CN106948816A CN201710167989.9A CN201710167989A CN106948816A CN 106948816 A CN106948816 A CN 106948816A CN 201710167989 A CN201710167989 A CN 201710167989A CN 106948816 A CN106948816 A CN 106948816A
Authority
CN
China
Prior art keywords
high pressure
fracturing
liquid
chamber
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710167989.9A
Other languages
Chinese (zh)
Other versions
CN106948816B (en
Inventor
康天合
张润旭
赵国飞
张晓雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201710167989.9A priority Critical patent/CN106948816B/en
Publication of CN106948816A publication Critical patent/CN106948816A/en
Application granted granted Critical
Publication of CN106948816B publication Critical patent/CN106948816B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/14Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by compressed air; by gas blast; by gasifying liquids

Abstract

A kind of automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method is liquid CO2Liquid CO is injected by high pressure liquid storage temperature control tank2Into high pressure fluid injection cylinder and phase change chamber, the liquid CO in phase change chamber2Heated pressure phase transition rise, gaseous state CO2Into accumulation chamber automatic energy storage and coal petrography fracturing room fracturing;CO in phase change chamber2During the pressure reduction of gas, high pressure CO2Gas enters high pressure fluid injection cylinder chamber and promotes piston to drive remaining CO2Gas, and enter the secondary fracturing of coal petrography fracturing room progress, above-mentioned " fluid injection oil bath heating phase-change accumulation energy fracturing " circulation is repeated, continuous impulse high-pressure jet fracturing is realized.This method realizes continuous impulse high-pressure jet fracturing, extends the Fracturing time, expands Fracturing scope, improves fracturing effect, it is adaptable to the solid material such as coal, rock, concrete, soil, scars fast and efficiently fracturing.

Description

Automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method
Technical field
The present invention relates to a kind of CO2Phase transformation solid fracturing method, is specifically that one kind utilizes liquid CO2It is situated between as Phase Transformation Booster The method that matter carries out coal and rock fracturing.
Background technology
With the fast development of national economy, the scale and quantity of engineering construction constantly expand, in many engineering processes It is related to the fracturing problem of solid kind material, the directional splitting in situ of such as stone pit rock mining, structures or building are torn open Remove, the disconnected top in tunnel digging, mining, face or tunnel, region of high stress coal and rock loosen release, tube wall cleaning, The separation of extremely frigid zones scars, the fracturing of particularly low-permeability oil gas reservoir is anti-reflection etc., fracturing method therein can direct shadow Ring progress, effect and the safety of engineering.At present, the method for fracturing solid material mainly has explosive blasting method, hydrofracturing method, machine Tool ballistic method, high electric field pulse method etc..Due to execution conditions, technique, cost, safety and the control to rupture event in Practical Project System and requirement etc., the selection of fracturing method is subject to certain restrictions, and such as the intensity of explosive blasting is high(MPa up to ten thousand), explosion velocity is fast(About 4000m/s)The local crushing of solid material can be caused, and should not be implemented in inflammable and explosive environment;Waterpower pressure break it is strong Degree is low(5~20MPa), crush speed is unstable, pressure break is produced fracture spacing is small, fracturing fluid leakage is serious, fracturing fluid is more Water lock and water-sensitive effects fracturing effect in the medium of hole;Mechanical shock will use heavy mechanical equipment, can roll up and apply Work cost, and limited by environment;High electric field pulse fracturing technology is perfect etc. not enough at present.Therefore, introduce a kind of earthquake intensity it is moderate, Safe efficient, cheap fracturing technology has important practical significance.
Liquid CO2Phase transformation gas explosion fracturing method is that one kind makes liquid phase-change formation gas boosting fracturing solid material by heating The emerging technology of material, can implement the moderate fracturing of earthquake intensity, in recent years to solid materials such as coal and rock, concrete, soil, freezes bodies It is developed rapidly and promotes at home, be particularly widely used in various engineering fields, in particular for hypotonicity oil The fracturing of gas reservoir is anti-reflection.Such as Publication No. CN203083463U discloses the patent of invention of a kind of " carbon dioxide exploitation device ", The recovery method of the exploitation device is to inject the liquid CO of compression into the sealing blasting cartridge assembled by booster pump2, it is powered and swashs Chemical powder stick is heated in pipe living, liquid CO2Heated rapid gasification expansion makes the increase of liquid storage overpressure, when pressure reaches one During definite value, the rupture diaphragm rupture of blasting cartridge simultaneously discharges gases at high pressure by steam vent, coal and rock is produced crack, liquid CO2Phase Become the surge pressure of fracturing generation far above hydraulic fracturing and the surge pressure of hydraulic slotted liner technique, the peak value of explosive blasting is much smaller than again Pressure, will not only cause excessively to crush but also easily produce the crack of insertion during fracturing to coal and rock.Liquid CO2Phase transformation is caused No-spark during splitting, the CO discharged during fracturing2Gas also has fire-retardant, explosion-proof effect, is particularly suitable for inflammable and explosive Used in environment.At present, the relevant device of the technology has carried out that coal petrography is anti-reflection to be tested with coal breakage in China many places colliery, obtains Preferable effect, but there is following defect in prior art.
One be the method the surge pressure duration it is short, it is impossible to realize continuous action.The volume of carbon dioxide blasting cartridge General about 1.2L, the liquid CO that can be accommodated2Extremely limited, the time of sustained firing is very short during a fracturing, high pressure dimension The time held is shorter, only a few tens of milliseconds, and fracturing scope is small, effect is poor, and fracturing efficiency is low.
Two be that the method is easily interfered in work progress at the scene, and for example the exploding wire appearance of a street is easily done by coal seam reclaimed water Disturbing causes to be unable to beam conduction ignition, and drilling easily to cave in after explosion makes blasting cartridge reclaim difficulty etc..
The content of the invention
The purpose of the present invention is to overcome existing liquid CO2There is provided a kind of automatic energy storage high pressure for the defect of phase transformation fracturing method Fluid injection CO2Phase conversion pulse coal and rock fracturing method.
The purpose of the invention described above is achieved through the following technical solutions.
A kind of automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method, the coal and rock fracturing method be by What the following steps were carried out:
(One)The feed liquid method of liquid-supplying system:Open vavuum pump to vacuumize high pressure liquid storage temperature control tank, rear start liquid booster pump With cooler bin compressed liquid CO is injected to high pressure liquid storage temperature control tank2, pressure sensor, temperature sensor and acquisition control system are certainly The temperature and pressure of dynamic monitoring high pressure liquid storage temperature control tank, by liquid booster pump and cooler bin, keeps high pressure liquid storage temperature control tank Temperature is in -5 DEG C ~ 5 DEG C, pressure in the range of 10MPa ~ 15MPa;
(Two)The automatic energy storage high pressure electrolyte filling method of automatic energy storage high pressure liquid injection system:Low temperature compression in high pressure liquid storage temperature control tank Liquid CO2Into the right chamber and phase change chamber of high pressure fluid injection cylinder, oil bath heating, the liquid CO in phase change chamber2Heated pressure phase transition rise During to 80MPa, the gaseous state CO in phase change chamber2Into accumulation chamber, stop after pressure rise in accumulation chamber to 80MPa, complete from Dynamic energy storage;Oil bath continues to heat, and the pressure of phase change chamber continues to raise, when pressure reaches 100MPa, and oil bath stops heating, high pressure CO2Gas enters fracturing room or fracturing hole fracturing experimental sample or coal and rock floor via pipeline;CO in phase change chamber2Gas When pressure is reduced to 15MPa, the 80Mpa high pressure COs of accumulation chamber storage2Gas enters the left chamber of high pressure fluid injection cylinder via pipeline, soon Speed promotes piston to move right, and makes the liquid CO in high pressure fluid injection cylinder right chamber2Into phase change chamber, remaining CO in phase change chamber is driven2 Gas enters fracturing room or fracturing hole, carries out secondary fracturing, while preventing that the residual gas in phase change chamber from taking up space influence Reservoir quantity;Piston in high pressure fluid injection cylinder is moved to right-hand member, when energy storage room pressure is reduced to 20MPa, completes automatic fluid injection;Release Put gaseous state CO in high pressure fluid injection cylinder2, the interior liquid CO by pressurization of high pressure liquid storage temperature control tank2It is again introduced into the right side of high pressure fluid injection cylinder Chamber, makes its fluid pressure reach 15MPa;Above-mentioned " fluid injection-oil bath heating-phase transformation-energy storage-fracturing " circulation is repeated, is realized continuous High voltage pulse jet fracturing.
Further technical scheme is as follows.
The CO2The volume of phase change chamber is 2L~300L, the volume and CO of high pressure fluid injection cylinder2The volume of phase change chamber is equal, storage The volume of energy room is CO2The 1/3 of the volume of phase change chamber, the volume of high pressure liquid storage temperature control tank is 2 times of phase change chamber volume.
The vavuum pump is X-type single-stage rotary vane vacuum pump, speed of exhaust 30L/s, limiting pressure 10Pa, power 5kw.
The liquid booster pump is the pneumatic liquid CO of special big flow2Booster pump, maximum output pressure 22.5Mpa, stream Measure 12.4L/min.
The stop valve is high-pressure stop valve, maximum pressure-resistant 20MPa.
The electromagnet cut off valve is the high pressure resistant stop valve of normally closed type, maximum pressure-resistant 120MPa.
The liquid pressure of the high pressure fluid injection cylinder is 10MPa~15MPa.
The temperature in the oily domain is 140 DEG C~160 DEG C.
The gas pressure of the accumulation chamber is 80MPa.
The device that the coal and rock fracturing method is used is to include liquid-supplying system, automatic energy storage high pressure liquid injection system, phase transformation Fracturing system and acquisition and control system;Wherein:
The liquid-supplying system is provided with a high pressure liquid storage temperature-controlling chamber, and its one end is provided with safety valve and is communicated with liquid booster pump And its stop valve and liquid CO2Source;The other end is provided with vavuum pump and its stop valve, and is communicated with high pressure by electromagnet cut off valve Fluid injection cylinder and CO2Phase change chamber, is provided with cooler bin, in the internal face of high pressure liquid storage temperature control tank in the periphery of high pressure liquid storage temperature control tank It is provided with pressure sensor and temperature sensor;
The automatic energy storage high pressure liquid injection system is provided with a high pressure fluid injection cylinder, and its rodless cavity one end connected electromagnet cut off valve It is communicated with CO2Phase change chamber and accumulation chamber;Rod chamber one end is communicated with accumulation chamber by electromagnet cut off valve and safety valve, and in energy storage The internal face of room is provided with pressure sensor and temperature sensor;
The phase transformation fracturing system is provided with a CO2Phase change chamber, its one end is provided with safety valve and connected by electromagnet cut off valve It is connected with high pressure fluid injection cylinder accumulation chamber;The other end is communicated with coal and rock fracturing room by electromagnet cut off valve, and in CO2Phase change chamber periphery Oil bath is provided with CO2The internal face of phase change chamber is provided with pressure sensor and temperature sensor;
The acquisition and control system is provided with a control computer, and is connected with pressure sensor, temperature sensor, electricity Magnetic stop valve, stop valve and safety valve, realize that data acquisition is controlled with computer.
Above-mentioned a kind of the provided automatic energy storage high pressure fluid injection CO2 phase conversion pulse coal and rock fracturing methods of the present invention, with showing There is technology to compare, its substantive distinguishing features protruded and marked improvement are as follows.
This method realizes " fluid injection-oil bath heating-phase transformation-energy storage-fracturing " circulation, has continuously generated multiple-pulse jet, The Fracturing time is extended, Fracturing scope is expanded, fracturing effect is improved.
This method is by the way of pushed at high pressure piston fluid injection by the liquid CO in high pressure fluid injection cylinder2It is rapidly injected phase transformation Room, the residual gas driven in phase change chamber enters fracturing room, secondary fracturing is realized, while also prevent the remaining gas in phase change chamber Body takes up space influence reservoir quantity.
This method monitors the pressure in phase change chamber by pressure sensor in real time, and electricity is passed through after the pressure limit for reaching setting The open and close controlling high temperature of magnet valve, the injection of gases at high pressure, compared with the rupture disk used in conventional equipment, pressure controllable precise, And can be according to the intensity and range regulation jet pressure and pulse number of fracturing solid material, to reach that more preferable fracturing is imitated Really.
Brief description of the drawings
Fig. 1 is the apparatus structure schematic diagram that this method is used.
Fig. 2 is 5 before and after the subpulse fracturing of this method three#Drainage holes gas pumping amount with the extraction time changing trend diagram.
Fig. 3 is this method test sample accumulated damage with fracturing number of times changing trend diagram.
In figure:1:High pressure liquid storage temperature control tank;2:High pressure fluid injection cylinder;3:Phase change chamber;4:Accumulation chamber;5:Fracturing room;6:Fracturing Hole;7:Control computer;8:Liquid CO2Source;9、10:Stop valve;11:Liquid booster pump;12:Cooler bin;13:Vavuum pump;14、 15、16:Safety valve;17、18、19:Pressure sensor;20、21、22:Temperature sensor;23:Data line;24、25、26、 27、28、29:Electromagnet cut off valve;30:Heat-insulation layer;31:Oil bath;32:Steam vent;33:Test test specimen;34:Coal and rock layer.
Embodiment
The embodiment to the present invention is further described below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of automatic energy storage high pressure fluid injection CO is implemented2Phase conversion pulse coal and rock fracturing method, this method The device used is by liquid-supplying system, automatic high pressure energy storage liquid injection system, phase transformation fracturing system, acquisition and control system Constituted Deng 4 parts.Wherein liquid-supplying system includes liquid CO2Source 8, liquid booster pump 11, high pressure liquid storage temperature control tank 1, cooler bin 12, Vavuum pump 13 and corresponding connecting line;Automatic energy storage high pressure liquid injection system include high pressure fluid injection cylinder 2, accumulation chamber 4, phase change chamber 3, Oil bath 31 and corresponding connecting line;Phase transformation fracturing system is corresponding including phase change chamber 3, oil bath 31, fracturing room 5, fracturing body 33 Connecting line;Acquisition and control system includes pressure sensor 17,18,19, temperature sensor 20,21,22, electromagnetism cut-off Valve 24,25,26,27,28,29, stop valve 9,10, safety valve 14,15,16 and control computer 7, specific coal and rock fracturing method It is as follows:
(One)The feed liquid method of liquid-supplying system:Vavuum pump 13 is opened, high pressure liquid storage temperature control tank 1 is vacuumized, start liquid supercharging Pump 11 and cooler bin 12, the liquid CO of compression is injected to high pressure liquid storage temperature control tank 12.Pressure sensor 17, the and of temperature sensor 20 Acquisition control system monitors the temperature and pressure of high pressure liquid storage temperature control tank 1 automatically, by liquid booster pump 11 and cooler bin 12, protects The temperature of high pressure liquid storage temperature control tank 1 is held in -5 DEG C ~ 5 DEG C, pressure in the range of 10MPa ~ 15MPa;
(Two)The automatic energy storage high pressure electrolyte filling method of automatic energy storage high pressure liquid injection system:Low temperature compression in high pressure liquid storage temperature control tank 1 Liquid CO2Enter the right chamber and phase change chamber 3 of high pressure fluid injection cylinder 2 by pipeline, oil bath 31 starts the liquid in heating, phase change chamber 3 CO2Heated pressure phase transition rise, when pressure reaches 80MPa, the gaseous state CO in phase change chamber 32Enter accumulation chamber 4 via pipeline, until Pressure rise in accumulation chamber 4 completes automatic energy storage to stopping after 80MPa;Oil bath 31 continues to heat, the pressure of phase change chamber 3 after Height of continuing rising, when its pressure reaches 100MPa, oil bath 31 stops heating, high pressure CO2Gas is caused via pipeline into fracturing room 5/ The coal petrography reservoir 34 of 6 fracturing experimental sample of ceasma 33/;CO in phase change chamber 32When the pressure of gas is reduced to 15MPa, in accumulation chamber 4 The 80Mpa high pressure COs of storage2Gas enters the left chamber of high pressure fluid injection cylinder 2 via pipeline, quick to promote piston to move right, and makes height Liquid CO in the right chamber of pressure injection fluid cylinder 22Into phase change chamber 3, remaining CO in phase change chamber 3 is driven2Gas enters the fracturing of fracturing room 5/ Hole 6, carries out secondary fracturing, while preventing that the residual gas in phase change chamber 3 from taking up space influence reservoir quantity;In high pressure fluid injection cylinder 2 Piston when being moved to that pressure is reduced to 20MPa in low order end, accumulation chamber 4, complete automatic fluid injection;Discharge in high pressure fluid injection cylinder 2 Gaseous state CO2, the interior liquid CO by pressurization of high pressure liquid storage temperature control tank 12The right chamber of high pressure fluid injection cylinder 2 is again introduced into via pipeline, is made Its fluid pressure reaches 15MPa;Above-mentioned " fluid injection-oil bath heating-phase transformation-energy storage-fracturing " circulation is repeated, realizes that continuous impulse is high Jet flow fracturing.
Heat-insulation layer is with outside accumulation chamber 4 and high pressure fluid injection cylinder 2, fracturing room 5 is provided with steam vent.In high pressure liquid storage temperature control tank 1 Pressure be higher than 20MPa after, the releasing pressure automatically of safety valve 14;Pressure in accumulation chamber 4 is higher than after 85MPa, the automatic leakage of safety valve 15 Pressure;Pressure in phase change chamber 3 is higher than after 110MPa, the releasing pressure automatically of safety valve 16.The volume of phase change chamber 3 may be designed as 2L~ 300L, to meet laboratory test and engineer applied, the volume of high pressure fluid injection cylinder 1 is equal with the volume of phase change chamber, accumulation chamber 4 Volume is the 1/3 of phase change chamber volume, and the volume of high pressure liquid storage temperature control tank 1 is 2 times of phase change chamber volume.
Here is pulse fracturing anti-reflection experiment of the present invention in certain colliery, and the tool of this method is illustrated by specific embodiment Body embodiment.
Embodiment 1
(1)Drilling.Constructed one group of horizontal bore along the vertical rib of laneway midline in certain tailentry of ore deposit 15116, altogether 11 Individual, from left to right number consecutively is 1#~11#, bore diameter 75mm, hole depth 30m, spacing of wells 3m.6 positioned at center#Bore Hole is pre- ceasma, and remaining drilling is drainage holes.At once to drainage holes sealing of hole extraction after the completion of drilling construction, hole sealing depth 10.5m, After negative pressure extraction 20 days, the experiment of the first subpulse fracturing is carried out.
(2)Vacuumize.Fracturing hole 20m depths and sealing of hole are delivered into tube outlet end.Stop valve 10 is opened, starts vavuum pump 13, it is de-gassed, the pressure of vacuum meter on record vavuum pump, until when pressure value does not change, stopping degassing, closes cut-off Valve 10.
(3)Feed flow.Stop valve 9, start liquid booster pump 11 and cooler bin 12 are opened, is injected to high pressure liquid storage temperature control tank 1 Liquid CO2, keep the temperature of high pressure liquid storage temperature control 13 in -5 DEG C ~ 5 DEG C, pressure in the range of 10MPa ~ 15MPa.Electromagnetism is opened to cut Liquid CO in only valve 24,25, high pressure liquid storage temperature control tank 12Enter the right chamber and phase change chamber 3 of high pressure fluid injection cylinder 2, phase transformation by pipeline When the fluid pressure of room 3 and high pressure fluid injection cylinder 2 reaches 15MPa, electromagnet cut off valve 24,25 is closed.
(4)Heating boosting.Start oil bath 31, to the liquid CO in phase change chamber 32Heated, liquid CO2Heated phase transformation, body Pressure in product expansion, phase change chamber 3 is constantly raised.
(5)Energy storage.After the monitor value of pressure sensor 19 reaches 80MPa, electromagnet cut off valve 26 is opened, to accumulation chamber 4 Interior storage gaseous state CO2.After the monitor value of pressure sensor 18 reaches 80MPa, magnetic valve 26 is closed, energy storage is completed.
(6)Fracturing.After the monitor value of pressure sensor 19 reaches 100MPa, oil bath 31 stops heating, opens magnetic valve HTHP CO in cut-off 29, phase change chamber 32Enter the pre- fracturing coal body 34 of ceasma 6 by pipeline.
(7)Quick fluid injection.With CO in phase change chamber 32The reduction of gas, when the monitor value of pressure sensor 19 is reduced to During 15MPa, the gaseous state CO of storage in electromagnet cut off valve 14,25, accumulation chamber 4 is opened2Enter high pressure fluid injection cylinder 2 via pipeline left Chamber, it is quick to promote piston to move right, by the liquid CO in the right chamber of high pressure fluid injection cylinder 22Phase change chamber 3 is injected via pipeline, is driven Remaining CO in phase change chamber 32Gas enters fracturing hole, realizes secondary fracturing.Piston is moved to pressure in low order end, accumulation chamber 4 When being reduced to 20MPa, electromagnet cut off valve 14,25,29 is closed, and completes automatic fluid injection.Open magnetic valve 27,24, high pressure liquid storage control By the liquid CO of pressurization in warm tank 12The right chamber of high pressure fluid injection cylinder 2 is again introduced into via pipeline, its fluid pressure is reached 15MPa。
(8)After negative pressure extraction for a period of time, repeat step(4)、(5)、(6)、(7), pulse fracturing 3 times altogether.
(9)Repairing experiment data.5 before and after three subpulse fracturings#Drainage holes gas pumping amount becomes with the change of extraction time Gesture such as accompanying drawing 2, average gas pumping amount is 3.13 times, 1.56 times and 1.42 times before presplitting respectively after each presplitting, pre- every time The trend that average gas pumping amount is all significantly increased after splitting, but this trend with the increase of fracturing number of times, exponentially pass by form Subtract.According to the change of each drainage holes gas pumping amount it could be speculated that the coverage of first time presplitting is in 6m or so, second pre- The coverage split is in 9m or so, and the coverage of third time presplitting is in 12m or so.
Embodiment 2
(1)Prepare sample.By cement, sand, gypsum, water in mass ratio 8:20:1:4 ratio is sufficiently mixed in mixer Afterwards, it is fabricated in 1000mm × 1000mm × 800mm sample, manufacturing process and uses small vibrating rod vibration tamping, it is artificial to support Shield 21 days.The universal coefficient f of sample is 3.4, and it is the fracturing hole that 50mm depth d is 500mm that diameter of phi is reserved in sample.
(2)Sealing of hole.Fracturing hole 400mm depths is delivered at tube outlet end, using PD composite sealing of holes, hole sealing depth is 300mm。
(3)Ultrasonic wave tests the speed.Using supersonic detector on the basis of drill center horizontal line and vertical curve line, above and below It is between left and right that a measuring point carries out being used as test probe and test block using butter in ultrasonic velocity measurement, measurement process every 50mm The couplant of contact surface.
(4)Vacuumize.Stop valve 10 is opened, starts vavuum pump 13, is de-gassed, the pressure of vacuum meter on record vavuum pump Power, until when pressure value does not change, stopping degassing, closes stop valve 10.
(5)Feed flow.Stop valve 9 is opened, start liquid booster pump 11 injects liquid CO to high pressure liquid storage temperature control tank 12, pressure The temperature and pressure of sensor 17, temperature sensor 20 and acquisition control system automated measurement &control high pressure liquid storage temperature control tank 1, By the automatic switch of liquid booster pump 11 and cooler bin 12, the temperature of high pressure liquid storage temperature control tank 1 is kept in -5 DEG C ~ 5 DEG C, pressure In the range of 10MPa ~ 15MPa.Open the liquid CO in electromagnet cut off valve 24,25, high pressure liquid storage temperature control tank 12Entered by pipeline When the fluid pressure of the right chamber and phase change chamber 3 of high pressure fluid injection cylinder 2, phase change chamber 3 and high pressure fluid injection cylinder 2 reaches 15MPa, electromagnetism cut-off Valve 24,25 is closed
(6)Heating boosting.Start oil bath 31, to the liquid CO in phase change chamber 32Heated, liquid CO2Heated phase transformation, volume Pressure in expansion, phase change chamber 3 is constantly raised.
(7)Energy storage.After the monitor value of pressure sensor 19 reaches 80MPa, open in electromagnet cut off valve 26, phase change chamber 3 Gaseous state CO2Enter accumulation chamber via pipeline.After the monitor value of pressure sensor 18 reaches 80MPa, magnetic valve 26, storage are closed It can complete.
(8)Fracturing.After the monitor value of pressure sensor 19 reaches 100MPa, oil bath 31 stops heating, opens magnetic valve HTHP CO in cut-off 29, phase change chamber 32Enter the fracturing solid material 33 of fracturing room 5 by pipeline.
(9)Quick fluid injection.With CO in phase change chamber 32The reduction of gas, when the monitor value of pressure sensor 19 is reduced to During 15MPa, the gaseous state CO of storage in electromagnet cut off valve 24,25, accumulation chamber 4 is opened2Enter high pressure fluid injection cylinder 2 via pipeline left Chamber, it is quick to promote piston to move right, by the liquid CO in the right chamber of high pressure fluid injection cylinder 22Phase change chamber 3 is injected, is driven in phase change chamber 3 Remaining CO2Gas enters fracturing room 5, realizes secondary fracturing.Piston is moved to pressure in low order end, accumulation chamber 4 and is reduced to During 20MPa, electromagnet cut off valve 24,25,29 is closed, and completes automatic fluid injection.Open in magnetic valve 24,27, high pressure liquid storage temperature control tank 1 Liquid CO by pressurization2The right chamber of high pressure fluid injection cylinder 2 is again introduced into via pipeline, its fluid pressure is reached 15MPa.Fluid injection Repeat step after end(3), measure the ultrasonic velocity of each measuring point after fracturing.
(10)Repeat step(6)、(7)、(8)、(9), until specimen surface discrepitate or sample are broken.
(11)Calculate progressive damage.According to formula 2(V is the ultrasonic wave ripple of medium before fracturing Speed, v0For the ultrasonic velocity of medium after fracturing)The progressive damage of each measuring point after each fracturing is calculated, and flat is asked to progressive damage Average.
(12)Repairing experiment data.Accompanying drawing 3 be test sample accumulated damage with fracturing number of times changing trend diagram, can see Go out, in the presence of shock loading, with being incremented by for fracturing number of times, the accumulated damage of test sample is in " rapid increase → slow hair Exhibition → explosion → tends towards stability " situation.

Claims (10)

1. a kind of automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method, the coal and rock fracturing method is by following What step was carried out:
(One)The feed liquid method of liquid-supplying system:Open vavuum pump(13)To high pressure liquid storage temperature control tank(1)Vacuumize, rear start liquid Booster pump(11)And cooler bin(12)To high pressure liquid storage temperature control tank(1)Inject compressed liquid CO2, pressure sensor(17), temperature Sensor(20)Monitor high pressure liquid storage temperature control tank automatically with acquisition control system(1)Temperature and pressure, pass through liquid booster pump (11)And cooler bin(12), keep high pressure liquid storage temperature control tank(1)Temperature in -5 DEG C ~ 5 DEG C, pressure in 10MPa ~ 15MPa scopes It is interior;
(Two)The automatic energy storage high pressure electrolyte filling method of automatic energy storage high pressure liquid injection system:High pressure liquid storage temperature control tank(1)Interior low temperature pressure The liquid CO of contracting2Into high pressure fluid injection cylinder(2)Right chamber and phase change chamber(3), oil bath(31)Heating, phase change chamber(3)Interior liquid CO2When heated pressure phase transition is increased to 80MPa, phase change chamber(3)Interior gaseous state CO2Into accumulation chamber(4), accumulation chamber(4)Interior pressure Power, which is increased to after 80MPa, to be stopped, and completes automatic energy storage;Oil bath(31)Continue to heat, phase change chamber(3)Pressure continue raise, when When pressure reaches 100MPa, oil bath(31)Stop heating, high pressure CO2Gas enters fracturing room via pipeline(5)Or fracturing hole (6)Fracturing experimental sample(33)Or coal and rock layer(34);Phase change chamber(3)Interior CO2When the pressure of gas is reduced to 15MPa, storage Can room(4)The 80Mpa high pressure COs of interior storage2Gas enters high pressure fluid injection cylinder via pipeline(2)Left chamber, it is quick promote piston to Move right, make high pressure fluid injection cylinder(2)Liquid CO in right chamber2Into phase change chamber(3), drive phase change chamber(3)Interior remaining CO2Gas Body enters fracturing room(5)Or fracturing hole(6), secondary fracturing is carried out, while preventing phase change chamber(3)Interior residual gas occupies sky Between influence reservoir quantity;High pressure fluid injection cylinder(2)Interior piston is moved to right-hand member, accumulation chamber(4)It is complete when interior pressure is reduced to 20MPa Into automatic fluid injection;Discharge high pressure fluid injection cylinder(2)Interior gaseous state CO2, high pressure liquid storage temperature control tank(1)The interior liquid CO by pressurization2Again Into high pressure fluid injection cylinder(2)Right chamber, its fluid pressure is reached 15MPa;Repeat above-mentioned " fluid injection-oil bath heating-phase transformation-storage Energy-fracturing " is circulated, and realizes continuous impulse high-pressure jet fracturing.
2. coal and rock fracturing method as claimed in claim 1, the CO2Phase change chamber(3)Volume be 2L~300L, high pressure injection Fluid cylinder(2)Volume and CO2Phase change chamber(3)Volume it is equal, accumulation chamber(4)Volume be CO2Phase change chamber(3)The 1/3 of volume, High pressure liquid storage temperature control tank(1)Volume be phase change chamber(3)2 times of volume.
3. coal and rock fracturing method as claimed in claim 1, the vavuum pump(13)It is X-type single-stage rotary vane vacuum pump, pumping Speed 30L/s, limiting pressure 10Pa, power 5kw.
4. coal and rock fracturing method as claimed in claim 1, the liquid booster pump(11)It is pneumatic liquid CO2Booster pump, most Big output pressure 22.5Mpa, flow 12.4L/min.
5. coal and rock fracturing method as claimed in claim 1, the stop valve(9、10)It is high-pressure stop valve, it is maximum Pressure-resistant 20MPa.
6. coal and rock fracturing method as claimed in claim 1, the electromagnet cut off valve(24、25、26、27、28、29)It is normally closed The high pressure resistant stop valve of formula, maximum pressure-resistant 120MPa.
7. coal and rock fracturing method as claimed in claim 1, the high pressure fluid injection cylinder(2)Fluid pressure be 10MPa~ 15MPa。
8. coal and rock fracturing method as claimed in claim 1, the oily domain(31)Temperature be 140 DEG C~160 DEG C.
9. coal and rock fracturing method as claimed in claim 1, the accumulation chamber(4)Gas pressure be 80MPa.
10. coal and rock fracturing method as claimed in claim 1, the device that the coal and rock fracturing method is used includes feed flow system System, automatic energy storage high pressure liquid injection system, phase transformation fracturing system and acquisition and control system;It is characterized in that:
The liquid-supplying system is provided with high pressure liquid storage temperature-controlling chamber(1), its one end is provided with safety valve(14)And it is communicated with liquid Booster pump(11)And its stop valve(9)With liquid CO2Source(8);The other end is provided with vavuum pump(13)And its stop valve(10), and Pass through electromagnet cut off valve(24)It is communicated with high pressure fluid injection cylinder(2)With CO2Phase change chamber(3), in high pressure liquid storage temperature control tank(1)Periphery It is provided with cooler bin(12), in high pressure liquid storage temperature control tank(1)Internal face be provided with pressure sensor(17)And temperature sensor (20);
The automatic energy storage high pressure liquid injection system is provided with high pressure fluid injection cylinder(2), its rodless cavity one end passes through electromagnet cut off valve (25)With(26)It is communicated with CO2Phase change chamber(3)And accumulation chamber(4);Rod chamber one end passes through electromagnet cut off valve(28)And safety valve (15)It is communicated with accumulation chamber(4), and in accumulation chamber(4)Internal face be provided with pressure sensor(18)And temperature sensor (21);
The phase transformation fracturing system is provided with CO2Phase change chamber(3), its one end is provided with safety valve(16)And ended by electromagnetism Valve(25)With(26)It is communicated with high pressure fluid injection cylinder(2)With accumulation chamber(4);The other end passes through electromagnet cut off valve(29)It is communicated with fracturing Room(5)Or fracturing hole(6), and in CO2Phase change chamber(3)Periphery is provided with oil bath(31), in CO2Phase change chamber(3)Internal face set It is equipped with pressure sensor(19)And temperature sensor(22);
The acquisition and control system is provided with controlling computer(7), and it is connected with pressure sensor(17、18、19), temperature Spend sensor(20、21、22), electromagnet cut off valve(24、25、26、27、28、29), stop valve(9、10)And safety valve(14、15、 16), realize that data acquisition is controlled with computer.
CN201710167989.9A 2017-03-21 2017-03-21 Automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method Active CN106948816B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710167989.9A CN106948816B (en) 2017-03-21 2017-03-21 Automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710167989.9A CN106948816B (en) 2017-03-21 2017-03-21 Automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method

Publications (2)

Publication Number Publication Date
CN106948816A true CN106948816A (en) 2017-07-14
CN106948816B CN106948816B (en) 2018-10-30

Family

ID=59472534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710167989.9A Active CN106948816B (en) 2017-03-21 2017-03-21 Automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method

Country Status (1)

Country Link
CN (1) CN106948816B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107941097A (en) * 2017-11-08 2018-04-20 中铁十局集团第八工程有限公司 A kind of process of liquid carbon dioxide fracturing rock
CN108679842A (en) * 2018-03-22 2018-10-19 山西能源学院 A kind of oil bath heating method of local cooling
CN108894782A (en) * 2018-07-31 2018-11-27 中南大学 A kind of low temperature frost heave fracturing induction ore body inbreak mining codes
CN110017124A (en) * 2019-03-05 2019-07-16 重庆大学 Coal-bed gas enhanced gas extraction method and extraction system based on phase-change heat-storage material
CN110836123A (en) * 2019-09-23 2020-02-25 山东科技大学 Phase-change pulse wave-based enhanced gas extraction method
CN111456698A (en) * 2020-04-23 2020-07-28 太原理工大学 High-energy impact directional hydraulic fracturing method
CN111701687A (en) * 2020-05-21 2020-09-25 中科前衍(深圳)工程科学发展有限公司 Based on gaseous promotion and liquid CO2Unloading iron ore pulverizing device and method
CN112881453A (en) * 2021-01-27 2021-06-01 山东大学 Solid-liquid phase change heat storage type power generation testing device and working method thereof
CN113738330A (en) * 2021-09-29 2021-12-03 辽宁工程技术大学 High-energy gas high-pressure charging control system and control method
CN113857156A (en) * 2021-09-28 2021-12-31 安徽酉鸣八方科技有限公司 CO2 safe phase change descaling device that possesses multiple impact effect

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4212354A (en) * 1979-03-19 1980-07-15 Service Fracturing Company and Airry, Inc. Method for injecting carbon dioxide into a well
US4593763A (en) * 1984-08-20 1986-06-10 Grayco Specialist Tank, Inc. Carbon dioxide well injection method
US7614450B2 (en) * 2006-02-13 2009-11-10 Team CO2 Holdings, Ltd. Pumping system and method for injecting a mixture of liquids into a subterranean formation
CN102423546A (en) * 2011-08-16 2012-04-25 中国石油集团工程设计有限责任公司 Control device and control method for carbon dioxide phase change
CN103967995A (en) * 2014-05-20 2014-08-06 湖南汉寿煤矿机械有限公司 Shock absorption rod for mine liquid carbon oxide phase changing and cracking device and mine liquid carbon oxide phase changing and cracking device
CN103993880A (en) * 2014-05-20 2014-08-20 湖南汉寿煤矿机械有限公司 Heater of electric firing head and liquid CO2 phase-change fracturing equipment applying heater
CN104675374A (en) * 2013-11-29 2015-06-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Unconventional CO2 fracturing site operation technology
CN106014408A (en) * 2016-07-07 2016-10-12 华北科技学院 Goaf overlaying hard rock mass fracturing device and method
CN106223921A (en) * 2016-09-22 2016-12-14 贵州致裂科技有限公司 A kind of gas fracturing device
CN106289988A (en) * 2015-05-29 2017-01-04 中国科学院地质与地球物理研究所 Supercritical carbon dioxide rock fracture pilot system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4212354A (en) * 1979-03-19 1980-07-15 Service Fracturing Company and Airry, Inc. Method for injecting carbon dioxide into a well
US4593763A (en) * 1984-08-20 1986-06-10 Grayco Specialist Tank, Inc. Carbon dioxide well injection method
US7614450B2 (en) * 2006-02-13 2009-11-10 Team CO2 Holdings, Ltd. Pumping system and method for injecting a mixture of liquids into a subterranean formation
CN102423546A (en) * 2011-08-16 2012-04-25 中国石油集团工程设计有限责任公司 Control device and control method for carbon dioxide phase change
CN104675374A (en) * 2013-11-29 2015-06-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Unconventional CO2 fracturing site operation technology
CN103967995A (en) * 2014-05-20 2014-08-06 湖南汉寿煤矿机械有限公司 Shock absorption rod for mine liquid carbon oxide phase changing and cracking device and mine liquid carbon oxide phase changing and cracking device
CN103993880A (en) * 2014-05-20 2014-08-20 湖南汉寿煤矿机械有限公司 Heater of electric firing head and liquid CO2 phase-change fracturing equipment applying heater
CN106289988A (en) * 2015-05-29 2017-01-04 中国科学院地质与地球物理研究所 Supercritical carbon dioxide rock fracture pilot system
CN106014408A (en) * 2016-07-07 2016-10-12 华北科技学院 Goaf overlaying hard rock mass fracturing device and method
CN106223921A (en) * 2016-09-22 2016-12-14 贵州致裂科技有限公司 A kind of gas fracturing device

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107941097A (en) * 2017-11-08 2018-04-20 中铁十局集团第八工程有限公司 A kind of process of liquid carbon dioxide fracturing rock
CN108679842A (en) * 2018-03-22 2018-10-19 山西能源学院 A kind of oil bath heating method of local cooling
CN108894782A (en) * 2018-07-31 2018-11-27 中南大学 A kind of low temperature frost heave fracturing induction ore body inbreak mining codes
CN110017124A (en) * 2019-03-05 2019-07-16 重庆大学 Coal-bed gas enhanced gas extraction method and extraction system based on phase-change heat-storage material
CN110836123B (en) * 2019-09-23 2022-01-18 山东科技大学 Phase-change pulse wave-based enhanced gas extraction method
CN110836123A (en) * 2019-09-23 2020-02-25 山东科技大学 Phase-change pulse wave-based enhanced gas extraction method
CN111456698A (en) * 2020-04-23 2020-07-28 太原理工大学 High-energy impact directional hydraulic fracturing method
CN111701687A (en) * 2020-05-21 2020-09-25 中科前衍(深圳)工程科学发展有限公司 Based on gaseous promotion and liquid CO2Unloading iron ore pulverizing device and method
CN111701687B (en) * 2020-05-21 2021-11-23 中科前衍(深圳)工程科学发展有限公司 Based on gaseous promotion and liquid CO2Unloading iron ore pulverizing device and method
CN112881453A (en) * 2021-01-27 2021-06-01 山东大学 Solid-liquid phase change heat storage type power generation testing device and working method thereof
CN113857156A (en) * 2021-09-28 2021-12-31 安徽酉鸣八方科技有限公司 CO2 safe phase change descaling device that possesses multiple impact effect
CN113857156B (en) * 2021-09-28 2022-11-11 安徽酉鸣八方科技有限公司 CO2 safe phase change descaling device that possesses multiple impact effect
CN113738330A (en) * 2021-09-29 2021-12-03 辽宁工程技术大学 High-energy gas high-pressure charging control system and control method
CN113738330B (en) * 2021-09-29 2023-03-14 辽宁工程技术大学 High-energy gas high-pressure charging control system and control method

Also Published As

Publication number Publication date
CN106948816B (en) 2018-10-30

Similar Documents

Publication Publication Date Title
CN106948816B (en) Automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing method
CN106978996B (en) Automatic energy storage high pressure fluid injection CO2Phase conversion pulse coal and rock fracturing device
US20240110465A1 (en) Cracking permeability increasing method combining hydraulic fracturing and methane in-situ combustion explosion
CN106437669B (en) A kind of thermal cracking seam method and system for deep hot dry rock formation production
CN104632174A (en) Coal seam liquid carbon dioxide fracturing device and method
LU500058B1 (en) Safe and environmentally friendly rock blasting device and method
CN108397182A (en) Electric pulse cooperates with the device and method in the anti-reflection coal seam of frozen-thawed
CN104061014A (en) Coal seam anti-reflection experiment device based on high-voltage electric pulse
CN203891922U (en) Effective extraction system for gas in coal seam
CN107849913B (en) Utilize the pressure break of air/fuel mixture
CN204419145U (en) Coal seam liquid carbon dioxide fracturing device
CN201606045U (en) Aerodynamic deep penetrating productivity and injection increasing device aerodynamic aerodynamic force
CN112943191A (en) Method for increasing permeability and displacing coal seam gas by filling dry ice in drill hole
US6375271B1 (en) Controlled foam injection method and means for fragmentation of hard compact rock and concrete
CN112665472B (en) Carbon dioxide rock breaking device and method for open-pit mine
CN108999596B (en) Method for gas explosion fracturing of coal rock mass by supercritical CO2 point-type jet flow
CN102200002A (en) method and device for sealing upward hole at high pressure by sections
CN111608631A (en) Supercritical CO excitation based on electric pulse2Device for fracturing coal seam and application method
TWI825107B (en) Resource collection system
CN110735637B (en) Carbon dioxide deflagration pulse type pressurization rock breaking device and process method
CN204574977U (en) A kind of deep hole blasting grouting for water blocking device
CN101235639A (en) Exploding expanding device for concrete filling pore bottom exploding expanding pile and pile forming method
CN107989611A (en) Loading method for the fracturing hole internal solid carbon dioxide of non-explosive excavation rock
CN208168859U (en) The device in the electric pulse collaboration anti-reflection coal seam of frozen-thawed
CN214537620U (en) Carbon dioxide rock breaking device for open pit mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant