CN106930408A - Rigid connection joint of steel pipe column and H-shaped steel beam and construction method of rigid connection joint - Google Patents

Rigid connection joint of steel pipe column and H-shaped steel beam and construction method of rigid connection joint Download PDF

Info

Publication number
CN106930408A
CN106930408A CN201710257532.7A CN201710257532A CN106930408A CN 106930408 A CN106930408 A CN 106930408A CN 201710257532 A CN201710257532 A CN 201710257532A CN 106930408 A CN106930408 A CN 106930408A
Authority
CN
China
Prior art keywords
profile steel
steel beam
pipe column
bracket
flange plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710257532.7A
Other languages
Chinese (zh)
Inventor
苏铠
张益民
章二龙
雷志强
吴文进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201710257532.7A priority Critical patent/CN106930408A/en
Publication of CN106930408A publication Critical patent/CN106930408A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2454Connections between open and closed section profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A steel pipe column and H-shaped steel beam rigid connection node is characterized in that brackets are correspondingly welded on the wall surface of the steel pipe column at preset positions of the H-shaped steel beam, and the cross section of each bracket is the same as that of the H-shaped steel beam; the upper flange plate of the bracket is correspondingly welded with the upper flange plate of the H-shaped steel beam, the lower flange plate of the bracket is correspondingly welded with the lower flange plate of the H-shaped steel beam, and the web plate of the bracket and the web plate of the H-shaped steel beam are respectively connected with the connecting plate through bolts to realize fixation; the bracket upper flange plate is provided with a positioning clamping plate which is used for being temporarily fixed with the H-shaped steel beam upper flange plate in an overlapping manner. The positioning clamping plate is an inverted groove-shaped positioning clamping plate, a fixing part of the positioning clamping plate is fixed on the H-shaped steel beam, and the clamping part at the other end of the positioning clamping plate is clamped or erected on the bracket. The node of the invention has definite force transmission and firm connection; the connection plates and the high-strength bolts are accurately aligned in a penetrating way, so that the correction time and the repair work are reduced; the H-shaped steel beam is accurately fixed on the bracket through the clamping groove, so that the high-altitude construction time and the safety risk are reduced; reduces the welding seams of the web plate and reduces the environmental pollution.

Description

The rigid joint and its construction method of a kind of steel pipe column and H profile steel beam
Technical field
The present invention relates to different steel construction joint connection in site technical fields, and in particular to a kind of steel pipe column and H profile steel beam it is firm Connect node and its construction method.
Background technology
Now with the development of China's building, assembling type steel structure building has that the live construction period is short, construction is fast, The advantages of being moved easily installation, is increasingly used by people, and various different steel construction joint connection in site are common occurrences, connection Mode mainly have and rigid connection and be hinged, rigid connection is characterized in that can not relatively move and rotate, conventional rigid connection after steel structure connection Form is directly to be welded two steel structure members, and rigid connection mode is to have lifted girder steel using lifting machine, high-altitude with Steel pipe column is aligned temporarily, is measured in real time using total powerstation on ground, and lifting machine constantly moves H according to measurement data Section steel beam, after final girder steel exactitude position, unclamps suspension hook, then welded steel beam and the butt weld of steel pipe column, that is, weld the upper and lower wing Three road weld seams of listrium and web and steel column.In this kind of method, steel construction aligns connection difficulty and causes contraposition not smart greatly in the air Really, substantial amounts of Site Welding work causes duration progress slow, and after the completion of welding, weld seam detection is unqualified, it is necessary to reprocess Again weld, substantial amounts of welding job will cause site environment arc light, flue dust and noise pollution, do not meet national green construction It is required that, to solve the above problems, spy provides a kind of new rigid joint and construction method.
The content of the invention
It is an object of the invention to provide a kind of steel pipe column and the rigid joint and its construction method of H profile steel beam, solve to pass Steel construction aligns connection difficulty and causes that contraposition is inaccurate, the work of substantial amounts of Site Welding is made greatly in the air in system node structure construction Into duration progress is slow, weldquality it cannot be guaranteed that, welding job amount is big, cause site environment arc light, flue dust and noise pollution The technical problem of the requirement of national green construction is not met.
To realize above-mentioned technical purpose, the present invention is adopted the following technical scheme that:
The rigid joint of a kind of steel pipe column and H profile steel beam, including steel pipe column and H profile steel beam, both axis are orthogonal, and it is special Levy and be:On the wall of the steel pipe column, one section of H profile steel bracket, the H profile steel are welded in the predeterminated position correspondence of H profile steel beam The section of bracket is identical with H profile steel beam;The welding corresponding with the top flange plate one of H profile steel beam of the top flange plate two of H profile steel bracket, institute The bottom wing listrium of the bottom wing listrium two and H profile steel beam of stating H profile steel bracket should be welded for a pair, on the web two of the H profile steel bracket A series of bolts hole two are provided with, a series of bolts hole one, the web two and web one are provided with the web one of the H profile steel beam After docking, by realizing fixing respectively with connecting plate bolt connection;The upper surface of the top flange plate one be provided with for The locating clamp plate of the overlap joint fixation temporarily of flange plate two.
The connecting plate is rectangle, including two pieces, respectively positioned at web two and the tow sides of web one, is opened up thereon Number of bolt hole is equal to the quantity sum of bolt hole two and bolt hole one.
Used as the preferred technical solution of the present invention, the locating clamp plate is the groove profile locating clamp plate of back-off, its one end welding On the top flange plate one of H profile steel beam, the other end is ridden upon on the top flange plate two of H profile steel bracket.
It is further preferred that the back-off groove profile locating clamp plate that the locating clamp plate is formed in one, its one end is fixed part, The fixed part is fixed on the top flange plate one of H profile steel beam, and the other end is Access Division, and the Access Division fixes or ride upon H On the top flange plate two of shaped steel bracket.
It is further preferred that the fixed part of the locating clamp plate and Access Division are the plate that cross section is L-shaped, from left-hand The right side is followed successively by fixed transverse part, the fixed vertical vertical portion of portion, clamping transverse part and clamping, and first place is sequentially connected with;Wherein fix transverse part and H profile steel The top flange plate one of beam is welded or is fixedly connected by peg;The afterbody elongation in the vertical portion of clamping, in the top flange plate of H profile steel bracket Two correspondence position sets draw-in groove, and the afterbody in the vertical portion of clamping is fixed in draw-in groove.
It is further preferred that the locating clamp plate at least includes two, respectively positioned at two of the bond end of top flange plate one.
It is further preferred that in the connection end of H profile steel bracket and H profile steel beam, the web of H profile steel bracket and H profile steel beam with The end of top flange plate or the connection of bottom wing listrium is equipped with reserved gap, reserves in gap and is set under the weld seam that welding is completed There is backing plate.
It is further preferred that the bolt is high-strength bolt.
It is further preferred that the steel pipe column is quadrate steel pipe column, it is fixedly connected with 1~4 H profile steel beam, accordingly, institute State and be provided with steel pipe column 1~4 section of H profile steel bracket.
It is further preferred that H profile steel bracket is 400~600mm in the length perpendicular to steel pipe column direction.
The present invention also provides the construction method of the rigid joint of above-mentioned steel pipe column and H profile steel beam, comprises the following steps:
Step one, material prepare:Punching treatment is carried out to H profile steel beam, connecting plate and H profile steel bracket, aperture ratio high intensity is beaten The big 2mm of diameter of bolt, the two ends stationary positioned clamp of top flange plate one in H profile steel beam connection end, in the upper limb of H profile steel bracket Listrium sets draw-in groove, is equipped with the end that top flange plate or bottom wing listrium are connected in H profile steel bracket and the web of H profile steel beam pre- Stay gap;
Step 2, the quantity for determining H profile steel beam and fixed position:It is determined that the quantity of the H profile steel beam being connected with steel pipe column and Fixed position;
Step 3, the welded H section steel bracket on steel pipe column:On the wall of the steel pipe column, in the H profile steel beam that step 2 determines Predeterminated position correspondence welded H section steel bracket;
Step 4, installation steel pipe column:The steel pipe column with H profile steel bracket, H profile steel beam and connecting plate after by drilling are transported to and apply Work scene, the installation of steel pipe column is carried out according to design;
Step 5, lifting:After the completion of erection of steel pipe column, the H profile steel beam welded after locating clamp plate is lifted to high-altitude, make end The locating clamp plate in portion is placed on the top flange plate two of H profile steel bracket, and the vertical portion of clamping of locating clamp plate is fixed in H profile steel bracket In the draw-in groove of top flange plate, after successfully aligning, the suspension hook of lifting machine is unclamped;
Step 6, web bolt connection:Connecting plate is correspondingly arranged respectively in the web tow sides of H profile steel beam and H profile steel bracket, Dock the top flange plate one of split H profile steel beam and the top flange plate two of H profile steel bracket, make top flange plate one and top flange plate two with After the bolt hole of connecting plate three overlaps, with high-strength bolt is to wearing and fixes;
The twice weld seam that the upper and lower flange plate of step 7, welded H section steel is docked with steel pipe column bracket:The top flange plate of H profile steel bracket Two welding corresponding with the top flange plate one of H profile steel beam, the bottom wing listrium two of the H profile steel bracket and the bottom wing listrium of H profile steel beam One correspondence welding, the weld seam that completion is welded in reserved gap divides into backing plate;
Step 8, overall quality inspection, so far, construction is completed.
Wherein, in the step 6, first by electric wrench high-strength bolt is carried out just twist, it is to be measured it is errorless after, Reusing electric wrench twist eventually.
Compared with prior art, there is following technical advantage in the present invention:
1. the present invention provide rigid joint power transmission clearly, be connected firmly, the parts of connecting node are few, simple structure, are ten Divide preferable connecting node;
2. pacified to wearing default bolt hole on H profile steel beam and H profile steel bracket web, girder steel using high-strength bolt by connecting plate Dress contraposition is accurate, reduces correction time and reclamation work;
3.H section steel beams have accurately been fixed on bracket by the draw-in groove on peg, clamp and bracket, you can unclamp suspension hook, are reduced The workman high-altitude engineering time, security risk is reduced, decrease the use machine-team of lifting machine;
4. after high-strength bolt installation, peg is cut off, take out clamp, clamp and peg can be recycled, do not waste, pacified Dress is easy, meets the trend of assembling;Replace the welding of traditional web interface using high-strength bolt, reduce tradition and apply Web weld seam most long in the road weld seams of work method Zhong tri-, greatly reduces the welding job at scene, reduces environmental pollution, fills With change degree it is higher, install and use it is efficient and convenient, and subsequently building service life expire after, scene be more prone to dismounting and more Change.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, of the invention above-mentioned and/or other aspects and advantage will become Become apparent from and be easier to understand, these accompanying drawings are schematical, are not intended to limit the present invention, wherein:
Fig. 1 is the structural representation before steel pipe column and the assembling of H profile steel beam in embodiment of the present invention;
Fig. 2 is the overall structure elevation of the rigid joint of steel pipe column and H profile steel beam in embodiment of the present invention;
Fig. 3 is the A-A cross-sectional views of Fig. 2;
Steel pipe column and four structural representations of H profile steel beam in the embodiment two that Fig. 4 is;
Fig. 5 is the structural representation of locating clamp plate of the present invention;
Fig. 6 is the overlooking the structure diagram of Fig. 5;
Fig. 7 is the working state schematic representation of locating clamp plate.
Reference:1- steel pipe columns, 2-H section steel beams, 21- top flange plates one, 22- bottom wings listrium one, 23- webs one, 24- Bolt hole one, 3- H profile steels bracket, 31- top flange plates two, 32- bottom wings listrium two, 33- webs two, 34- bolts hole two, 35- cards Groove, 4- locating clamp plates, 41- clampings transverse part, the vertical portion of 42- clampings, 43- fix transverse part, 44- pegs, 45- preformed holes, 46- and fix vertical Portion, 5- high-strength bolts, 6- connecting plates, 7- weld seams, 8- backing plates, the reserved gap of 9-.
Specific embodiment
Hereinafter, the rigid joint and its construction method of steel pipe column of the invention and H profile steel beam are described with reference to the accompanying drawings Embodiment.The embodiment recorded herein is specific specific embodiment of the invention, for illustrating design of the invention, It is explanatory and exemplary, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein Implement exception, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious Other technical schemes being clear to, these technical schemes include any obvious using making for the embodiment to recording herein The technical scheme of substitutions and modifications.The accompanying drawing of this specification is schematic diagram, aids in illustrating design of the invention, it is schematically indicated The shape and its correlation of each several part.Note that for the ease of clearly showing the knot of each part of the embodiment of the present invention Structure, does not draw between each accompanying drawing according to identical ratio.Identical reference marker is used to represent identical part.
Principle of the invention and feature are described below in conjunction with accompanying drawing, example is served only for explaining the present invention, and It is non-for limiting the scope of the present invention.
It is that the structure that the steel pipe column of embodiment of the present invention one and H profile steel beam are attached is shown as described in Fig. 1-3 It is intended to, as illustrated, the rigid joint of steel pipe column of the present invention and H profile steel beam, including steel pipe column 1 and H profile steel beam 2, two Person axis is orthogonal, it is characterised in that:On the wall of steel pipe column 1, one section of H is welded in the predeterminated position correspondence of H profile steel beam 2 Shaped steel bracket 3, the section of H profile steel bracket 3 is identical with H profile steel beam 2;The top flange plate 2 31 of H profile steel bracket 3 and H profile steel beam 2 The correspondence of top flange plate 1 is welded, the weldering corresponding with the bottom wing listrium 1 of H profile steel beam 2 of the bottom wing listrium 2 33 of H profile steel bracket 3 Connect, a series of bolts hole 2 34 are provided with the web 2 32 of H profile steel bracket 3, be provided with the web 1 of H profile steel beam 2 a series of After bolt hole 1, web 2 32 and web 1 are docked, by realizing fixing respectively with the bolt connection of connecting plate 6;Top flange The upper surface of plate 1 is provided with for the locating clamp plate 4 with the overlap joint fixation temporarily of top flange plate 2 31.Bolt is high-strength bolt 5。
Preferably, such as Fig. 5~7, the back-off groove profile locating clamp plate that locating clamp plate 4 is formed in one, its one end is Fixed part, fixed part is fixed on the top flange plate 1 of H profile steel beam 2, and the other end is Access Division, and Access Division fixes or rides upon On the top flange plate 2 31 of H profile steel bracket 3;Fixed part and Access Division are the plate that cross section is L-shaped, are followed successively by from left to right Fixed transverse part 46, the fixed vertical vertical portion 42 of portion 46, clamping transverse part 41 and clamping, four first places are sequentially connected with;Wherein fix transverse part 46 Welded with the top flange plate 1 of H profile steel beam 2 or be fixedly connected by peg 44;The afterbody elongation in the vertical portion 42 of clamping, in H profile steel The correspondence position of the top flange plate 2 31 of bracket 3 sets draw-in groove 35, and the afterbody in the vertical portion 42 of clamping is fixed in draw-in groove 35.Connecting plate 6 It is rectangle, including two pieces, respectively positioned at web 2 32 and the tow sides of web 1, the number of bolt hole for opening up thereon is equal to The quantity sum of bolt hole 2 34 and bolt hole 1.Locating clamp plate 4 is the groove profile locating clamp plate of back-off, and its one end is welded on H On the top flange plate 1 of section steel beam 2, the other end is ridden upon on the top flange plate 2 31 of H profile steel bracket 3.Locating clamp plate 4 is at least Including two, respectively positioned at two of the bond end of top flange plate 1.H profile steel bracket 3 is in the length perpendicular to the direction of steel pipe column 1 It is 400~600mm, preferably 500 mm.
Additionally, in H profile steel bracket 3 and the connection end of H profile steel beam 2, the web and upper limb of H profile steel bracket 3 and H profile steel beam 2 The end of listrium or the connection of bottom wing listrium is equipped with reserved gap 9, reserves in gap 9 and is set under the weld seam 7 that welding is completed There is backing plate 8.Steel pipe column 1 is preferably quadrate steel pipe column, and it is fixedly connected with 1~4 H profile steel beam 2, accordingly, is set on steel pipe column 1 There is 1~4 section of H profile steel bracket 3.Fig. 4 is the structural representation that the steel pipe column of embodiment two and four H profile steel beams are attached, and it is also Other any types of attachment can be formed with 2 or 3 H profile steel beams 2 as requested.
The present invention also provides the construction method of the rigid joint of above-mentioned steel pipe column and H profile steel beam, comprises the following steps:
Step one, material prepare:Punching treatment is carried out to H profile steel beam 2, connecting plate 6 and H profile steel bracket 3, aperture ratio is beaten high-strength The big 2mm of diameter of bolt is spent, locating clamp plate 4 is welded at the two ends of the connection end top flange plate 1 of H profile steel beam 2, in processing factory's system Make rectangular connecting panels and girder steel locating clamp plate, clamp material is Q235B, and locating clamp plate detail drawing is shown in Fig. 5 to Fig. 7, in processing factory It is fixed on the top flange plate of H profile steel beam 2 through the preformed hole 45 of locating clamp plate using the peg 44 of diameter 16mm, peg 44 encloses It is sewn on top flange, while draw-in groove 35 is opened up in the end top flange of H profile steel bracket 3, in H profile steel bracket 3 and H profile steel beam 2 The end that web is connected with top flange plate or bottom wing listrium is equipped with reserved gap 9;
Step 2, the quantity for determining H profile steel beam 2 and fixed position:It is determined that the quantity of the H profile steel beam 2 being connected with steel pipe column 1 with And fixed position;
Step 3, the welded H section steel bracket 3 on steel pipe column 1:On the wall of steel pipe column 1, in the H profile steel beam 2 that step 2 determines Predeterminated position correspondence welded H section steel bracket 3;
Step 4, installation steel pipe column 1:The steel pipe column 1 with H profile steel bracket 3, H profile steel beam 2 and connecting plate 6 after by drilling are transported Job site is delivered to, the installation of steel pipe column 1 is carried out according to design;
Step 5, lifting:After the installation of steel pipe column 1, the H profile steel beam 2 welded after locating clamp plate 4 is lifted to high-altitude, The locating clamp plate 4 of end is set to be placed on the top flange plate 2 31 of H profile steel bracket 3, the vertical portion 42 of clamping of locating clamp plate 4 fixes In the draw-in groove 35 of the top flange plate of H profile steel bracket 3, after successfully aligning, the suspension hook of lifting machine is unclamped;
Step 6, web bolt connection:Connection is correspondingly arranged respectively in the web tow sides of H profile steel beam 2 and H profile steel bracket 3 Plate 6, the top flange plate 1 of docking split H profile steel beam 2 and the top flange plate 2 31 of H profile steel bracket 3, make top flange plate 1 and After top flange plate 2 31 overlaps with the bolt hole of the three of connecting plate 6, worn and fixed for 5 pairs with high-strength bolt;
The twice weld seam that the upper and lower flange plate of step 7, welded H section steel is docked with steel pipe column bracket:The top flange of H profile steel bracket 3 The welding corresponding with the top flange plate 1 of H profile steel beam 2 of plate 2 31, under the bottom wing listrium 2 33 and H profile steel beam 2 of H profile steel bracket 3 Flange plate 1 is corresponding to be welded, and the weld seam 7 of welding completion divides into backing plate 8 in reserved gap 9;
Step 8, overall quality inspection, so far, construction is completed.
In step 6, first by electric wrench high-strength bolt 5 is carried out just twist, it is to be measured it is errorless after, reuse electronic Spanner twist eventually.
Wherein, high-strength bolt is not reproducible uses, high-strength bolt be used for it is permanently connected, high-strength bolt connection be divided into just twist and Twist eventually, just twist and whole twisting uses electric wrench, can not be adjusted after twisting eventually, the bolt hole area on connecting plate is needed in processing factory Sanding treatment is inside carried out, to strengthen the frictional force of high-strength bolt and joint face, increases bonding strength.The making diameter of bolt hole 2mm more slightly larger than high-strength bolt diameter, to facilitate Field adjustment to wearing.
The upper and lower flange plate of girder steel enhances the tension and compression strength of connecting node, girder steel with the welding of steel pipe column bracket Web uses permanent high strength exploitation with steel pipe column bracket, enhances the shearing strength of connecting node, has agreed with rigid connection The requirement of node.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all it is of the invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (10)

1. a kind of rigid joint of steel pipe column and H profile steel beam, including steel pipe column(1)With H profile steel beam(2), both axis are mutual Vertically, it is characterised in that:The steel pipe column(1)Wall on, in H profile steel beam(2)Predeterminated position correspondence welding one section of H profile steel Bracket(3), the H profile steel bracket(3)Section and H profile steel beam(2)It is identical;H profile steel bracket(3)Top flange plate two(31)With H profile steel beam(2)Top flange plate one(21)Correspondence welding, the H profile steel bracket(3)Bottom wing listrium two(33)With H profile steel beam (2)Bottom wing listrium one(23)Correspondence welding, the H profile steel bracket(3)Web two(32)On be provided with a series of bolts hole two (34), the H profile steel beam(2)Web one(22)On be provided with a series of bolts hole one(24), the web two(32)And web One(22)After docking, by respectively with connecting plate(6)Bolt connection is realized fixing;The top flange plate one(21)Upper surface set Be equipped with for top flange plate two(31)The fixed locating clamp plate of interim overlap joint(4).
2. the rigid joint of a kind of steel pipe column according to claim 1 and H profile steel beam, it is characterised in that:The connecting plate (6)It is rectangle, including two pieces, respectively positioned at web two(32)With web one(22)Tow sides, the bolt hole for opening up thereon Quantity is equal to bolt hole two(34)With bolt hole one(24)Quantity sum.
3. the rigid joint of a kind of steel pipe column according to claim 1 and H profile steel beam, it is characterised in that:The locator card Plate(4)The back-off groove profile locating clamp plate being formed in one, its one end is fixed part, and the fixed part is fixed on H profile steel beam(2)'s Top flange plate one(21)On, the other end is Access Division, and the Access Division fixes or ride upon H profile steel bracket(3)Top flange plate Two(31)On.
4. the rigid joint of a kind of steel pipe column according to claim 3 and H profile steel beam, it is characterised in that:The locator card Plate(4)Fixed part and Access Division be cross section be L-shaped plate, fixed transverse part is followed successively by from left to right(46), it is fixed vertical Portion(46), clamping transverse part(41)Portion is found with clamping(42), first place is sequentially connected with;Wherein fix transverse part(46)With H profile steel beam(2)'s Top flange plate one(21)Weld or by peg(44)It is fixedly connected;Portion is found in clamping(42)Afterbody elongation, in H profile steel bracket (3)Top flange plate two(31)Correspondence position set draw-in groove(35), clamping founds portion(42)Afterbody fix in draw-in groove(35)It is interior.
5. the rigid joint of a kind of steel pipe column according to claim 1 and H profile steel beam, it is characterised in that:The locator card Plate(4)At least include two, respectively positioned at top flange plate one(21)Two of bond end.
6. the rigid joint of a kind of steel pipe column according to claim 1 and H profile steel beam, it is characterised in that:In H profile steel bracket (3)With H profile steel beam(2)Connection end, H profile steel bracket(3)With H profile steel beam(2)Web and top flange plate or bottom wing listrium connect The end for connecing is equipped with reserved gap(9), reserve gap(9)The weld seam that inherence welding is completed(7)Be arranged with backing plate(8).
7. the rigid joint of a kind of steel pipe column according to claim 1 and H profile steel beam, it is characterised in that:The bolt is High-strength bolt(5);H profile steel bracket(3)Perpendicular to steel pipe column(1)The length in direction is 400~600mm.
8. the rigid joint of a kind of steel pipe column according to claim 1 and H profile steel beam, it is characterised in that:The steel pipe column (1)It is quadrate steel pipe column, itself and 1~4 H profile steel beam(2)It is fixedly connected, accordingly, the steel pipe column(1)On be provided with 1~4 section H profile steel bracket(3).
9. a kind of steel pipe column described in claim 1~8 any one and the construction method of the rigid joint of H profile steel beam, it is special Levy and be, comprise the following steps:
Step one, material prepare:To H profile steel beam(2), connecting plate(6)With H profile steel bracket(3)Punching treatment is carried out, footpath of punching 2mm bigger than the diameter of high-strength bolt, in H profile steel beam(2)Connection end top flange plate one(21)Two ends stationary positioned clamp (4), in H profile steel bracket(3)Top flange plate set draw-in groove(35), while in H profile steel bracket(3)With H profile steel beam(2)Web The end being connected with top flange plate or bottom wing listrium is equipped with reserved gap(9);
Step 2, determine H profile steel beam(2)Quantity and fixed position:It is determined that and steel pipe column(1)The H profile steel beam of connection(2)'s Quantity and fixed position;
Step 3, in steel pipe column(1)Upper welded H section steel bracket(3):In the steel pipe column(1)Wall on, step 2 determine H profile steel beam(2)Predeterminated position correspondence welded H section steel bracket(3);
Step 4, installation steel pipe column(1):After by drilling with H profile steel bracket(3)Steel pipe column(1), H profile steel beam(2)And even Fishplate bar(6)Job site is transported to, steel pipe column is carried out according to design(1)Installation;
Step 5, lifting:In steel pipe column(1)After installation, locating clamp plate is determined into solid welding(4)H profile steel beam afterwards(2)Lifting To high-altitude, make the locating clamp plate of end(4)It is placed on H profile steel bracket(3)Top flange plate two(31)On, locating clamp plate(4)'s Portion is found in clamping(42)Fix in H profile steel bracket(3)Top flange plate draw-in groove(35)It is interior, after successfully aligning, unclamp lifting machine Suspension hook;
Step 6, web bolt connection:In H profile steel beam(2)With H profile steel bracket(3)Web tow sides be correspondingly arranged respectively Connecting plate(6), dock split H profile steel beam(2)Top flange plate one(21)With H profile steel bracket(3)Top flange plate two(31), make Top flange plate one(21)And top flange plate two(31)With connecting plate(6)After the bolt hole of three overlaps, high-strength bolt is used(5)To wearing And it is fixed;
The twice weld seam that the upper and lower flange plate of step 7, welded H section steel is docked with steel pipe column bracket:H profile steel bracket(3)Upper limb Listrium two(31)With H profile steel beam(2)Top flange plate one(21)Correspondence welding, the H profile steel bracket(3)Bottom wing listrium two (33)With H profile steel beam(2)Bottom wing listrium one(23)Correspondence welding, in reserved gap(9)The weld seam that interior welding is completed(7)Under If backing plate(8);
Step 8, overall quality inspection, so far, construction is completed.
10. the construction method of the rigid joint of a kind of steel pipe column according to claim 9 and H profile steel beam, it is characterised in that: In the step 6, first by electric wrench to high-strength bolt(5)Carry out just twist, it is to be measured it is errorless after, reuse electronic pulling Hand twist eventually.
CN201710257532.7A 2017-04-19 2017-04-19 Rigid connection joint of steel pipe column and H-shaped steel beam and construction method of rigid connection joint Pending CN106930408A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710257532.7A CN106930408A (en) 2017-04-19 2017-04-19 Rigid connection joint of steel pipe column and H-shaped steel beam and construction method of rigid connection joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710257532.7A CN106930408A (en) 2017-04-19 2017-04-19 Rigid connection joint of steel pipe column and H-shaped steel beam and construction method of rigid connection joint

Publications (1)

Publication Number Publication Date
CN106930408A true CN106930408A (en) 2017-07-07

Family

ID=59437669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710257532.7A Pending CN106930408A (en) 2017-04-19 2017-04-19 Rigid connection joint of steel pipe column and H-shaped steel beam and construction method of rigid connection joint

Country Status (1)

Country Link
CN (1) CN106930408A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476435A (en) * 2017-09-15 2017-12-15 莱芜钢铁集团有限公司 A kind of flat tube post H profile steel beam connecting node
CN108044251A (en) * 2017-12-14 2018-05-18 中铁九桥工程有限公司 A kind of welding method of cross weld seam patch glass fabric
CN108867997A (en) * 2018-06-29 2018-11-23 上海宝冶集团有限公司 The installation method of large H-shaped steel beam clamping plate
CN110306665A (en) * 2019-06-24 2019-10-08 上海泰大建筑科技有限公司 Assembling type steel structure dwelling house system and its node installation method
CN110886388A (en) * 2019-11-26 2020-03-17 乐清市智能装备与制造研究院 Connecting assembly of square steel and steel beam
CN111287468A (en) * 2020-03-19 2020-06-16 中国二十二冶集团有限公司 Method for mounting super high-rise steel beam
CN112031164A (en) * 2020-08-17 2020-12-04 上海建工(江苏)钢结构有限公司 Method for ensuring perforation rate of high-strength bolt of steel structure
CN112709326A (en) * 2020-12-22 2021-04-27 江苏中锐华东建筑设计研究院有限公司 Assembled building coupling assembling convenient to installation
CN112814158A (en) * 2021-01-29 2021-05-18 中国二十二冶集团有限公司 Method for installing beam-column connecting node of steel structure of prefabricated house
CN112878492A (en) * 2021-03-22 2021-06-01 中国五冶集团有限公司 Aerial large H-shaped steel beam connecting mechanism and connecting method thereof
CN113958135A (en) * 2021-09-14 2022-01-21 中国人民解放军63653部队 Rapid high-precision alignment device and alignment method for multi-section H-shaped steel beam
CN114439115A (en) * 2020-11-06 2022-05-06 宁波建工工程集团有限公司 Steel frame beam column connecting structure and connecting method thereof
CN117822736A (en) * 2024-03-05 2024-04-05 福建省工业设备安装有限公司 Connecting device and connecting method for steel structure nodes

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2513038A1 (en) * 2001-08-30 2003-03-13 Robert J. Simmons Quick-set, full-moment-lock, column and beam building frame system and method
CN201794169U (en) * 2010-09-07 2011-04-13 中冶东方工程技术有限公司上海分公司 Connection structure of steel structure factory building frame beam column
CN202482998U (en) * 2011-11-10 2012-10-10 中国二十冶集团有限公司 Connection positioning device for high-altitude installation of large cross-section steel beam
CN104003301A (en) * 2014-05-15 2014-08-27 河南中美铝业有限公司 Steel beam suspension fixing device with adjusting function and application method thereof
CN105178441A (en) * 2015-09-18 2015-12-23 杭萧钢构股份有限公司 Side plate type connection joint for steel beam and steel tube beam concrete shear wall
CN204921558U (en) * 2015-07-10 2015-12-30 中建钢构有限公司 A interim connecting device that is used for component and bracket to dock
CN206844322U (en) * 2017-04-19 2018-01-05 中国建筑第二工程局有限公司 Rigid connection node of steel pipe column and H-shaped steel beam
CN210049617U (en) * 2019-03-27 2020-02-11 中建一局钢结构工程有限公司 Detachable temporary connecting plate
CN214575821U (en) * 2020-11-16 2021-11-02 中冶(上海)钢结构科技有限公司 H-shaped steel beam assembling combined type rapid installation and in-place device
CN214885668U (en) * 2021-07-23 2021-11-26 中建科工集团有限公司 Temporary fixing device for steel beam installation

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2513038A1 (en) * 2001-08-30 2003-03-13 Robert J. Simmons Quick-set, full-moment-lock, column and beam building frame system and method
CN201794169U (en) * 2010-09-07 2011-04-13 中冶东方工程技术有限公司上海分公司 Connection structure of steel structure factory building frame beam column
CN202482998U (en) * 2011-11-10 2012-10-10 中国二十冶集团有限公司 Connection positioning device for high-altitude installation of large cross-section steel beam
CN104003301A (en) * 2014-05-15 2014-08-27 河南中美铝业有限公司 Steel beam suspension fixing device with adjusting function and application method thereof
CN204921558U (en) * 2015-07-10 2015-12-30 中建钢构有限公司 A interim connecting device that is used for component and bracket to dock
CN105178441A (en) * 2015-09-18 2015-12-23 杭萧钢构股份有限公司 Side plate type connection joint for steel beam and steel tube beam concrete shear wall
CN206844322U (en) * 2017-04-19 2018-01-05 中国建筑第二工程局有限公司 Rigid connection node of steel pipe column and H-shaped steel beam
CN210049617U (en) * 2019-03-27 2020-02-11 中建一局钢结构工程有限公司 Detachable temporary connecting plate
CN214575821U (en) * 2020-11-16 2021-11-02 中冶(上海)钢结构科技有限公司 H-shaped steel beam assembling combined type rapid installation and in-place device
CN214885668U (en) * 2021-07-23 2021-11-26 中建科工集团有限公司 Temporary fixing device for steel beam installation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
覃银辉等: "钢梁-混凝土墙刚接节点低周反复荷载作用下的受力性能试验研究", 《混凝土与水泥制品》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476435B (en) * 2017-09-15 2023-05-09 莱芜钢铁集团有限公司 Flat tubular column-H-shaped steel beam connecting node
CN107476435A (en) * 2017-09-15 2017-12-15 莱芜钢铁集团有限公司 A kind of flat tube post H profile steel beam connecting node
CN108044251A (en) * 2017-12-14 2018-05-18 中铁九桥工程有限公司 A kind of welding method of cross weld seam patch glass fabric
CN108044251B (en) * 2017-12-14 2020-04-14 中铁九桥工程有限公司 Welding method for pasting glass fiber cloth on cross-shaped welding seam
CN108867997A (en) * 2018-06-29 2018-11-23 上海宝冶集团有限公司 The installation method of large H-shaped steel beam clamping plate
CN110306665A (en) * 2019-06-24 2019-10-08 上海泰大建筑科技有限公司 Assembling type steel structure dwelling house system and its node installation method
CN110886388A (en) * 2019-11-26 2020-03-17 乐清市智能装备与制造研究院 Connecting assembly of square steel and steel beam
CN111287468A (en) * 2020-03-19 2020-06-16 中国二十二冶集团有限公司 Method for mounting super high-rise steel beam
CN112031164A (en) * 2020-08-17 2020-12-04 上海建工(江苏)钢结构有限公司 Method for ensuring perforation rate of high-strength bolt of steel structure
CN114439115A (en) * 2020-11-06 2022-05-06 宁波建工工程集团有限公司 Steel frame beam column connecting structure and connecting method thereof
CN112709326A (en) * 2020-12-22 2021-04-27 江苏中锐华东建筑设计研究院有限公司 Assembled building coupling assembling convenient to installation
CN112814158A (en) * 2021-01-29 2021-05-18 中国二十二冶集团有限公司 Method for installing beam-column connecting node of steel structure of prefabricated house
CN112878492A (en) * 2021-03-22 2021-06-01 中国五冶集团有限公司 Aerial large H-shaped steel beam connecting mechanism and connecting method thereof
CN113958135A (en) * 2021-09-14 2022-01-21 中国人民解放军63653部队 Rapid high-precision alignment device and alignment method for multi-section H-shaped steel beam
CN117822736A (en) * 2024-03-05 2024-04-05 福建省工业设备安装有限公司 Connecting device and connecting method for steel structure nodes

Similar Documents

Publication Publication Date Title
CN106930408A (en) Rigid connection joint of steel pipe column and H-shaped steel beam and construction method of rigid connection joint
CN206844322U (en) Rigid connection node of steel pipe column and H-shaped steel beam
CN106835997B (en) Steel box-girder lifts interim accurate positioning device and localization method
CN205501837U (en) Steel case roof beam becomes bridge welding simple platform
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
CN109531029A (en) A kind of steel construction people's air defense door skin welding equipment
CN106758882A (en) For the hood type automatic leveling anchor and its method for suspender replacement of CFST Arch Bridge suspender replacement
CN106828825A (en) A kind of stage apparatus
CN105040591B (en) A kind of positioner of Wavelike steel webplate and its localization method
CN105081519B (en) Welding method for large-scale surface hole radial gate leaves
CN110258357A (en) A kind of construction method that steel tube arch rib segment connects in the air
CN208219384U (en) A kind of overlapping girder segment
CN213329466U (en) Rigid connection node of rectangular steel column
CN106400675A (en) Steel anchor box and mounting method thereof
CN103495793A (en) Improved construction method for hoisting and welding large-tonnage cast steel component complex joints
CN206844321U (en) Simple steel structure rigid connection node
CN205778937U (en) A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate
CN107285200A (en) A kind of high large-span truss integral translation construction method for hanging
JP2000291262A (en) Erection piece for column erection and column erection method
CN207079948U (en) A kind of life rope fixed mount
CN207104143U (en) A kind of steel plate splicing weld seam bottom surface ceramic substrate lifting device
CN214668791U (en) Ultrasonic detection device for building steel structure detection
CN212224677U (en) Temporary fixing adjusting system for drop position of section steel beam
CN210239143U (en) Reserved hole sleeve fixing part for laminated floor slab
CN207469437U (en) A kind of suspended beam type steel structure frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170707