CN108256657A - Substation based on electronics debugging list becomes more meticulous adjustment method - Google Patents
Substation based on electronics debugging list becomes more meticulous adjustment method Download PDFInfo
- Publication number
- CN108256657A CN108256657A CN201810175721.4A CN201810175721A CN108256657A CN 108256657 A CN108256657 A CN 108256657A CN 201810175721 A CN201810175721 A CN 201810175721A CN 108256657 A CN108256657 A CN 108256657A
- Authority
- CN
- China
- Prior art keywords
- debugging
- task
- list
- module
- debugging task
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention discloses the substations based on electronics debugging list to become more meticulous adjustment method, and stage and debugging maintenance stage are built including system.The adjustment method that becomes more meticulous be intended to structure one can electronic management debugging task system, whole debugging task processes of operation maintenance personnel are completed under the auxiliary of debugging task system, it is interacted by debugging task list with operation maintenance personnel, and after the completion of debugging task, then the record of debugging task list is returned and is stored to system.The present invention provides a kind of substations based on electronics debugging list to become more meticulous adjustment method, realize standardization, the procedure of debugging task flow and project, also simplify the workload of operation maintenance personnel, and procedure control can be carried out to the detection progress of operation maintenance personnel, it reduces in work and the possibility slipped occurs.
Description
Technical field
The present invention relates to a kind of substations based on electronics debugging list to become more meticulous adjustment method.
Background technology
It is higher and higher for electric power safety, reliability service requirement as society is constantly progressive.For a long time, power scheduling
Control system carries the heavy responsibility of monitoring electricity net safety stable reliability service, ensured power grid continue, strong development, be strong electricity
The powerful support of net, intelligent grid.
The normal table operation of regulator control system, be unable to do without efficient system O&M.For system operation maintenance personnel, how
In time, it effectively safeguards power scheduling control system, fast and efficiently completes substation data and access and debug, always be
One subject being difficult to resolve.As power grid continues to develop, the continuous fusion of power business system, power business system contains tradition
The letter verification of data of signal, the verification of anti-error data, the debugging of remote control, fixed value modification are protected in the signal verification of four distant data
The multinomial content such as debugging, the debugging of pressing plate switching, the verification of anti-mis-logical.The work of converting station debugging is increasingly heavy, and gives
Operation maintenance personnel causes greatly to perplex.It is mainly reflected in, first, since debugging task is numerous and diverse, operation maintenance personnel is performing debugging task
When, careless omission is susceptible to, the correctness in turn resulting in debugging efforts is affected, and is that regulator control system is accurate, monitors operation of power networks
Bring certain hidden danger;Second, debugging task lacks electronical record, fine-grained management can not be carried out to debugging task, it is also unfavorable
It is shared in by debugging task information.
Current regulator control system operation maintenance personnel, still carries out substation data access and debugging using traditional approach.I.e. into
When row substation data is debugged, (attend class to be divided into before first inspection, power transmission substantially and check, example inspection, protect first, in accordance with the difference of debugging task
Shield upgrading four major class) and debugging business difference, issue different debugging task lists.Debugging task list mainly enumerates
The work debugged substantially is needed, what can not be become more meticulous is depicted each single item task specifically to be debugged, for commissioning staff
Speech, it is still desirable to which certain professional skill could preferably complete debugging task, and for example which signal needs to debug, debugging task
Completion standard be what etc..
Invention describes how solving the problems, such as that plant stand becomes more meticulous debugging, operation maintenance personnel debugging complexity is reduced, is reduced
Debugging work load promotes debugging efficiency, strengthens debugging accuracy rate.
Invention content
It is an object of the invention to overcome the deficiency of the prior art, a kind of substation based on electronics debugging list is provided
Become more meticulous adjustment method, realizes standardization, the procedure of debugging task flow and project, also simplifies the work of operation maintenance personnel
Amount, and procedure control can be carried out to the detection progress of operation maintenance personnel, it reduces in work and the possibility slipped occurs.
The technical solution adopted by the present invention to solve the technical problems is as follows:
Substation based on electronics debugging list becomes more meticulous adjustment method, including:
System builds the stage:
Debugging task system construction step, the debugging task system include database module, debugging recording module, list life
Into module, task record module and debugging task definition module;The debugging task definition module specifically includes traditional four remote signalling
Breath debugging submodule protects letter information debugging submodule, Microcomputer Protection information debugging submodule and anti-false information debugging submodule, often
Several optional detection projects are respectively arranged under one debugging submodule again;
Database step, the structure of corresponding debugging task definition module establish database, which has often
The corresponding Debugging message of one detection project;
The debugging maintenance stage:
List generation step, operation maintenance personnel select specific one or more sons in debugging module according to current debugging task
Module, and several detection projects of submodule subordinate are further selected, corresponding debugging is generated by list generation module
Task form, operation maintenance personnel hold debugging task list and debugging task are waited for start in corresponding plant stand, the debugging task list
Content includes the detection project list of debugging task and the corresponding Debugging message of detection project;
Signal detection step, debugging task system send debugging signal, operation maintenance personnel root by main website to debugged plant stand
According to the detection project list recorded on debugging task list, it is whether qualified that corresponding detection project is checked successively;
Signal checking step, as the output signal of institute's detection project numberical range allowable corresponding with the detection project is not inconsistent
It closes, then contacts maintenance personal and faulty equipment is overhauled, and repeating signal detecting step again;Such as the detection in debugging task
Project numberical range allowable corresponding with the detection project meets, then terminates this debugging task, and record is had this tune
The debugging task list typing of examination task result is preserved to the debugging recording module.
As a preferred embodiment, the debugging task definition module has the debug-type parameter that can be set, the debug-type
Parameter includes inspection, example inspection and protection four classes of upgrading before first inspection, power transmission;A kind of preset inspection is corresponded to per one kind debug-type parameter
Bulleted list is surveyed, and can need to carry out final election according to practical debugging.
As a preferred embodiment, the debugging task system further includes debugging scope setting module, debugging scope setting mould
Block detects plant stand, voltage class and voltage spaces for setting.
As a preferred embodiment, the debugging task system further includes interactive module, which is used for debugging task
Status visualization is presented, and the input of operation maintenance personnel is changed to the content of debugging task definition module.
As a preferred embodiment, the Debugging message of the debugging task list includes debugging desired value, debugging actual value, main website
Verification personnel, plant stand verification personnel, debug time and debugging checked result.
As a preferred embodiment, the debugging task system further includes server module, the task record module passes through clothes
Business device module is connected into internet.
The beneficial effects of the invention are as follows:
1st, the present situation that existing debugging task relies on operation maintenance personnel professional skill is changed, it is to adjust that debugging task, which is changed,
Task system is tried to carry out for core.Standardization, the procedure of debugging task flow and project are realized, also simplifies operation maintenance personnel
Workload, and can to the detection progress of operation maintenance personnel carry out procedure control, reduce work in the possibility slipped occur.
2nd, debugging task is self-defined by the progress of debugging task module, operation maintenance personnel can select corresponding according to plant stand situation
Submodule, and select the detection project under corresponding submodule, generate debugging task list.It is and optional by debug-type parameter
Default debugging task pattern is selected, operation maintenance personnel carries out final election further according to actual demand each time, makes debugging task system that can fit
With different use demands.
3rd, the record of debugging efforts is made all to record to be stored in system, debugging task record each time can trace, just
Debugging task is recorded in substation and carries out digitization management.
The present invention is described in further detail with reference to the accompanying drawings and embodiments;But the present invention's debugs table based on electronics
Single substation adjustment method that becomes more meticulous is not limited to embodiment.
Description of the drawings
Fig. 1 is the structure diagram of the present invention.
Specific embodiment
Embodiment:
Shown in Figure 1, in the present embodiment, should be become more meticulous adjustment method based on the substation of electronics debugging list, specifically
Stage and debugging maintenance stage are built including system.That is the component of debugging task system and two stages of application.
The system structure stage is specific as follows:
Debugging task system construction step, the debugging task system include database module, debugging recording module, list life
Into module, task record module, debugging scope setting module, debugging task definition module and server module.
The debugging task definition module specifically includes traditional four remote sensing informations debugging submodule, protects letter information debugging submodule
Block, Microcomputer Protection information debugging submodule and anti-false information debugging submodule, each debugging submodule are provided with several optional
Detection project.Specific submodule subordinate detection project ginseng is shown in Table 1.
1 debugging task definition module structural representation table of table
Wherein, the detection project in debugging task definition module is respectively provided with corresponding Debugging message.Debugging message is specific
Refer in plant stand debugging process, for the information of specific every debugging substance record, substance is debugged including every
Desired value, debugging actual value, main website verification personnel, plant stand verification personnel, debug time, debugging checked result etc. are debugged, for
For instantaneous value, the instantaneous value of all communication ports is enumerated.The Debugging message is stored in database module, and is adjusted for generating
Try task form.
Detection project list and each detection project of the content of debugging task list including debugging task are corresponding
Debugging message.The numberical range allowable of output signal.Further include commissioning staff's information, debugging power plant and substation's information, debug-type and tune
Try the beginning and ending time.
Database step, the structure of corresponding debugging task definition module establish database, which has often
The corresponding Debugging message of one detection project.
The debugging task definition module has the debug-type parameter that can set, the debug-type parameter include first inspection,
It is checked before power transmission, example inspection and protection upgrade four classes;A kind of preset detection project list is corresponded to per one kind debug-type parameter, and
It can need to carry out final election according to practical debugging.
The debugging task system further includes debugging scope setting module, which is examined for setting
Survey plant stand, voltage class and voltage spaces.
The debugging task system further includes interactive module, the interactive module be used for by debugging task status visualization be in
Now, and by the input of operation maintenance personnel the content of debugging task definition module is changed.
The debugging task system further includes server module, and the task record module is connected into mutually by server module
Networking.
The debugging maintenance stage is specific as follows:
List generation step, operation maintenance personnel select specific one or more sons in debugging module according to current debugging task
Module, and several detection projects of submodule subordinate are further selected, corresponding debugging is generated by list generation module
Task form, operation maintenance personnel hold debugging task list and debugging task are waited for start in corresponding plant stand;
Signal detection step, debugging task system send debugging signal to plant stand, and operation maintenance personnel is according to debugging task list
The detection project list of upper record checks corresponding output signal whether in numberical range allowable successively.It is debugged according to plant stand
Need, based on plant stand, voltage class, interval signal filter base on, further, realize signal mistake based on equipment
The signal more to become more meticulous filtering is supported in filter, reduces the workload of commissioning staff's signal browsing.
According to electronics debug list, with reference to electronics debug list in commissioning content, automatic identification debugging signal, and with tune
Desired value, actual value in examination content are matched, and realize the signal debugging verification function of automation.Commissioning staff can be automatic
On the signal debugging verification basis of change, spot-check by hand, whether examination debugging checked result is correct.
In debugging process, system is identified in system frequently using take place frequently blipology, multiple blipology
The debugging signal of generation, debugging signal etc. caused by non-debugging purpose, and submit commissioning staff be confirmed whether it is the signal that takes place frequently,
Mistaking signal etc. realizes the plant stand signal debugging more to become more meticulous.
Signal checking step, as the output signal of institute's detection project numberical range allowable corresponding with the detection project is not inconsistent
It closes, then contacts maintenance personal and faulty equipment is overhauled, and repeating signal detecting step again;Such as the detection in debugging task
Project numberical range allowable corresponding with the detection project meets, then terminates this debugging task, and record is had this tune
The debugging task list typing of examination task result is preserved to the debugging recording module.
After the completion of debugging efforts, system is according to debugging letter self registering in electronics debugging list and debugging process
Breath, automatic regular generation experiment table, when experiment table includes commissioning staff, the plant stand of debugging, debug-type, debugging start-stop
Between, the information such as commissioning content and debugging result.
System shows plant stand debugging process on the basis of experiment table, by interactive interface so that commissioning staff can
With very clear understanding plant stand debugging result and procedural information.
Test form data can persistent storage, system support pilot scale study table is traced, can refer to fix time, debug
The conditions such as personnel are traced.
The substation based on electronics debugging list that above-described embodiment is only used for further illustrating the present invention becomes more meticulous debugging
Method, but the invention is not limited in embodiment, every technical spirit according to the present invention makees above example any
Simple modification, equivalent change and modification is each fallen in the protection domain of technical solution of the present invention.
Claims (6)
- The adjustment method 1. substation based on electronics debugging list becomes more meticulous, which is characterized in that including:System builds the stage:Debugging task system construction step, the debugging task system include database module, debugging recording module, list generation mould Block, task record module and debugging task definition module;The debugging task definition module specifically includes traditional four remote sensing information tune Swab module protects letter information debugging submodule, Microcomputer Protection information debugging submodule and anti-false information debugging submodule, each Several optional detection projects are respectively arranged under debugging submodule again;Database step, the structure of corresponding debugging task definition module establish database, which has each The corresponding Debugging message of detection project;The debugging maintenance stage:List generation step, operation maintenance personnel select specific one or more submodules in debugging module according to current debugging task Block, and several detection projects of submodule subordinate are further selected, generating corresponding debugging by list generation module appoints Be engaged in list, operation maintenance personnel hold debugging task list corresponding plant stand wait for debugging task start, the debugging task list it is interior Appearance includes the detection project list of debugging task and the corresponding Debugging message of detection project;Signal detection step, debugging task system send debugging signal by main website to debugged plant stand, and operation maintenance personnel is according to tune Whether qualified the detection project list recorded in examination task form, check corresponding detection project successively;Signal checking step, if the output signal of institute's detection project numberical range allowable corresponding with the detection project is not met, It then contacts maintenance personal to overhaul faulty equipment, and repeating signal detecting step again;Such as the detection in debugging task Mesh numberical range allowable corresponding with the detection project meets, then terminates this debugging task, and record is had this debugging The debugging task list typing of task result is preserved to the debugging recording module.
- The adjustment method 2. substation according to claim 1 based on electronics debugging list becomes more meticulous, it is characterised in that:Institute Stating debugging task definition module has the debug-type parameter that can set, which includes checking before first inspection, power transmission, Example inspection and protection four classes of upgrading;A kind of preset detection project list is corresponded to, and can be according to reality per one kind debug-type parameter Debugging needs to carry out final election.
- The adjustment method 3. substation according to claim 1 based on electronics debugging list becomes more meticulous, it is characterised in that:Institute It states debugging task system and further includes debugging scope setting module, which detects plant stand, electricity for setting Press grade and voltage spaces.
- The adjustment method 4. substation according to claim 1 based on electronics debugging list becomes more meticulous, it is characterised in that:Institute It states debugging task system and further includes interactive module, the interactive module is for debugging task status visualization to be presented, and by O&M The content of the input change debugging task definition module of personnel.
- The adjustment method 5. substation according to claim 1 based on electronics debugging list becomes more meticulous, it is characterised in that:Institute State debugging task list Debugging message include debugging desired value, debugging actual value, main website verification personnel, plant stand verification personnel, Debug time and debugging checked result.
- The adjustment method 6. substation according to claim 1 based on electronics debugging list becomes more meticulous, it is characterised in that:Institute It states debugging task system and further includes server module, the task record module is connected into internet by server module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810175721.4A CN108256657A (en) | 2018-03-02 | 2018-03-02 | Substation based on electronics debugging list becomes more meticulous adjustment method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810175721.4A CN108256657A (en) | 2018-03-02 | 2018-03-02 | Substation based on electronics debugging list becomes more meticulous adjustment method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108256657A true CN108256657A (en) | 2018-07-06 |
Family
ID=62745550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810175721.4A Pending CN108256657A (en) | 2018-03-02 | 2018-03-02 | Substation based on electronics debugging list becomes more meticulous adjustment method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108256657A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111030301A (en) * | 2019-12-18 | 2020-04-17 | 广东电网有限责任公司 | Method for checking correlation of scheduling automation information points |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102593733A (en) * | 2011-12-31 | 2012-07-18 | 长园深瑞继保自动化有限公司 | Debugging method for transformer substation equipment |
CN202906578U (en) * | 2012-11-22 | 2013-04-24 | 山西省电力公司朔州供电分公司 | Auxiliary device for transformer station standardization acceptance check |
CN204361788U (en) * | 2015-01-22 | 2015-05-27 | 南京大全自动化科技有限公司 | Merge the split type network debugging apparatus of intelligent grid of geographic positioning technology |
CN104715347A (en) * | 2015-04-09 | 2015-06-17 | 山东中实易通集团有限公司 | Comprehensive data processing system for debugging work of nuclear power station |
CN105141475A (en) * | 2015-08-18 | 2015-12-09 | 电子科技大学 | Auxiliary debugging system for station level equipment of intelligent substation |
US20160309352A1 (en) * | 2013-11-04 | 2016-10-20 | State Grid Corporation Of China | Intelligent power utilization communication product detecting system |
CN106971273A (en) * | 2017-03-31 | 2017-07-21 | 国网山东省电力公司 | The transformer station's checking and accepting process control system and control method of intelligent alarm prompting |
-
2018
- 2018-03-02 CN CN201810175721.4A patent/CN108256657A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102593733A (en) * | 2011-12-31 | 2012-07-18 | 长园深瑞继保自动化有限公司 | Debugging method for transformer substation equipment |
CN202906578U (en) * | 2012-11-22 | 2013-04-24 | 山西省电力公司朔州供电分公司 | Auxiliary device for transformer station standardization acceptance check |
US20160309352A1 (en) * | 2013-11-04 | 2016-10-20 | State Grid Corporation Of China | Intelligent power utilization communication product detecting system |
CN204361788U (en) * | 2015-01-22 | 2015-05-27 | 南京大全自动化科技有限公司 | Merge the split type network debugging apparatus of intelligent grid of geographic positioning technology |
CN104715347A (en) * | 2015-04-09 | 2015-06-17 | 山东中实易通集团有限公司 | Comprehensive data processing system for debugging work of nuclear power station |
CN105141475A (en) * | 2015-08-18 | 2015-12-09 | 电子科技大学 | Auxiliary debugging system for station level equipment of intelligent substation |
CN106971273A (en) * | 2017-03-31 | 2017-07-21 | 国网山东省电力公司 | The transformer station's checking and accepting process control system and control method of intelligent alarm prompting |
Non-Patent Citations (3)
Title |
---|
TANGZHIJUN ET AL.: "A Novel Simulation And Test Program For Secondary System In Intelligent Substation", 《2ND JOINT INTERNATIONAL INFORMATION TECHNOLOGY, MECHANICAL AND ELECTRONIC ENGEERING CONFERENCE》 * |
李萼青: "智能变电站二次系统调试方法研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
高俊彦: "调度自动化调试精益化管理技术", 《电力自动化》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111030301A (en) * | 2019-12-18 | 2020-04-17 | 广东电网有限责任公司 | Method for checking correlation of scheduling automation information points |
CN111030301B (en) * | 2019-12-18 | 2020-09-25 | 广东电网有限责任公司 | Method for checking correlation of scheduling automation information points |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106199276B (en) | The intelligent diagnosis system and method for exception information in a kind of power information acquisition system | |
CN107977714A (en) | A kind of intelligent control platform of power transformation fortune inspection | |
CN104219315A (en) | Operation monitoring system for electricity consumption information acquisition system and monitoring method thereof | |
CN111948489B (en) | Intelligent substation secondary equipment board card level abnormal defect diagnosis positioning method and system | |
CN106383763A (en) | Data center intelligent fault detection alarm system | |
CN112701790A (en) | Transformer substation and main station intelligent joint debugging platform and joint debugging method | |
CN105279919A (en) | Electricity utilization information acquiring system | |
CN110097275A (en) | A kind of family change relational checking method and device based on platform area power failure data | |
CN109816349A (en) | A kind of test verification management platform | |
CN110335008A (en) | A kind of net source coordination management method and platform for dispatching of power netwoks | |
CN116743079A (en) | Photovoltaic string fault processing method and device, photovoltaic management system and medium | |
CN115017484A (en) | Access control method and device | |
CN108512231A (en) | A kind of data processing method of the status monitoring integrated platform based on IEC61850 agreements | |
CN105404269A (en) | Three-remote signal acceptance system of intelligent transformer station | |
CN108256657A (en) | Substation based on electronics debugging list becomes more meticulous adjustment method | |
CN115953264B (en) | Screen cabinet model integrated design system and fault judgment method based on three-dimensional modeling | |
CN111146868A (en) | Power communication machine room dynamic loop monitoring standardized access method and system | |
CN116404751A (en) | Device state monitoring method, device, storage medium and computer product | |
CN116014893A (en) | Remote visual intelligent inspection system for transformer substation | |
CN115203287A (en) | Remote checking method and system for version of relay protection device | |
CN107748701A (en) | A kind of analysis method for reliability of electric energy measurement automation system | |
CN103647760A (en) | Manufacturing message specification (MMS) communication platform of intelligent substation digital protection device and access method of manufacturing message specification (MMS) communication platform | |
CN114123482A (en) | Main plant station information joint debugging decoupling method | |
CN109738717B (en) | Intelligent substation equipment sampling verification method and system based on continuity variance | |
CN202404664U (en) | Monitoring device and system for automatic plug-in equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180706 |
|
RJ01 | Rejection of invention patent application after publication |