- CN106907011A CN106907011A CN201710221861.6A CN201710221861A CN106907011A CN 106907011 A CN106907011 A CN 106907011A CN 201710221861 A CN201710221861 A CN 201710221861A CN 106907011 A CN106907011 A CN 106907011A
- Authority
- CN
- China
- Prior art keywords
- hanging ladder
- metope
- color steel
- installation
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C1/00—Ladders in general
- E06C1/02—Ladders in general with rigid longitudinal member or members
- E06C1/34—Ladders attached to structures, such as windows, cornices, poles, or the like
Abstract
The invention provides a kind of metope color steel construction method of installation, first makes the rigid hanging ladder highly adaptable with metope, and set road wheel in hanging ladder bottom;Guide rail is being set along metope direction near the position of metope;Lift the initial position installed as color steel to the leeward termination to side of factory building metope, the termination;Hanging ladder road wheel and guide rail are coordinated, and factory building steel column is blocked into hanging ladder upper end;After checking hanging ladder fastness, operating personnel carry out the installation of color steel into the operating platform on hanging ladder;After hanging ladder initial position color steel is installed, hanging ladder to next installation region is promoted.The invention simple structure, easy to operate, during metope color steel installation, operating personnel are without frequent upper and lower hanging ladder, you can continuously carry out construction operation, high working efficiency, meanwhile, work progress is safe, and hanging ladder will not be rocked, reliable and stable.
Description
Technical field
The invention belongs to steel construction piece mounting technique field, more particularly, to a kind of metope color steel installation side
Method and its hanging ladder of application.
Background technology
With the policy requirements that national energy-saving emission reduction and environmental protection are constructed, steel-structure factory building will be futurity industry factory building
Dominant direction, color steel building enclosure also increasingly will be widely applied in industrial premises structure, usual metope color steel
It is the simple flexible steel ladder welded with round steel to install steel ladder, hangs on parapet purlin steel ladder during installation, and installation personnel is divided into
Upper, middle and lower several rows stand on hanging ladder, is installed successively according to upwind order, after each piece of shingle nail is installed, installs people
Member need under to ground or climb steel ladder is moved to roofing after carry out the next piece of installation of wallboard again.This conventional construction method is main
Have a disadvantage that:Personnel station operates steel ladder easily to rock on steel ladder when the 1st, installing colored steel, the bad guarantee of construction quality;2nd, operability
Difference, needs one hand to hold steel ladder, one-handed performance during human users;3rd, security is poor in work progress;4th, steel ladder hangs over parapet purlin
On bar, purlin deformation is easily caused;5th, steel ladder moves trouble, and personnel need upper and lower steel ladder, low construction efficiency repeatedly when mobile, take a lot of work
When.
The content of the invention
In view of this, the invention is intended to overcome defect present in above-mentioned prior art, proposes a kind of wall surface colorful steel
Plate construction method of installation and its hanging ladder of application.
To reach above-mentioned purpose, what the technical scheme of the invention was realized in:
A kind of metope color steel construction method of installation, comprises the following steps:
1. the rigid hanging ladder highly adaptable with metope is made, and road wheel is set in hanging ladder bottom;
2. guide rail is being set along metope direction near the position of metope;
3. with crane by step 1. in hanging ladder lift to the leeward termination to side of factory building metope, the termination is used as color steel
The initial position that plate is installed;
4. the guide rail for 2. setting hanging ladder road wheel and step coordinates, and hanging ladder upper end is blocked into factory building steel column;
5. after checking hanging ladder fastness, operating personnel carry out the installation of color steel into the operating platform on hanging ladder;
6. after hanging ladder initial position color steel is installed, hanging ladder to next installation region is promoted.
Further, the top directive wheel being slidably matched with factory building steel column is provided with the hanging ladder.
Further, the road wheel is the universal wheel from strap brake.
Further, the factory building steel column is provided with gutter, and the hanging ladder top is provided with the folding for blocking gutter medial surface
Turn of bilge.
Further, the guide rail uses channel-section steel.
Further, the hanging ladder is provided with several operating platforms of different height position.
Further, the operating platform in the vertical direction spaced set.
The hanging ladder applied in a kind of above-mentioned metope color steel construction method of installation, including hanging ladder body, hanging ladder body bottom portion
The road wheel of setting, the kink on hanging ladder top;The kink is provided with and gutter snug engagement in factory building steel column
Top directive wheel;The hanging ladder body be provided with personnel mark time up and down and different height position several operating platforms.
Further, the road wheel is the universal wheel from strap brake.
Relative to prior art, the invention has the advantage that:
The invention simple structure, easy to operate, during metope color steel installation, operating personnel are without frequency
Numerous upper and lower hanging ladder, you can continuously carry out construction operation, high working efficiency, meanwhile, work progress is safe, and hanging ladder will not shake
It is dynamic, it is reliable and stable.
Brief description of the drawings
The accompanying drawing for constituting the part of the invention is used for providing further understanding the invention, present invention wound
The schematic description and description made does not constitute the improper restriction to the invention for explaining the invention.
In accompanying drawing:
Fig. 1 is the structural representation of hanging ladder in the invention;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is that hanging ladder installs schematic diagram in place;
Fig. 4 is the right view of Fig. 3;
Fig. 5 is hanging ladder position adjustment schematic diagram.
Description of reference numerals:
1-hanging ladder;2-metope color steel;3-factory building steel column;4-gutter;5-operating platform;6-bottom directive wheel;
7-guide rail;8-road wheel;9-top directive wheel;10-metope purlin;11-personnel mark time up and down;12-bending part.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the invention can
To be mutually combined.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", D score,
The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " are
Based on orientation shown in the drawings or position relationship, it is for only for ease of description the invention and simplifies description, rather than instruction
Or imply that the device or element of meaning with specific orientation, with specific azimuth configuration and operation, therefore must not be understood that
It is the limitation to the invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating
Or imply relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined
Feature can express or implicitly include one or more this feature.In the description of the invention, unless separately
It is described, " multiple " is meant that two or more.
, it is necessary to explanation, unless otherwise clearly defined and limited, term " is pacified in the description of the invention
Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly
Connection;Can mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary,
Can be two connections of element internal.For the ordinary skill in the art, can be by concrete condition understanding
State concrete meaning of the term in the invention.
Describe the invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
A kind of metope color steel construction method of installation, as shown in Fig. 1 to 5, comprises the following steps:
1. the rigid hanging ladder 1 highly adaptable with metope is made, and road wheel 8 is set in the bottom of hanging ladder 1;
2. guide rail 7 is being set along metope direction near the position of metope;
3. with crane by step 1. in hanging ladder 1 lift to the leeward termination to side of factory building metope, the termination is used as coloured silk
The initial position that steel plate is installed;
4. the guide rail 7 for 2. setting hanging ladder road wheel 8 and step coordinates, it is ensured that road wheel slides freely on guide rail, and
Factory building steel column inner side is blocked into the upper end of hanging ladder 1, it is to avoid hanging ladder is tumbled;
5. after checking the fastness of hanging ladder 1, operating personnel are marked time up and down by climbing personnel, into the operating platform on hanging ladder
5 installations that wall surface colorful steel plate 2 is carried out on metope purlin 10;
6. after hanging ladder initial position color steel is installed, the locking of road wheel is contacted, promotes hanging ladder to next installation
Region, as shown in the direction of arrow in Fig. 5, after reaching installation site, locks road wheel, carries out the installation of subsequent region.According to this
Program is constructed successively, until after metope color steel is all installed, removing hanging ladder.
Above-mentioned factory building steel column 3 is provided with gutter 4, and the top of the hanging ladder 1 is provided with the bending part for blocking gutter medial surface
12 are provided with the top directive wheel 9 being slidably matched with factory building steel column 3 on the hanging ladder 1, and the bending part is of an L-shaped structure, its
With horizontal segment and the vertical end for stretching into gutter, top directive wheel 9 is set between vertical section and gutter madial wall.Promote hanging ladder
When, hanging ladder bottom road wheel is slided on guide rail, and the kink of upper end forms spacing to hanging ladder, it is to avoid hanging ladder is toppled over.
It is pointed out that in order to ensure stability during hanging ladder adjustment position, can be in hanging ladder bottom and factory building steel column
Between set bottom guide wheel, the bottom guide wheel near road wheel set.Top directive wheel Slideslip in gutter, bottom guide wheel exists
Factory building steel column lateral surface is slided, and on guide rail, adjustment process is very stablized, and slip is smooth freely for road wheel migration.
Formally based on top directive wheel, bottom directive wheel and road wheel three synergy, the work on hanging ladder is just ensured
The comfort level of personnel, especially ensure that the security of personnel, and three groups of pulleys are indispensable, lack any pulley and are not up to
Ensure that hanging ladder adjustment is smooth, without impact, the security of construction is can guarantee that again.If it is excessive that directive wheel is set, not only make
Into complex structure, manufacture is difficult, and cost is improved, and, when using and installing, it is difficult to operate, in the invention, upper guide
Spacing is formed to hanging ladder to wheel, bottom directive wheel and road wheel are effective, it is ensured that the security for using, in addition on road wheel certainly
The brake gear of band, while being respectively formed spacing to all frees degree of hanging ladder, it is ensured that the simplification of structure, the simplicity of operation,
It is the failure to what is realized in the prior art.
Above-mentioned road wheel 8 is the universal wheel from strap brake, after the completion of hanging ladder movement, is fixed using its brake gear for carrying
Firmly road wheel, it is to avoid be moved when in use.
Above-mentioned guide rail 7 uses the groove fit of channel-section steel, road wheel and channel-section steel, and channel-section steel provides dragging track, takes for road wheel
Material is convenient, and without complicated processing, scene can take, low cost.
Above-mentioned hanging ladder 1 is provided with several operating platforms 5 of different height position.Generally, the in the vertical direction of operating platform 5
Spaced set.
The hanging ladder applied in above-mentioned metope color steel construction method of installation, including hanging ladder body, hanging ladder body bottom portion set
Road wheel, the kink on hanging ladder top put;The kink be provided with factory building steel column gutter snug engagement it is upper
Portion's directive wheel;The hanging ladder body be provided with personnel mark time up and down and different height position several operating platforms.Specifically,
The road wheel is the universal wheel from strap brake.
Operating personnel can up and down mark time the step of offer by personnel, climb up the operating platform of different height, operation side
Just, it is safe and reliable.
When the invention efficiently solves conventional metope color steel installation, movable hook ladder needs personnel repeatedly upper and lower and reduces
The problem of efficiency of construction, the efficiency of construction had both been improve by improving constructing device, in turn ensure that the security of construction.
The preferred embodiment of the invention is the foregoing is only, creation is not intended to limit the invention, it is all at this
Within the spirit and principle of innovation and creation, any modification, equivalent substitution and improvements made etc. should be included in the invention
Protection domain within.
Claims (9)
1. a kind of metope color steel construction method of installation, it is characterised in that comprise the following steps:
1. the rigid hanging ladder highly adaptable with metope is made, and road wheel is set in hanging ladder bottom;
2. guide rail is being set along metope direction near the position of metope;
3. with crane by step 1. in hanging ladder lift to the leeward termination to side of factory building metope, the termination as color steel pacify
The initial position of dress;
4. the guide rail for 2. setting hanging ladder road wheel and step coordinates, and hanging ladder upper end is blocked into factory building steel column;
5. after checking hanging ladder fastness, operating personnel carry out the installation of color steel into the operating platform on hanging ladder;
6. after hanging ladder initial position color steel is installed, hanging ladder to next installation region is promoted.
2. a kind of metope color steel construction method of installation according to claim 1, it is characterised in that:Set on the hanging ladder
It is equipped with the top directive wheel being slidably matched with factory building steel column.
3. a kind of metope color steel construction method of installation according to claim 1, it is characterised in that:The road wheel is certainly
The universal wheel of strap brake.
4. a kind of metope color steel construction method of installation according to claim 1, it is characterised in that:In the factory building steel column
Gutter is provided with, the hanging ladder top is provided with the bending part for blocking gutter medial surface.
5. a kind of metope color steel construction method of installation according to claim 1, it is characterised in that:The guide rail uses groove
Steel.
6. a kind of metope color steel construction method of installation according to claim 1, it is characterised in that:The hanging ladder is provided with
Several operating platforms of different height position.
7. a kind of metope color steel construction method of installation according to claim 6, it is characterised in that:The operating platform exists
Spaced set on vertical direction.
8. the hanging ladder applied in the metope color steel construction method of installation described in a kind of claim 1, it is characterised in that:Including hanging
Road wheel, the kink on hanging ladder top that terraced body, hanging ladder body bottom portion are set;The kink be provided with factory building steel column
The top directive wheel of gutter snug engagement;The hanging ladder body is provided with personnel and marks time up and down and different height position
Several operating platforms.
9. the hanging ladder applied in a kind of metope color steel installation according to claim 8, it is characterised in that:The row
It is the universal wheel from strap brake to walk wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710221861.6A CN106907011A (en) | 2017-04-06 | 2017-04-06 | A kind of metope color steel construction method of installation and its hanging ladder of application |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710221861.6A CN106907011A (en) | 2017-04-06 | 2017-04-06 | A kind of metope color steel construction method of installation and its hanging ladder of application |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106907011A true CN106907011A (en) | 2017-06-30 |
Family
ID=59195978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710221861.6A Pending CN106907011A (en) | 2017-04-06 | 2017-04-06 | A kind of metope color steel construction method of installation and its hanging ladder of application |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106907011A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098453A (en) * | 2018-08-28 | 2018-12-28 | 中国化学工程第十四建设有限公司 | Steel-structure factory building battenboard wall face construction technique |
CN110905181A (en) * | 2019-11-07 | 2020-03-24 | 广西建工集团第五建筑工程有限责任公司 | 7-shaped large-angle inner-inclined high-altitude sliding operation platform and construction method thereof |
CN113006324A (en) * | 2021-03-19 | 2021-06-22 | 中建七局第一建筑有限公司 | Sandwich plate installation method for steel structure factory building |
CN113323459A (en) * | 2021-05-24 | 2021-08-31 | 中国华冶科工集团有限公司 | Wall skin system sliding installation method and device |
CN113914592A (en) * | 2021-10-29 | 2022-01-11 | 中冶建工集团有限公司 | Installation method of profiled steel sheet on wall surface of factory building |
CN113982239A (en) * | 2021-10-28 | 2022-01-28 | 中化二建集团有限公司 | Steel structure wall panel installation construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4232759A (en) * | 1979-08-02 | 1980-11-11 | Jacobs Ronald S | Mobile ladder-scaffolding system |
CN201400964Y (en) * | 2009-04-14 | 2010-02-10 | 中冶成工建设有限公司 | Hook ladder for rapidly mounting color steel plate on lower roof |
CN202706899U (en) * | 2012-09-06 | 2013-01-30 | 安徽富煌钢构股份有限公司 | Movable steel ladder for super-high walls |
CN103029817A (en) * | 2012-12-12 | 2013-04-10 | 渤海装备辽河重工有限公司 | Lift cage for folding ships and offshore engineering structures |
CN205477339U (en) * | 2015-12-14 | 2016-08-17 | 中国一冶集团有限公司 | A cage ladder that is used for steel construction factory building shingle nail to install |
CN206233851U (en) * | 2016-11-21 | 2017-06-09 | 中冶天工集团有限公司 | Running type metope color steel installation hanging ladder |
-
2017
- 2017-04-06 CN CN201710221861.6A patent/CN106907011A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4232759A (en) * | 1979-08-02 | 1980-11-11 | Jacobs Ronald S | Mobile ladder-scaffolding system |
CN201400964Y (en) * | 2009-04-14 | 2010-02-10 | 中冶成工建设有限公司 | Hook ladder for rapidly mounting color steel plate on lower roof |
CN202706899U (en) * | 2012-09-06 | 2013-01-30 | 安徽富煌钢构股份有限公司 | Movable steel ladder for super-high walls |
CN103029817A (en) * | 2012-12-12 | 2013-04-10 | 渤海装备辽河重工有限公司 | Lift cage for folding ships and offshore engineering structures |
CN205477339U (en) * | 2015-12-14 | 2016-08-17 | 中国一冶集团有限公司 | A cage ladder that is used for steel construction factory building shingle nail to install |
CN206233851U (en) * | 2016-11-21 | 2017-06-09 | 中冶天工集团有限公司 | Running type metope color steel installation hanging ladder |
Non-Patent Citations (1)
Title |
---|
匿名: ""彩板安装施工组织设计与安全措施"", 《豆丁建筑HTTP://JZ.DOCIN.COM/P-1340998049.HTML》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098453A (en) * | 2018-08-28 | 2018-12-28 | 中国化学工程第十四建设有限公司 | Steel-structure factory building battenboard wall face construction technique |
CN109098453B (en) * | 2018-08-28 | 2021-01-26 | 中国化学工程第十四建设有限公司 | Outer wall surface installation and construction process of sandwich board of steel structure factory building |
CN110905181A (en) * | 2019-11-07 | 2020-03-24 | 广西建工集团第五建筑工程有限责任公司 | 7-shaped large-angle inner-inclined high-altitude sliding operation platform and construction method thereof |
CN113006324A (en) * | 2021-03-19 | 2021-06-22 | 中建七局第一建筑有限公司 | Sandwich plate installation method for steel structure factory building |
CN113323459A (en) * | 2021-05-24 | 2021-08-31 | 中国华冶科工集团有限公司 | Wall skin system sliding installation method and device |
CN113982239A (en) * | 2021-10-28 | 2022-01-28 | 中化二建集团有限公司 | Steel structure wall panel installation construction method |
CN113914592A (en) * | 2021-10-29 | 2022-01-11 | 中冶建工集团有限公司 | Installation method of profiled steel sheet on wall surface of factory building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106907011A (en) | A kind of metope color steel construction method of installation and its hanging ladder of application | |
US20140318895A1 (en) | Adjustable length scaffolding and method therefor | |
CN208518306U (en) | A kind of levels operation platform for lighting roof construction | |
CN206233851U (en) | Running type metope color steel installation hanging ladder | |
CN205637628U (en) | Hoist and mount construction structures of aerial vestibule furred ceiling | |
CN206158563U (en) | People's cat ladder on telescopic roofing | |
CN106245863A (en) | A kind of steel structure roof and the attachment structure of parapet | |
CN206987720U (en) | A kind of double shield cage cat ladders | |
CN205605104U (en) | Tower is with climbing nail and communication tower | |
CN205743678U (en) | Steel house metope installs special-purpose ladder | |
CN105201158B (en) | Roof penal locking seam extension track system | |
CN205840371U (en) | For the card that protection cap of plastering is stuck on line lid is set mechanism | |
CN106592956A (en) | Method for moving and changing fastener type steel pipe double-row scaffold | |
CN218290239U (en) | Tower crane regularization channel equipment with formula lift scaffold promotes | |
CN206908980U (en) | A kind of shell of building electric apparatus control device | |
CN209523700U (en) | A kind of safe and easy for installation ladder | |
CN206636153U (en) | Indoor individual layer scaffold | |
CN205637295U (en) | It detains secretly to put up multi -functional both feet installation of smallpox | |
CN218779930U (en) | A running-board frock for installation of glass big-arch shelter roof plane skylight | |
CN205100240U (en) | Utilize lightning protection structure of equipment foundations | |
CN208454438U (en) | A kind of spider-type straight-arm type aerial work platform | |
CN218346774U (en) | Two-stage turnover plate splicing structure | |
CN108840202A (en) | Construction elevator climbing type attached wall | |
CN211548419U (en) | Vent parapet structure | |
CN205894447U (en) | Hook -like mounting structure of ceiling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |