CN108038657A - A kind of method and system of the above-the-line project application approval based on wechat public platform - Google Patents
A kind of method and system of the above-the-line project application approval based on wechat public platform Download PDFInfo
- Publication number
- CN108038657A CN108038657A CN201711086104.9A CN201711086104A CN108038657A CN 108038657 A CN108038657 A CN 108038657A CN 201711086104 A CN201711086104 A CN 201711086104A CN 108038657 A CN108038657 A CN 108038657A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- application
- examination
- duplicate checking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/55—Push-based network services
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Data Mining & Analysis (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method and system of the above-the-line project application approval based on wechat public platform, project application person applies in project application module initiation project first, then the project shape person of examining examines module in project shape and is examined, then project duplicate checking person carries out project duplicate checking in project duplicate checking module, expert scores project in experts' evaluation module, and final race examination & approval person carries out project examination in project examination module.The system includes project application module, project shape examines module, project duplicate checking module, experts' evaluation module, project examination module and experts' evaluation setup module.
Description
Technical field
The present invention relates to project examination field, more particularly, to a kind of above-the-line project application based on wechat public platform
The method and system of examination & approval.
Background technology
Project application needs to follow the existing duty wound project application flow of provincial company, bases oneself upon the reality that constituent parts declare auditor
The characteristics of border demand, combining information, mobile, is built using demand to be oriented to, and based on technology maturity, is focused on real
With property, economy, continuity, exploitativeness and replicability.
But at present in existing project application system, project application, approval results prompting be not real-time, and project management is unclear
The clear application for causing duplicated project, project application is of high cost, and the innovation for reducing project is actively spent.
The content of the invention
Reminded present invention aim to address project application, approval results in current off-the-shelf item application system not real-time
Defect, proposes a kind of method and system of the above-the-line project application approval based on wechat public platform.
To realize above goal of the invention, the technical solution of use is:
A kind of method of the above-the-line project application approval based on wechat public platform, comprises the following steps:
S1:Project application person applies in project application module initiation project, and system is by solicitation message real time propelling movement to shape
Examine member;
S2:The project shape person of examining examines module in project shape and is examined, and system is by approval information real time propelling movement to project duplicate checking
Member;
S3:Project duplicate checking person carries out project duplicate checking in project duplicate checking module, and system is according to duplicate checking result and project specialty intelligence
Expert can be distributed, and project information is pushed into expert;
S4:Expert scores project in experts' evaluation module, and score information is pushed to project examination person by system;
S5:Project examination person carries out project examination in project examination module, and approval results are pushed to project application by system
Member.
Wherein step S3 comprises the following steps:
S3.1:If project is not allocated to expert by system sub-distribution again;
S3.2:System does not yet distribute project success after n sub-distribution expert, and system will abandon distribution and tie distribution
Fruit pushes to project examination person.
System wherein described in step S1-S5 carries out message push to be pushed by wechat or short message.
A kind of system of the above-the-line project application approval based on wechat public platform, including project application module, project shape are examined
Module, project duplicate checking module, experts' evaluation module, project examination module and experts' evaluation setup module;Wherein project application mould
Block include initiating project application, check project application that change do not submit, check by project, check and do not pass through project;
Project shape, which examines module, to include examining affiliated unit's project application progress shape, checks that the shape passed through is examined task, checked
Unsanctioned shape examines task;
Project duplicate checking module includes carrying out duplicate checking inspection to project and checks the duplicate checking task of duplicate checking;
Experts' evaluation module includes evaluating affiliated professional project application, checking the evaluation task passed through, look into
See unsanctioned evaluation task;
Project examination module includes examining all items application, checking the examination & approval task passed through and check and do not lead to
The examination & approval task crossed;
Experts' evaluation setup module includes the quantity for setting configuration distribution expert and the weight for setting expert analysis mode.
Compared with prior art, the beneficial effects of the invention are as follows:
1) intelligent terminal and the application of existing mainstream are combined, establishes polynary, adaptable project application channel, is realized fast
Speed is declared, and solves to declare the time of platform, geographical limitation in the past;
2) existing project examination flow is based on, intelligent terminal and application with reference to existing mainstream, establish polynary, adaptability
Strong project examination channel, makes full use of the chip time of approving person;
3) optimize existing project expert assignment mechanism, realized and be randomly assigned by informatization platform, further ensure that item
Mesh is evaluated fair and just;
4) duty wound project appraisal experts database is established, expert is managed collectively to constituent parts.
Brief description of the drawings
Fig. 1 is flow chart of the present invention.
Embodiment
Attached drawing is only for illustration, it is impossible to is interpreted as the limitation to this patent;
Below in conjunction with drawings and examples, the present invention is further elaborated.
Embodiment 1
A kind of method of the above-the-line project application approval based on wechat public platform, please refers to Fig.1, comprises the following steps:
S1:Project application person applies in project application module initiation project, and system is by solicitation message real time propelling movement to shape
Examine member;
S2:The project shape person of examining examines module in project shape and is examined, and system is by approval information real time propelling movement to project duplicate checking
Member;
S3:Project duplicate checking person carries out project duplicate checking in project duplicate checking module, and system is according to duplicate checking result and project specialty intelligence
Expert can be distributed, and project information is pushed into expert;
S4:Expert scores project in experts' evaluation module, and score information is pushed to project examination person by system;
S5:Project examination person carries out project examination in project examination module, and approval results are pushed to project application by system
Member.
Wherein step S3 comprises the following steps:
S3.1:If project is not allocated to expert by system sub-distribution again;
S3.2:System does not yet distribute project success after n sub-distribution expert, and system will abandon distribution and tie distribution
Fruit pushes to project examination person.
System wherein described in step S1-S5 carries out message push to be pushed by wechat or short message.
A kind of system of the above-the-line project application approval based on wechat public platform, including project application module, project shape are examined
Module, project duplicate checking module, experts' evaluation module, project examination module and experts' evaluation setup module;Wherein project application mould
Block include initiating project application, check project application that change do not submit, check by project, check and do not pass through project;
Project shape, which examines module, to include examining affiliated unit's project application progress shape, checks that the shape passed through is examined task, checked
Unsanctioned shape examines task;
Project duplicate checking module includes carrying out duplicate checking inspection to project and checks the duplicate checking task of duplicate checking;
Experts' evaluation module includes evaluating affiliated professional project application, checking the evaluation task passed through, look into
See unsanctioned evaluation task;
Project examination module includes examining all items application, checking the examination & approval task passed through and check and do not lead to
The examination & approval task crossed;
Experts' evaluation setup module includes the quantity for setting configuration distribution expert and the weight for setting expert analysis mode.
Obviously, the above embodiment of the present invention is only intended to clearly illustrate example of the present invention, and is not pair
The restriction of embodiments of the present invention.For those of ordinary skill in the field, may be used also on the basis of the above description
To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this
All any modification, equivalent and improvement made within the spirit and principle of invention etc., should be included in the claims in the present invention
Protection domain within.
Claims (4)
- A kind of 1. method of the above-the-line project application approval based on wechat public platform, it is characterised in that comprise the following steps:S1:Project application person applies in project application module initiation project, and system is by solicitation message real time propelling movement to the shape person of examining;S2:The project shape person of examining examines module in project shape and is examined, and system is by approval information real time propelling movement to project duplicate checking person;S3:Project duplicate checking person carries out project duplicate checking in project duplicate checking module, and system is according to duplicate checking result and project professional intellectual ability point Expert is pushed to expert, and by project information;S4:Expert scores project in experts' evaluation module, and score information is pushed to project examination person by system;S5:Project examination person carries out project examination in project examination module, and approval results are pushed to project application person by system.
- 2. a kind of method of above-the-line project application approval based on wechat public platform according to claim 1, its feature exist In step S3 comprises the following steps:S3.1:If project is not allocated to expert by system sub-distribution again;S3.2:System does not yet distribute project success after n sub-distribution expert, and system will be abandoned distributing and pushing away allocation result Send to project examination person.
- 3. a kind of method of above-the-line project application approval based on wechat public platform according to claim 1, its feature exist In the system described in step S1-S5 carries out message push to be pushed by wechat or short message.
- 4. a kind of system according to any one of claim 1-3 method, it is characterised in that including project application module, project shape Examine module, project duplicate checking module, experts' evaluation module, project examination module and experts' evaluation setup module;Wherein project application Module include initiating project application, check project application that change do not submit, check by project, check and do not pass through project;Project shape, which examines module, to include examining affiliated unit's project application progress shape, checks that the shape passed through examines task, checks and do not lead to The shape crossed examines task;Project duplicate checking module includes carrying out duplicate checking inspection to project and checks the duplicate checking task of duplicate checking;Experts' evaluation module includes evaluating affiliated professional project application, checking the evaluation task passed through, check not The evaluation task passed through;Project examination module includes examining all items application, checking the examination & approval task passed through and check unsanctioned Examination & approval task;Experts' evaluation setup module includes the quantity for setting configuration distribution expert and the weight for setting expert analysis mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711086104.9A CN108038657A (en) | 2017-11-07 | 2017-11-07 | A kind of method and system of the above-the-line project application approval based on wechat public platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711086104.9A CN108038657A (en) | 2017-11-07 | 2017-11-07 | A kind of method and system of the above-the-line project application approval based on wechat public platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108038657A true CN108038657A (en) | 2018-05-15 |
Family
ID=62093675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711086104.9A Pending CN108038657A (en) | 2017-11-07 | 2017-11-07 | A kind of method and system of the above-the-line project application approval based on wechat public platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108038657A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109615329A (en) * | 2018-12-07 | 2019-04-12 | 广东溢达纺织有限公司 | Processing method, device and computer equipment on the line of conductive suggestion |
CN112749379A (en) * | 2021-02-20 | 2021-05-04 | 上海理工大学 | Deep learning-based project declaration system and method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548322A (en) * | 2016-09-29 | 2017-03-29 | 中工国际工程股份有限公司 | Project examination system |
CN106572000A (en) * | 2016-10-29 | 2017-04-19 | 中国十七冶集团有限公司 | WeChat official account platform-based construction site quality and safety management method |
CN106897844A (en) * | 2017-03-17 | 2017-06-27 | 国网四川省电力公司经济技术研究院 | The checking method and system of a kind of electric power enterprise project |
-
2017
- 2017-11-07 CN CN201711086104.9A patent/CN108038657A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548322A (en) * | 2016-09-29 | 2017-03-29 | 中工国际工程股份有限公司 | Project examination system |
CN106572000A (en) * | 2016-10-29 | 2017-04-19 | 中国十七冶集团有限公司 | WeChat official account platform-based construction site quality and safety management method |
CN106897844A (en) * | 2017-03-17 | 2017-06-27 | 国网四川省电力公司经济技术研究院 | The checking method and system of a kind of electric power enterprise project |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109615329A (en) * | 2018-12-07 | 2019-04-12 | 广东溢达纺织有限公司 | Processing method, device and computer equipment on the line of conductive suggestion |
CN112749379A (en) * | 2021-02-20 | 2021-05-04 | 上海理工大学 | Deep learning-based project declaration system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Olmedo et al. | Evaluating the design of behavior change interventions: a case study of rhino horn in Vietnam | |
Iriberri et al. | The role of role uncertainty in modified dictator games | |
De Meo et al. | On Facebook, most ties are weak | |
CN108038657A (en) | A kind of method and system of the above-the-line project application approval based on wechat public platform | |
Kittikunchotiwut | The role of social capital on absorptive capacity and organizational innovation | |
Low et al. | The adoption of environmental management system in Malaysia’s manufacturing organizations | |
Legara et al. | Critical capacity, travel time delays and travel time distribution of rapid mass transit systems | |
CN109242522A (en) | The foundation of target user's identification model, target user's recognition methods and device | |
Dehghanan et al. | A study on effect of big five personality traits on emotional intelligence | |
To | Centrality of an urban rail system | |
Paterson | Trasformismo at the World Trade Organization | |
Chemisto et al. | Examining the adoption and usage of an e-government system in rural South Africa: Examining e-government system adoption | |
Durso et al. | How to study political activists: A petition survey approach | |
KR20210004091A (en) | Method For Credit Rating Based On Block Chain | |
Olckers et al. | The dark side of social media-cyberbullying, catfishing and trolling: a systematic literature review | |
Biancone et al. | Employing value chain theory to address Covid-19 outbreak in tourism management: A resilience and stakeholder view | |
Danesh et al. | A Comparative Study of the Development of Urban Areas in Rasht by Using Multi Criteria Evaluation Methods | |
Catbas et al. | Development of a benchmark problem for bridge health monitoring | |
Praveen et al. | Strophocincla Laughingthrushes of South India: a case for allopatric speciation and impact on their conservation | |
Yang et al. | # MeToo: intersecting gender, race, user identity, social judgment and social support | |
Wachter et al. | The impact of a local thematic focus on community building activities in rural villages | |
McCrea et al. | Responding to change in a growing Melbourne: Community acceptance, wellbeing, and resilience | |
Liu et al. | Research on the city emergency logistics scheduling decision based on cloud theory-based genetic algorithm | |
PRZYBYŁOWSKI | Smart mobility in the selected EU cities | |
Šambronská et al. | Perception of tourist products by destination management with an emphasis on monitoring quality and sustainability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180515 |
|
RJ01 | Rejection of invention patent application after publication |