CN106968268A - A kind of installation method of foundation bolt - Google Patents
A kind of installation method of foundation bolt Download PDFInfo
- Publication number
- CN106968268A CN106968268A CN201710366952.9A CN201710366952A CN106968268A CN 106968268 A CN106968268 A CN 106968268A CN 201710366952 A CN201710366952 A CN 201710366952A CN 106968268 A CN106968268 A CN 106968268A
- Authority
- CN
- China
- Prior art keywords
- bolt
- plate
- foundation
- center line
- foundation bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Abstract
A kind of installation method of foundation bolt, including step:Foundation bolt is got all the ready according to drawing;Interception is horizontal, longitudinal bolt support bar;Intercept connecting rod;Bolt location-plate is made, the required amount of bolt hole is got out on top surface;Two pieces of located lateral surface plates are cut, and mounted in positioning plate top surface front and rear sides, its apical side height is determined according to the diameter of nut thickness and cross bolts support bar;Two pieces of longitudinal register surface plates are cut, and mounted in the bolt positioning plate top surface left and right sides, its apical side height subtracts longitudinal bolt support shank diameter by located lateral surface plate apical side height and obtained;Foundation bolt is fixed on bolt location-plate by nut;Transverse direction, longitudinal bolt support bar and connecting rod are welded on foundation bolt;Removed after assembling is integral;Overall foundation bolt is put into column cap to erect in muscle institute enclosure cavity body, cross bolts support bar and top layer stirrup are welded.The present invention can quickly realize the installation of foundation bolt, and construction quality is can guarantee that again, save construction cost.
Description
Technical field
It is especially that many single foundation bolts are assembled into an entirety by one kind the present invention relates to the realm of building construction
Foundation bolt installation method.
Background technology
In steel structure base construction, it can't do without foundation bolt, the design of foundation bolt is single to be embedded in steel construction base
Among plinth.When the basic post head timesharing of construction, people's common practice is that first colligation column cap erects muscle, then installation form, so
Bolt locating rack is arranged in template by surveying setting-out afterwards, then again determined foundation bolt installed in bolt one by one
On the frame of position, the root of every foundation bolt and column cap are finally erected into muscle using bar dowel and are welded to connect, qualified after-pouring concrete.
There is following unfavorable factor in above-mentioned construction method:1st, how many steel structure bases are poured, it is necessary to make how many bolts
Locating rack, very waste of materials;2nd, when column cap erects the stirrup comparatively dense of muscle, crotch or the anchor slab (system of foundation bolt one end
Referred to as pre-buried structure) it would become hard to be put into column cap and erect in muscle, installation difficulty is quite big, accordingly, it would be desirable to look for the good workman of a little technologies to come
Operation, nevertheless, still there are problems.Such as, when foundation bolt is difficult to install, have by pulling hard sled firmly, with
The mode for damaging bar construction to complete the installation of foundation bolt reluctantly, but, it is necessary to which adjustment repeatedly, takes a lot of work and time-consuming after installation;
Some use gas cutting destruction stirrups realized the installation of foundation bolt later, but this will have a strong impact on the quality of construction;Need also
Will be bigger do over again could realize the installation of foundation bolt.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of installation method of foundation bolt, can quickly realize lower margin
The installation of bolt, can guarantee that construction quality again, construction cost be saved, so as to thoroughly solve to annoying foundation bolt always for many years
The technical problem that hardly possible is installed.
The technical solution of the present invention is to provide a kind of installation method of foundation bolt, comprises the following steps:
(1) according to the horizontal layout requirement in design drawing to foundation bolt in single basic column cap, by regulatory specifications
Foundation bolt quantity is got all the ready;
(2) two cross bolts support bars are intercepted, its length is equal with the widthwise edge length of basic column cap section, at this two
Center line is drawn on cross bolts support bar;
(3) two longitudinal bolt support bars are intercepted, its length is equal with the longitudinal edge length of basic column cap section, at this two
Center line is drawn on longitudinal bolt support bar;
(4) length of side that the foundation bolt arranged in four connecting rods, the length and drawing of the connecting rod encloses shape is intercepted
It is equal;
(5) bolt location-plate is made, the bolt equal with the foundation bolt quantity arranged in drawing is got out on its top face
Through hole, the installation site of foundation bolt of the position of these bolt holes with being arranged in drawing is identical, and plate top surface is positioned in bolt
On get basic axis sample dotting punch or depict center line;
(6) two pieces of located lateral surface plates are cut out, and gets basic axis sample dotting punch on its top face or depicts
This two pieces located lateral surface plates are symmetrically mounted on the front and rear sides that bolt positions plate top surface by center line respectively, it is ensured that
Here basic axis sample dotting punch depicts center line basic axis sample dotting punch or quarter on plate top surface is positioned with bolt
Center line is drawn to align, the height between located lateral plane plate top surface and bolt positioning plate top surface according to the thickness of nut and
The diameter of cross bolts support bar is determined, when the end face of nut is abutted on bolt location-plate bottom surface and cross bolts support bar
When on located lateral plane plate top surface, furthermore the distance between h and foundation bolt specified in drawing be installed to column cap and erect
When on muscle, the height h ' that thread segment exposes is equal;
(7) two pieces of longitudinal register surface plates are cut out, and gets basic axis sample dotting punch on its top face or depicts
This two pieces of longitudinal register surface plates are symmetrically mounted on the left and right sides that bolt positions plate top surface, it is ensured that here by center line respectively
Basic axis sample dotting punch or depict center line and bolt and position the basic axis sample dotting punch on plate top surface or depict
Center line aligns, and the height between longitudinal register plane plate top surface and bolt positioning plate top surface is by the top of located lateral surface plate
The diameter that face highly subtracts longitudinal bolt support bar is obtained;
(8) some supporting legs are cut out, and are installed on the bottom surface of bolt location-plate;
(9) thread segment of foundation bolt is inserted in bolt hole, and bolt is fixed in by two nuts and positioned
On plate, a nut is respectively set on the top surface of bolt location-plate and bottom surface, the bottom surface of thread segment and the nut of lower section are ensured herein
Bottom surface flush or the nut for just exposing lower section, other foundation bolts are also fixed on bolt location-plate in this way;
(10) two cross bolts support bars are individually positioned on two pieces of located lateral surface plates, it is ensured that drawn on its perisporium
The center line gone out and the basic axis sample dotting punch on located lateral surface plate depict center line and aligned, to cross bolts
The foundation bolt that support bar is affixed with it is welded;
(11) two longitudinal bolt support bars are individually positioned on two pieces of longitudinal register surface plates, and ensured on its perisporium
The center line drawn and the basic axis sample dotting punch on longitudinal register surface plate depict center line and aligned, to longitudinal spiral shell
The foundation bolt that bolt support bar is affixed with it is welded;
(12) four connecting rods are welded to the surrounding that foundation bolt encloses shape, this four connecting rods are located at foundation bolt
Pre-buried structure end;
(13) all foundation bolts an entirety has been assembled into just all after the completion of welding, has backed out nut and taken
Under;
(14) treat after the completion of the concreting below basic column cap, muscle is erected according to drawing requirement adjustment column cap, it is ensured that its
Height and plan-position;
(15) erected by surveying setting-out in column cap and draw the elevation location line of top layer stirrup and positioned at pre-buried at the top of muscle
The elevation location line of stirrup under most last layer below structure;
(16) the top layer stirrup of top rib portion outermost is erected according to position line colligation column cap, and itself and column cap are erected into muscle and is firmly welded
Connect, then all lower stirrups below colligation pre-buried structure, wouldn't colligation stirrup between stirrup under top layer stirrup and most last layer;
(17) the plane positioning center line of foundation bolt is drawn on top layer stirrup by surveying setting-out;
(18) the overall foundation bolt for removing step (13) is put into column cap and erected in muscle institute enclosure cavity body, it is ensured that thread segment court
On, at this moment two cross bolts support bars are ridden on top layer stirrup, ensure two cross bolts support bars and two longitudinal directions herein
The center line drawn on bolt support bar aligns with the plane positioning center line that is drawn on top layer stirrup respectively, then by two
Cross bolts support bar carries out firm colligation with top layer stirrup;
(19) the stirrup colligation that column cap erects all non-colligations in muscle is finished;
(20) frame line of basic column cap is drawn by surveying setting-out, then mounting post head mould plate;
(21) the overall foundation bolt installed is detected, it is qualified after by cross bolts support bar and top layer stirrup
Weld, and finished product protection is carried out to the thread segment of foundation bolt.
A kind of installation method of foundation bolt of the present invention, wherein, interception simultaneously one strengthens oblique in step (4)
Bar, and the bracing diagonal is welded on the diagonal that all foundation bolts enclose shape in step (12).
A kind of installation method of foundation bolt of the present invention, wherein, offer square opening in the middle part of bolt location-plate.
After above structure, compared with prior art, a kind of installation method of foundation bolt of the invention has following excellent
Point:
1st, during mounting foot bolt, it is no longer necessary to existing bolt locating rack, if so as to save making bolt stem locating rack
Material and manual manufacture cost;
When the 2nd, making the present invention, all it can be made using leftover bits, and invention is after completing, and can make repeatedly
With greatling save cost;
3rd, the present invention can be produced in advance before concrete blinding installation, and assembles foundation bolt in advance, so that
During subsequent installation continuous productive process, the installation procedure of the live mounting foot bolt of workman is reduced, makes construction speed
Greatly speed up;
4th, the foundation bolt after assembling is put into column cap and erected after muscle, and center line alignment center line is simple, convenient and swift, regulation
Easily, so as to reduce the installation difficulty of foundation bolt, it is ensured that construction quality and the progress for greatly speeding up construction.
The setting of bracing diagonal considerably increases the intensity of the overall foundation bolt after assembling.
Square opening can effectively mitigate the weight of the present invention and save material cost.
Brief description of the drawings
Fig. 1 is that bolt location-plate, longitudinal register surface plate, located lateral surface plate and leg link together in the present invention
When overlooking the structure diagram;
Fig. 2 is the cross section structure diagram along line A-A in Fig. 1;
Fig. 3 is the cross section structure diagram along line B-B in Fig. 1;
Main structure diagram when Fig. 4 is the present invention many foundation bolts of assembling;
Fig. 5 is main structure diagram when many single foundation bolts are assembled into an entirety;
Fig. 6 is the cross section structure diagram along line C-C in Fig. 5;
Fig. 7 is the main structure diagram when column cap is erected on muscle by top layer stirrup and all lower stirrup colligations;
Fig. 8 is the cross section structure diagram along line D-D in Fig. 7;
Fig. 9 is that the foundation bolt for being assembled into an entirety is arranged on to main structure diagram when on the perpendicular muscle of column cap.
Embodiment
Further detailed is made to a kind of installation method of foundation bolt of the invention with reference to the accompanying drawings and detailed description
Explanation:
For sake of convenience, " front, rear, left and right " described below are respectively Fig. 1 bottom, top, left part and right part.
In this embodiment, a kind of installation method of foundation bolt of the invention, comprises the following steps:
(1) according to the horizontal layout requirement in design drawing to foundation bolt in single basic column cap, by regulatory specifications
Foundation bolt quantity is got all the ready;In the present embodiment, the foundation bolt in drawing in basic column cap is in rectangular layout, it is desirable to which quantity is
Eight;
(2) see Fig. 4 to Fig. 6, intercept two cross bolts support bars 22, the length of this two cross bolts support bars 22 is equal
It is equal with the widthwise edge length of basic column cap section, draw center line on cross bolts support bar 22;
(3) see Fig. 4 to Fig. 6, intercept two longitudinal bolt support bars 23, the length of this two longitudinal bolt support bars 23 is equal
It is equal with the longitudinal edge length of basic column cap section, draw center line on longitudinal bolt support bar 23;
(4) see Fig. 4 to Fig. 6, intercept the foundation bolt arranged in four connecting rods 21, the length and drawing of the connecting rod 21
20 enclose shape the length of side it is equal;
(5) see Fig. 1 to Fig. 3, the bolt location-plate 10 of a rectangle is made using steel plate, in the top surface of bolt location-plate 10
On get out in the bolt hole 16 equal with the quantity of foundation bolt 20 arranged in drawing, the present embodiment and be drilled with eight, this eight
The installation site of foundation bolt 20 of the position of bolt hole 16 with being arranged in drawing is identical, is beaten on the top surface of bolt location-plate 10
Go out some equally distributed basic axis sample dotting punches 11, the center position of four edges has, it is of course also possible in four edges
Center position depicts center line, and its purpose is to accelerate to assemble positioning work during foundation bolt;
(6) Fig. 1 is seen to Fig. 3, cuts out two pieces of located lateral surface plates 12, and in this two pieces of located lateral surface plates 12
Some equally distributed basic axis sample dotting punches 11 are got at end face center position, naturally it is also possible to depict center line;Respectively
This two pieces located lateral surface plates 12 are symmetrically mounted on two before and after the top surface of bolt location-plate 10 by horizontal riser 13
Side, it is ensured that basic axis sample dotting punch 11 here aligns with the basic axis sample dotting punch 11 on the top surface of bolt location-plate 10;See
Height between Fig. 4, the top surface of located lateral surface plate 12 and bolt location-plate 10 top surface is according to the thickness and horizontal stroke of nut 25
Determine to the diameter of bolt support bar 22, the end face of square nut 25 is abutted on the bottom surface of bolt location-plate 10 and horizontal spiral shell instantly
When bolt support bar 22 is located on the top surface of located lateral surface plate 12, furthermore the distance between h and foundation bolt specified in drawing
When being installed on the perpendicular muscle 30 of column cap, the height h ' (see Fig. 9) that thread segment exposes is equal;
(7) Fig. 1 is seen to Fig. 3, cuts out two pieces of longitudinal register surface plates 15, and in this two pieces of longitudinal register surface plates 15
Basic axis sample dotting punch 11 is got on top surface, naturally it is also possible to depict center line;Respectively by this two pieces of longitudinal register surface plates
15 are symmetrically mounted on the left and right sides of the top surface of bolt location-plate 10 by longitudinal riser 14, it is ensured that basic axis sample dotting punch here
11 align with the basic axis sample dotting punch 11 on the top surface of bolt location-plate 10;See Fig. 4, the top surface of longitudinal register surface plate 15
Height between the top surface of bolt location-plate 10 subtracts longitudinal bolt support bar 23 by the apical side height of located lateral surface plate 12
Diameter obtain;
(8) Fig. 1 is seen to Fig. 3, four supporting legs 18 are cut out, and is installed on the bottom surface of bolt location-plate 10, one
The supporting leg 18 of corner one;
(9) combine Fig. 4, the thread segment of foundation bolt 20 inserted in bolt hole 16, and by two nuts 25 by its
It is fixed on bolt location-plate 10, a nut 25 is respectively set on the top surface of bolt location-plate 10 and bottom surface, screw thread is ensured herein
Section bottom surface and lower section the bottom surface flush of nut 25 or just expose lower section nut 25, other foundation bolts 20 also according to
The method is fixed on bolt location-plate 10, now, and each foundation bolt 20 is in vertical configuration under the fixation of nut 25
State;
(10) Fig. 4 is combined, two cross bolts support bars 22 are individually positioned on two pieces of located lateral surface plates 12, really
Protect the center line drawn on its perisporium to align with the basic axis sample dotting punch 11 on located lateral surface plate 12, to cross bolts
The foundation bolt 20 that support bar 22 is affixed with it is welded, so that this two cross bolts support bars 22 are respectively with front and rear two
The foundation bolt 20 of side is fixed together;
(11) Fig. 4 is combined, two longitudinal bolt support bars 23 are individually positioned on two pieces of longitudinal register surface plates 15, and
Ensure that the center line drawn on its perisporium aligns with the basic axis sample dotting punch 11 on longitudinal register surface plate 15, to longitudinal spiral shell
The foundation bolt 20 that bolt support bar 23 is affixed with it is welded so that this two longitudinal bolt support bars 23 respectively with left and right
The foundation bolt 20 of both sides is fixed together;
(12) Fig. 4 is combined, four connecting rods 21 surrounding that eight foundation bolts 20 enclose rectangular shape is welded to, this four
Root connecting rod 21 is respectively positioned on the end of pre-buried structure 26 of foundation bolt 20;
(13) eight foundation bolts an entirety has been assembled into just all after the completion of welding, has backed out nut 25 and taken
Under;
(14) see Fig. 7, treat after the completion of the concreting below basic column cap, muscle is erected according to drawing requirement adjustment column cap
30, it is ensured that its height and plan-position;
(15) see Fig. 7 and Fig. 9, the elevation location of top layer stirrup 31 is drawn at the top that column cap erects muscle 30 by surveying setting-out
Line and under most last layer of the pre-buried structure below 26 stirrup 32 elevation location line;
(16) see Fig. 7 to Fig. 9, erect the top layer stirrup 31 of muscle 30 top outermost according to position line colligation column cap, and by its
Muscle 30 is erected with column cap firmly to weld, then all lower stirrups 32 of the colligation pre-buried structure below 26, top layer stirrup 31 and most upper one
Wouldn't colligation stirrup between the lower stirrup 32 of layer;
(17) see Fig. 7, draw the plane positioning center line of foundation bolt 20 on top layer stirrup 31 by surveying setting-out;
(18) Fig. 9 is seen, the overall foundation bolt that step (13) is removed is put into column cap and erected in 30 enclosure cavity bodies of muscle, it is ensured that spiral shell
Upward, at this moment two cross bolts support bars 22 ride on top layer stirrup 31 line section, ensure two cross bolts support bars herein
22 and two longitudinal bolt support bars 23 on the plane positioning center line of the center line that draws respectively with being drawn on top layer stirrup 31
Align, cross bolts support bar 22 and top layer stirrup 31 are then subjected to firm colligation;
(19) the stirrup colligation that column cap erects all non-colligations in muscle 30 is finished;
(20) frame line of basic column cap is drawn by surveying setting-out, then mounting post head mould plate, due to two horizontal spiral shells
The length of bolt support bar 22 and two longitudinal bolt support bars 23 is equal with the length of side of basic column cap section, therefore, both can be with
The installation quality of column cap template is checked by them, the peace of foundation bolt 20 can also be checked by the installation of column cap template
Packing quality, makes error be adjusted in time in installation operation and eliminates;
(21) see Fig. 9, the overall foundation bolt installed detected, it is qualified after by cross bolts support bar 22 with
Top layer stirrup 31 is welded, and carries out finished product protection to the thread segment of foundation bolt 20, has now possessed concreting condition.
See Fig. 4 to Fig. 6, in order to greatly increase the intensity of the overall foundation bolt after assembling, intercepted simultaneously in step (4)
A piece bracing diagonal 24, and the bracing diagonal 24 is welded on eight foundation bolts 20 in step (12) encloses rectangular shape
On diagonal, the bracing diagonal 24 is close to cross bolts support bar 22.
In order to effectively mitigate the weight of the present invention and save material cost, the middle part side of offering of the bolt location-plate 10
Shape hole 17.
A kind of installation method of foundation bolt of the present invention has advantages below:
1st, during mounting foot bolt, it is no longer necessary to existing bolt locating rack, if so as to save making bolt stem locating rack
Material and manual manufacture cost;
When the 2nd, making the present invention, all it can be made using leftover bits, and invention is after completing, and can make repeatedly
With greatling save cost;
3rd, the present invention can be produced in advance before concrete blinding installation, and assembles foundation bolt in advance, so that
During subsequent installation continuous productive process, this integrally foot bolt is disposably arranged on to column cap and erected in muscle institute enclosure cavity body, is subtracted
Lack the installation procedure of workman's mounting foot bolt at the scene, greatly speed up construction speed;
4th, the foundation bolt after assembling is put into column cap and erected after muscle, and center line alignment center line is simple, convenient and swift, regulation
Easily, so as to reduce the installation difficulty of foundation bolt, it is ensured that construction quality and the progress for greatly speeding up construction.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention
Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention
Various modifications and improvement that case is made, all should fall within the scope of protection of the present invention.
Claims (3)
1. a kind of installation method of foundation bolt, it is characterised in that comprise the following steps:
(1) according to the horizontal layout requirement in design drawing to foundation bolt in single basic column cap, by the lower margin of regulatory specifications
Bolt quantity is got all the ready;
(2) two cross bolts support bars (22) are intercepted, its length is equal with the widthwise edge length of basic column cap section, at this two
Cross bolts support bar draws center line on (22);
(3) two longitudinal bolt support bars (23) are intercepted, its length is equal with the longitudinal edge length of basic column cap section, at this two
Longitudinal bolt support bar draws center line on (23);
(4) intercept the foundation bolt arranged in four connecting rods (21), the length and drawing of the connecting rod (21) and enclose shape
The length of side is equal;
(5) bolt location-plate (10) is made, is got out on its top face equal with foundation bolt (20) quantity arranged in drawing
Bolt hole (16), the installation site of foundation bolt (20) of the position of these bolt holes (16) with being arranged in drawing is identical,
Basic axis sample dotting punch (11) is got on bolt location-plate (10) top surface or center line is depicted;
(6) two pieces of located lateral surface plates (12) are cut out, and get basic axis sample dotting punch (11) or quarter on its top face
Center line is drawn, this two pieces located lateral surface plates (12) are symmetrically mounted on before bolt location-plate (10) top surface respectively
Both sides afterwards, it is ensured that basic axis sample dotting punch (11) here depicts center line and the base on bolt location-plate (10) top surface
Plinth axis sample dotting punch (11) depicts center line and aligned, located lateral surface plate (12) top surface and bolt location-plate
(10) height between top surface is determined according to the thickness of nut (25) and the diameter of cross bolts support bar (22), when nut (25)
End face abut on bolt location-plate (10) bottom surface and cross bolts support bar (22) be located at located lateral surface plate (12)
When on top surface, furthermore the distance between h and foundation bolt specified in drawing when being installed to column cap and erecting on muscle, what thread segment exposed
Height h ' is equal;
(7) two pieces of longitudinal register surface plates (15) are cut out, and get basic axis sample dotting punch (11) or quarter on its top face
Center line is drawn, this two pieces of longitudinal register surface plates (15) are symmetrically mounted on to the left and right two of bolt location-plate (10) top surface respectively
Side, it is ensured that basic axis sample dotting punch (11) here depicts center line and the basic axle on bolt location-plate (10) top surface
Line sample dotting punch (11) depicts center line and aligned, longitudinal register surface plate (15) top surface and bolt location-plate (10)
The diameter that height between top surface subtracts longitudinal bolt support bar (23) by the apical side height of located lateral surface plate (12) is obtained;
(8) some supporting legs (18) are cut out, and are installed on the bottom surface of bolt location-plate (10);
(9) thread segment of foundation bolt (20) is inserted in bolt hole (16), and be fixed in by two nuts (25)
On bolt location-plate (10), a nut (25) is respectively set on the top surface of bolt location-plate (10) and bottom surface, screw thread is ensured herein
The bottom surface of section and nut (25) the bottom surface flush of lower section or the nut (25) for just exposing lower section, other foundation bolts (20)
Also it is fixed in this way on bolt location-plate (10);
(10) two cross bolts support bars (22) are individually positioned on two pieces of located lateral surface plates (12), it is ensured that its perisporium
On the center line that draws and the basic axis sample dotting punch (11) on located lateral surface plate (12) or to depict center line relative
Together, the foundation bolt (20) that cross bolts support bar (22) is affixed with it is welded;
(11) two longitudinal bolt support bars (23) are individually positioned on two pieces of longitudinal register surface plates (15), and ensure its week
The center line drawn on wall and the basic axis sample dotting punch (11) on longitudinal register surface plate (15) depict center line phase
Alignment, is welded to the foundation bolt (20) that longitudinal bolt support bar (23) is affixed with it;
(12) four connecting rods (21) are welded to the surrounding that foundation bolt (20) encloses shape, this four connecting rods (21) are located at
Pre-buried structure (26) end of foundation bolt (20);
(13) all foundation bolts an entirety has been assembled into just all after the completion of welding, has backed out nut (25) and taken
Under;
(14) treat after the completion of the concreting below basic column cap, muscle (30) is erected according to drawing requirement adjustment column cap, it is ensured that its
Height and plan-position;
(15) the elevation location line of top layer stirrup (31) is drawn at the top of the perpendicular muscle (30) of column cap by surveying setting-out and be located at
The elevation location line of stirrup (32) under the most last layer of pre-buried structure (26) below;
(16) the top layer stirrup (31) of outermost at the top of muscle (30) is erected according to position line colligation column cap, and it is erected into muscle with column cap
(30) firmly weld, then all lower stirrups (32) of colligation pre-buried structure (26) below, top layer stirrup (31) and most last layer
Wouldn't colligation stirrup between lower stirrup (32);
(17) the plane positioning center line of foundation bolt (20) is drawn on top layer stirrup (31) by surveying setting-out;
(18) the overall foundation bolt for removing step (13) is put into column cap and erected in muscle (30) institute enclosure cavity body, it is ensured that thread segment court
On, at this moment two cross bolts support bars (22) are ridden on top layer stirrup (31), ensure two cross bolts support bars herein
(22) plane positioning of the center line and on two longitudinal bolt support bars (23) drawn respectively with being drawn on top layer stirrup (31)
Center line is aligned, and two cross bolts support bars (22) and top layer stirrup (31) then are carried out into firm colligation;
(19) the stirrup colligation that column cap erects all non-colligations in muscle (30) is finished;
(20) frame line of basic column cap is drawn by surveying setting-out, then mounting post head mould plate;
(21) the overall foundation bolt installed is detected, it is qualified after by cross bolts support bar (22) and top layer stirrup
(31) weld, and finished product protection is carried out to the thread segment of foundation bolt (20).
2. a kind of installation method of foundation bolt according to claim 1, it is characterised in that:Cut simultaneously in step (4)
A bracing diagonal (24) is taken, and the bracing diagonal (24) is welded on all foundation bolts (20) in step (12) and encloses shape
On the diagonal of shape.
3. a kind of installation method of foundation bolt according to claim 2, it is characterised in that:The bolt location-plate (10)
Middle part offer square opening (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710366952.9A CN106968268B (en) | 2017-05-23 | 2017-05-23 | Installation method of foundation bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710366952.9A CN106968268B (en) | 2017-05-23 | 2017-05-23 | Installation method of foundation bolt |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106968268A true CN106968268A (en) | 2017-07-21 |
CN106968268B CN106968268B (en) | 2023-03-28 |
Family
ID=59325724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710366952.9A Active CN106968268B (en) | 2017-05-23 | 2017-05-23 | Installation method of foundation bolt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106968268B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107761756A (en) * | 2017-09-26 | 2018-03-06 | 郑州东辰科技有限公司 | A kind of installation method of stringing steel tower |
CN112647531A (en) * | 2020-12-14 | 2021-04-13 | 太原重工工程技术有限公司 | Method for mounting rear inverted-pi foundation bolt |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010043468A (en) * | 2008-08-12 | 2010-02-25 | Yukiyasu Nakajima | Anchor bolt setting apparatus and construction method of foundation |
CN104895101A (en) * | 2015-06-10 | 2015-09-09 | 杭州江润科技有限公司 | Construction method for raft plate basic high-precision overall pre-embedded large-diameter bolt group structure |
-
2017
- 2017-05-23 CN CN201710366952.9A patent/CN106968268B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010043468A (en) * | 2008-08-12 | 2010-02-25 | Yukiyasu Nakajima | Anchor bolt setting apparatus and construction method of foundation |
CN104895101A (en) * | 2015-06-10 | 2015-09-09 | 杭州江润科技有限公司 | Construction method for raft plate basic high-precision overall pre-embedded large-diameter bolt group structure |
Non-Patent Citations (1)
Title |
---|
苏铠等: "大型钢柱柱脚螺栓精确定位安装技术", 《建筑施工》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107761756A (en) * | 2017-09-26 | 2018-03-06 | 郑州东辰科技有限公司 | A kind of installation method of stringing steel tower |
CN112647531A (en) * | 2020-12-14 | 2021-04-13 | 太原重工工程技术有限公司 | Method for mounting rear inverted-pi foundation bolt |
Also Published As
Publication number | Publication date |
---|---|
CN106968268B (en) | 2023-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109736449B (en) | Beam column joint of stiff structure and construction method | |
CN107217839A (en) | Cast-in-situ concrete beam plate form bracing system and its construction method | |
CN105863253A (en) | Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method | |
KR101310844B1 (en) | Concrete Mold assembly and Method of constructing Beam by using the same | |
CN106968268A (en) | A kind of installation method of foundation bolt | |
CN109914239B (en) | Bridge cast-in-place concrete anti-collision guardrail construction device and method thereof | |
CN114482691A (en) | Assembled airport enclosure foundation template and using method thereof | |
CN105952140B (en) | Tool-type steel framework Wood-plastic formwork system and its construction technology for cast-in-place concrete | |
CN109837924B (en) | Construction method for intersection part of lattice column and main body structure of foundation pit support | |
KR100997106B1 (en) | Jig System for A Bridge Pier | |
CN110080273A (en) | The method for carrying out the installation of steel construction foundation bolt using flitch | |
CN109763572A (en) | A kind of device and its operating method of the quick pre-buried verticality of adjustment foundation bolt group | |
CN211473319U (en) | One-time positioning device for multiple vertical rods of overhanging scaffold | |
EP2430245B1 (en) | Process for forming a foundation | |
CN213978605U (en) | Assembled pier stud connection structure | |
CN209812717U (en) | Prefabricated two skin wall bench formwork stop device of assembled | |
CN109610795B (en) | Construction method of inverted cone-shaped building | |
CN113073789A (en) | Construction method of crotch column inclined column of swimming pool | |
JP2630623B2 (en) | Anchor bolt installation method and anchor bolt support device used for it | |
CN205875706U (en) | Asynchronous stairwell wall post formwork system that pours of whole formwork | |
CN217782797U (en) | High-altitude construction operation platform suitable for lattice column | |
CN206706820U (en) | Assemble foundation bolt mould | |
CN214403606U (en) | Template supporting construction of T shape basis | |
CN218758728U (en) | Reinforcing device for beam and column connection | |
CN214785936U (en) | Core tube structure-based auxiliary steel structure for climbing of creeping formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 230000 East Fozhang Road and North Tingyun Road Office Building, Hefei Economic and Technological Development Zone, Anhui Province Applicant after: CHINA NATIONAL CHEMICAL ENGINEERING THIRD CONSTRUCTION Co.,Ltd. Address before: 232038 No. 98 Dongshan Road, Tianjiaan District, Huainan City, Anhui Province Applicant before: CHINA NATIONAL CHEMICAL ENGINEERING THIRD CONSTRUCTION Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |