed time Give this phased acceptance task full marks.Keeping a perfect score for checking and accepting task is completed in stipulated time, delays one day and detains 10 points;Submit number According to disposable by keeping a perfect score with examination task, do over again and once detain 20 points;When task starts, intelligent alarm device is initiated task and opened After beginning, response handles keeping a perfect score for work in 2 working days, delays one day button 10;
As shown in Fig. 2 transformer station's checking and accepting flow control method of intelligent alarm prompting of the present invention, with A power transformations Stand exemplified by newly-built put into operation, including check and accept preparatory stage and monitoring information acceptance phase, specific working condition is followed successively by:Transformer station Acceptance application and information importing, the pretreatment of information point table, examination & verification Acceptance application, the system that the artwork of main website is drawn and boss stands Configuration, point table and the importing of artwork information, the examination of transformer station, the examination for simulating main website, spot sampling check are checked and accepted, form final test Receiving is accused and examination report.Examination wherein to imitating substation and simulation main website can be carried out simultaneously.Specifically:
Step 1:" transformer station's Acceptance application and information are imported " state.A transformer stations, which have constructed, to be finished, supervisory engineering department Coordinate unit in charge of construction and submit Acceptance application;Rule judgment module can receive the preparation examination instruction that master controller is sent, and rule is sentenced Disconnected module prompts the user with the data for needing to prepare by intelligent alarm device.User is according to prompting by information point table, relaying configuration Table is imported into this control system.After rule judgment module judges that the data of input are complete, then open timer and carry out timing, and Monitoring of tools management specific responsibility is adjusted to initiate Acceptance application to ground by intelligent alarm device, while sending the related director of SMS notification. Open transformer station's checking and accepting.
Step 2:" pretreatment of information point table " state.Ground adjusts monitoring of tools management specific responsibility to sign in this control system, advises Then judge module can be prompted to user by intelligent alarm device, and inform that user proceeds by the pretreatment work of import information. Every information that data processing module can be carried out in pretreatment examination & verification, described information point table to the information that user imports includes sequence number And signal name, the standardization to information point table pre-processes, and checks whether sequence number has repetition, checks whether signal name meets Standardization Requirement.Pre-processed results are prompted to user if signal name does not meet Standardization Requirement or sequence number has repetition, User is asked to make rectification.Standardization processing process:Title such as certain signal is " profound careless I line 3354 is switched ", and the title is not included Voltage class, correct title should be " profound careless I lines 3354 of 330kV_31621 are switched ", and now data processing module will can be located Reason result is given after rule judgment module, rule judgment module judged, points out subscriber signal title scarce by intelligent alarm device Few voltage class;Such as certain signal name is " 16303 disconnecting link ", and the title does not include voltage class, compartment name, data processing mould Result can be given rule judgment module by block;After rule judgment module is judged, the name can be pointed out by intelligent alarm device Title lacks voltage class and compartment name.
Step 3:Adjust the knot that monitoring of tools management specific responsibility is pre-processed according to this control system in " examination & verification Acceptance application " state, ground Really, tissue examination & verification Acceptance application.After examination & verification passes through, workflow module can receive the request for carrying out next step, notify main control Device is switched to NextState, and all data messages and this task are taken into information storage into memory.If review Do not pass through, review result and suggestion can then be passed through intelligent alarm device photos and sending messages to supervisory engineering department by rule judgment module, be System state is switched to " Acceptance application rectification " state.Supervisory engineering department director is logged in after this control system, can receive examination The suggestion for revision of application examination & verification not by pointing out and advising.Acceptance application rectification confinement time can be prompted to user simultaneously.Rule Then the judge module presetting Acceptance application rectification time is 2 days, and user needs as requested complete to testing within the defined time Receive the rectification of application.After Acceptance application rectification, this control system is submitted to, state is switched to " Acceptance application by this control system Rectification is submitted " state, and monitoring of tools management specific responsibility is adjusted by intelligent alarm device hair prompt message with giving.Adjust Supervision keyholed back plate in ground Reason specific responsibility is received after information, does review to the Acceptance application of rectification, and review is by rear, and this control system state is switched to next shape State, and all data messages and this task are taken into information storage into memory.
Step 4:" the artwork drafting of main website and the system configuration at main and sub station ".This control system by intelligent alarm device to Automation Specialty personnel send Acceptance application examination & verification by result, and point out the working time in this stage to limit.Rule judgment module This stage was worked into the default time for 10 days.Automation Specialty personnel log in this control system, according to carrying for intelligent alarm device Show, confirm to start the drafting preparation of main website artwork.Automation personnel completes the artwork data of main website within the defined time Preparation.After artwork data is made, primary connection figure and model data are imported into this control system.Data processing mould Block can carry out standardization processing to primary connection figure, check whether primary connection figure meets graphics standard, while checking pattern primitive Whether element associates correctly with equipment.For example, being had in graphic file<Path Name=" Liangshan office Yang Ying transformer station .10kV. Stand-by 170130 interval .0130-D3 earthing knife-switch " Object ID=" _ 58124566F01B2060F " Resource ID=" 0.1870665 " Type=" Ground Dis-connector " Object Name=" 0130-D3 earthing knife-switch "/>At attribute, data Reason module can check whether attribute writing is correct, and check whether Object ID attributes are filled in correctly, extract the attribute " 58124566F01B2060F ", the corresponding PSID of the attribute is searched in model data and whether there is whether to judge its association Correctly.
After the completion of artwork data standardization, rule judgment module can send system configuration work by intelligent alarm device will Ask.Automation Specialty personnel complete to simulate main website as requested and simulate the system configuration work of substation.As main website IP address is set It is set to:64.37.48.127, simulation substation is set to 64.37.48.68, and port is set to 2404.After the completion of the work of this stage, State can be switched to NextState by workflow module, and all data messages and the time-consuming information storage of this task are arrived In memory.
Step 5:" importing of monitoring information table " state.Intelligent alarm device photos and sending messages notify engineering management head of the unit to enter Row monitoring information lead-in stage, engineering management unit coordinates unit in charge of construction and monitoring information is imported into this control system, data Information in the monitoring information of importing and the information point table imported before is carried out comparison check by processing module, checks monitoring information Whether the classification information of table is correct.Such as:Entitled " 110kV_2111 mothers _ I bus transitions air chamber alarm " category of 3549 information points In abnormal category information, if classification information points out user profile classification error and provides the letter to inform in the information table imported The guiding opinion that breath point is correctly classified;2084 information points entitled " mother 110kV_III_IV _ switch mechanism heater failure " belong to In informing category information, if classifying in the information table imported not to inform, user profile classification error is pointed out, and provide information point The guiding opinion correctly classified.After monitoring information has been checked, state can be switched to NextState by Cheng Liuzhuan modules, and by institute Some data messages and this task take information storage into memory.
Step 6:" examination of transformer station " state.The information that intelligent alarm device can send out the examination of beginning A transformer stations gives engineering pipe Manage head of the unit.Rule judgment module sets the work deadline in this stage as 5 working days, and Field Force exists as requested In stipulated time, examination of the simulation main website to A transformer stations is completed.This control system whole can record the whole mistake that transformer station checks and accepts Journey, and the data in the course of receiving are automatically transferred in memory, form station end acceptance report;Cheng Liuzhuan modules can be by state NextState is switched to, and all data messages and this task are taken into information storage into memory.
Step 7:" examination of simulation main website " state.The information that intelligent alarm device can send out the examination of beginning main website is special to automation Industry personnel.Rule judgment module sets the work deadline in this stage as 5 working days, and Automation Specialty personnel exist as requested In stipulated time, the examination of simulation main website is completed.This control system whole can record the whole process that main website is checked and accepted, and will check and accept During data be automatically transferred in memory, form main website acceptance report;State can be switched to next by Cheng Liuzhuan modules State, and all data messages and this task are taken into information storage into memory.
Step 8:" examination & verification station end, main website acceptance report " state.Rule judgment module has detected A transformer stations and main website all Complete check and accept simultaneously submit after check and acceptance result, and judge core station end, whether the acceptance report of main website meets requirement.As A transformer stations have 58 intervals, 4889 equipment, 4982 remote signalling points, 622 telemetry stations, 217 remote controlled points, rule judgment module can be sentenced successively Whether all information points of breaking check and accept completion.Completed if do not checked and accepted all, rule judgment module can pass through intelligent alarm device Initiate to check and accept unfinished indicative prompting to the unit for not checking and accepting completion, and notify workflow module to switch flow again For corresponding acceptance phase.When all information points, all completion is checked and accepted on request, and examination meets reporting requirement, Cheng Liuzhuan modules State can be switched to NextState, and will determine that the result of module examination & verification is stored into memory.
Step 9:" spot sampling check examination " state.Rule judgment module can by intelligent alarm device to ground adjust Supervision keyholed back plate The task of reason specific responsibility prompting sampling observation checking and accepting.Rule judgment module can carry out classification extraction according to principle is checked and accepted to checking and accepting task Information point;As 300 information points, remote measurement 50 information points of extraction, 40 information click-through of remote control extraction are extracted in remote signalling.Adjust and set in ground The information point that standby monitoring personnel is extracted to this control system is rechecked.The result that sampling observation is checked and accepted is carried out automatically with check and acceptance result before Compare, after sampling observation is finished, this control system stores comparison result into memory, and state can be switched to down by Cheng Liuzhuan modules One state.
Step 10:" form final acceptance report and examination is reported " state.Rule judgment module can pass through intelligent alarm device The information that specific responsibility submits examination to complete is managed to monitoring of tools, while generating acceptance report and examination report.Automatic examination module The data of whole record are examined in the course of receiving that can be stood according to this control system to boss, and form examination report.
So far, transformer station's checking and accepting is completed.
Simply the preferred embodiment of the present invention described above, for those skilled in the art, Without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications are also regarded as this hair Bright protection domain.

Claims (10)

1. transformer station's checking and accepting process control system of intelligent alarm prompting, it is characterized in that:Sentence including intelligent alarm device, rule Disconnected module, workflow module, master controller, timer, memory, data processing module and automatic examination module;The intelligence Can alarm device concatenate rule judge module, the rule judgment module difference connection timer, workflow module and main control Device, the master controller is also respectively connected with timer, workflow module, memory and data processing module, the memory It is also connected with data processing module and automatic examination module;
The intelligent alarm device is used to carry out alarm prompting to the mission bit stream that rule judgment module is sent;The rule judgment mould Block is used to set working rules, and the implementation status of work at present task is judged;The workflow module Execution task requests for being sent to master controller are received, and the request of the execution task is sent into rule judgment mould Block, according to the judged result of rule judgment module, task of arranging work;The master controller is used for the control to workflow, Trigger, call the module being connected with master controller;The timer provides the time standard of the course of receiving and the reality of logger task Border use time;The memory is deposited for artwork data, information point table, acceptance report, problem log and appraisal result Storage;The information point table, primary connection figure and model data that the data processing module is used to submit user are carried out at standardization Reason, comparison check is done to monitoring information table and information point table;The automatic examination module is used for the implementation status to each task Carry out examination scoring.
2. transformer station's checking and accepting process control system of intelligent alarm prompting according to claim 1, it is characterized in that:Institute State the alarm that intelligent alarm device sends remind include it is indicative remind, suggestiveness is reminded and seriousness is alerted.
3. transformer station's checking and accepting process control system of intelligent alarm prompting according to claim 1, it is characterized in that:Institute Stating setting of the rule judgment module to working rules includes the rule settings of responsible department in acceptance process, checks and accepts task time The setting of rule settings and examination code of points.
4. transformer station's checking and accepting process control system of intelligent alarm prompting according to claim 3, it is characterized in that:Institute Stating responsible department's rule settings of acceptance process includes submission, information point table and the protection information allocation list of transformer station's Acceptance application Importing, the modification of information point table, the importing of point table and artwork information, use simulation main website to the work of the examination of transformer station etc. Make, setting is responsible for by engineering management/unit in charge of construction;The issue after examination & verification, the examination & verification of monitoring information table to transformer station's Acceptance application Deng work, setting by ground adjust monitoring of tools management specific responsibility be responsible for;Drafting to main website artwork, the system configuration at boss station, make Work with simulation substation to the examination of main website etc., setting is responsible for by Automation Specialty personnel;To main and sub station end check and acceptance result Inspect work by random samples, setting is responsible for by monitoring of tools personnel;To boss station end check and acceptance result examination & verification confirm, formed final acceptance report and The work of report is checked and rated, setting is responsible for by monitoring of tools management specific responsibility.
5. transformer station's checking and accepting process control system of intelligent alarm prompting according to claim 3, it is characterized in that:Institute State examination task time rule settings and be set as 10 including the issue after the examination & verification to power station Acceptance application, the examination & verification of monitoring information table Individual working day;The modification of information point table is set as 2 working days;The making of main website artwork data and the system configuration at boss station Work, be set as 10 working days;Information point table, the authorization of artwork information and the work importeding into this control system, if It is set to 5 working days;Using simulation main website to the checking and accepting of transformer station, it is set as 5 working days;Using simulation substation to master The checking and accepting stood, is set as 5 working days;Sampling observation operation setup to main and sub station end check and acceptance result is 5 working days.
6. transformer station's checking and accepting process control system of intelligent alarm prompting according to claim 1, it is characterized in that:Institute Stating the form of memory stores information includes the form of Word, Excel, PDF and TXT document.
7. transformer station's checking and accepting flow control method of intelligent alarm prompting, including check and accept testing for preparatory stage and monitoring information The receipts stage, it is characterized in that:Comprise the following steps:
Step 1, transformer station's Acceptance application and information are imported:After construction of transformer substation is finished, transformer station's Acceptance application is submitted;This control System points out user to submit material by intelligent alarm device;
Step 2, the pretreatment of information point table:Data processing module submits the standardization of material to pre-process user;
Step 3, Acceptance application is audited:Result to pretreatment is checked, and audits Acceptance application;
Step 4, the artwork drafting of main website and the system configuration at main and sub station:According to the prompting of intelligent alarm device, main website artwork is carried out Drawing, and drawn primary connection figure and main website artwork data are imported into this control system;Data processing module Standardization processing is carried out to primary connection figure;After standardization processing, carry out simulation main website and simulate the system configuration work of substation;
Step 5, the importing of monitoring information table:Monitoring information table is imported into this control system, data processing module is by the prison of importing Control information table and carry out comparison check with the information in information point table;
Step 6, the examination of transformer station:Examination of the simulation main website to transformer station is carried out, station end acceptance report is formed;
Step 7, the examination of main website is simulated:Examination of the simulation substation to simulation main website is carried out, main website acceptance report is formed;
Step 8, examination & verification station end, main website acceptance report:Rule judgment module detects that main website and transformer station are completed after checking and accepting, automatic to examine Whether core station end, the acceptance report of main website meet requirement;
Step 9, spot sampling check is checked and accepted:Rule judgment module classification extracts signaling point, and the signaling point of extraction is rechecked;
Step 10, form final acceptance report and examination is reported:After the completion of reinspection, this control system generates final acceptance report With examination report.
8. transformer station's checking and accepting flow control method of intelligent alarm prompting according to claim 7, it is characterized in that:Institute The examination task that main website is simulated in the examination and step 7 for stating step 6 transformer station can be while carry out.
9. transformer station's checking and accepting flow control method of intelligent alarm prompting according to claim 7, it is characterized in that:Profit Recorded respectively with timer step 1 information import, step 3 examination & verification Acceptance application, the artwork of step 4 main website draw and it is main, System configuration, the importing of step 5 table and artwork information, the examination of step 6 transformer station and the step 7 of substation simulate testing for main website Receipts task completes the time used.
10. transformer station's checking and accepting flow control method of intelligent alarm prompting according to claim 7, it is characterized in that: The pretreatment of the step 2 information point table includes checking whether sequence number has repetition, checks whether signal name meets standardization and want Ask.
CN201710207904.5A 2017-03-31 2017-03-31 Transformer substation acceptance workflow control system and control method with intelligent alarm prompt Active CN106971273B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710207904.5A CN106971273B (en) 2017-03-31 2017-03-31 Transformer substation acceptance workflow control system and control method with intelligent alarm prompt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710207904.5A CN106971273B (en) 2017-03-31 2017-03-31 Transformer substation acceptance workflow control system and control method with intelligent alarm prompt

Publications (2)

Publication Number Publication Date
CN106971273A true CN106971273A (en) 2017-07-21
CN106971273B CN106971273B (en) 2020-11-27

Family

ID=59336537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710207904.5A Active CN106971273B (en) 2017-03-31 2017-03-31 Transformer substation acceptance workflow control system and control method with intelligent alarm prompt

Country Status (1)

Country Link
CN (1) CN106971273B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107450445A (en) * 2017-09-05 2017-12-08 国网山东省电力公司 A kind of unified check of electric power supervisory control signal multistation and acceptance method
CN107658985A (en) * 2017-10-13 2018-02-02 国网新疆电力公司阿勒泰供电公司 Transformer station's Centralized Monitoring visualization system and its application method
CN107666179A (en) * 2017-09-01 2018-02-06 国网湖南省电力公司 A kind of power distribution automation artwork interaction point table information updating method and system
CN108256657A (en) * 2018-03-02 2018-07-06 国网福建省电力有限公司 Substation based on electronics debugging list becomes more meticulous adjustment method
CN108510173A (en) * 2018-03-23 2018-09-07 长江勘测规划设计研究有限责任公司 Hydraulic and hydroelectric engineering element project inspection of quality rate the process control system and method
CN108808853A (en) * 2018-05-18 2018-11-13 广东电网有限责任公司 A kind of power grid alarm signal flow system Internet-based
CN109359950A (en) * 2018-10-31 2019-02-19 国网河南省电力公司濮阳供电公司 A kind of method of power system monitor information overall process control
CN109741003A (en) * 2018-11-29 2019-05-10 国网浙江宁波市鄞州区供电有限公司 The automatic Acceptance Test System of substation information table
CN109978341A (en) * 2019-02-28 2019-07-05 北京新研汇医药研发有限公司 A kind of monitoring method and apparatus of clinical test
CN110112831A (en) * 2019-06-03 2019-08-09 国网四川省电力公司电力科学研究院 A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN111179119A (en) * 2020-01-03 2020-05-19 云南电网有限责任公司电力科学研究院 Intelligent monitoring and early warning system and method for substation law enforcement recorder
CN112233250A (en) * 2020-09-23 2021-01-15 云南电网有限责任公司昆明供电局 Technical safety management and control system and method based on VR
CN112508404A (en) * 2020-12-07 2021-03-16 云南电网有限责任公司普洱供电局 Automatic checking and accepting method, device and equipment for operation of power distribution network equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102096849A (en) * 2009-12-15 2011-06-15 苏州铭星软件科技有限公司 Flow management design method based on network program
WO2014054107A1 (en) * 2012-10-01 2014-04-10 富士通株式会社 Power distribution management device, pattern extraction method, and pattern extraction program

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102096849A (en) * 2009-12-15 2011-06-15 苏州铭星软件科技有限公司 Flow management design method based on network program
WO2014054107A1 (en) * 2012-10-01 2014-04-10 富士通株式会社 Power distribution management device, pattern extraction method, and pattern extraction program

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张周晶: "智能变电站验收帮助系统的设计与实现", 《中国优秀硕士学位论文全文数据库》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107666179A (en) * 2017-09-01 2018-02-06 国网湖南省电力公司 A kind of power distribution automation artwork interaction point table information updating method and system
CN107666179B (en) * 2017-09-01 2021-06-08 国网湖南省电力公司 Method and system for updating information of power distribution automation graph-model interaction point table
CN107450445B (en) * 2017-09-05 2020-03-27 国网山东省电力公司 Multi-station unified checking and accepting method for monitoring signals of electric power system
CN107450445A (en) * 2017-09-05 2017-12-08 国网山东省电力公司 A kind of unified check of electric power supervisory control signal multistation and acceptance method
CN107658985A (en) * 2017-10-13 2018-02-02 国网新疆电力公司阿勒泰供电公司 Transformer station's Centralized Monitoring visualization system and its application method
CN107658985B (en) * 2017-10-13 2020-12-25 国网新疆电力公司阿勒泰供电公司 Transformer substation centralized monitoring visualization system and use method thereof
CN108256657A (en) * 2018-03-02 2018-07-06 国网福建省电力有限公司 Substation based on electronics debugging list becomes more meticulous adjustment method
CN108510173A (en) * 2018-03-23 2018-09-07 长江勘测规划设计研究有限责任公司 Hydraulic and hydroelectric engineering element project inspection of quality rate the process control system and method
CN108808853A (en) * 2018-05-18 2018-11-13 广东电网有限责任公司 A kind of power grid alarm signal flow system Internet-based
CN109359950A (en) * 2018-10-31 2019-02-19 国网河南省电力公司濮阳供电公司 A kind of method of power system monitor information overall process control
CN109741003A (en) * 2018-11-29 2019-05-10 国网浙江宁波市鄞州区供电有限公司 The automatic Acceptance Test System of substation information table
CN109978341A (en) * 2019-02-28 2019-07-05 北京新研汇医药研发有限公司 A kind of monitoring method and apparatus of clinical test
CN110112831A (en) * 2019-06-03 2019-08-09 国网四川省电力公司电力科学研究院 A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN111179119A (en) * 2020-01-03 2020-05-19 云南电网有限责任公司电力科学研究院 Intelligent monitoring and early warning system and method for substation law enforcement recorder
CN111179119B (en) * 2020-01-03 2024-03-19 云南电网有限责任公司电力科学研究院 Intelligent monitoring and early warning system and method for law enforcement recorder of transformer substation
CN112233250A (en) * 2020-09-23 2021-01-15 云南电网有限责任公司昆明供电局 Technical safety management and control system and method based on VR
CN112508404A (en) * 2020-12-07 2021-03-16 云南电网有限责任公司普洱供电局 Automatic checking and accepting method, device and equipment for operation of power distribution network equipment and storage medium

Also Published As

Publication number Publication date
CN106971273B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
CN106971273A (en) The transformer station&#39;s checking and accepting process control system and control method of intelligent alarm prompting
CN108400908A (en) Supervisory control of substation information checks and accepts device and method automatically
CN104656574B (en) One kind divides the inspection of gap auto-control and monitoring method based on time domain
CN108322374A (en) A kind of boss station monitoring information check method based on wide-area services bus
CN107450445A (en) A kind of unified check of electric power supervisory control signal multistation and acceptance method
CN110112831A (en) A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN101710456A (en) Training management system of power plant simulator
CN103166323A (en) System for monitoring secondary circuit model on line in real time based on protection device
CN108107851A (en) A kind of production line intelligent remote pacifies lamp control system
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN104483842A (en) Regulation and control integrated automatic master station comparison method
CN204291050U (en) A kind of dispatching and monitoring information check system
CN103942654A (en) Electric power engineering quality supervision and management platform
CN107730647A (en) A kind of smart mobile phone cruising inspection system and its method for inspecting based on SCADA
CN102609423A (en) Cooperative question bank system and implementing method thereof
CN112737115A (en) Remote signaling joint debugging decoupling method for main station and plant station of transformer substation
CN109376167A (en) Selection of specialists method, apparatus and server
CN116562852B (en) Distribution network power failure information management system based on knowledge graph
CN109389524A (en) Integrated O&amp;M collaborative management method, storage equipment, terminal and system based on electric network data
CN117439264A (en) Automatic acceptance checking system for monitoring information of substation of dispatching master station
CN112001025B (en) Multi-file format engineering drawing on-line examination method and system
CN108989195B (en) Scheduling cloud real-time monitoring system and method
CN109814507A (en) A kind of concrete mixing station production mix proportion witness monitoring system and method
CN206696883U (en) A kind of air traffic control system quality safety checks whole process electronic operating system
CN115587729A (en) Digital dispatching management system and method for nuclear power plant

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant