CN106897844A - The checking method and system of a kind of electric power enterprise project - Google Patents

The checking method and system of a kind of electric power enterprise project Download PDF

Info

Publication number
CN106897844A
CN106897844A CN201710161721.4A CN201710161721A CN106897844A CN 106897844 A CN106897844 A CN 106897844A CN 201710161721 A CN201710161721 A CN 201710161721A CN 106897844 A CN106897844 A CN 106897844A
Authority
CN
China
Prior art keywords
project
result
evaluation
pending
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710161721.4A
Other languages
Chinese (zh)
Inventor
曾鉴
曹开江
罗毅
徐浩
王海燕
陈礼频
马瑞光
汪伟
任志超
尹洪苓
陈润东
郝振兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Sichuan Economic Research Institute
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Beijing Guodiantong Network Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Beijing China Power Information Technology Co Ltd
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Information and Telecommunication Co Ltd, Beijing China Power Information Technology Co Ltd, Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710161721.4A priority Critical patent/CN106897844A/en
Publication of CN106897844A publication Critical patent/CN106897844A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The checking method and system of a kind of electric power enterprise project of disclosure, methods described is by carrying out data-integrity evaluation, project reproducibility and the synthetic evaluation of projects to pending project, respectively obtain data-integrity evaluation result, project reproducibility result and synthetic evaluation of projects result, final foundation data-integrity evaluation result, project reproducibility result and synthetic evaluation of projects result, obtain the final review result of pending project.Each step of application scheme can automate realization, so as to manual examination and verification cost can be reduced, and application scheme to electric power enterprise project when auditing, project repeatability can effectively be considered, in view of the influence that examination & verification data in real work is audited to project, data-integrity evaluation also is carried out to pending project simultaneously, compared to manual examination and verification mode, the application can the further science of Improving Project examination, reasonability and validity.

Description

The checking method and system of a kind of electric power enterprise project
Technical field
Examination & verification, decision-making technic field the invention belongs to electric power enterprise project, more particularly to a kind of electric power enterprise project Checking method and system.
Background technology
At present, the plan of electric power enterprise project is audited still based on manual examination and verification, and this aspect can increase cost of labor;Separately On the one hand, manual examination and verification do not have the appraisement system of a set of maturation, do not form a set of unification and effective standard, it is impossible to ensure to examine Core work science, rationally, effectively carry out.
For example, manual examination and verification are when in face of numerous pending projects, it is impossible to accomplish to be compared one by one with history item, it is impossible to have Effect considers the repeatability of project examination & verification, and whether project repeats that micro-judgment must be leaned on, and easily causes the repetition deposit of project;And to item The mesh key element that passes through of examination & verification considers insufficient, to have ignored and audit the influence that data audit to project in real work, audits The standard given a mark in evaluation procedure is more according to working experience determination, lacks science etc..
The content of the invention
In view of this, it is an object of the invention to provide the checking method and system of a kind of electric power enterprise project, it is intended to gram Take any of the above problem of manual examination and verification presence, the science of further Improving Project examination, reasonability and validity.
Therefore, the present invention is disclosed directly below technical scheme:
A kind of checking method of electric power enterprise project, including:
Data-integrity evaluation is carried out to pending project, data-integrity evaluation result is obtained;
Project reproducibility is carried out to the pending project, project reproducibility result is obtained;
The synthetic evaluation of projects is carried out to the pending project, synthetic evaluation of projects result is obtained;
According to the data-integrity evaluation result, the project reproducibility result and the synthetic evaluation of projects As a result, the final review result of the pending project is obtained.
The above method, it is preferred that described to carry out data-integrity evaluation to pending project, obtains data-integrity evaluation As a result, including:
Obtain the project data Integrity Assessment index system for pre-establishing corresponding to the pending project;The item Mesh data-integrity assessment indicator system includes the multiple first for carrying out data-integrity evaluation to the pending project Index;
For described each first index, data-integrity evaluation is carried out to the pending project, obtain it is described each First index distinguishes corresponding index data-integrity evaluation result;
According to index weights in advance to each first Distribution Indexes, to each index data-integrity evaluation result Fusion calculation is weighted, the corresponding data-integrity evaluation result of the pending project is obtained.
The above method, it is preferred that project reproducibility is carried out to the pending project, project reproducibility is obtained As a result, including:
Strategy is extracted according to default word, a series of words are extracted from the pending item destination document, obtain described The corresponding word information of pending project;
Weight distribution is carried out to each word in the word information, the word weight of each word is obtained;
Based on the word information, retrieved from the history item information bank being pre-created has with the pending project The associated document of incidence relation;
Obtain the weight of each word and each word included in the associated document;
Based on each word in corresponding each word of the pending project and word weight, and the associated document and its Word weight, calculates the degree of correlation of the pending project and the associated document;
Based on the correlation score, the project reproducibility result of the pending project is obtained.
The above method, it is preferred that described to carry out the synthetic evaluation of projects to the pending project, obtains the synthetic evaluation of projects As a result, including:
Obtain the synthetic evaluation of projects index system for pre-establishing corresponding to the pending project;The project synthesis Assessment indicator system includes multiple second indexs for carrying out the synthetic evaluation of projects to the pending project;
For described each second index, the synthetic evaluation of projects is carried out to the pending project, obtain it is described each the Two indexs distinguish corresponding index comprehensive evaluation result;
According to index weights in advance to each second Distribution Indexes, each index comprehensive evaluation result is added Power fusion calculation, obtains the corresponding synthetic evaluation of projects result of the pending project.
The above method, it is preferred that described according to the data-integrity evaluation result, the project reproducibility result And the synthetic evaluation of projects result, the final review result of the pending project is obtained, including:
To the data-integrity evaluation result, the project reproducibility result and the synthetic evaluation of projects knot Fruit carries out weight distribution, respectively obtains corresponding first weight of the data-integrity evaluation result, the project repeatability and comments Corresponding second weight of valency result, and corresponding 3rd weight of the synthetic evaluation of projects result;
Using first weight, second weight and the 3rd weight, to the data-integrity evaluation result, The project reproducibility result and the synthetic evaluation of projects result are weighted fusion calculation, obtain Weighted Fusion meter Calculate result;
Based on the Weighted Fusion result of calculation and the opinion rating criteria for classifying for pre-establishing, obtain described pending The final review result of project.
A kind of auditing system of electric power enterprise project, including:
Data-integrity evaluation unit, for carrying out data-integrity evaluation to pending project, obtains data-integrity Evaluation result;
Project reproducibility unit, for carrying out project reproducibility to the pending project, obtains project weight Renaturation evaluation result;
Synthetic evaluation of projects unit, for carrying out the synthetic evaluation of projects to the pending project, obtains project and comprehensively comments Valency result;
Project audit unit, for according to the data-integrity evaluation result, the project reproducibility result with And the synthetic evaluation of projects result, obtain the final review result of the pending project.
Said system, it is preferred that the data-integrity evaluation unit, is further used for:
Obtain the project data Integrity Assessment index system for pre-establishing corresponding to the pending project;The item Mesh data-integrity assessment indicator system includes the multiple first for carrying out data-integrity evaluation to the pending project Index;For described each first index, data-integrity evaluation is carried out to the pending project, obtain it is described each first Index distinguishes corresponding index data-integrity evaluation result;According to index power in advance to each first Distribution Indexes Weight, fusion calculation is weighted to each index data-integrity evaluation result, obtains the corresponding data of the pending project Integrity Assessment result.
Said system, it is preferred that the project reproducibility unit, is further used for:
Strategy is extracted according to default word, a series of words are extracted from the pending item destination document, obtain described The corresponding word information of pending project;Weight distribution is carried out to each word in the word information, the word weight of each word is obtained; Based on the word information, retrieved from the history item information bank being pre-created has incidence relation with the pending project Associated document;Obtain each word that the associated document includes and the weight of each word;Based on the pending project pair Each word and its word weight in each word and word weight, and the associated document for answering, calculate the pending project with The degree of correlation of the associated document;Based on the correlation score, the project reproducibility knot of the pending project is obtained Really.
Said system, it is preferred that the synthetic evaluation of projects unit, is further used for:
Obtain the synthetic evaluation of projects index system for pre-establishing corresponding to the pending project;The project synthesis Assessment indicator system includes multiple second indexs for carrying out the synthetic evaluation of projects to the pending project;For described each Individual second index, the synthetic evaluation of projects is carried out to the pending project, is obtained described each second index and is distinguished corresponding finger Mark comprehensive evaluation result;According to index weights in advance to each second Distribution Indexes, to each index comprehensive evaluation knot Fruit is weighted fusion calculation, obtains the corresponding synthetic evaluation of projects result of the pending project.
Said system, it is preferred that the project audits unit, is further used for:
To the data-integrity evaluation result, the project reproducibility result and the synthetic evaluation of projects knot Fruit carries out weight distribution, respectively obtains corresponding first weight of the data-integrity evaluation result, the project repeatability and comments Corresponding second weight of valency result, and corresponding 3rd weight of the synthetic evaluation of projects result;Using first weight, Second weight and the 3rd weight, to the data-integrity evaluation result, the project reproducibility result with And the synthetic evaluation of projects result is weighted fusion calculation, obtains Weighted Fusion result of calculation;Based on the Weighted Fusion Result of calculation and the opinion rating criteria for classifying for pre-establishing, obtain the final review result of the pending project.
The checking method and system of a kind of electric power enterprise project provided from above scheme, the application, by treating Examination & verification project carries out data-integrity evaluation, project reproducibility and the synthetic evaluation of projects, respectively obtains data-integrity and comments Valency result, project reproducibility result and synthetic evaluation of projects result, it is final according to data-integrity evaluation result, project weight Renaturation evaluation result and synthetic evaluation of projects result, obtain the final review result of pending project.Application scheme each Step can automate realization, so that manual examination and verification cost can be reduced, and application scheme is audited to electric power enterprise project When, can effectively consider project repeatability, it is contemplated that the influence that data is audited to project is audited in real work, also simultaneously to pending Core project has carried out data-integrity evaluation, and compared to manual examination and verification mode, the application can further Improving Project examination Science, reasonability and validity.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is the examination & verification block schematic illustration of the Power Project examination & verification that the present invention is provided;
Fig. 2 is the checking method flow chart of the electric power enterprise project that the embodiment of the present invention one is provided;
Fig. 3 is that the flow that data-integrity evaluation is carried out to electric power enterprise project that the embodiment of the present invention one is provided is illustrated Figure;
Fig. 4 is that the flow that project reproducibility is carried out to electric power enterprise project that the embodiment of the present invention one is provided is illustrated Figure;
Fig. 5 is the schematic diagram of locating vector and the document vector for searching out in the N-dimensional space that the embodiment of the present invention one is provided;
Fig. 6 is the schematic flow sheet that the synthetic evaluation of projects is carried out to electric power enterprise project that the embodiment of the present invention one is provided;
Fig. 7 is the offer of the embodiment of the present invention one based on project data Integrity Assessment result, project reproducibility knot Fruit and synthetic evaluation of projects result, carry out the schematic flow sheet of project examination & verification;
Fig. 8 is the structural representation of the auditing system of the electric power enterprise project that the embodiment of the present invention two is provided.
Specific embodiment
For the sake of quoting and understanding, the technical term that hereinafter uses, write a Chinese character in simplified form or summary of abridging is explained as follows:
Analytic hierarchy process (AHP):A kind of systematic analytic method, it combines quantification and qualification, simulates the policy-making thought mistake of people Journey.Can be easy, widely applicable, systemic strong etc. with clear thinking, method by subjective judgement systematization, quantification, modelling Feature, is analysis multiple target, the powerful of multifactor, multiple criteria complex large system.
Field Using Fuzzy Comprehensive Assessment:It is one kind application to fuzzy mathematics, by the relevant knowledge of fuzzy mathematics so that will not The integrated evaluating method of the factor quantification of easy quantification;Its general principle is, according to the theory of fuzzy set, to carry out Dan Yin Element is evaluated, and comprehensive evaluation result is finally drawn with reference to the weight of each factor.Its indispensable four elements is set of factors, sentences Disconnected collection, single factor evaluation and weight sets.
Weight:Balance is evaluated the value of all influence factor relative importances of things.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
The checking method and system of a kind of electric power enterprise project of disclosure, to overcome manual examination and verification side in the prior art The various problems that formula is present, the science of further Improving Project examination, reasonability and validity.
Specifically, the present invention is to deal with objects with electric power enterprise project.Applicant is audited by analyzing electric power enterprise project Vital point in work is analyzed to project examination & verification requirement, it is found that electric power enterprise project has more (the China national electricity of classification Power Project Preliminary division is 16 special projects by net company), contain much information, the characteristics of each intermediate item has different, and artificial examine The features such as core easily causes repetition, so as to propose a kind of more excellent electric power enterprise project examination & verification scheme.As shown in figure 1, the application Electric power enterprise project audits scheme by " project data Integrity Assessment ", " project reproducibility " and " synthetic evaluation of projects " three Individual part composition, completes final project examination & verification according to three evaluation results of part afterwards, is determined with the project for being embodied as follow-up Plan provides foundation.
Next application scheme will be described in detail by each embodiment.
Embodiment one
The embodiment of the present application one discloses a kind of checking method of electric power enterprise project, the electric power enterprise with reference to shown in Fig. 2 Purpose checking method flow chart, methods described may comprise steps of:
Step 201, data-integrity evaluation is carried out to pending project, obtain data-integrity evaluation result.
In project data Integrity Assessment part, the application is directed to 16 special species of Power Project, according to each kind The different characteristics that class Power Project each has, in advance for the Power Project of each species establishes project data Integrity Assessment Index system, wherein, the corresponding project data Integrity Assessment index system of a certain species Power Project, including for this kind Class Power Project carries out a series of indexs of project data Integrity Assessment.
By taking power network construction project as an example, the project multiple engineerings such as including project of transmitting and converting electricity, line project, output engineering, With quantities it is big, investment amount is more, regional power supply is had a major impact the features such as, the application is upper according to power network construction project State feature and choose appropriate criteria, slave unit account information, equipment operation information, project economic efficiency index and project operation efficiency The aspect of index four starts with setting up the data-integrity assessment indicator system of power network construction project, exemplarily, the electricity set up The data-integrity assessment indicator system of net construction project is with specific reference to following table 1:
Table 1
In this step 201, the pending project is specially a certain species Power Project in 16 special projects of Power Project.
The project data Integrity Assessment index system that matches is pre-established with the Power Project for various species On the basis of, when needing to audit pending project, all material needed for examination & verification decision-making is collected first, and to each material Unification, nondimensionalization treatment are carried out, realizes carrying out data-integrity evaluation to pending project afterwards using this step 201.
Specifically, with reference to Fig. 3, can realize carrying out project data Integrity Assessment to pending project by procedure below:
The project data Integrity Assessment index body for pre-establishing corresponding to step 301, the acquisition pending project System;The project data Integrity Assessment index system is included for carrying out data-integrity evaluation to the pending project Multiple first indexs;
Step 302, for described each first index, data-integrity evaluation is carried out to the pending project, obtain Described each first index distinguishes corresponding index data-integrity evaluation result;
Step 303, the advance index weights to each first Distribution Indexes of foundation, to each index data-integrity Evaluation result is weighted fusion calculation, obtains the corresponding data-integrity evaluation result of the pending project.
Wherein, the present embodiment determines pending project pair using methods such as analytic hierarchy process (AHP) and Field Using Fuzzy Comprehensive Assessments The weight of each the first index in the project data Integrity Assessment index system answered.
For described each first index, data-integrity evaluation is carried out to pending project, can refer to specifically foundation Pending project (document) corresponds to the complete data degree of each the first index, and pending project is beaten in the index Point, in general, the corresponding marking score value of certain index is higher, then it represents that the data that pending project corresponds to the index is completeer It is whole.On this basis, fusion calculation is weighted to the corresponding index data-integrity evaluation result of each index, obtains pending The data-integrity evaluation result of core project, the result be also one marking numerical value, the marking numerical value can concentrated expression it is pending , in the data-integrity of whole index system, accordingly, the marking numerical value is higher, then it represents that the item of pending project for core project Mesh data is more complete.
By taking above-mentioned power network construction project as an example, due to including one in the corresponding project data Integrity Assessment system of the project Level index and two-level index two-stage index altogether so that, can first evaluate the data-integrity of each two-level index, obtain each two The corresponding data-integrity marking of level index, and determine each two-level index using analytic hierarchy process (AHP) and Field Using Fuzzy Comprehensive Assessment Weight, afterwards, using the weight of two-level index, by being weighted fusion meter to the corresponding two-level index of each first class index Calculate, draw the corresponding data-integrity marking of each first class index.
On this basis, reuse analytic hierarchy process (AHP) and Field Using Fuzzy Comprehensive Assessment determines the power of each first class index Weight, and the weight based on each first class index is weighted fusion meter to the corresponding data-integrity marking of each first class index Calculate, finally draw the corresponding project data integrality marking of power network construction project.
Step 202, project reproducibility is carried out to the pending project, obtain project reproducibility result.
Project reproducibility, is particularly used for evaluating in pending project and history item information bank each that include and goes through The repetition degree of history project, with reference to Fig. 4, this step 202 can be realized carrying out project weight to pending project by procedure below Renaturation is evaluated:
Step 401, according to default word extract strategy, extract a series of words from the pending item destination document, Obtain the corresponding word information of the pending project;
Step 402, weight distribution is carried out to each word in the word information, obtain the word weight of each word;
Step 403, based on the word information, retrieved from the history item information bank being pre-created pending with described Project has the associated document of incidence relation;
Step 404, the weight for obtaining each word and each word included in the associated document;
Step 405, based on corresponding each word of the pending project and word weight, and the associated document in it is each Individual word and its word weight, calculate the degree of correlation of the pending project and the associated document;
Step 406, based on the correlation score, obtain the project reproducibility result of the pending project.
Wherein, the project information that pending item destination document can be specifically included, such as project name, project code, project Classification, project summary, contents of a project etc., regard a series of combination of words (Term) as, are needing to carry out project to pending project During reproducibility, the present embodiment is first depending on default word and extracts strategy, and participle is carried out to the pending item destination document, And based on word segmentation result, a series of words are extracted from the pending item destination document, such as from pending item destination document In only extract the word of summary part, or extract all words etc. from pending item destination document, it is described pending to be embodied as The reproducibility of core project provides word foundation.
Afterwards, it is that each word assigns a word weight, different roots influence text according to oneself weight in a document The marking of shelves correlation is calculated.Wherein, when the word in for document assigns weight, mainly with global weight (GW, Global Weight) it is calculation, it is assumed that giI-th weight of word in document, then giSpecifically by i-th word in whole system text Shelves set in, i.e., in whole history item information bank distribution determine weight, it for the purpose of improving precision ratio, in many The word all occurred in document gives relatively low weight, and the word higher to the frequency of occurrence only in particular document then give it is larger Weight.
The typical method for calculating the global weight of word is exactly inverse document frequency (IDF, Inverse Document Frequency) weighting method, specific formula is as follows:
gi=log (P/ni) (1)
Wherein, giI-th weight of word in pending document is represented, P represents total number of files, niRepresent containing i-th word Number of files.
Word in history item in all documents can regard a vector as, specifically be represented by:
Document=(term1, term2..., termN) (2)
Wherein, N represents the number of the word in all documents in history item.
Using the weight of each word in document as vector value, then history item document vector be represented by:
DocumentVector=(weight1, weight2..., weightN) (3)
Wherein, termiRepresent i-th word, weightiRepresent the corresponding weight of i-th word.
On this basis, can be using the word in all documents in pending project as retrieval foundation, to history item information Storehouse is retrieved, and specifically, query statement is equally regarded as a simple document by the present embodiment, is also represented with vector, tool Body surface is shown as:
Query=(term1, term2..., termM) (4)
Wherein, M represents the number of the word in all documents in pending project, by the vector of formula (4) in each of which word dimension The value of degree, is set to the weight of the word of corresponding dimension, then can obtain with following formula (5):
QueryVector=(weight1, weight2..., weightM) (5)。
Afterwards, be put into a N-dimensional space for all document vectors for searching out and query vector by the present embodiment, each word (term) it is one-dimensional, specifically refers to shown in Fig. 5.And calculate the included angle cosine of the document vector that query vector is searched out with each Value, using the included angle cosine value of query vector and the document vector for searching out, as pending project and the document for searching out to Correlation marking numerical value (correlation score) of amount, wherein, angle is smaller, and cosine value is bigger, gives a mark higher, then it represents that correlation Bigger, relativity evaluation formula is as follows:
Wherein, q represents query statement vector QueryVector, d and represents history item document vector DocumentVector, QTiIt is i-th weights of word, DT in query statementiIt is corresponding i-th word in history item document Weights, N is total item number.
Finally, the project reproducibility result of pending project according to the correlation score, can be obtained, wherein, institute State that correlation score is bigger, represent that the project repeatability of pending project is higher, can be that the project of pending project is repeated now Property evaluation gives a relatively low marking numerical value.Conversely, the correlation score is bigger, then it represents that the project weight of pending project Renaturation is lower, can be that the project reproducibility of pending project gives a marking numerical value higher correspondingly.
Step 203, the synthetic evaluation of projects is carried out to the pending project, obtain synthetic evaluation of projects result.
In synthetic evaluation of projects part, the application is directed to 16 special species of Power Project, also according to various species The different characteristics that Power Project each has, in advance for the Power Project of each species establishes synthetic evaluation of projects index body System, wherein, the corresponding synthetic evaluation of projects index system of a certain species Power Project, including for entering to the species Power Project A series of indexs of the row synthetic evaluation of projects.
The present embodiment is specifically started with terms of urgency, importance, policy and feasibility four, for electric power enterprise 16 Class special project sets up the assessment indicator system of the synthetic evaluation of projects respectively, and table 2- tables 12 below respectively illustrate part special project project Corresponding System of Comprehensive Evaluation.
Table 2 (power network construction project sequence standard diagrams)
Table 3 (production technology is transformed and equipment rebuilding entry sorting evaluation index)
Table 4 (the special entry sorting evaluation index of marketing)
Table 5 (information-based special project entry sorting evaluation index)
Table 6 (small-sized capital construction special project entry sorting evaluation index)
Table 7 (nonproductive technological transformation, overhaul special project entry sorting evaluation index)
The educational training of table 8 special project entry sorting evaluation index
Table 9 (the special entry sorting evaluation index of research and development)
The Management Advisory Services of table 10 special project entry sorting evaluation index
Table 11 (industry capital construction special project entry sorting evaluation index)
Table 12 (technological transformation and overhaul special project entry sorting evaluation index)
On the basis of the Power Project for various species is pre-established with the synthetic evaluation of projects index system for matching, When needing to carry out the synthetic evaluation of projects to pending project, with reference to Fig. 6, this step 203 can specifically be realized by procedure below The synthetic evaluation of projects is carried out to pending project:
The synthetic evaluation of projects index system for pre-establishing corresponding to step 601, the acquisition pending project;It is described Synthetic evaluation of projects index system includes multiple second indexs for carrying out the synthetic evaluation of projects to the pending project;
Step 602, for described each second index, the synthetic evaluation of projects is carried out to the pending project, obtain institute State each second index and distinguish corresponding index comprehensive evaluation result;
Step 603, the advance index weights to each second Distribution Indexes of foundation, to each index comprehensive evaluation knot Fruit is weighted fusion calculation, obtains the corresponding synthetic evaluation of projects result of the pending project.
Wherein, the present embodiment determines pending item also with methods such as analytic hierarchy process (AHP) and Field Using Fuzzy Comprehensive Assessments The weight of each the second index in the corresponding synthetic evaluation of projects index system of mesh.
For described each second index, the synthetic evaluation of projects is carried out for each second index to pending project first Marking, in general, the corresponding marking numerical value of certain index is higher, then it represents that pending project corresponds to the overall merit of the index It is higher.On this basis, the overall merit marking to each index is weighted fusion calculation, obtains the project of pending project Comprehensive evaluation result, the result is also a marking numerical value, and accordingly, the marking numerical value is higher, then it represents that pending project Overall merit it is higher.
For the synthetic evaluation of projects index system for having two-stage index, similarly, can be first against two-level index pair Pending project carries out overall merit marking, and the synthesis of each two-level index corresponding to Weighted Fusion each first class index is commented Valency is given a mark numerical value, obtains each first class index corresponding synthetic evaluation of projects marking, on this basis, then Weighted Fusion each one The overall merit marking of level index, finally gives current project, and such as the overall merit of pending project is given a mark.
Wherein, the weight of the first class index or two-level index is same using analytic hierarchy process (AHP) and Field Using Fuzzy Comprehensive Assessment Determine etc. method.
Step 204, according to the data-integrity evaluation result, the project reproducibility result and the project Comprehensive evaluation result, obtains the final review result of the pending project.
With reference to Fig. 7, this step 204 can specifically be realized carrying out final review to pending project by procedure below:
It is step 701, comprehensive to the data-integrity evaluation result, the project reproducibility result and the project Closing evaluation result carries out weight distribution, respectively obtains corresponding first weight of the data-integrity evaluation result, the project Corresponding second weight of reproducibility result and corresponding 3rd weight of the synthetic evaluation of projects result.
Wherein, the data-integrity is determined where like using methods such as analytic hierarchy process (AHP) and Field Using Fuzzy Comprehensive Assessments Evaluation result, the project reproducibility result and the synthetic evaluation of projects result distinguish corresponding weight.
Step 702, using first weight, second weight and the 3rd weight, to the data-integrity Evaluation result, the project reproducibility result and the synthetic evaluation of projects result are weighted fusion calculation, obtain Weighted Fusion result of calculation.
The data-integrity evaluation result, project reproducibility result and synthetic evaluation of projects result can be One corresponding marking numerical value.
Step 703, based on the Weighted Fusion result of calculation and the opinion rating criteria for classifying for pre-establishing, obtain institute State the final review result of pending project.
The opinion rating criteria for classifying set up is specifically referred to shown in following table 13, and table 13 shows that opinion rating is drawn An accurate specific example of minute mark, in practical application, can combine carry out of the actual demand to the required opinion rating criteria for classifying Formulate.
Table 13
So as to, finally first weight, the second weight and the 3rd weight can will be utilized, data-integrity evaluation is beaten Divide, the marking of project reproducibility and the synthetic evaluation of projects are given a mark, and are weighted total marking numerical value of gained after fusion, with The above-mentioned opinion rating criteria for classifying is compared, and the final review result of pending project is drawn based on comparison result, and this is most Whole auditing result is according to " outstanding ", " good ", " considered " or " not passing through " described in the possible corresponding table 13 of its scoring event In one kind.Pending project is being carried out after evaluation draws final review result, subsequently can be such as excellent according to the auditing result It is elegant, good or do not pass through, corresponding decision is carried out to pending project, such as carry out reality using outstanding project as key project Apply, or cancel unsanctioned project etc..
The checking method of a kind of electric power enterprise project provided from above scheme, the application, by pending item Mesh carries out data-integrity evaluation, project reproducibility and the synthetic evaluation of projects, respectively obtain data-integrity evaluation result, Project reproducibility result and synthetic evaluation of projects result, it is final to be commented according to data-integrity evaluation result, project repeatability Valency result and synthetic evaluation of projects result, obtain the final review result of pending project.Each step of application scheme can Automation is realized, so that manual examination and verification cost can be reduced, and application scheme to electric power enterprise project when auditing, and can have Effect considers project repeatability, it is contemplated that the influence that data is audited to project is audited in real work, also simultaneously to pending project Carried out data-integrity evaluation, compared to manual examination and verification mode, the application can further Improving Project examination science Property, reasonability and validity.
Embodiment two
The present embodiment two discloses a kind of auditing system of electric power enterprise project, the electric power enterprise project with reference to shown in Fig. 8 Auditing system structural representation, the system can include:
Data-integrity evaluation unit 801, for carrying out data-integrity evaluation to pending project, obtains complete data Property evaluation result;Project reproducibility unit 802, for carrying out project reproducibility to the pending project, obtains Project reproducibility result;Synthetic evaluation of projects unit 803, for carrying out the synthetic evaluation of projects to the pending project, Obtain synthetic evaluation of projects result;Project audits unit 804, for according to the data-integrity evaluation result, the project Reproducibility result and the synthetic evaluation of projects result, obtain the final review result of the pending project.
In an implementation method of the embodiment of the present invention, the data-integrity evaluation unit is further used for:Obtain institute State the project data Integrity Assessment index system for pre-establishing corresponding to pending project;The project data integrality is commented Valency index system includes multiple first indexs for carrying out data-integrity evaluation to the pending project;For described each Individual first index, data-integrity evaluation is carried out to the pending project, obtains each first index difference corresponding Index data-integrity evaluation result;According to index weights in advance to each first Distribution Indexes, each index is provided Material Integrity Assessment result is weighted fusion calculation, obtains the corresponding data-integrity evaluation result of the pending project.
In an implementation method of the embodiment of the present invention, the project reproducibility unit is further used for:According to pre- If word extract strategy, extract a series of words from the pending item destination document, obtain the pending project correspondence Word information;Weight distribution is carried out to each word in the word information, the word weight of each word is obtained;Based on institute's predicate letter Breath, retrieves the associated document for having incidence relation with the pending project from the history item information bank being pre-created; Obtain each word that the associated document includes and the weight of each word;Based on corresponding each word of the pending project and Each word and its word weight in word weight, and the associated document, calculate the pending project and the associated document The degree of correlation;Based on the correlation score, the project reproducibility result of the pending project is obtained.
In an implementation method of the embodiment of the present invention, the synthetic evaluation of projects unit is further used for:Obtain described The synthetic evaluation of projects index system for pre-establishing corresponding to pending project;The synthetic evaluation of projects index system includes Multiple second indexs for carrying out the synthetic evaluation of projects to the pending project;For described each second index, to institute Stating pending project carries out the synthetic evaluation of projects, obtains described each second index and distinguishes corresponding index comprehensive evaluation result; According to index weights in advance to each second Distribution Indexes, fusion meter is weighted to each index comprehensive evaluation result Calculate, obtain the corresponding synthetic evaluation of projects result of the pending project.
In an implementation method of the embodiment of the present invention, the project audits unit, is further used for:It is complete to the data Whole property evaluation result, the project reproducibility result and the synthetic evaluation of projects result carry out weight distribution, respectively Obtain corresponding first weight of the data-integrity evaluation result, corresponding second weight of the project reproducibility result And corresponding 3rd weight of the synthetic evaluation of projects result;Using first weight, second weight and described Three weights, to the data-integrity evaluation result, the project reproducibility result and the synthetic evaluation of projects knot Fruit is weighted fusion calculation, obtains Weighted Fusion result of calculation;Based on the Weighted Fusion result of calculation and pre-establish The opinion rating criteria for classifying, obtain the final review result of the pending project.
Herein, it is necessary to explanation, the description of the auditing system of the electric power enterprise project that the present embodiment is related to, with side above The description of method is similar, and with the beneficial effect description of method, the auditing system for electric power enterprise project of the invention exists The ins and outs not disclosed in the present embodiment, refer to the explanation of the inventive method embodiment, and this implementation does not remake to this and repeats.
In sum, application scheme has the advantage that:
The present invention program sets about in terms of data-integrity, project repeatability and project appraisal three, constructs various species The index system that Power Project is evaluated, and the power of every evaluation index is determined using analytic hierarchy process (AHP) and fuzzy synthetic appraisement method Weight, evaluates Power Project in terms of data-integrity, project repeatability and project appraisal three based on this, is formed A set of unification and effectively evaluating system, provide science for the examination & verification of electric power enterprise project, effectively support.Practical application In, power industry can make full use of the Decision-Making Evaluation thinking and the invention achievement of index constructive system of present invention offer, carry out Project is audited, and other industry builds required index system according to every profession and trade feature also dependent on the thinking in the present invention, The examination & verification Decision Model of design personalized, and then the support of science is provided for administrative decision.
Also, it should be noted that each embodiment in this specification is described by the way of progressive, each embodiment What is stressed is all the difference with other embodiment, and identical similar part is mutually referring to i.e. between each embodiment Can.
For convenience of description, describe with function to be divided into various modules when system above or device or unit is described respectively. Certainly, the function of each unit can be realized in same or multiple softwares and/or hardware when the application is implemented.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can Realized by the mode of software plus required general hardware platform.Based on such understanding, the technical scheme essence of the application On the part that is contributed to prior art in other words can be embodied in the form of software product, the computer software product Can store in storage medium, such as ROM/RAM, magnetic disc, CD, including some instructions are used to so that a computer equipment (can be personal computer, server, or network equipment etc.) performs some of each embodiment of the application or embodiment Method described in part.
Finally, in addition it is also necessary to explanation, herein, the relational terms of such as first, second, third and fourth or the like It is used merely to make a distinction an entity or operation with another entity or operation, and not necessarily requires or imply these There is any this actual relation or order between entity or operation.And, term " including ", "comprising" or its is any Other variants are intended to including for nonexcludability, so that process, method, article or equipment including a series of key elements Not only include those key elements, but also other key elements including being not expressly set out, or also include being this process, side Method, article or the intrinsic key element of equipment.In the absence of more restrictions, limited by sentence "including a ..." Key element, it is not excluded that also there is other identical element in the process including the key element, method, article or equipment.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of checking method of electric power enterprise project, it is characterised in that including:
Data-integrity evaluation is carried out to pending project, data-integrity evaluation result is obtained;
Project reproducibility is carried out to the pending project, project reproducibility result is obtained;
The synthetic evaluation of projects is carried out to the pending project, synthetic evaluation of projects result is obtained;
According to the data-integrity evaluation result, the project reproducibility result and the synthetic evaluation of projects knot Really, the final review result of the pending project is obtained.
2. method according to claim 1, it is characterised in that described that data-integrity evaluation is carried out to pending project, Data-integrity evaluation result is obtained, including:
Obtain the project data Integrity Assessment index system for pre-establishing corresponding to the pending project;The project money Material Integrity Assessment index system includes multiple first indexs for carrying out data-integrity evaluation to the pending project;
For described each first index, data-integrity evaluation is carried out to the pending project, obtain it is described each first Index distinguishes corresponding index data-integrity evaluation result;
According to index weights in advance to each first Distribution Indexes, each index data-integrity evaluation result is carried out Weighted Fusion is calculated, and obtains the corresponding data-integrity evaluation result of the pending project.
3. method according to claim 1, it is characterised in that project reproducibility is carried out to the pending project, Project reproducibility result is obtained, including:
Strategy is extracted according to default word, a series of words are extracted from the pending item destination document, obtain described pending The corresponding word information of core project;
Weight distribution is carried out to each word in the word information, the word weight of each word is obtained;
Based on the word information, retrieved from the history item information bank being pre-created with the pending project have associate The associated document of relation;
Obtain the weight of each word and each word included in the associated document;
Weighed based on each word in corresponding each word of the pending project and word weight, and the associated document and its word Weight, calculates the degree of correlation of the pending project and the associated document;
Based on the correlation score, the project reproducibility result of the pending project is obtained.
4. method according to claim 1, it is characterised in that described project is carried out to the pending project comprehensively to comment Valency, obtains synthetic evaluation of projects result, including:
Obtain the synthetic evaluation of projects index system for pre-establishing corresponding to the pending project;The synthetic evaluation of projects Index system includes multiple second indexs for carrying out the synthetic evaluation of projects to the pending project;
For described each second index, the synthetic evaluation of projects is carried out to the pending project, obtain described each second finger The corresponding index comprehensive evaluation result of mark difference;
According to index weights in advance to each second Distribution Indexes, each index comprehensive evaluation result is weighted and is melted It is total to calculate, obtain the corresponding synthetic evaluation of projects result of the pending project.
5. the method according to claim any one of 1-4, it is characterised in that described according to the data-integrity evaluation knot Really, the project reproducibility result and the synthetic evaluation of projects result, obtain the most last instance of the pending project Core result, including:
The data-integrity evaluation result, the project reproducibility result and the synthetic evaluation of projects result are entered Row weight distribution, respectively obtains corresponding first weight of the data-integrity evaluation result, the project reproducibility knot Really corresponding second weight, and corresponding 3rd weight of the synthetic evaluation of projects result;
Using first weight, second weight and the 3rd weight, to the data-integrity evaluation result, described Project reproducibility result and the synthetic evaluation of projects result are weighted fusion calculation, obtain Weighted Fusion and calculate knot Really;
Based on the Weighted Fusion result of calculation and the opinion rating criteria for classifying for pre-establishing, the pending project is obtained Final review result.
6. a kind of auditing system of electric power enterprise project, it is characterised in that including:
Data-integrity evaluation unit, for carrying out data-integrity evaluation to pending project, obtains data-integrity evaluation As a result;
Project reproducibility unit, for carrying out project reproducibility to the pending project, obtains project repeatability Evaluation result;
Synthetic evaluation of projects unit, for carrying out the synthetic evaluation of projects to the pending project, obtains synthetic evaluation of projects knot Really;
Project audits unit, for according to the data-integrity evaluation result, the project reproducibility result and institute Synthetic evaluation of projects result is stated, the final review result of the pending project is obtained.
7. system according to claim 6, it is characterised in that the data-integrity evaluation unit, is further used for:
Obtain the project data Integrity Assessment index system for pre-establishing corresponding to the pending project;The project money Material Integrity Assessment index system includes multiple first indexs for carrying out data-integrity evaluation to the pending project; For described each first index, data-integrity evaluation is carried out to the pending project, obtain described each first index The corresponding index data-integrity evaluation result of difference;It is right according to index weights in advance to each first Distribution Indexes Each index data-integrity evaluation result is weighted fusion calculation, obtains the corresponding data-integrity of the pending project Evaluation result.
8. system according to claim 6, it is characterised in that the project reproducibility unit, is further used for:
Strategy is extracted according to default word, a series of words are extracted from the pending item destination document, obtain described pending The corresponding word information of core project;Weight distribution is carried out to each word in the word information, the word weight of each word is obtained;It is based on The word information, retrieves the pass for having incidence relation with the pending project from the history item information bank being pre-created Connection document;Obtain each word that the associated document includes and the weight of each word;It is corresponding based on the pending project Each word and its word weight in each word and word weight, and the associated document, calculate the pending project with it is described The degree of correlation of associated document;Based on the correlation score, the project reproducibility result of the pending project is obtained.
9. system according to claim 6, it is characterised in that the synthetic evaluation of projects unit, is further used for:
Obtain the synthetic evaluation of projects index system for pre-establishing corresponding to the pending project;The synthetic evaluation of projects Index system includes multiple second indexs for carrying out the synthetic evaluation of projects to the pending project;For it is described each Two indexs, the synthetic evaluation of projects is carried out to the pending project, obtains the corresponding index of each second index difference comprehensive Close evaluation result;According to index weights in advance to each second Distribution Indexes, each index comprehensive evaluation result is entered Row Weighted Fusion is calculated, and obtains the corresponding synthetic evaluation of projects result of the pending project.
10. the system according to claim any one of 6-9, it is characterised in that the project audits unit, further uses In:
The data-integrity evaluation result, the project reproducibility result and the synthetic evaluation of projects result are entered Row weight distribution, respectively obtains corresponding first weight of the data-integrity evaluation result, the project reproducibility knot Really corresponding second weight, and corresponding 3rd weight of the synthetic evaluation of projects result;Using first weight, described Second weight and the 3rd weight, to the data-integrity evaluation result, the project reproducibility result and institute State synthetic evaluation of projects result and be weighted fusion calculation, obtain Weighted Fusion result of calculation;Calculated based on the Weighted Fusion Result and the opinion rating criteria for classifying for pre-establishing, obtain the final review result of the pending project.
CN201710161721.4A 2017-03-17 2017-03-17 The checking method and system of a kind of electric power enterprise project Pending CN106897844A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710161721.4A CN106897844A (en) 2017-03-17 2017-03-17 The checking method and system of a kind of electric power enterprise project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710161721.4A CN106897844A (en) 2017-03-17 2017-03-17 The checking method and system of a kind of electric power enterprise project

Publications (1)

Publication Number Publication Date
CN106897844A true CN106897844A (en) 2017-06-27

Family

ID=59193170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710161721.4A Pending CN106897844A (en) 2017-03-17 2017-03-17 The checking method and system of a kind of electric power enterprise project

Country Status (1)

Country Link
CN (1) CN106897844A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107368974A (en) * 2017-07-25 2017-11-21 山西百得科技开发股份有限公司 One kind is changed places poverty alleviation relocation project declaration method and system
CN108038657A (en) * 2017-11-07 2018-05-15 广东电网有限责任公司 A kind of method and system of the above-the-line project application approval based on wechat public platform
CN108364184A (en) * 2018-01-26 2018-08-03 天津市未来星科技有限公司 A kind of consumer goods assessment method
CN110070452A (en) * 2019-03-19 2019-07-30 阿里巴巴集团控股有限公司 Model training method, calculates equipment and computer readable storage medium at device
CN112199941A (en) * 2020-11-12 2021-01-08 深圳供电局有限公司 Scientific research project evaluation platform
CN113064979A (en) * 2021-03-10 2021-07-02 国网河北省电力有限公司 Keyword retrieval-based method for judging construction period and price reasonability
CN113255290A (en) * 2021-06-25 2021-08-13 北京国电通网络技术有限公司 Electric power project information display method, equipment and computer readable medium
CN113554342A (en) * 2021-08-09 2021-10-26 中国人民解放军63677部队 Highly-configurable bid evaluation method for complex engineering construction project
CN113962565A (en) * 2021-10-26 2022-01-21 广东省技术经济研究发展中心 Project scoring method and system based on big data and readable storage medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102915510A (en) * 2012-09-21 2013-02-06 国家电网公司 Power project network post-evaluation system based on multilevel fuzzy integrative evaluation model

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102915510A (en) * 2012-09-21 2013-02-06 国家电网公司 Power project network post-evaluation system based on multilevel fuzzy integrative evaluation model

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗灏: "《基于语义的科技项目相似度计算研究》", 《中国优秀硕士学位论文全文数据库》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107368974A (en) * 2017-07-25 2017-11-21 山西百得科技开发股份有限公司 One kind is changed places poverty alleviation relocation project declaration method and system
CN108038657A (en) * 2017-11-07 2018-05-15 广东电网有限责任公司 A kind of method and system of the above-the-line project application approval based on wechat public platform
CN108364184A (en) * 2018-01-26 2018-08-03 天津市未来星科技有限公司 A kind of consumer goods assessment method
CN110070452A (en) * 2019-03-19 2019-07-30 阿里巴巴集团控股有限公司 Model training method, calculates equipment and computer readable storage medium at device
CN110070452B (en) * 2019-03-19 2023-03-10 创新先进技术有限公司 Model training method and device, computing equipment and computer readable storage medium
CN112199941A (en) * 2020-11-12 2021-01-08 深圳供电局有限公司 Scientific research project evaluation platform
CN112199941B (en) * 2020-11-12 2023-07-14 深圳供电局有限公司 Scientific research project review platform
CN113064979A (en) * 2021-03-10 2021-07-02 国网河北省电力有限公司 Keyword retrieval-based method for judging construction period and price reasonability
CN113255290A (en) * 2021-06-25 2021-08-13 北京国电通网络技术有限公司 Electric power project information display method, equipment and computer readable medium
CN113554342A (en) * 2021-08-09 2021-10-26 中国人民解放军63677部队 Highly-configurable bid evaluation method for complex engineering construction project
CN113962565A (en) * 2021-10-26 2022-01-21 广东省技术经济研究发展中心 Project scoring method and system based on big data and readable storage medium
CN113962565B (en) * 2021-10-26 2024-05-21 广东省技术经济研究发展中心 Item scoring method and system based on big data and readable storage medium

Similar Documents

Publication Publication Date Title
CN106897844A (en) The checking method and system of a kind of electric power enterprise project
Mardani et al. A systematic review and meta-Analysis of SWARA and WASPAS methods: Theory and applications with recent fuzzy developments
CN110334212A (en) A kind of territoriality audit knowledge mapping construction method based on machine learning
El-Mashaleh Decision to bid or not to bid: a data envelopment analysis approach
US20150347489A1 (en) Information retrieval system and method based on query and record metadata in combination with relevance between disparate items in classification systems
CN104536881A (en) Public testing error report priority sorting method based on natural language analysis
CN112801530A (en) Intelligent review system based on semantic splitting and working method
TW201519150A (en) Document classification system, document classification method and recording medium recording therein a document classification program
CN111401040A (en) Keyword extraction method suitable for word text
CN102262663B (en) Method for repairing software defect reports
CN107545038A (en) A kind of file classification method and equipment
CN106663302A (en) Method, system, and program for evaluating intellectual property right
Cazazian Blockchain technology adoption in artificial intelligence-based digital financial services, accounting information systems, and audit quality control
CN110020048A (en) A kind of business risk evaluation system and method based on open source data
CN108428200A (en) A kind of the electric business field patent infringement decision-making system and determination method of case-based reasioning
CN106484919A (en) A kind of industrial sustainability sorting technique based on webpage autonomous word and system
CN108228788A (en) Guide of action automatically extracts and associated method and electronic equipment
Wang et al. The global system‐ranking efficiency model and calculating examples with consideration of the nonhomogeneity of decision‐making units
CN111159396A (en) Method for establishing text data classification hierarchical model facing data sharing exchange
Jabjaimoh et al. Optimization for better world university rank.
CN116775879A (en) Fine tuning training method of large language model, contract risk review method and system
CN110866694A (en) Power grid construction project financial evaluation system and method
Mahapatra et al. Performance measurement–an DEA-AHP based approach
Imoniana et al. Impact of technological advancements on auditing of financial statements
Rosnidah et al. Detecting and preventing fraud with big data analytics: Auditing perspective

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610041 4th Floor, Junlong Street, Jinjiang District, Chengdu City, Sichuan Province

Applicant after: STATE GRID SICHUAN ECONOMIC Research Institute

Applicant after: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd.

Applicant after: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: 610041 4th Floor, Junlong Street, Jinjiang District, Chengdu City, Sichuan Province

Applicant before: STATE GRID SICHUAN ECONOMIC Research Institute

Applicant before: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd.

Applicant before: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd.

Applicant before: State Grid Corporation of China

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20190730

Address after: 100085 Building 32-3-4108-4109, Pioneer Road, Haidian District, Beijing

Applicant after: BEIJING GUODIANTONG NETWORK TECHNOLOGY Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd.

Applicant after: STATE GRID SICHUAN ECONOMIC Research Institute

Address before: 610041 4th Floor, Junlong Street, Jinjiang District, Chengdu City, Sichuan Province

Applicant before: STATE GRID SICHUAN ECONOMIC Research Institute

Applicant before: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd.

Applicant before: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd.

Applicant before: STATE GRID CORPORATION OF CHINA

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627

RJ01 Rejection of invention patent application after publication