CN110439172A - Assembled architecture ceiling suspension system and its furred ceiling attachment device - Google Patents

Assembled architecture ceiling suspension system and its furred ceiling attachment device Download PDF

Info

Publication number
CN110439172A
CN110439172A CN201910734206.XA CN201910734206A CN110439172A CN 110439172 A CN110439172 A CN 110439172A CN 201910734206 A CN201910734206 A CN 201910734206A CN 110439172 A CN110439172 A CN 110439172A
Authority
CN
China
Prior art keywords
crossbeam
pull rod
assembled architecture
drag hook
attachment device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910734206.XA
Other languages
Chinese (zh)
Inventor
林雄强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jiumi Space Technology Co Ltd
Original Assignee
Guangdong Jiumi Space Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jiumi Space Technology Co Ltd filed Critical Guangdong Jiumi Space Technology Co Ltd
Priority to CN201910734206.XA priority Critical patent/CN110439172A/en
Publication of CN110439172A publication Critical patent/CN110439172A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/10Connections between parallel members of the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a kind of assembled architecture ceiling suspension system and its furred ceiling attachment devices, connection for first crossbeam arranged up and down and second cross beam, the attachment device includes the connector being detachably connected with first crossbeam, connection drag hook immediately below connector, and one end and the pull rod that connect drag hook and be fixedly connected, the other end of pull rod is rotatably connected with connector, pull rod can be around own axis, connecting drag hook includes connecting rod and two eave tiles for being respectively arranged on connecting rod both ends, eave tile is upward, second cross beam is equipped with cavity, and the insertion groove and limit hole being connected to cavity, limit hole and eave tile correspond and are located at the two sides of insertion groove, connection drag hook, which can be protruded into from insertion groove in cavity and by rotating tension bar, is inserted into two eave tiles respectively in corresponding limit hole.The lifting of first crossbeam and second cross beam is realized by the attachment device, whole process is easy to operate, and installation speed is fast, is also conducive to the reuse of beam body, reduces production cost.

Description

Assembled architecture ceiling suspension system and its furred ceiling attachment device
Technical field
The present invention relates to assembled architecture field, in particular to a kind of assembled architecture ceiling suspension system and its furred ceiling connection dress It sets.
Background technique
Aluminium formula assembly building is with its simple easily dress, portable construction and intensity is high, various shapes and sense of touch is built compared with other metals It builds more comfortable, is extensively big well-established.When furred ceiling crossbeam in the assembly of aluminum current formula connects, generally by welding It is connected and fixed, but connects by welding, there are heat affected areas for aluminum alloy piping welding, the intensity of component can be reduced, to meet Design requirement needs to thicken the section of component, and so as to cause cost increase, and mounting means is complicated, and consuming time is long, once structure Assembly welding mistake between part be easy to cause scrapping for component, is unfavorable for the reuse of component.
Summary of the invention
The purpose of the present invention is to provide a kind of assembled architecture ceiling suspension system and its furred ceiling attachment devices, can be convenient for peace Dress improves assembling speed, is additionally favorable for the reuse of beam body, reduces production cost.
To achieve the purpose of the present invention, it adopts the technical scheme that:
A kind of assembled architecture furred ceiling attachment device should for the connection of first crossbeam arranged up and down and second cross beam Attachment device include the connector being detachably connected with first crossbeam, the connection drag hook immediately below connector and one end with The pull rod that connection drag hook is fixedly connected, the other end and the connector of pull rod are rotatably connected, and pull rod can be around own axis, even Connecing drag hook includes connecting rod and two eave tiles for being respectively arranged on connecting rod both ends, and eave tile is upward, second cross beam be equipped with cavity, And the insertion groove and limit hole being connected to cavity, limit hole and eave tile correspond and are located at the two sides of insertion groove, connect Drag hook, which can be protruded into from insertion groove in cavity and by rotating tension bar, is inserted into two eave tiles respectively in corresponding limit hole.
When installation, first crossbeam is fixed on connector, connection drag hook is then inserted into second cross beam by insertion groove Cavity in, and drive by rotating tension bar turning to for drag hook of connection to be aligned with the limit hole on second cross beam, and pass through Moving up and down makes to realize the lifting of first crossbeam and second cross beam, whole process is easy to operate, installation in drag hook insertion limit hole Speed is fast, can also dismantle and adjust without scrapping original beam body again even if structure change, flexible and changeable, is also conducive to beam The reuse of body reduces production cost.
Technical solution is further illustrated below:
Further, the first side plate and the second side plate that connector includes bottom plate, is set on the bottom plate and is oppositely arranged, bottom Plate, the first side plate and the second side plate cooperatively form the card slot with first crossbeam cooperation, first crossbeam can be caught in card slot and with even Fitting is detachably connected.
Further, first crossbeam is equipped with intercommunicating pore, the first side plate and the second side plate are respectively equipped with to be cooperated with intercommunicating pore Connecting hole, first crossbeam and connector are cooperatively connected by intercommunicating pore, connecting hole and screw rod.When installation, screw rod is sequentially passed through The connecting hole of first side plate, the intercommunicating pore of first crossbeam, the second side plate connecting hole after both ends fixed by nut, make first cross Realize and be detachably connected between beam and connector, and by this screw rod to connection type is worn, make to connect it is more stable, frequent It is not easily to fall off under dynamic load, keep overall structure more firm.
Further, connecting hole is kidney slot.It is more convenient for the installation contraposition of first crossbeam and connector, makes installation effectiveness It is higher.
Further, the first side plate and the second side plate are respectively equipped with spaced apart two connecting holes up and down.Make first Connection between crossbeam and connector is more firm.
Further, pull rod is detachably connected finite place piece backwards to one end of connection drag hook, bottom plate is equipped with bottom outlet, pull rod One end pass through bottom outlet after connect with locating part, there are gaps between bottom outlet and pull rod.Pull rod can be in bottom outlet around itself axis Line rotation.
Further, locating part is stop nut, pull rod is equipped with the screw thread cooperated with stop nut.It is easily installed and tears open It unloads, improves working efficiency.
Further, connector, pull rod and the connection equal stainless steel material of drag hook.It prevents material from getting rusty, extends the connection The service life of device guarantees integrally-built stability.
The present invention also provides a kind of assembled architecture ceiling suspension system, including first crossbeam arranged up and down and second cross beam, And above-mentioned assembled architecture furred ceiling attachment device.
When installation, first crossbeam is fixed on connector, connection drag hook is then inserted into second cross beam by insertion groove Cavity in, and drive by rotating tension bar turning to for drag hook of connection to be aligned with the limit hole on second cross beam, and pass through Moving up and down makes to realize the lifting of first crossbeam and second cross beam, whole process is easy to operate, installation in drag hook insertion limit hole Speed is fast, can also dismantle and adjust without scrapping original beam body again even if structure change, flexible and changeable, is also conducive to beam The reuse of body reduces production cost.
It is arranged in parallel or relatively arranged in a crossed manner up and down further, first crossbeam and second cross beam are opposite up and down.The company Connection device is suitble to the lifting of various orientation crossbeams, applied widely.
Compared with prior art, the invention has the following advantages:
Then connection drag hook is passed through the second cross of insertion groove insertion by the way that first crossbeam to be fixed on connector by the present invention In the cavity of beam, and turning to for drag hook of connection is driven to be aligned with the limit hole on second cross beam by rotating tension bar, and lead to Crossing to move up and down makes to realize the lifting of first crossbeam and second cross beam, whole process is easy to operate, peace in drag hook insertion limit hole It is fast to fill speed, can also dismantle and adjust without scrapping original beam body again even if structure change, it is flexible and changeable, also it is conducive to The reuse of beam body reduces production cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of assembled architecture ceiling suspension system of the embodiment of the present invention;
Fig. 2 is the A direction view of Fig. 1;
Fig. 3 is the structural schematic diagram of second cross beam of the embodiment of the present invention
Fig. 4 is the structural schematic diagram of furred ceiling attachment device of the embodiment of the present invention;
Fig. 5 is the B direction view of Fig. 3.
Description of symbols:
10. first crossbeam, 20. second cross beams, 210. cavitys, 220. insertion grooves, 230. limit holes, 30. attachment devices, 310. connectors, 311. bottom plates, 312. first side plates, 313. second side plates, 314. card slots, 315. connecting holes, 320. connections are drawn Hook, 321. connecting rods, 322. eave tiles, 330. pull rods, 40. screw rods, 50. nuts, 60. locating parts.
Specific embodiment
The embodiment of the present invention is described in detail with reference to the accompanying drawing:
As shown in Figures 1 to 5, a kind of assembled architecture ceiling suspension system, including first crossbeam 10, be located at first crossbeam 10 under The second cross beam 20 of side and the assembled architecture furred ceiling attachment device 30 connected for first crossbeam 10 and second cross beam 20, should Attachment device 30 include include the connector 310 being detachably connected with first crossbeam 10, the connection immediately below connector 310 Drag hook 320 and one end can be rotated with the pull rod 330 for connecting drag hook 320 and being fixedly connected, the other end and connector 310 of pull rod 330 Connection, pull rod 330 can connect drag hook 320 including connecting rod 321 and be respectively arranged on 321 both ends of connecting rod around own axis Two eave tiles 322, two eave tiles 322 are upward, and second cross beam 20 is equipped with cavity 210 and the insertion that is connected to cavity 210 Slot 220 and limit hole 230, limit hole 230 and eave tile 322 correspond and are located at the two sides of insertion groove 220, connect drag hook 320 can protrude into cavity 210 from insertion groove 220 and so that two eave tiles 322 is inserted into corresponding limit respectively by rotating tension bar 330 In hole 230, the shape of insertion groove 220 cooperates with the peripheral shape for connecting drag hook 320, enables to connect drag hook 320 across insertion groove 220 enter in cavity 210.
When installation, first crossbeam 10 is fixed on connector 310, then inserts connection drag hook 320 by insertion groove 220 Enter in the cavity 210 of second cross beam 20, and driven by rotating tension bar 330 connection drag hook 320 turn to and second cross beam Limit hole 230 on 20 is aligned, and is inserted into drag hook in limit hole 230 by moving up and down, and realizes first crossbeam 10 and second The lifting of crossbeam 20, whole process is easy to operate, and installation speed is fast, even if structure change can also dismantle again adjusting without Original beam body is scrapped, it is flexible and changeable, also it is conducive to the reuse of beam body, reduces production cost.
In the present embodiment, first crossbeam 10 is furred ceiling crossbeam, and first crossbeam 10 and about 20 second cross beam are relatively parallel Setting, first crossbeam 10 and second cross beam 20 can also be set as relatively arranged in a crossed manner up and down according to actual needs, connection dress 30 liftings for being suitble to various orientation crossbeams are set, it is applied widely.
As shown in Figures 1 to 5, connector 310 includes bottom plate 311, on bottom plate 311 and the first side plate for being oppositely arranged 312 and second side plate 313, bottom plate 311, the first side plate 312 and the second side plate 313, which are cooperatively formed, to be cooperated and opens with first crossbeam 10 The upward card slot 314 of mouth, first crossbeam 10 can be caught in card slot 314 and be detachably connected with connector 310.First crossbeam 10 is set Having intercommunicating pore (attached drawing does not identify), the first side plate 312 and the second side plate 313 are respectively equipped with the connecting hole 315 with intercommunicating pore cooperation, First crossbeam 10 and connector 310 are cooperatively connected by intercommunicating pore, connecting hole 315 and screw rod 40.When installation, screw rod 40 is successively worn Both ends pass through after crossing the connecting hole 315 of the connecting hole 315 of the first side plate 312, the intercommunicating pore of first crossbeam 10, the second side plate 313 Nut 50 is fixed, makes to realize between first crossbeam 10 and connector 310 and is detachably connected, and by this screw rod 40 to wearing connection Mode, make to connect it is more stable, it is not easily to fall off under frequent dynamic load, keep overall structure more firm.
In the present embodiment, as shown in figure 4, the first side plate 312 and the second side plate 313 be respectively equipped with up and down it is spaced apart Two connecting holes 315, keep the connection between first crossbeam 10 and connector 310 more firm, the first side plate 312 and the second side plate More than one can also be arranged in 315 quantity of connecting hole on 313 according to actual needs.And connecting hole 315 is circular hole, connecting hole 315 can also be set as kidney slot according to actual needs, and the installation contraposition of be more convenient for first crossbeam 10 and connector 310 makes to pacify It fills more efficient.
As shown in Figure 2 and Figure 5, pull rod 330 is detachably connected finite place piece 60, bottom plate backwards to one end of connection drag hook 320 311 are equipped with bottom outlet (attached drawing does not identify), and one end of pull rod 330 connect after passing through bottom outlet with locating part 60, bottom outlet and pull rod 330 it Between there are gap, pull rod 330 can be in bottom outlet around own axis.
In the present embodiment, locating part 60 is stop nut, and pull rod 330 is equipped with the screw thread cooperated with stop nut, is convenient for Installation and removal improve working efficiency.Pull rod 330 can also pass through other modes and the bottom plates such as bearing connection according to actual needs 311 realizations are rotatably connected, and make to rotate more stable.
In the present embodiment, first crossbeam 10 and second cross beam 20 are aluminium, and first crossbeam 10 and second cross beam 20 It is square tube, first crossbeam 10 and second cross beam 20 can also be set as the other shapes such as round tube according to actual needs.Connector 310, pull rod 330 and the connection equal stainless steel material of drag hook 320, prevent material from getting rusty, extend the service life of the attachment device 30, Guarantee integrally-built stability.Connector 310, pull rod 330, connection drag hook 320, first crossbeam 10 and second cross beam 20 may be used also To use other materials according to actual needs.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of assembled architecture furred ceiling attachment device, special for the connection of first crossbeam arranged up and down and second cross beam Sign is, the connector including being detachably connected with first crossbeam, the connection drag hook immediately below the connector and one end The pull rod being fixedly connected with the connection drag hook, the other end of the pull rod are rotatably connected with the connector, the pull rod Can be around own axis, the connection drag hook includes connecting rod and two eave tiles for being respectively arranged on the connecting rod both ends, institute State the insertion groove and limit hole that eave tile is upward, and the second cross beam is equipped with cavity and is connected to the cavity, the limit Hole and the eave tile correspond and are located at the two sides of the insertion groove, and the connection drag hook can be protruded into from the insertion groove Two eave tiles are inserted into respectively in the corresponding limit hole in the cavity and by rotating the pull rod.
2. assembled architecture furred ceiling attachment device according to claim 1, which is characterized in that the connector includes bottom Plate, on the bottom plate and the first side plate and the second side plate that are oppositely arranged, the bottom plate, first side plate and described Two side plates cooperatively form the card slot with first crossbeam cooperation, the first crossbeam can be caught in the card slot and with the company Fitting is detachably connected.
3. assembled architecture furred ceiling attachment device according to claim 2, which is characterized in that the first crossbeam, which is equipped with, to be connected Through-hole, first side plate and second side plate are respectively equipped with the connecting hole with intercommunicating pore cooperation, the first crossbeam It is cooperatively connected with the connector by the intercommunicating pore, the connecting hole and screw rod.
4. assembled architecture furred ceiling attachment device according to claim 3, which is characterized in that the connecting hole is kidney-shaped Hole.
5. assembled architecture furred ceiling attachment device according to claim 4, which is characterized in that first side plate and described Second side plate is respectively equipped with spaced apart two connecting holes up and down.
6. assembled architecture furred ceiling attachment device according to claim 2, which is characterized in that the pull rod is backwards to the company The one end for connecing drag hook is detachably connected finite place piece, and the bottom plate is equipped with bottom outlet, after one end of the pull rod passes through the bottom outlet It is connect with the locating part, there are gaps between the bottom outlet and the pull rod.
7. assembled architecture furred ceiling attachment device according to claim 6, which is characterized in that the locating part is limit spiral shell Mother, the pull rod are equipped with the screw thread cooperated with the stop nut.
8. assembled architecture furred ceiling attachment device according to any one of claims 1 to 7, which is characterized in that the connection Part, the pull rod and the equal stainless steel material of the connection drag hook.
9. a kind of assembled architecture ceiling suspension system, which is characterized in that including first crossbeam arranged up and down and second cross beam and such as The described in any item assembled architecture furred ceiling attachment devices of claim 1 to 8.
10. assembled architecture ceiling suspension system according to claim 9, which is characterized in that the first crossbeam and described Two crossbeams are opposite up and down to be arranged in parallel or relatively arranged in a crossed manner up and down.
CN201910734206.XA 2019-08-09 2019-08-09 Assembled architecture ceiling suspension system and its furred ceiling attachment device Pending CN110439172A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910734206.XA CN110439172A (en) 2019-08-09 2019-08-09 Assembled architecture ceiling suspension system and its furred ceiling attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910734206.XA CN110439172A (en) 2019-08-09 2019-08-09 Assembled architecture ceiling suspension system and its furred ceiling attachment device

Publications (1)

Publication Number Publication Date
CN110439172A true CN110439172A (en) 2019-11-12

Family

ID=68434402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910734206.XA Pending CN110439172A (en) 2019-08-09 2019-08-09 Assembled architecture ceiling suspension system and its furred ceiling attachment device

Country Status (1)

Country Link
CN (1) CN110439172A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306547A (en) * 2013-05-14 2013-09-18 苏州德仕耐五金技术有限公司 Anti-theft security tensioning lock
CN204112918U (en) * 2014-10-09 2015-01-21 浙江汇力锁业有限公司 Simple and easy drawer-lock
CN104912395A (en) * 2015-06-23 2015-09-16 东莞市怡丰锁业有限公司 Side lock for coded lock and coded lock
CN204984198U (en) * 2015-07-17 2016-01-20 成都我来啦网格信息技术有限公司 Compact structure's door
CN106968376A (en) * 2017-01-10 2017-07-21 浙江精工钢结构集团有限公司 A kind of assembled hanging platform structure and its construction method
CN208718334U (en) * 2018-08-14 2019-04-09 广州建筑产业研究院有限公司 A kind of support frame of assembled architecture cantilevered plate
CN208811607U (en) * 2018-09-30 2019-05-03 湖北中硕科技有限公司 A kind of pipe cutting fixture of adjustable angle
CN208996285U (en) * 2018-08-31 2019-06-18 广东省建筑装饰工程有限公司 A kind of assembled space structure aluminum strip plate furred ceiling
CN210597839U (en) * 2019-08-09 2020-05-22 广东玖米空间科技有限公司 Assembly type building ceiling system and ceiling connecting device thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306547A (en) * 2013-05-14 2013-09-18 苏州德仕耐五金技术有限公司 Anti-theft security tensioning lock
CN204112918U (en) * 2014-10-09 2015-01-21 浙江汇力锁业有限公司 Simple and easy drawer-lock
CN104912395A (en) * 2015-06-23 2015-09-16 东莞市怡丰锁业有限公司 Side lock for coded lock and coded lock
CN204984198U (en) * 2015-07-17 2016-01-20 成都我来啦网格信息技术有限公司 Compact structure's door
CN106968376A (en) * 2017-01-10 2017-07-21 浙江精工钢结构集团有限公司 A kind of assembled hanging platform structure and its construction method
CN208718334U (en) * 2018-08-14 2019-04-09 广州建筑产业研究院有限公司 A kind of support frame of assembled architecture cantilevered plate
CN208996285U (en) * 2018-08-31 2019-06-18 广东省建筑装饰工程有限公司 A kind of assembled space structure aluminum strip plate furred ceiling
CN208811607U (en) * 2018-09-30 2019-05-03 湖北中硕科技有限公司 A kind of pipe cutting fixture of adjustable angle
CN210597839U (en) * 2019-08-09 2020-05-22 广东玖米空间科技有限公司 Assembly type building ceiling system and ceiling connecting device thereof

Similar Documents

Publication Publication Date Title
CN202187431U (en) Adjustable support rod
CN208715417U (en) A kind of mast assemblies and navigation unit by water
CN207762120U (en) It is angular to adjust connecting rod
CN110439172A (en) Assembled architecture ceiling suspension system and its furred ceiling attachment device
CN201028136Y (en) Rigid pipe fixture mechanism
CN113565258B (en) Deformable truss structure
CN204621963U (en) Drawbench
CN210944607U (en) Underframe type tower crane concrete beam structure
CN208994967U (en) A kind of lifting equipment double hook Anti-hook releasing device
CN208545831U (en) A kind of dismountable steel structure and dismountable steel structure house
CN207733138U (en) A kind of cabinet reinforcer
CN202152543U (en) Exposed column template support combining structure
CN214089531U (en) Reinforced structure based on reinforcing bar for bridge design
CN110629879A (en) Assembly type building structure system and upright post and cross beam connecting device thereof
CN109137665A (en) A kind of quick despatch concrete road surface mould plate supporting device
CN213946242U (en) Rear axle middle end support convenient to installation and dismantlement
CN219189389U (en) Tool shared by horizontal machining centers
CN214531429U (en) Large space truss of building roof layout system
CN209117376U (en) Tower barrel platform carries experimental provision
CN203948440U (en) A kind of cellular roller
CN220238863U (en) Air column type hydraulic cyclone for inhibiting air
CN215293138U (en) Convenient fixing and mounting mechanism for bed
CN208217913U (en) The stabilising arrangement of feed screw is used in concrete production
CN207825146U (en) A kind of T beam forms adhesion type vibrating device
CN212634936U (en) Riveting rod mechanism of nut riveting gun

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Room 407, Room 408, Room 409, Room 410, No. 15 Zhifeng Street, Huangpu District, Guangzhou City, Guangdong Province, 510000

Applicant after: Guangdong Jiumi Space Technology Co.,Ltd.

Address before: 510000 9th floor, no.5-3, Tianyuan Road, Tianhe District, Guangzhou City, Guangdong Province

Applicant before: Guangdong Jiumi Space Technology Co.,Ltd.