CN106906842A CN201710259821.0A CN201710259821A CN106906842A CN 106906842 A CN106906842 A CN 106906842A CN 201710259821 A CN201710259821 A CN 201710259821A CN 106906842 A CN106906842 A CN 106906842A
Authority
CN
China
Prior art keywords
anchor
reinforced concrete
riser
retaining walls
bar body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710259821.0A
Other languages
Chinese (zh)
Inventor
黄伟达
赵剑豪
方家强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Engineering Consulting Co Ltd Fujian Academy Of Building Research
Original Assignee
Engineering Consulting Co Ltd Fujian Academy Of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering Consulting Co Ltd Fujian Academy Of Building Research filed Critical Engineering Consulting Co Ltd Fujian Academy Of Building Research
Priority to CN201710259821.0A priority Critical patent/CN106906842A/en
Publication of CN106906842A publication Critical patent/CN106906842A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Abstract

The present invention provides a kind of drawing anchor formula L-type Reinforced Concrete Retaining Walls, including an armored concrete riser, a reinforced concrete floor and several drawing anchor bar bodies;The armored concrete riser is built up on the reinforced concrete floor vertically;Some anchor heads are provided with the armored concrete riser, several anchor plates are embedded with the reinforced concrete floor;It is locked on anchor head described in per one end of the drawing anchor bar body, the other end is anchored on anchor plate described in.Advantage of the present invention:The lateral displacement of riser can be effectively controlled, effective supporting and retaining system of barricade is improve highly;The reinforcing bar and concrete of buttress portion can be saved;The duration of formwork erection and maintenance is greatly reduced.

Description

One kind draws anchor formula L-type Reinforced Concrete Retaining Walls
Technical field
The present invention relates to one kind building barricade, more particularly to a kind of drawing anchor formula L-type Reinforced Concrete Retaining Walls.
Background technology
At present, the Cantilever Retaining Wall and counterfort wall for being poured using armored concrete are widely used in engineering construction and worked as In.But, according to《Technique Code for Building Slope Engineering》Regulation, existing Cantilever Retaining Wall supporting height is helped no more than 6m Wall type barricade is no more than 10m.Therefore, Cantilever Retaining Wall there are following defect:Barricade supporting and retaining system limited height;Wall height is got over High concrete consumption will be increased dramatically, and economy is poorer;Barricade deforms and stability is difficult to control to.And counterfort wall is by adding If floor, although improve the anti-side rigidity of retaining structure, maxi-mum height has also obtained certain raising, but concrete amount It is consequently increased, while concrete component formwork erection, the work on the spot amount such as pouring also than larger.Therefore, a new material is sought Extremely it is necessary to substitute concrete component.
The content of the invention
The technical problem to be solved in the present invention, is to provide a kind of drawing anchor formula L-type Reinforced Concrete Retaining Walls, by the barricade To substitute traditional counterfort, to save the reinforcing bar and concrete of buttress portion, it is possible to improve effective supporting and retaining system of barricade highly.
What the present invention was realized in:One kind drawing anchor formula L-type Reinforced Concrete Retaining Walls, including an armored concrete riser, One reinforced concrete floor and several drawing anchor bar bodies;The armored concrete riser is built up in the armored concrete vertically On base plate;Some anchor heads are provided with the armored concrete riser, several anchors are embedded with the reinforced concrete floor Backing plate;It is locked on anchor head described in per one end of the drawing anchor bar body, the other end is anchored on anchor plate described in.
Further, a PVC protection pipes are arranged with per the outside of the drawing anchor bar body.
Further, the armored concrete riser and reinforced concrete floor be live formwork erection casting concrete one into Type.
Further, it is described to draw the axial tension component that anchor bar body is applying prestressed stretch-draw locking.
Further, the angle drawn between anchor bar body and reinforced concrete floor is 45 °~75 °.
Further, it is 3~5m that the distance between anchor bar body is drawn described in adjacent two.
Further, the back of the armored concrete riser is arranged at per the anchor head.
The invention has the advantages that:1st, using drawing anchor bar body to substitute traditional counterfort, the reinforcing bar of buttress portion is saved And concrete;2nd, the stress of base plate and riser is simplified and clearly, is connected with anchor bar body flexibility is drawn by setting dark beam Connect, closer to the situation of one-way slabs, this causes that longitudinal reinforcement consumption is reduced for the stress of such base plate and riser;3rd, by opening Grappling is drawn, the lateral displacement of riser can be effectively controlled, effective supporting and retaining system of barricade is improve highly;4th, process is simple, maturation, and The duration of formwork erection and maintenance is greatly reduced.In a word, the present invention draw anchor formula L-type Reinforced Concrete Retaining Walls be to Cantilever Retaining Wall and The optimization and improvement of counterfort wall, it is not only simplified force modes, and saves substantial amounts of reinforcing bar and coagulation Soil, the construction period has also obtained effective shortening, is the type that a kind of side slope, the supporting and retaining system of barricade are all highly profitable, economy effect Benefit and social benefit also highly significant.
Brief description of the drawings
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is a kind of structural representation of drawing anchor formula L-type Reinforced Concrete Retaining Walls of the present invention.
Fig. 2 is a kind of side view of drawing anchor formula L-type Reinforced Concrete Retaining Walls of the present invention.
Description of reference numerals:
100- barricades, 1- armored concrete risers, 2- reinforced concrete floors, 3- draws anchor bar body, 4- anchor heads, 5- anchor pads Plate.
Specific embodiment
Refer to shown in Fig. 1 and Fig. 2, the present invention is a kind of to draw anchor formula L-type Reinforced Concrete Retaining Walls 100, including a reinforcing bar to mix Solidifying soil riser 1, a reinforced concrete floor 2 and several drawing anchor bar bodies 3;The armored concrete riser 1 is built up in vertically On the reinforced concrete floor 2;Some anchor heads 4, the reinforced concrete floor are provided with the armored concrete riser 1 Several anchor plates 5 are embedded with 2;It is locked on anchor head 4 described in per one end of the drawing anchor bar body 3, the equal anchor of the other end It is fixed on anchor plate 5 described in.After by being optimized for drawing anchor bar body 3 by traditional counterfort (or it may be said that the present invention draws anchor formula L Steel bar concrete guard wall 100 is the simplified version of counterfort wall), the constraint type of armored concrete riser 1 also there occurs change Change, i.e., be no longer the computation schema for being reduced to T-shaped beam, but level off to the force modes of one-way slabs;Meanwhile, anchor bar body 3 will be drawn End anchorage in reinforced concrete floor 2, this causes that reinforced concrete floor 2 is no longer divided into each three-dimensional and constrains Two-way slab, but level off to the stress of one-way slabs under conditions of dark beam is set.
The back of the armored concrete riser 1 is arranged at per the anchor head 4.The armored concrete riser 1 and steel Reinforced concrete base plate 2 is that live formwork erection casting concrete is integrally formed, i.e. armored concrete riser 1 and reinforced concrete floor 2 It is reinforced concrete structure.In the specific implementation, needing first to be reserved with several on armored concrete riser 1 draws anchor anchor holes (not scheme Show), to facilitate drawing anchor bar body 3 to be locked with the anchor head 4 at back through armored concrete riser 1, anchor bar body 3 is drawn locking Afterwards, it is necessary to using concrete or cement grout anchor anchor hole will be drawn to close, Pouring concrete at the same time pier closes anchor head 4;Certainly, exist When being locked, can also first pass through tensioning and apply prestressing force according to actual needs, then will draw anchor pole with anchor head 4 again Body 3 is locked.
A PVC protection pipes (not shown) are arranged with per the outside of the drawing anchor bar body 3, guarantor is played with Counter-pulled bolts body 3 The effect of shield.
It is described to draw anchor bar body 3 to apply the axial tension component of prestressed stretch-draw locking, in the specific implementation, the drawing anchor pole Body 3 can be the axial direction such as high-strength deformed steel bar muscle or steel strand wires tensional element.
In order to improve stressed effect, in specific design, the folder between the drawing anchor bar body 3 and reinforced concrete floor 2 Angle α is 45 °~75 °.It is 3~5m that the distance between anchor bar body 3 d is drawn described in adjacent two.
Specific operation process of the present invention is as follows:
(1) setting-out and positioning are carried out;(2) bed course is laid;(3) reinforcement placing concrete riser and reinforced concrete floor Reinforcing bar;(4) formwork erection, now needs to reserve some pvc pipes in the part of armored concrete riserIn order to draw anchor pole Body can be passed through;(5) one end of anchor bar body will be drawn to be fixed on anchor plate and be positioned in reinforced concrete floor, pours coagulation Soil;(6) age of the maintenance to design;(7) other end of anchor bar body will be drawn to be locked on anchor head, and if it is screw-thread steel to draw anchor bar body Muscle, then locked using supporting nut;If drawing anchor bar body is steel strand wires, first using jack tension to the intensity for designing, so Locked using intermediate plate again afterwards;Simultaneously before anchor head is locked, can also according to actual needs apply the prestressing force for needing; (8) closing of anchor anchor hole will be drawn using concrete, Pouring concrete at the same time pier closes anchor head.
With reference to some specific embodiments, the invention will be further described:
Specific embodiment one:
Refer to shown in Fig. 1 and Fig. 2, one kind draws anchor formula L-type Reinforced Concrete Retaining Walls 100, including an armored concrete to stand Plate 1, a reinforced concrete floor 2 and several drawing anchor bar bodies 3;The armored concrete riser 1 is built up in the steel vertically On reinforced concrete base plate 2;Some anchor heads 4 are provided with the armored concrete riser 1, it is pre- on the reinforced concrete floor 2 It is embedded with several anchor plates 5;It is locked on anchor head 4 described in per one end of the drawing anchor bar body 3, the other end is anchored in one On the anchor plate 5.
The back of the armored concrete riser 1 is arranged at per the anchor head 4.The armored concrete riser 1 and steel Reinforced concrete base plate 2 is that live formwork erection casting concrete is integrally formed, i.e. armored concrete riser 1 and reinforced concrete floor 2 It is reinforced concrete structure.In the specific implementation, need first to be reserved with several drawing anchor anchor holes on armored concrete riser 1, with side Just draw anchor bar body 3 can be locked with the anchor head 4 at back through armored concrete riser 1, lock drawing anchor bar body 3 after, it is necessary to Anchor anchor hole will be drawn to close using concrete or cement grout, Pouring concrete at the same time pier closes anchor head 4;Certainly, locked Regularly, can also first pass through tensioning and apply prestressing force according to actual needs, then with anchor head 4 anchor bar body 3 will be drawn to lock again It is fixed.
A PVC protection pipes (not shown) are arranged with per the outside of the drawing anchor bar body 3, guarantor is played with Counter-pulled bolts body 3 The effect of shield.
It is described to draw anchor bar body 3 to apply the axial tension component of prestressed stretch-draw locking, in this embodiment, the drawing anchor The body of rod 3 uses high-strength deformed steel bar muscle, when the high-strength deformed steel bar muscle is locked, it is necessary to be locked using supporting nut.
In order to improve stressed effect, in this embodiment, the folder drawn between anchor bar body 3 and reinforced concrete floor 2 Angle α is 45 °.It is 3m that the distance between anchor bar body 3 d is drawn described in adjacent two.
Specific embodiment two:
From unlike specific embodiment one, in the specific embodiment two, the drawing anchor bar body 3 uses steel strand wires, , it is necessary to first using jack tension to the intensity for designing, then be locked using intermediate plate again when locking the steel strand wires.And in order to improve Stressed effect, in the specific embodiment two, the angle α drawn between anchor bar body 3 and reinforced concrete floor 2 is 53 °.Phase It is 4.2m that the distance between anchor bar body 3 d is drawn described in adjacent two.
Specific embodiment three:
From unlike specific embodiment one, in the specific embodiment three, the drawing anchor bar body 3 uses steel strand wires, , it is necessary to first using jack tension to the intensity for designing, then be locked using intermediate plate again when locking the steel strand wires.And in order to improve Stressed effect, in the specific embodiment three, the angle α drawn between anchor bar body 3 and reinforced concrete floor 2 is 75 °.Phase It is 5m that the distance between anchor bar body 3 d is drawn described in adjacent two.
In sum, the present invention has the advantages that:1st, using drawing anchor bar body to substitute traditional counterfort, save and help The reinforcing bar and concrete of wall part;2nd, the stress of base plate and riser is simplified and clearly, by setting dark beam and drawing Closer to the situation of one-way slabs, this causes that longitudinal reinforcement consumption subtracts to the stress of anchor bar body flexible connection, such base plate and riser It is few;3rd, by tensioning grappling, the lateral displacement of riser can be effectively controlled, improves effective supporting and retaining system of barricade highly;4th, work Skill is simple, ripe, and the duration of formwork erection and maintenance is greatly reduced.In a word, present invention drawing anchor formula L-type Reinforced Concrete Retaining Walls are Optimization and improvement to Cantilever Retaining Wall and counterfort wall, it is not only simplified force modes, and saves big The reinforcing bar and concrete of amount, the construction period have also obtained effective shortening, are that a kind of side slope, the supporting and retaining system of barricade are all highly profitable Type, economic benefit and social benefit also highly significant.
Although the foregoing describing specific embodiment of the invention, those familiar with the art should manage Solution, the specific embodiment described by us is merely exemplary, and rather than for the restriction to the scope of the present invention, is familiar with this The technical staff in field should be covered of the invention in the equivalent modification and change made according to spirit of the invention In scope of the claimed protection.

Claims (7)

  1. It is 1. a kind of to draw anchor formula L-type Reinforced Concrete Retaining Walls, it is characterised in that:Including an armored concrete riser, a reinforced concrete Native base plate and several drawing anchor bar bodies;The armored concrete riser is built up on the reinforced concrete floor vertically;Institute State and some anchor heads are provided with armored concrete riser, several anchor plates are embedded with the reinforced concrete floor;Every institute State and draw one end of anchor bar body to be locked on anchor head described in, the other end is anchored on anchor plate described in.
  2. 2. one kind according to claim 1 draws anchor formula L-type Reinforced Concrete Retaining Walls, it is characterised in that:Per the drawing anchor pole The outside of body is arranged with a PVC protection pipes.
  3. 3. one kind according to claim 1 draws anchor formula L-type Reinforced Concrete Retaining Walls, it is characterised in that:The reinforced concrete Native riser is that live formwork erection casting concrete is integrally formed with reinforced concrete floor.
  4. 4. one kind according to claim 1 draws anchor formula L-type Reinforced Concrete Retaining Walls, it is characterised in that:The drawing anchor bar body To apply the axial tension component of prestressed stretch-draw locking.
  5. 5. one kind according to claim 1 draws anchor formula L-type Reinforced Concrete Retaining Walls, it is characterised in that:The drawing anchor bar body Angle between reinforced concrete floor is 45 °~75 °.
  6. 6. one kind according to claim 1 draws anchor formula L-type Reinforced Concrete Retaining Walls, it is characterised in that:Drawn described in adjacent two The distance between anchor bar body is 3~5m.
  7. 7. one kind according to claim 1 draws anchor formula L-type Reinforced Concrete Retaining Walls, it is characterised in that:It is equal per the anchor head It is arranged on the back of the armored concrete riser.
CN201710259821.0A 2017-04-20 2017-04-20 One kind draws anchor formula L-type Reinforced Concrete Retaining Walls Pending CN106906842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710259821.0A CN106906842A (en) 2017-04-20 2017-04-20 One kind draws anchor formula L-type Reinforced Concrete Retaining Walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710259821.0A CN106906842A (en) 2017-04-20 2017-04-20 One kind draws anchor formula L-type Reinforced Concrete Retaining Walls

Publications (1)

Publication Number Publication Date
CN106906842A true CN106906842A (en) 2017-06-30

Family

ID=59209460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710259821.0A Pending CN106906842A (en) 2017-04-20 2017-04-20 One kind draws anchor formula L-type Reinforced Concrete Retaining Walls

Country Status (1)

Country Link
CN (1) CN106906842A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761759A (en) * 2017-12-04 2018-03-06 建华建材(安徽)有限公司 A kind of L-type concrete guard wall
CN110820795A (en) * 2019-10-16 2020-02-21 同济大学 Double-deck corrugated steel plate concrete combination retaining wall
CN114790752A (en) * 2022-05-18 2022-07-26 中建八局第三建设有限公司 Recyclable temporary slope reinforcement device and construction method
CN107761759B (en) * 2017-12-04 2024-04-26 建华建材(安徽)有限公司 L-shaped concrete retaining wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1634531A1 (en) * 1965-05-28 1970-06-25 Rumsey Jun John Watrous Process for the production of retaining walls using prefabricated concrete walls
CN202280075U (en) * 2011-09-07 2012-06-20 华侨大学 Combined type retaining wall of prefabricated part
CN103352477A (en) * 2013-07-12 2013-10-16 青岛理工大学 Vertical pres-stressed anchor rod gravity-type composite retaining wall and method for designing and constructing retaining wall
CN103469814A (en) * 2013-09-24 2013-12-25 兰州理工大学 Novel barricade supporting structure for road or river bank dam and construction method thereof
CN105862858A (en) * 2016-05-12 2016-08-17 大连交通大学 Anchor head structure arranged in concrete slab for anchor retaining wall and construction method for anchor head structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1634531A1 (en) * 1965-05-28 1970-06-25 Rumsey Jun John Watrous Process for the production of retaining walls using prefabricated concrete walls
CN202280075U (en) * 2011-09-07 2012-06-20 华侨大学 Combined type retaining wall of prefabricated part
CN103352477A (en) * 2013-07-12 2013-10-16 青岛理工大学 Vertical pres-stressed anchor rod gravity-type composite retaining wall and method for designing and constructing retaining wall
CN103469814A (en) * 2013-09-24 2013-12-25 兰州理工大学 Novel barricade supporting structure for road or river bank dam and construction method thereof
CN105862858A (en) * 2016-05-12 2016-08-17 大连交通大学 Anchor head structure arranged in concrete slab for anchor retaining wall and construction method for anchor head structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761759A (en) * 2017-12-04 2018-03-06 建华建材(安徽)有限公司 A kind of L-type concrete guard wall
CN107761759B (en) * 2017-12-04 2024-04-26 建华建材(安徽)有限公司 L-shaped concrete retaining wall
CN110820795A (en) * 2019-10-16 2020-02-21 同济大学 Double-deck corrugated steel plate concrete combination retaining wall
CN110820795B (en) * 2019-10-16 2021-03-26 同济大学 Double-deck corrugated steel plate concrete combination retaining wall
CN114790752A (en) * 2022-05-18 2022-07-26 中建八局第三建设有限公司 Recyclable temporary slope reinforcement device and construction method

Similar Documents

Publication Publication Date Title
US20200102751A1 (en) Precast column base joint and construction method therefor
KR102055436B1 (en) Prefabricated pier column member with steel-concrete composite structure
CN104746435B (en) A kind of construction method of great-angle Y type pier stud
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN206956565U (en) A kind of steel box girder bridge hogging moment area pre-stress system
CN102979221A (en) Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure
CN108999088A (en) A kind of construction method of cable-stayed bridge
CN106906842A (en) One kind draws anchor formula L-type Reinforced Concrete Retaining Walls
CN111074795A (en) Construction method for pouring continuous beam in cantilever mode spanning existing railway
CN108060789A (en) A kind of wall support and change method of existing masonry structure base isolation reinforcement
CN102051980A (en) Prestress structure with tendon simultaneously acting as inner and outer elements
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN107100322B (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN218091465U (en) Assembled non-bearing masonry wall structure
CN206752500U (en) One kind draws anchor formula L-type Reinforced Concrete Retaining Walls
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN204385941U (en) Prestressing force buckling restrained brace
KR20130090453A (en) Reinforcement member and girder using the same
CN211899791U (en) Prefabricated floor preformed hole adopts and wears steel pull rod to consolidate masonry structure
EP1705313A2 (en) Reinforced console column and the method of its production
CN208907228U (en) A kind of prestressing force modular retaining wall
CN210562169U (en) Node connecting part and frame prestressed anchor cable supporting structure
CN206769198U (en) Separate combination type armored concrete prefabricated section anchored end supporting construction
CN105672645A (en) Cantilever beam anchoring structure of projecting scaffold and cantilever beam anchoring construction method of cantilever beam anchoring structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170630