CN106968376A - A kind of assembled hanging platform structure and its construction method - Google Patents

A kind of assembled hanging platform structure and its construction method Download PDF

Info

Publication number
CN106968376A
CN106968376A CN201710016145.4A CN201710016145A CN106968376A CN 106968376 A CN106968376 A CN 106968376A CN 201710016145 A CN201710016145 A CN 201710016145A CN 106968376 A CN106968376 A CN 106968376A
Authority
CN
China
Prior art keywords
rectangular tube
platform structure
girder
suspension rod
round steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710016145.4A
Other languages
Chinese (zh)
Inventor
邢遵胜
曹欢
刘中华
周鹏洋
刘思丽
肖湘
张俊夫
吴楚桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201710016145.4A priority Critical patent/CN106968376A/en
Publication of CN106968376A publication Critical patent/CN106968376A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/10Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/22Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings

Abstract

The invention belongs to construction steel structure field, specifically related to a kind of assembled hanging platform structure and its construction method, the platform structure is arranged on bottom of the building face, including some rectangular tube girders, adjacent rectangle pipe girder is connected by some rectangular tube secondary beams, and platform bed board is provided between adjacent rectangle pipe secondary beam;Each rectangular tube girder is provided at both ends with round steel suspension rod, and round steel suspension rod is connected by built-in fitting with bottom of the building face.Sling point can not installation question, the construction precision of guarantee hanging platform caused by the present invention can overcome embedded part embedding deviation;Using fabricated structure, efficiency of construction can be greatly improved.

Description

A kind of assembled hanging platform structure and its construction method
Technical field
The invention belongs to construction steel structure field, and in particular to a kind of assembled hanging platform structure and its construction method.
Background technology
In recent years, with the rise of logistics express delivery industry, the hangar system application for logistics transmission is more and more extensive.Hang Hang plateform system and effectively utilize upper space, be connected by built-in fitting with top concrete structure, it is ensured that bottom building is used Demand.
The presence of construction deviation is had due to being embedded in the built-in fitting of concrete structure bottom in advance, traditional Platform Designing needs elder generation The physical location of embedded part is measured, design platform structure is carried out further according to physical location.Such way had not only taken but also effort, and scene Welding job amount is big.Simultaneously as the deviation of embedded part causes, lower section hanging Platform Designing difficulty is big, and platform arrangement is irregular.
Therefore the present invention is exactly that there is provided a kind of assembled hanging platform structure and its construction from the demand of practice of construction Thus method, this case produces.
The content of the invention
It is an object of the invention to provide a kind of assembled hanging platform structure and its construction method, to realize without measurement The existing deviation of built-in fitting, directly adapts to the deviation of embedded part using assembling type steel structure platform, improves convenience for construction, simultaneously Improve the efficiency and security of construction.
To achieve the above object, the technical scheme that specifically provides of the present invention is:A kind of assembled hangs platform structure, and this is put down Platform structure setting is on bottom of the building face, including some rectangular tube girders, and adjacent rectangle pipe girder is connected by some rectangular tube secondary beams, Platform bed board is provided between adjacent rectangle pipe secondary beam;Each rectangular tube girder is provided at both ends with round steel suspension rod, round steel Suspension rod is connected by built-in fitting with bottom of the building face.
Further, rectangular tube girder and rectangular tube the secondary beam junction is provided with adaptor, and adaptor is U-shaped steel tank.
Further, the built-in fitting bottom, which is fixed with steel channel connector, steel channel connector, is fixed with connecting plate, and round steel is hung Bar is secured by bolts on connecting plate.
Further, the rectangular tube girder is provided with slotted hole with round steel suspension rod junction, and round steel suspension rod is solid by bolt Due in the slotted hole.
Further, the rectangular tube girder is additionally provided with slotted hole stiffener with round steel suspension rod junction, and the slotted hole is mended Strong part is located in rectangular tube girder.
A kind of assembled hangs the construction method of platform structure, and one, carry out using measuring instrument getting setting-out ready on ground; 2nd, rectangular tube girder is placed according to the point position of setting-out;3rd, rectangular tube secondary beam is directly rested on U-shaped adaptor, and passes through point Weldering is fixed;4th, platform bed board is laid on rectangular tube girder and rectangular tube secondary beam;5th, platform structure lifting construction, and with Built-in fitting is welded;6th, lifting device is removed, repetition measurement simultaneously adjusts round steel length of boom, platform structure construction is completed.
After such scheme, the present invention has many beneficial effects:
Measurement work is greatly reduced in one, and large airport baggage handling system steel platform area is big, the built-in fitting point position that need to be used Quantity is big, if surveying the position of each built-in fitting, and measurement work is huge.The use of the present invention, it is not necessary to measure built-in fitting Physical location, reduces measurement workload, improves efficiency of construction.
The whole platforms of two, are assembled, and all girders and secondary beam are the standard component that factory makes, easy construction, Site Welding amount is small.
Brief description of the drawings
Fig. 1 is the general structure schematic diagram of present pre-ferred embodiments;Fig. 2 is close-up schematic view at A in Fig. 1;Fig. 3 For close-up schematic view at B in Fig. 1;Fig. 4 is close-up schematic view at C in Fig. 1;Fig. 5 is present pre-ferred embodiments group Close use state schematic diagram.
Embodiment
With reference to accompanying drawing, present pre-ferred embodiments are described in further details.
As Figure 1-4, a kind of assembled hanging platform structure, the platform structure is arranged on bottom of the building face, including some Rectangular tube girder 6, adjacent rectangle pipe girder 6 is connected by some rectangular tube secondary beams 8, is provided between adjacent rectangle pipe secondary beam 8 Platform bed board 9;Each rectangular tube girder 6 is provided at both ends with round steel suspension rod 4, and round steel suspension rod 4 passes through built-in fitting 10 and building Bottom surface is connected.
Rectangular tube girder 6 and rectangular tube secondary beam 8 junction is provided with adaptor 7, and adaptor 7 is U-shaped steel tank.
The bottom of built-in fitting 10, which is fixed with steel channel connector 1, steel channel connector 1, is fixed with connecting plate 3, round steel suspension rod 4 are fixed on connecting plate 3 by bolt 2.
Rectangular tube girder 6 is provided with slotted hole 11 with the junction of round steel suspension rod 4, and round steel suspension rod 4 is fixed on institute by bolt 2 State in slotted hole;The rectangular tube girder 6 is additionally provided with slotted hole stiffener 5 with the junction of round steel suspension rod 4, the slotted hole reinforcement Part 5 is located in rectangular tube girder 6.
A kind of assembled hangs the construction method of platform structure, comprises the following steps:
First, rectangular tube girder 6 makes, using 200X100X5 rectangular tubes, the long 2.6m of girder, is in apart from beam-ends 0.2m on girder Lower surface respectively opens the slotted hole that a size is 200mmX22mm, and slotted hole stiffener 5 carries out reinforcement to rectangular tube girder 6;
2nd, rectangular tube secondary beam 8 makes, and this example secondary beam uses 100X100x4 rectangular tubes, makes full-length.
The 3rd, the U-shaped adaptor 7 of the both sides of rectangular tube girder 6, spacing of the adaptor 7 along the length direction of rectangular tube girder 6 are installed Determined according to the spacing of rectangular tube secondary beam 8.The height that adaptor is located at the side of rectangular tube girder 6 is true according to the height of rectangular tube secondary beam 8 It is fixed, it is ensured that the upper surface flush of rectangular tube girder 6 and rectangular tube secondary beam 8.
The 4th, steel channel connector 1 under built-in fitting 10 and the connecting plate 3 of channel-section steel bottom are installed, this example is using No. eight channel-section steels.
The 5th, round steel suspension rod 4 is installed, this example uses a diameter of 20 round steel suspension rod 4.The upper end of round steel suspension rod 4 passes through bolt 2 It is connected with the connecting plate 3 under steel channel connector 1;The lower end of round steel suspension rod 4 is connected by bolt 2 with rectangular tube girder 6.
The 6th, rectangular tube secondary beam 8 is installed, rectangular tube secondary beam 8 directly rests on the U-shaped adaptor 7 of the both sides of rectangular tube girder 6 On, local location spot welding is fixed.
7th, pave platform bed board in platen 9, this example and use the thick checkered steel plates of 4mm.
8th, platform structure lifting construction, and welded with built-in fitting 10;
9th, lifting device is removed, repetition measurement simultaneously adjusts the length of round steel suspension rod 4, platform structure construction is completed.
Above-described embodiment is only used for illustrating the inventive concept of the present invention, rather than the restriction to rights protection of the present invention, All changes for being carried out unsubstantiality to the present invention using this design, are such as replaced by steel grating or expanded sheet metal by landing slab, changed Stiffener etc. is set below girder, secondary beam cross-sectional shape, U-shaped connector, protection scope of the present invention all should be fallen into.

Claims (6)

1. a kind of assembled hangs platform structure, the platform structure is arranged on bottom of the building face, it is characterised in that:Including some rectangles Pipe girder, adjacent rectangle pipe girder is connected by some rectangular tube secondary beams, and platform bed board is provided between adjacent rectangle pipe secondary beam; Each rectangular tube girder is provided at both ends with round steel suspension rod, and round steel suspension rod is connected by built-in fitting with bottom of the building face.
2. a kind of assembled hanging platform structure according to claim 1, it is characterised in that:The rectangular tube girder and square Shape pipe secondary beam junction is provided with adaptor, and adaptor is U-shaped steel tank.
3. a kind of assembled hanging platform structure according to claim 1, it is characterised in that:The built-in fitting bottom is fixed Have and connecting plate is fixed with steel channel connector, steel channel connector, round steel suspension rod is secured by bolts on connecting plate.
4. a kind of assembled hanging platform structure according to claim 1, it is characterised in that:The rectangular tube girder and circle Steel suspension rod junction is provided with slotted hole, and round steel suspension rod is secured by bolts in the slotted hole.
5. a kind of assembled hanging platform structure according to claim 4, it is characterised in that:The rectangular tube girder and circle Steel suspension rod junction is additionally provided with slotted hole stiffener, and the slotted hole stiffener is located in rectangular tube girder.
6. a kind of assembled hangs the construction method of platform structure, it is characterised in that:First, beaten using measuring instrument on ground Point setting-out;2nd, rectangular tube girder is placed according to the point position of setting-out;3rd, rectangular tube secondary beam is directly rested on U-shaped adaptor, And fixed by spot welding;4th, platform bed board is laid on rectangular tube girder and rectangular tube secondary beam;5th, platform structure is lifted Construction, and welded with built-in fitting;6th, lifting device is removed, repetition measurement simultaneously adjusts round steel length of boom, platform structure construction is completed.
CN201710016145.4A 2017-01-10 2017-01-10 A kind of assembled hanging platform structure and its construction method Pending CN106968376A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710016145.4A CN106968376A (en) 2017-01-10 2017-01-10 A kind of assembled hanging platform structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710016145.4A CN106968376A (en) 2017-01-10 2017-01-10 A kind of assembled hanging platform structure and its construction method

Publications (1)

Publication Number Publication Date
CN106968376A true CN106968376A (en) 2017-07-21

Family

ID=59334620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710016145.4A Pending CN106968376A (en) 2017-01-10 2017-01-10 A kind of assembled hanging platform structure and its construction method

Country Status (1)

Country Link
CN (1) CN106968376A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439172A (en) * 2019-08-09 2019-11-12 广东玖米空间科技有限公司 Assembled architecture ceiling suspension system and its furred ceiling attachment device
CN112432012A (en) * 2020-11-24 2021-03-02 中建八局科技建设有限公司 Suspension type object mounting support base

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200421539Y1 (en) * 2006-05-02 2006-07-12 두우균 structure of the insert mold with complex functions
CN101200916A (en) * 2007-11-29 2008-06-18 浙江精工钢结构有限公司 Construction method of prestressed suspension type building structure
CN202416577U (en) * 2012-02-27 2012-09-05 山东同圆设计集团有限公司 Suspended type equipment layer
CN204491837U (en) * 2015-03-17 2015-07-22 天津天一建设集团有限公司 Suspension type high-strength steel bar lifting module
CN205688642U (en) * 2016-06-18 2016-11-16 青岛海川建设集团有限公司 A kind of large space ceiling decoration supporting construction
CN206495384U (en) * 2017-01-10 2017-09-15 浙江精工钢结构集团有限公司 A kind of assembled hangs platform structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200421539Y1 (en) * 2006-05-02 2006-07-12 두우균 structure of the insert mold with complex functions
CN101200916A (en) * 2007-11-29 2008-06-18 浙江精工钢结构有限公司 Construction method of prestressed suspension type building structure
CN202416577U (en) * 2012-02-27 2012-09-05 山东同圆设计集团有限公司 Suspended type equipment layer
CN204491837U (en) * 2015-03-17 2015-07-22 天津天一建设集团有限公司 Suspension type high-strength steel bar lifting module
CN205688642U (en) * 2016-06-18 2016-11-16 青岛海川建设集团有限公司 A kind of large space ceiling decoration supporting construction
CN206495384U (en) * 2017-01-10 2017-09-15 浙江精工钢结构集团有限公司 A kind of assembled hangs platform structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439172A (en) * 2019-08-09 2019-11-12 广东玖米空间科技有限公司 Assembled architecture ceiling suspension system and its furred ceiling attachment device
CN112432012A (en) * 2020-11-24 2021-03-02 中建八局科技建设有限公司 Suspension type object mounting support base

Similar Documents

Publication Publication Date Title
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN104088467B (en) A kind of large Steel Cantilever truss structure high-altitude construction Deformation monitoring method
CN104060542B (en) Compound beam cable stayed bridge direction across bridge prestress application device and applying method thereof
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN206495384U (en) A kind of assembled hangs platform structure
CN203947771U (en) A kind of Bailey beam pendent form support system
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN103306206B (en) A kind of construction method adopting thin-wall hollow high-pier reinforcement bar support fixing of the forming frame reinforcing bar
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN104264706B (en) External elevator steel beam foundation structure and construction method thereof
CN103243922B (en) Floorslab concrete thickness control device
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN106968376A (en) A kind of assembled hanging platform structure and its construction method
CN108678181B (en) High-altitude construction method for steel truss and concrete combined structure on top of bin
CN110409624A (en) A kind of installation of large scale equipment and main structure be inverse to be made to calculate and construction method
CN108797607B (en) Construction method for double-pipe inclined strut support deep foundation pit
CN204163104U (en) External elevator steel beam foundation constructs
CN103174300B (en) Viscous damper installation construction method
CN102605945B (en) Manufacturing method of big wood formwork
CN109778702A (en) Across existing city intersection steel box-girder pushing tow model and its application method
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN209163448U (en) A kind of superelevation long-span beams formwork support structure
CN109138152B (en) Assembled concrete frame structure

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170721

RJ01 Rejection of invention patent application after publication