CN106896017A - The method of aluminium alloy leakage and the method for testing of breaking force of rope are prevented in a kind of steel wire rope sample preparation - Google Patents

The method of aluminium alloy leakage and the method for testing of breaking force of rope are prevented in a kind of steel wire rope sample preparation Download PDF

Info

Publication number
CN106896017A
CN106896017A CN201710192130.3A CN201710192130A CN106896017A CN 106896017 A CN106896017 A CN 106896017A CN 201710192130 A CN201710192130 A CN 201710192130A CN 106896017 A CN106896017 A CN 106896017A
Authority
CN
China
Prior art keywords
steel wire
wire rope
aluminium alloy
sample preparation
leak preventive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710192130.3A
Other languages
Chinese (zh)
Other versions
CN106896017B (en
Inventor
吴伟
李国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Original Assignee
Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd filed Critical Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Priority to CN201710192130.3A priority Critical patent/CN106896017B/en
Publication of CN106896017A publication Critical patent/CN106896017A/en
Application granted granted Critical
Publication of CN106896017B publication Critical patent/CN106896017B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/36Embedding or analogous mounting of samples
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/36Embedding or analogous mounting of samples
    • G01N2001/366Moulds; Demoulding
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0017Tensile
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0058Kind of property studied
    • G01N2203/006Crack, flaws, fracture or rupture
    • G01N2203/0067Fracture or rupture
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/026Specifications of the specimen
    • G01N2203/0262Shape of the specimen
    • G01N2203/0278Thin specimens
    • G01N2203/028One dimensional, e.g. filaments, wires, ropes or cables

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The method of aluminium alloy leakage and the method for testing of breaking force of rope are prevented in a kind of steel wire rope sample preparation, is related to steel wire rope performance detection technical field.A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, including:The step of inserting leak preventive near the tie part before pouring into a mould aluminium alloy to steel wire rope, the fusing point of the fusing point higher than aluminium alloy of leak preventive, leak preventive is in granular form.Can prevent the aluminium alloy in steel wire rope sample preparation from revealing.A kind of method of testing of breaking force of rope, including:The steel wire rope sample obtained using the method for preventing aluminium alloy from leaking in above-mentioned steel wire rope sample preparation carries out rupture pull force test.The result of test is more accurate.

Description

Method and steel wire that aluminium alloy is leaked are prevented in a kind of steel wire rope sample preparation The method of testing of rope rupture pull force
Technical field
Prevent the present invention relates to steel wire rope performance detection technical field, and in more particularly to a kind of steel wire rope sample preparation Method and the method for testing of breaking force of rope that only aluminium alloy is leaked.
Background technology
Alloy casting method is the method for most generally used when overall breaking force of steel wire rope is tested, and it is by sample two End is tied up after rearward end scatters, cleans up, and is cast with the molten alloy of low melting point, after being cooled to room temperature, in tensile testing machine On carry out the method for tension test.The Chinese patent of Application No. 201210091982.0 proposes a kind of detection whole rope of steel wire rope The method of rupture pull force, belongs to one kind of alloy casting method, preferably resolves detection overall breaking force of steel wire rope and steel wire The problem of rope sample preparation.But existed in actual use, due to the structure that steel wire rope is special, between stock and stock certain Gap, even if be provided in mold bottom card sample element being fully contacted with steel wire rope, but is not avoided that the presence in gap, this Have led to the fused solution in casting easily to be spilt from gap, in turn result in the leakage of alloy liquid, and have a strong impact on safety Production.
The content of the invention
A kind of method it is an object of the invention to provide preventing aluminium alloy from leaking in steel wire rope sample preparation, it leads to Cross and add leak preventive near the tie part of steel wire rope, can prevent the aluminium alloy in steel wire rope sample preparation from revealing.
Another object of the present invention is to provide a kind of method of testing of breaking force of rope, tried using above-mentioned steel wire rope The steel wire rope sample that the method for preventing aluminium alloy from leaking in sample preparation process is obtained carries out rupture pull force test, and the result of test is more Plus it is accurate.
The present invention is solved its technical problem and is realized using following technical scheme.
The present invention proposes a kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, including:Closed in cast The step of before golden liquid to inserting leak preventive near the tie part of steel wire rope, the fusing point of the fusing point higher than aluminium alloy of leak preventive, leakproof Agent is in granular form.
The present invention also proposes a kind of method of testing of breaking force of rope, including:Prepared using above-mentioned steel wire rope sample During prevent the steel wire rope sample that obtains of method that aluminium alloy is leaked from carrying out rupture pull force test.
The beneficial effect of the embodiment of the present invention is:A kind of side for preventing aluminium alloy from leaking in steel wire rope sample preparation Method, inserts leak preventive near the tie part of steel wire rope, the fusing point of the fusing point higher than aluminium alloy of leak preventive, and leak preventive will not be with The low-melting alloy liquid such as bismuth, antimony, tin, zinc reacts, and leak preventive is in granular form, and can be prevented with the gap between filler wires The only leakage of aluminium alloy, does not influence the rupture pull force of steel wire rope to test.
A kind of method of testing of breaking force of rope, including:Using prevented in above-mentioned steel wire rope sample preparation close The steel wire rope sample that the method for golden liquid leakage is obtained carries out rupture pull force test.Using the above-mentioned method for preventing aluminium alloy from leaking During sample preparation, aluminium alloy is not leaked on tensile test portion or ground, and the temperature of aluminium alloy is more uniform;If using tradition side Method, after aluminium alloy is injected to mould, the aluminium alloy of mold bottom can be leaked, and due to the continuous injection of aluminium alloy, work as conjunction After golden liquid is contacted with steel wire rope, quickly, the aluminium alloy solidification first injected could continue to inject alloy after blocking gap for temperature drop Liquid, it is uneven to cause aluminium alloy temperature in mould, entirely pours deadhead and does not merge completely, so as to influence cast quality, Ke Nengzao Into pour deadhead cracking etc., and then influence test result.Therefore, the steel wire rope for being obtained using the above-mentioned method for preventing aluminium alloy from leaking Sample, can be used for the test of the rupture pull force of steel wire rope, can guarantee that the accuracy of test result.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be attached to what is used needed for embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, thus be not construed as it is right The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
The construction of wire rope schematic diagram that Fig. 1 is provided for embodiment of the present invention;
Steel wire rope and the cooperation figure of mould that Fig. 2 is provided for embodiment of the present invention.
Icon:100- moulds;200- mould racks;300- steel wire ropes;310- tie parts;320- tensile tests portion;330- Casting portion.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below will be in the embodiment of the present invention Technical scheme be clearly and completely described.Unreceipted actual conditions person, builds according to normal condition or manufacturer in embodiment The condition of view is carried out.Agents useful for same or the unreceipted production firm person of instrument, are the conventional product that can be obtained by commercially available purchase Product.
Alloy casting method is to carry out the method that most generally uses when breaking force of rope is tested, it take one section it is to be measured Steel wire rope 300, then ties up after rearward end scatters, cleans up the two ends of steel wire rope 300, is poured with the molten alloy of low melting point Casting, after being cooled to room temperature, the method that tension test is carried out on tensile testing machine.
Steel wire rope 300 tie up after shape as shown in figure 1, the opposite sides of the tie part 310 of steel wire rope 300 is respectively drawing Power test department 320 and casting portion 330, casting portion 330 are located at the end of steel wire rope 300 and in dispersed.
Below to prevented in a kind of steel wire rope sample preparation of the embodiment of the present invention aluminium alloy leak method and The method of testing of breaking force of rope is specifically described.
A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, is included in the tie part of steel wire rope 300 The step of inserting leak preventive near 310, the fusing point of the fusing point higher than aluminium alloy of leak preventive, leak preventive is in granular form.
Due to 300 strands of steel wire rope and strand between there is gap, and leak preventive is in granular form, and leak preventive inserts steel wire rope 300 Tie part 310 near, can be with the gap between filler wires;Also, fusing point is higher than the component of aluminium alloy fusing point in leak preventive, Will not be reacted with the low-melting alloy liquid such as bismuth, antimony, tin, zinc, and then prevent the leakage of aluminium alloy, steel wire rope 300 is not influenceed Rupture pull force test.Further, leak preventive includes alkali halide, such as sodium chloride, potassium chloride, lithium chloride, fluorination Sodium, potassium fluoride, lithium fluoride, sodium bromide, KBr, lithium bromide etc., in an embodiment of the present invention, preferably sodium chloride.Chlorination Sodium can use edible salt or Nacl.When the temperature of low-melting alloy liquid it is high to a certain extent when, sodium chloride can because temperature Du Taigao and melt, it is preferred that further, leak preventive also includes alkaline-earth halide, such as calcirm-fluoride, fluorine Change magnesium, sodium chloride, magnesium chloride, calcium bromide, magnesium bromide.In an embodiment of the present invention, preferably calcirm-fluoride.Calcirm-fluoride and chlorination Sodium using preceding stirring, calcirm-fluoride can not only filler wires rope 300 gap, and its fusing point is 1402 DEG C, and low melting point is closed The temperature of golden liquid typically not achieves temperature so high, and calcirm-fluoride will not melt, the effect meeting for preventing aluminium alloy from revealing More preferably.When calcirm-fluoride and sodium chloride are used as into leak preventive, calcirm-fluoride it may happen that float, it is preferred that equal using mixing Even calcirm-fluoride and sodium chloride prevent calcirm-fluoride from floating.In order to preferably reach the effect for preventing aluminium alloy from revealing, it is preferable that Alkali halide is the 20wt%-60wt% of leak preventive;It is further preferred that alkaline-earth halide is leak preventive 40wt%-80wt%.It is further preferred that 40wt%-50wt% of the alkali halide for leak preventive.The proportion is The preferred value that inventor obtains with reference to experience and creative work, when leak preventive is alkali halide and alkaline-earth metal halogen During the mixture of compound, above-mentioned proportion is selected to be capable of the leakage of preferably mode aluminium alloy.Furthermore, have selected sodium chloride Or the mixture of sodium chloride and calcirm-fluoride is when making leak preventive, can be according to the aluminium alloy of selection and its temperature for finally reaching To carry out the specifically chosen of leak preventive.
Further, the opposite sides of the tie part 310 of steel wire rope 300 is respectively tensile test portion 320 and casting portion 330, casting portion 330 is located at the end of steel wire rope 300 and in dispersed, and leak preventive fills out the close casting portion 330 in tie part 310 Side.During concrete operations, steel wire rope 300 is tied up near the place at both ends, then from tie part 310 by its both ends Opening makes it be in dispersed, and the opposite sides of tie part 310 is respectively tensile test portion 320 and casting portion 330.Leak preventive is filled out In the side of the close casting portion 330 of tie part 310, leak preventive inserts position closer to tie part 310, and it prevents aluminium alloy The effect of leakage is better.Before leak preventive is inserted, first casting portion 330 is cleaned.Casting portion 330 to scattering is carried out fully Cleaning, it is ensured that steel wire without grease, the foreign matter of tie part 310 to the end of steel wire rope 300.In order to avoid the effect of influence aluminium alloy injection. The usually used cleaning agent of cleaning, for example:By way of being soaked in kerosene and being cleaned with water again.In other embodiments, also may be used Cleaned without to casting portion 330.
Further, in the preferred embodiments of the present invention, alloy is poured into a mould for convenience, employ a kind of mould 100, such as scheme Shown in 2, mould 100 is provided with inner chamber, and the bottom of mould 100 is provided with through hole.Before leak preventive is inserted, first by steel wire rope 300 Casting portion 330 be positioned in the inner chamber of mould 100.The bottom of mould 100 has and inner space and diameter and steel wire rope 300 External diameter matching through hole, tie part 310 be located at through hole, be then filled with leak preventive;The position that leak preventive is inserted includes tying up Gap between the side of the close casting portion 330 in portion 310, and the outer wall of steel wire rope 300 and the wall of formation through hole.
The concrete structure of mould 100 refers to Fig. 2, and mould 100 is provided with inner chamber, and the bottom of mould 100 is provided with through hole, leads to Hole can contact with the outer surface of the steel wire rope 300 placed along the axis direction of inner chamber, and mould 100 is removably disposed in mould On tool support 200.Mould rack 200 has the space positioned at the through hole bottom of mould 100, and space has can be made along inner chamber The unbending height of steel wire rope 300 that axis direction is placed.During cast, the space can be such that steel wire rope 300 keeps without deviously Hang.
During concrete operations, steel wire rope 300 is passed through the through hole of mould 100, so that the casting portion 330 of steel wire rope 300 In the inner chamber of mould 100, the through hole of mould 100 is tied portion 310 and fills, then in the close casting portion of tie part 310 Insert leak preventive in gap between 330 side, and the outer wall of steel wire rope 300 and the wall of formation through hole.Leak preventive seals steel The gap between gap and steel wire between the outer wall of cord 300 and the wall for forming through hole.Then closed to injection in mould 100 Golden liquid.The aluminium alloy of injection generally selects the aluminium alloy of low melting point, such as the low-melting alloy liquid such as bismuth, antimony, tin, zinc.
Further, after inserting leak preventive, to aluminium alloy is injected in mould 100, the edge to mould 100 is vibrated. In an embodiment of the present invention, mould 100 is mainly tapped by the vibration for tapping the edge of mould 100 to realize mould 100 Edge is contacted with each other winding to prevent from being located at the steel wire rope 300 that scatters in mould 100, and aluminium alloy is evenly distributed, and is kept away Exempt to form hole and cannot be used for the test of the rupture pull force of steel wire rope 300 when aluminium alloy injects.Injection aluminium alloy after, interval time compared with It is short that just mould 100 is tapped, it is likely to result in aluminium alloy and penetrates application of anti-leakage layers, reveal aluminium alloy, it is therefore preferred that closing After the completion of golden liquid injection, kept for the time of at least 12 seconds, at this moment the temperature of aluminium alloy has becoming for solidification because being passed away Gesture, then avoid aluminium alloy and penetrate application of anti-leakage layers, it is therefore prevented that the leakage of aluminium alloy.
Further, after the aluminium alloy in the inner chamber of mould 100 solidifies completely, kept for more than 2 minutes, then by steel wire rope 300 take out from mould 100.Because solidification, with regard to taking out, can not cause certain safety to the aluminium alloy in mould 100 completely Hidden danger.
Present invention also offers a kind of method of testing of breaking force of rope, including:Using above-mentioned steel wire rope sample system The steel wire rope sample that the method for preventing aluminium alloy from leaking during standby is obtained carries out rupture pull force test.
If carrying out sample preparation using conventional method, the step of it does not prevent aluminium alloy from revealing, closed when being injected to mould 100 After golden liquid, the aluminium alloy of the bottom of mould 100 can be leaked, due to the continuous injection of aluminium alloy, when aluminium alloy and steel wire rope 300 After contact, quickly, the aluminium alloy solidification first injected could continue to inject aluminium alloy after blocking gap, cause mould for temperature drop Aluminium alloy temperature is uneven in 100, entirely pours deadhead and does not merge completely, so as to influence quality of casting, is likely to result in and pours deadhead and open Split, and then influence test result.Therefore, using the above-mentioned steel wire rope sample for preventing the method that aluminium alloy is leaked from obtaining, can For the test of the rupture pull force of steel wire rope 300, the accuracy of test result is can guarantee that,.
Further, the test of rupture pull force is carried out on testing machine, and the clamping length of the fixture of testing machine is h, position In the tie part 310 of same one end and the distance between the end of steel wire rope sample be H1, the height for inserting leak preventive is H2, preferably Ground, H2≤ 8mm, h=H1-H2.So set benefit be, it is ensured that the tensile test portion 320 of steel wire rope 300 be without The region of leak preventive or aluminium alloy, it is ensured that the test to the rupture pull force of steel wire rope 300 is not influenceed by other factors, surveys Test result is more accurate, accurate.It is preferably located at the distance between end and tie part 310 of the steel wire rope sample of same one end etc. In clamping length.
Feature of the invention and performance are described in further detail with reference to embodiments.
Embodiment 1
A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, in steel wire rope 300 near both ends Position is tied up, and steel wire rope 300 is divided into casting portion 330 and tensile test portion 320 by tie part 310, and casting portion 330 is located at steel The end of cord 300.Then casting portion 330 is opened makes it be in dispersed, then the casting portion 330 scattered is carried out fully clear Wash, it is ensured that steel wire without grease, the foreign matter of tie part 310 to the end of steel wire rope 300.Then by steel wire rope 300 through mould 100 Through hole, so that the wherein one end of steel wire rope 300 is located in the inner chamber of mould 100 by the casting portion 330 of cleaning treatment, mould 100 through hole is tied portion 310 and fills.Then to tie part 310 close casting portion 330 side, and steel wire rope 300 Leak preventive is inserted in gap between outer wall and the wall for forming through hole, and leak preventive is sodium chloride particle.Then injected in mould 100 The aluminium alloy of bismuth-containing, after keeping 15s, taps the edge of mould 100, after the aluminium alloy in the inner chamber of mould 100 solidifies completely, protects Hold 2 minutes, then steel wire rope 300 is taken out from mould 100.It is all same that the other end of steel wire rope 300 prevents aluminium alloy from revealing Operating procedure.
A kind of method of testing of breaking force of rope, including:Using prevented in above-mentioned steel wire rope sample preparation close The steel wire rope sample that the method for golden liquid leakage is obtained carries out rupture pull force test.
Embodiment 2
A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, in steel wire rope 300 near both ends Position is tied up, and steel wire rope 300 is divided into casting portion 330 and tensile test portion 320 by tie part 310, and casting portion 330 is located at steel The end of cord 300.Then casting portion 330 is opened makes it be in dispersed, then the casting portion 330 scattered is carried out fully clear Wash, it is ensured that steel wire without grease, the foreign matter of tie part 310 to the end of steel wire rope 300.Then by steel wire rope 300 through mould 100 Through hole, so that the wherein one end of steel wire rope 300 is located in the inner chamber of mould 100 by the casting portion 330 of cleaning treatment, mould 100 through hole is tied portion 310 and fills.Then to tie part 310 close casting portion 330 side, and steel wire rope 300 Leak preventive is inserted in gap between outer wall and the wall for forming through hole, and leak preventive is well mixed sodium chloride particle and calcirm-fluoride The mass ratio of grain, sodium chloride and calcirm-fluoride is 1:1.Then to the aluminium alloy that bismuth-containing is injected in mould 100, after keeping 12s, tap The edge of mould 100, after the aluminium alloy in the inner chamber of mould 100 solidifies completely, is kept for 3 minutes, then by steel wire rope 300 from mould Taken out in 100.It is all same operating procedure that the other end of steel wire rope 300 prevents aluminium alloy from revealing.
A kind of method of testing of breaking force of rope, including:Using prevented in above-mentioned steel wire rope sample preparation close The steel wire rope sample that the method for golden liquid leakage is obtained carries out rupture pull force test.
Embodiment 3
A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, in steel wire rope 300 near both ends Position is tied up, and steel wire rope 300 is divided into casting portion 330 and tensile test portion 320 by tie part 310, and casting portion 330 is located at steel The end of cord 300.Then casting portion 330 is opened makes it be in dispersed, then the casting portion 330 scattered is carried out fully clear Wash, it is ensured that steel wire without grease, the foreign matter of tie part 310 to the end of steel wire rope 300.Then by steel wire rope 300 through mould 100 Through hole, so that the wherein one end of steel wire rope 300 is located in the inner chamber of mould 100 by the casting portion 330 of cleaning treatment, mould 100 through hole is tied portion 310 and fills.Then to tie part 310 close casting portion 330 side, and steel wire rope 300 Leak preventive is inserted in gap between outer wall and the wall for forming through hole, and leak preventive is well mixed sodium chloride particle and calcirm-fluoride The mass ratio of grain, sodium chloride and calcirm-fluoride is 2:3.Then to the aluminium alloy that bismuth-containing is injected in mould 100, after keeping 18s, tap The edge of mould 100, after the aluminium alloy in the inner chamber of mould 100 solidifies completely, is kept for 5 minutes, then by steel wire rope 300 from mould Taken out in 100.It is all same operating procedure that the other end of steel wire rope 300 prevents aluminium alloy from revealing.
A kind of method of testing of breaking force of rope, including:Using prevented in above-mentioned steel wire rope sample preparation close The steel wire rope sample that the method for golden liquid leakage is obtained carries out rupture pull force test.
Embodiment 4
A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, in steel wire rope 300 near both ends Position is tied up, and steel wire rope 300 is divided into casting portion 330 and tensile test portion 320 by tie part 310, and casting portion 330 is located at steel The end of cord 300.Then casting portion 330 is opened makes it be in dispersed, then the casting portion 330 scattered is carried out fully clear Wash, it is ensured that steel wire without grease, the foreign matter of tie part 310 to the end of steel wire rope 300.Then by steel wire rope 300 through mould 100 Through hole, so that the wherein one end of steel wire rope 300 is located in the inner chamber of mould 100 by the casting portion 330 of cleaning treatment, mould 100 through hole is tied portion 310 and fills.Then to tie part 310 close casting portion 330 side, and steel wire rope 300 Leak preventive is inserted in gap between outer wall and the wall for forming through hole, and leak preventive is well mixed sodium chloride particle and calcirm-fluoride The mass ratio of grain, sodium chloride and calcirm-fluoride is 3:2.Then to the aluminium alloy that bismuth-containing is injected in mould 100, after keeping 20s, tap The edge of mould 100, after the aluminium alloy in the inner chamber of mould 100 solidifies completely, is kept for 5 minutes, then by steel wire rope 300 from mould Taken out in 100.It is all same operating procedure that the other end of steel wire rope 300 prevents aluminium alloy from revealing.
A kind of method of testing of breaking force of rope, including:Using prevented in above-mentioned steel wire rope sample preparation close The steel wire rope sample that the method for golden liquid leakage is obtained carries out rupture pull force test.
Embodiment 5
A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, in steel wire rope 300 near both ends Position is tied up, and steel wire rope 300 is divided into casting portion 330 and tensile test portion 320 by tie part 310, and casting portion 330 is located at steel The end of cord 300.Then casting portion 330 is opened makes it be in dispersed, then the casting portion 330 scattered is carried out fully clear Wash, it is ensured that steel wire without grease, the foreign matter of tie part 310 to the end of steel wire rope 300.Then by steel wire rope 300 through mould 100 Through hole, so that the wherein one end of steel wire rope 300 is located in the inner chamber of mould 100 by the casting portion 330 of cleaning treatment, mould 100 through hole is tied portion 310 and fills.Then to tie part 310 close casting portion 330 side, and steel wire rope 300 Leak preventive is inserted in gap between outer wall and the wall for forming through hole, and leak preventive is well mixed sodium chloride particle and calcirm-fluoride The mass ratio of grain, sodium chloride and calcirm-fluoride is 1:4.Then to the aluminium alloy that bismuth-containing is injected in mould 100, after keeping 30s, tap The edge of mould 100, after the aluminium alloy in the inner chamber of mould 100 solidifies completely, is kept for 4 minutes, then by steel wire rope 300 from mould Taken out in 100.It is all same operating procedure that the other end of steel wire rope 300 prevents aluminium alloy from revealing.
A kind of method of testing of breaking force of rope, including:Using prevented in above-mentioned steel wire rope sample preparation close The steel wire rope sample that the method for golden liquid leakage is obtained carries out rupture pull force test.
Comparative example 1
The preparation method of steel wire rope sample:Tied up near the position at both ends in steel wire rope 300, tie part 310 will Steel wire rope 300 is divided into casting portion 330 and tensile test portion 320, and casting portion 330 is located at the end of steel wire rope 300.Then by casting portion 330 openings make it be in dispersed, then the casting portion 330 scattered fully are cleaned, it is ensured that tie part 310 to steel wire rope The steel wire without grease of 300 ends, foreign matter.Then by steel wire rope 300 through mould 100 through hole so that steel wire rope 300 its Middle one end is located in the inner chamber of mould 100 by the casting portion 330 of cleaning treatment, and the through hole of mould 100 is tied portion 310 and fills out Fill.To the aluminium alloy that bismuth-containing is injected in mould 100, after keeping 30s, the edge of mould 100 is tapped, in treating the inner chamber of mould 100 After aluminium alloy solidifies completely, kept for 4 minutes, then steel wire rope 300 is taken out from mould 100.The other end of steel wire rope 300 is same The operating procedure of sample.
Comparative example 2
The preparation method of steel wire rope sample:Tied up near the position at both ends in steel wire rope 300, tie part 310 will Steel wire rope 300 is divided into casting portion 330 and tensile test portion 320, and casting portion 330 is located at the end of steel wire rope 300.Then by casting portion 330 openings make it be in dispersed, then the casting portion 330 scattered fully are cleaned, it is ensured that tie part 310 to steel wire rope The steel wire without grease of 300 ends, foreign matter.Then by steel wire rope 300 through mould 100 through hole so that steel wire rope 300 its Middle one end is located in the inner chamber of mould 100 by the casting portion 330 of cleaning treatment, and the through hole of mould 100 is tied portion 310 and fills out Fill.Then to tie part 310 close casting portion 330 side, and steel wire rope 300 outer wall and formed through hole wall between Gap insert leak preventive, leak preventive is the matter of well mixed sodium chloride particle and calcium fluoride particles, sodium chloride and calcirm-fluoride Amount is than being 1:9.Then to the aluminium alloy that bismuth-containing is injected in mould 100, after keeping 30s, the edge of mould 100 is tapped, treats mould After aluminium alloy in 100 inner chambers solidifies completely, kept for 4 minutes, then steel wire rope 300 is taken out from mould 100.Steel wire rope 300 The other end be same operating procedure.
Test example
Whether when the steel wire rope sample to embodiment 1-5 and comparative example 1-2 carries out sample preparation, visually observing has aluminium alloy Leak case.Its result is recorded in table 1.
The leak case of the steel wire rope sample aluminium alloy of the embodiment 1-5 of table 1 and comparative example 1-2
As can be seen from Table 1, embodiment 1-5 prevent aluminium alloy leak method effect preferably, aluminium alloy substantially all without Leakage, and the comparative example 1 for being not added with leak preventive reveals more.Comparative example 1-5 and comparative example 2 find that comparative example 2 is in sample preparation Also some aluminium alloys reveal, when the leak preventive for illustrating the embodiment of the present invention is sodium chloride and calcirm-fluoride, using of the invention real Applying the ratio of example can preferably prevent the leakage of aluminium alloy.
In sum, a kind of leak preventive of the embodiment of the present invention, prevent aluminium alloy leak method and steel wire rope sample, A kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, leak preventive is inserted near the tie part of steel wire rope, Higher than the fusing point of aluminium alloy, leak preventive will not react the fusing point of leak preventive with the low-melting alloy liquid such as bismuth, antimony, tin, zinc, and Leak preventive is in granular form, and can prevent the leakage of aluminium alloy with the gap between filler wires, and the rupture pull force of steel wire rope is not influenceed Test.A kind of method of testing of breaking force of rope, including:Using preventing aluminium alloy in above-mentioned steel wire rope sample preparation The steel wire rope sample that the method for leakage is obtained carries out rupture pull force test.Not only can guarantee that the accuracy of test result, moreover it is possible to keep away Exempt from safety problem generation.
Embodiments described above is a part of embodiment of the invention, rather than whole embodiments.Reality of the invention The detailed description for applying example is not intended to limit the scope of claimed invention, but is merely representative of selected implementation of the invention Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made Every other embodiment, belongs to the scope of protection of the invention.

Claims (10)

1. a kind of method for preventing aluminium alloy from leaking in steel wire rope sample preparation, it is characterised in that including:In cast alloy The step of before liquid to inserting leak preventive near the tie part of steel wire rope, the fusing point of the leak preventive is molten higher than the aluminium alloy Point, the leak preventive is in granular form.
2. the method for preventing aluminium alloy from leaking in steel wire rope sample preparation according to claim 1, it is characterised in that The leak preventive includes alkali halide.
3. the method for preventing aluminium alloy from leaking in steel wire rope sample preparation according to claim 2, it is characterised in that The alkali halide is sodium chloride.
4. the method for preventing aluminium alloy from leaking in steel wire rope sample preparation according to claim 2, it is characterised in that The leak preventive also includes alkaline-earth halide, and the alkali halide is the 20wt%-60wt% of the leak preventive.
5. the method for preventing aluminium alloy from leaking in steel wire rope sample preparation according to claim 4, it is characterised in that The alkaline-earth halide is the 40wt%-80wt% of the leak preventive.
6. the method for preventing aluminium alloy from leaking in steel wire rope sample preparation according to claim 4, it is characterised in that The alkaline-earth halide is calcirm-fluoride.
7. the method for preventing aluminium alloy from leaking in the steel wire rope sample preparation according to claim any one of 1-6, its It is characterised by, the opposite sides of the tie part of the steel wire rope is respectively tensile test portion and casting portion, and the casting portion is located at The end of the steel wire rope and in dispersed, the leak preventive fills out the side of the close described casting portion in the tie part.
8. the method for preventing aluminium alloy from leaking in steel wire rope sample preparation according to claim 7, it is characterised in that Before the leak preventive is inserted, first the casting portion of the steel wire rope is positioned in the inner chamber of mould, the bottom tool of the mould There is the through hole matched with the external diameter of the steel wire rope with the inner space and diameter, the tie part is located at the through hole, It is then filled with the leak preventive;The position that the leak preventive is inserted includes the side of the close described casting portion of the tie part, And the gap between the outer wall of the steel wire rope and the wall of the formation through hole.
9. the method for preventing aluminium alloy from leaking in steel wire rope sample preparation according to claim 8, it is characterised in that After inserting the leak preventive, to aluminium alloy is injected in the mould, the edge to the mould is vibrated.
10. a kind of method of testing of breaking force of rope, it is characterised in that including:Using described in claim any one of 1-9 Steel wire rope sample preparation in prevent the steel wire rope sample that obtains of method that aluminium alloy is leaked from carrying out rupture pull force test.
CN201710192130.3A 2017-03-28 2017-03-28 Method for preventing alloy liquid from leaking in preparation process of steel wire rope sample and method for testing breaking tension of steel wire rope Active CN106896017B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710192130.3A CN106896017B (en) 2017-03-28 2017-03-28 Method for preventing alloy liquid from leaking in preparation process of steel wire rope sample and method for testing breaking tension of steel wire rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710192130.3A CN106896017B (en) 2017-03-28 2017-03-28 Method for preventing alloy liquid from leaking in preparation process of steel wire rope sample and method for testing breaking tension of steel wire rope

Publications (2)

Publication Number Publication Date
CN106896017A true CN106896017A (en) 2017-06-27
CN106896017B CN106896017B (en) 2020-02-18

Family

ID=59193235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710192130.3A Active CN106896017B (en) 2017-03-28 2017-03-28 Method for preventing alloy liquid from leaking in preparation process of steel wire rope sample and method for testing breaking tension of steel wire rope

Country Status (1)

Country Link
CN (1) CN106896017B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101829764A (en) * 2010-04-17 2010-09-15 贵州钢绳股份有限公司 Molten metal casting method for cable wire end
CN102636389A (en) * 2012-03-31 2012-08-15 攀钢集团攀枝花钢铁研究院有限公司 Method for detecting integrally breaking force for steel wire rope
CN202533299U (en) * 2012-03-31 2012-11-14 攀钢集团攀枝花钢铁研究院有限公司 Device for preparing sample for testing breaking force of steel wire rope
CN103207115A (en) * 2013-03-12 2013-07-17 北京北方车辆集团有限公司 Overall tensile detection method for wire ropes
CN204855232U (en) * 2015-08-03 2015-12-09 中钢集团郑州金属制品研究院有限公司 Disrumpent feelings tensile sample of wire rope casting testing method's device
CN106769308A (en) * 2016-12-19 2017-05-31 鞍钢钢绳有限责任公司 The method for preventing overall breaking force of steel wire rope from testing wire rope core fusing when filling head

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101829764A (en) * 2010-04-17 2010-09-15 贵州钢绳股份有限公司 Molten metal casting method for cable wire end
CN102636389A (en) * 2012-03-31 2012-08-15 攀钢集团攀枝花钢铁研究院有限公司 Method for detecting integrally breaking force for steel wire rope
CN202533299U (en) * 2012-03-31 2012-11-14 攀钢集团攀枝花钢铁研究院有限公司 Device for preparing sample for testing breaking force of steel wire rope
CN103207115A (en) * 2013-03-12 2013-07-17 北京北方车辆集团有限公司 Overall tensile detection method for wire ropes
CN204855232U (en) * 2015-08-03 2015-12-09 中钢集团郑州金属制品研究院有限公司 Disrumpent feelings tensile sample of wire rope casting testing method's device
CN106769308A (en) * 2016-12-19 2017-05-31 鞍钢钢绳有限责任公司 The method for preventing overall breaking force of steel wire rope from testing wire rope core fusing when filling head

Also Published As

Publication number Publication date
CN106896017B (en) 2020-02-18

Similar Documents

Publication Publication Date Title
CN102636389B (en) Method for detecting integrally breaking force for steel wire rope
CN101829764A (en) Molten metal casting method for cable wire end
CN101314923A (en) Technique for pouring hoisting cable anchorage head with alloy
JPWO2009136650A1 (en) Manufacturing method of salt core for casting
CN106896017A (en) The method of aluminium alloy leakage and the method for testing of breaking force of rope are prevented in a kind of steel wire rope sample preparation
ITTO960398A1 (en) METHOD FOR JUDGING THE PROPERTIES OF CAST CAST IRON.
US20090288797A1 (en) Expendable salt core for casting
CN105014254B (en) A kind of photovoltaic welding belt corrosion-resistant solder and preparation method thereof
CN105324498A (en) Copper alloy for plumbing member
CN104070149B (en) A kind of production method of small square billet continuous casting bearing steel
CN113213839B (en) Concrete building member crack prevention and control method
US4164148A (en) Method for determining sulfur content of cast iron
JP5101634B2 (en) Method and oxygen sensor for influencing the properties of cast iron
ES2856029T3 (en) Copper alloy for use in a member for hydraulic works
JP2007216243A (en) Mold powder for continuous casting of steel, and continuous casting method using the same
KR100241405B1 (en) Measuring method for freezing solidification shell
US6444056B1 (en) Refined magnesium material and method for producing the same
JPH0520184B2 (en)
DE2631242C2 (en) Process for coating the inner wall of a centrifugal casting mold for casting copper or its alloys
CN110042686A (en) A kind of tail rope head manufacture craft
JP2000326090A (en) Tig welding flux of stainless steel
JPS6131263B2 (en)
US1749541A (en) Compound for filling recesses in metal castings and the like
RU2026153C1 (en) Method of alloying mould cavity
CN106834601A (en) For the line of refining molten metal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant