CN110042686A - A kind of tail rope head manufacture craft - Google Patents

A kind of tail rope head manufacture craft Download PDF

Info

Publication number
CN110042686A
CN110042686A CN201910380572.XA CN201910380572A CN110042686A CN 110042686 A CN110042686 A CN 110042686A CN 201910380572 A CN201910380572 A CN 201910380572A CN 110042686 A CN110042686 A CN 110042686A
Authority
CN
China
Prior art keywords
rope
head
cup body
steel wire
wirerope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910380572.XA
Other languages
Chinese (zh)
Other versions
CN110042686B (en
Inventor
杨雪
何维斌
操礼发
王全效
柳晓飞
黄兴鹏
曹彬
方祝友
王征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201910380572.XA priority Critical patent/CN110042686B/en
Publication of CN110042686A publication Critical patent/CN110042686A/en
Application granted granted Critical
Publication of CN110042686B publication Critical patent/CN110042686B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • DTEXTILES; PAPER
    • D07ROPES; CABLES OTHER THAN ELECTRIC
    • D07BROPES OR CABLES IN GENERAL
    • D07B9/00Binding or sealing ends, e.g. to prevent unravelling

Landscapes

  • Ropes Or Cables (AREA)

Abstract

The present invention relates to coal production fields, and in particular to a kind of tail rope head manufacture craft includes the following steps: A, whipping;B, rope end is shelled;C, it hamulas;D, rope end is cleaned;E, it is poured;F, cooled and solidified.The present invention has the advantages that labor intensity is small, while in terms of existing technologies, integrated operation process is by a relatively simple, and required operator is less, and safety also greatly increases, and the whole used time is much less also relative to the prior art.

Description

A kind of tail rope head manufacture craft
Technical field
The present invention relates to coal production fields, and in particular to a kind of tail rope head manufacture craft.
Background technique
During previous mine rounded tail rope, tail rope head is all made of the mode that babbit heating pours and is made, the work Skill process is many and diverse, and quality requirement is high, and construction risk point is more, careless slightly that the production of tail rope head will be caused to scrap.Therefore tail rope head Production has become the core that entire tail rope more changes jobs, and determines the duration that lifting system is restored.Babbit system is used in the past When making the traditional handicraft of tail rope head, stripping cable wire end length is longer, and quantity of hamulaing is more, needs a large amount of construction personnel while making Industry can just be timely completed the task of stripping head cleaning.Babbit heating temperature is high, easily splashes or scald personnel, these all give operation Personnel bring many danger.High, cup body and Pasteur are required to the size of the cleaning quality of tail rope and chrysanthemum head in production The heating temperature of alloy requires stringent, and careless slightly to will lead to tail rope head production quality unqualified.
Summary of the invention
The technical problem to be solved by the present invention is tail rope head complex manufacturing technology, the problem of safety difference in the prior art.
In order to solve the above technical problems, the technical solution used in the present invention is: a kind of tail rope head manufacture craft, including such as Lower step:
A, whipping:
A1, the rope end of wirerope is passed through into cup body from the small bore end of the bellmouth of cup body;
A2, rope end is tied up from the position apart from rope end 2.5d-3.5d, d is wirerope diameter, the length of bellmouth Greater than the distance of bundling position to rope end;
B, rope end is shelled:
B1, the rope strand of rope end is opened from rope end to from tying up, wire rope core is cut off from the place of tying up root;
B2, all steel wires of rope strand and wire rope core are opened to place is tied up, chrysanthemum head is collectively formed in the steel wire of all openings;
C, it hamulas:
By the head of the thicker steel wire of chrysanthemum head outer layer to the interior lateral bend of chrysanthemum head, crotch is formed, the length of crotch is 20-30mm;
D, rope end is cleaned:
Impurity, the greasy dirt on steel wire are washed with cleaning agent;
E, it is poured:
E1, wirerope is pulled, enters chrysanthemum head in the bellmouth of cup body;
The posture of E2, adjustment wirerope and cup body make the big nose end of the bellmouth of cup body vertically upward;
E3, it will be sealed between wirerope and the small bore end of bellmouth;
E4, the casting resin into bellmouth;
F, cooled and solidified:
It after F1, casting complete, keeps the posture of wirerope and cup body constant, stands 10-20min, hardening of resin;
After F2, hardening of resin, keep the posture of wirerope and cup body constant, then stand 5-15min;
At least 100min after F3, step F2, wirerope and cup body can come into operation.
Compared with the existing technology, using the tail rope head manufacture craft in the present invention, in the case where guaranteeing tail rope head quality, The length for shelling rope end is shorter, and labor intensity is smaller, while only needing the head of the thicker steel wire of chrysanthemum head outer layer to chrysanthemum head Interior lateral bend, compared with the prior art, labor intensity is small, while in terms of existing technologies, and integrated operation process is relatively To be simple, required operator is less, and the used time is also less, in addition use resin-cast, compared with the existing technology in need to heat High temperature babbit, pours into cup body, needs more people's cooperations, while to prevent from scalding, splash danger, needs 5-6 people simultaneously Cooperation, and the present invention only needs for resin compound to be stirred, and pours into cup body, only meeting nature generates heat 40 DEG C -60 DEG C, only needs 2- 3 people operation, safety also greatly increase, and the whole used time is much less also relative to the prior art.
Further, in step A2, to the direction far from rope end to rope end since the position apart from rope end 2.5d-3.5d It is tied up, tying up width is 1.5d-2.5d.
Further, in step B, the cordage stripped out is cut off from root.
Further, in step B2, chrysanthemum head is cleared up, sundries is removed, to ensure subsequent chrysanthemum head and tree Rouge can sufficiently bond together.
Further, in step C, the head of steel wire is to after the interior lateral bend of chrysanthemum head, between the head and steel wire of steel wire Angle be 30 ° -90 °, it is ensured that the head of steel wire can effectively hook resin, improve its tensile strength.
Further, in step D, cleaning agent used is trichloro ethylene cleaning agent, rinses steel wire with trichloro ethylene cleaning agent 3-4 time, the sundries on steel wire then is brushed away with hairbrush, cleans steel wire in the past, each steel wire is cleaned using diesel oil and dilute hydrochloric acid, Hydrochloric acid is corrosive, and operation is dangerous, while wash number is more, wipes distance, and repeatedly could be more clean after cleaning, Need personnel more, to need 4-6 people to cooperate habitually in the past while clean, cleaning material is disposable, and uses trichloro ethylene clear Lotion, it is non-corrosive, nonflammable, and cleaning effect is preferable, number needed for cleaning is also less, while cleaning agent is reusable.
Further, in step E3, first the gap between wirerope and the small bore end of bellmouth is blocked with yellow mud, and will Yellow mud is smeared uniformly, is then tightly wrapped the yellow mud on wirerope surface with adhesive tape, yellow mud and adhesive tape are easier to obtain, and operate simultaneously Simply, cost is relatively low.
Further, in step E4, resin used is SOCKET LOCK steel wire rope resin glue, SOCKET LOCK steel wire Restrict resin glue adhesive effect it is preferable, safety is higher, compared with the existing technology in babbit it is safer.
Further, in step E4, the side casting resin thereto being open from bellmouth, until casting complete, resin Bellmouth is filled up, casting resin, resin uniformly diffuse in bellmouth thereto from the side that bellmouth is open, the bubble of generation Less, contact of the resin with steel wire is more closely knit, reliable, and intensity is bigger after casting complete.
Further, in step F3, before coming into operation, resin extra on cup body is cleaned up, guarantees cup body macropore The end face at end is plane, removes extra resin, it is ensured that the end face of the big nose end of cup body is plane, it is ensured that the big nose end of cup body can It is bonded with connected member in tight, connection effect is more preferable.
The beneficial effects of the present invention are:
1. compared with the existing technology, using the tail rope head manufacture craft in the present invention, the case where guaranteeing tail rope head quality Under, the length for shelling rope end is shorter, and labor intensity is smaller, while only needing the head of the thicker steel wire of chrysanthemum head outer layer to chrysanthemum head Interior lateral bend, compared with the prior art, labor intensity is small, while in terms of existing technologies, and integrated operation process is opposite Relatively simple, required operator is less, and the used time is also less, in addition use resin-cast, compared with the existing technology in need plus Hot high temperature babbit, pours into cup body, needs more people's cooperations, while to prevent from scalding, splash danger, needs 5-6 people same Shi Peihe, and the present invention only needs for resin compound to be stirred, and pours into cup body, only meeting nature generates heat 40 DEG C -60 DEG C, only needs 2-3 people's operation, safety also greatly increase, and the whole used time is much less also relative to the prior art.
2. a pair chrysanthemum head is cleared up, sundries is removed, it can be ensured that subsequent chrysanthemum head can be sufficiently be bonded with resin Together.
3. the head of steel wire is to after the interior lateral bend of chrysanthemum head, the angle between the head and steel wire of steel wire is 30 ° -90 °, Ensure that the head of steel wire can effectively hook resin, improves its tensile strength.
4. cleaning steel wire in the past, cleans each steel wire using diesel oil and dilute hydrochloric acid, hydrochloric acid is corrosive, and operation has danger Danger, while wash number is more, wipes distance, and more completely personnel could be needed more, to need 4- habitually in the past after cleaning repeatedly 6 people cooperate while cleaning, and cleaning material is disposable, and use trichloro ethylene cleaning agent, non-corrosive, nonflammable, and Cleaning effect is preferable, and number needed for cleaning is also less, while cleaning agent is reusable.
5. yellow mud and adhesive tape are easier to obtain, while easy to operate, cost is relatively low.
6.SOCKET LOCK steel wire rope resin glue adhesive effect is preferable, and safety is higher, compared with the existing technology in Babbit is safer.
7. from the side that bellmouth is open, casting resin, resin are uniformly diffused in bellmouth thereto, the bubble of generation Less, contact of the resin with steel wire is more closely knit, reliable, and intensity is bigger after casting complete.
8. removing extra resin, it is ensured that the end face of the big nose end of cup body is plane, it is ensured that the big nose end of cup body can be with quilt The member in tight of connection is bonded, and connection effect is more preferable.
Detailed description of the invention
Fig. 1-8 is a kind of schematic diagram of tail rope head manufacture craft in the embodiment of the present invention;
Fig. 9 is the cross-sectional view of cup body in the embodiment of the present invention;
Figure 10 is the top view of cup body in the embodiment of the present invention;
Figure 11 is the bottom view of cup body in the embodiment of the present invention;
Wherein,
Wirerope -1, rope strand -11, wire rope core -12, steel wire -13;
Cup body -2, bellmouth -21.
Specific embodiment
The present invention is described in detail below in conjunction with attached drawing.
Embodiment one:
A kind of tail rope head manufacture craft, includes the following steps:
A, whipping:
A1, as shown in Figure 1, the rope end of wirerope 1 is passed through cup body 2 from the small bore end of the bellmouth 21 of cup body 2;
Comprehensive reference Fig. 9-11, the cup body 2 in the present embodiment are upper coarse and lower fine truncated cone-shaped, are provided in cup body 2 big Under small bellmouth 21,2 upper end-face edge of cup body is provided with flange, the through-hole for installation offered on flange, and cup body 2 is existing Technology, market purchase.
A2, as shown in Fig. 2, being tied up from the position apart from rope end 2.5d-3.5d with thin wire to rope end, d is steel wire Rope diameter, the length of bellmouth 21 are greater than bundling position to the distance of rope end;Since the position apart from rope end 2.5d-3.5d to Rope end is tied up in direction far from rope end, and tying up width is 1.5d-2.5d;
D=50mm in the present embodiment carries out rope end to the direction far from rope end since the position apart from rope end 125mm It ties up, tying up width is 75mm;
B, rope end is shelled:
B1, as shown in figure 3, opening the rope strand 11 of rope end from rope end to from tying up, wire rope core 12 is cut from the place of tying up root It is disconnected;
B2, as shown in figure 4, by all steel wires 13 of rope strand 11 and wire rope core 12 open to tie up place, the steel wire of all openings 13 are collectively formed chrysanthemum head;
The cordage stripped out is cut off from root, chrysanthemum head is cleared up, sundries is removed.
C, it hamulas:
As shown in figure 5, the head of the thicker steel wire 13 of chrysanthemum head outer layer is formed into crotch to the interior lateral bend of chrysanthemum head, The length of crotch is 20mm;
To after the interior lateral bend of chrysanthemum head, the angle between the head and steel wire 13 of steel wire 13 is 30 ° on the head of steel wire 13.
D, rope end is cleaned:
Impurity, the greasy dirt on steel wire 13 are washed with cleaning agent;
Cleaning agent used is trichloro ethylene cleaning agent, is rinsed 3-4 times with trichloro ethylene cleaning agent to steel wire 13, then uses hair The sundries on steel wire 13 is brushed away, trichloro ethylene cleaning agent is the prior art, market purchase;
E, it is poured:
E1, as shown in fig. 6, pull wirerope 1, enter chrysanthemum head in the bellmouth 21 of cup body 2;
E2, as shown in fig. 6, adjustment wirerope 1 and cup body 2 posture, make the vertical court of big nose end of the bellmouth 21 of cup body 2 On;
E3, it will be sealed between wirerope 1 and the small bore end of bellmouth 21;
As shown in fig. 7, first the gap between wirerope 1 and the small bore end of bellmouth 21 is blocked with yellow mud, and by yellow mud It smears uniformly, is then tightly wrapped the yellow mud on 1 surface of wirerope with adhesive tape.
E4, the casting resin into bellmouth 21;
Resin used is SOCKET LOCK steel wire rope resin glue, is poured tree thereto from the side that bellmouth 21 is open Rouge, until casting complete, resin fill up bellmouth 21, i.e., state as shown in Figure 8, SOCKET LOCK steel wire rope resin glue For the prior art, market purchase.
F, cooled and solidified:
It after F1, casting complete, keeps the posture of wirerope 1 and cup body 2 constant, stands 10min, hardening of resin;
After F2, hardening of resin, keep the posture of wirerope 1 and cup body 2 constant, then stand 5min;
100min after F3, step F2, wirerope 1 and cup body 2 can come into operation, will be more on cup body 2 before coming into operation Remaining resin cleans up, and guarantees that the end face of the big nose end of cup body 2 is plane, i.e., state as shown in Figure 8.
Embodiment two:
The difference of the present invention and embodiment one are:
D=50mm in A2, the present embodiment, to the direction far from rope end to rope end since the position apart from rope end 150mm It is tied up, tying up width is 100mm;
C, it hamulas:
By the head of the thicker steel wire 13 of chrysanthemum head outer layer to the interior lateral bend of chrysanthemum head, crotch, the length of crotch are formed For 25mm;
To after the interior lateral bend of chrysanthemum head, the angle between the head and steel wire 13 of steel wire 13 is 60 ° on the head of steel wire 13.
F, cooled and solidified:
It after F1, casting complete, keeps the posture of wirerope 1 and cup body 2 constant, stands 15min, hardening of resin;
After F2, hardening of resin, keep the posture of wirerope 1 and cup body 2 constant, then stand 10min;
110min after F3, step F2, wirerope 1 and cup body 2 can come into operation,
Embodiment three:
The difference of the present invention and embodiment one are:
D=50mm in A2, the present embodiment, to the direction far from rope end to rope end since the position apart from rope end 175mm It is tied up, tying up width is 125mm;
C, it hamulas:
By the head of the thicker steel wire 13 of chrysanthemum head outer layer to the interior lateral bend of chrysanthemum head, crotch, the length of crotch are formed For 30mm;
To after the interior lateral bend of chrysanthemum head, the angle between the head and steel wire 13 of steel wire 13 is 90 ° on the head of steel wire 13.
F, cooled and solidified:
It after F1, casting complete, keeps the posture of wirerope 1 and cup body 2 constant, stands 20min, hardening of resin;
After F2, hardening of resin, keep the posture of wirerope 1 and cup body 2 constant, then stand 15min;
120min after F3, step F2, wirerope 1 and cup body 2 can come into operation,
Compared with the existing technology, using the tail rope head manufacture craft in the present invention, in the case where guaranteeing tail rope head quality, The length for shelling rope end is shorter, and labor intensity is smaller, while only needing the head of the thicker steel wire 13 of chrysanthemum head outer layer to chrysanthemum head Interior lateral bend, compared with the prior art, labor intensity is small, while in terms of existing technologies, and integrated operation process is opposite Relatively simple, required operator is less, and the used time is also less, in addition use resin-cast, compared with the existing technology in need plus Hot high temperature babbit, pours into cup body, needs more people's cooperations, while to prevent from scalding, splash danger, needs 5-6 people same Shi Peihe, and the present invention only needs for resin compound to be stirred, and pours into cup body, only meeting nature generates heat 40 DEG C -60 DEG C, only needs 2-3 people's operation, safety also greatly increase, and the whole used time is much less also relative to the prior art.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of tail rope head manufacture craft, characterized by the following steps:
A, whipping:
A1, the rope end of wirerope (1) is passed through into cup body (2) from the small bore end of the bellmouth (21) of cup body (2);
A2, rope end is tied up from the position apart from rope end 2.5d-3.5d, d is wirerope diameter, the length of bellmouth (21) Greater than the distance of bundling position to rope end;
B, rope end is shelled:
B1, the rope strand (11) of rope end is opened from rope end to from tying up, wire rope core (12) is cut off from the place of tying up root;
B2, all steel wires (13) of rope strand (11) are opened to place is tied up, chrysanthemum head is collectively formed in the steel wire (13) of all openings;
C, it hamulas:
By the head of the thicker steel wire (13) of chrysanthemum head outer layer to the interior lateral bend of chrysanthemum head, crotch is formed, the length of crotch is 20-30mm;
D, rope end is cleaned:
Impurity, the greasy dirt on steel wire (13) are washed with cleaning agent;
E, it is poured:
E1, wirerope (1) is pulled, enters chrysanthemum head in the bellmouth (21) of cup body (2);
The posture of E2, adjustment wirerope (1) and cup body (2) make the big nose end of the bellmouth (21) of cup body (2) vertically upward;
E3, it will be sealed between wirerope (1) and the small bore end of bellmouth (21);
E4, the casting resin in bellmouth (21);
F, cooled and solidified:
It after F1, casting complete, keeps the posture of wirerope (1) and cup body (2) constant, stands 10-20min, hardening of resin;
After F2, hardening of resin, keep the posture of wirerope (1) and cup body (2) constant, then stand 5-15min;
At least 100min after F3, step F2, wirerope (1) and cup body (2) can come into operation.
2. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step A2, from apart from rope end The position of 2.5d-3.5d starts to tie up rope end to the direction far from rope end, and tying up width is 1.5d-2.5d.
3. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step B, the cordage that will strip out It is cut off from root.
4. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step B2, carried out to chrysanthemum head Cleaning, sundries is removed.
5. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step C, the head of steel wire (13) To after the interior lateral bend of chrysanthemum head, the angle between the head and steel wire (13) of steel wire (13) is 30 ° -90 °.
6. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step D, cleaning agent used is three Vinyl chloride cleaning agent rinses steel wire (13) 3-4 times with trichloro ethylene cleaning agent, is then brushed away with hairbrush miscellaneous on steel wire (13) Object.
7. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step E3, first with yellow mud by steel Gap between cord (1) and the small bore end of bellmouth (21) is blocked, and yellow mud is smeared uniformly, then with adhesive tape by wirerope (1) yellow mud on surface tightly wraps.
8. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step E4, resin used is SOCKET LOCK steel wire rope resin glue.
9. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step E4, from bellmouth (21) The side of opening casting resin thereto, until casting complete, resin fill up bellmouth (21).
10. a kind of tail rope head manufacture craft according to claim 1, it is characterised in that: in step F3, come into operation it Before, resin extra on cup body (2) is cleaned up, guarantees that the end face of cup body (2) big nose end is plane.
CN201910380572.XA 2019-05-08 2019-05-08 Tail rope head manufacturing process Active CN110042686B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910380572.XA CN110042686B (en) 2019-05-08 2019-05-08 Tail rope head manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910380572.XA CN110042686B (en) 2019-05-08 2019-05-08 Tail rope head manufacturing process

Publications (2)

Publication Number Publication Date
CN110042686A true CN110042686A (en) 2019-07-23
CN110042686B CN110042686B (en) 2021-07-30

Family

ID=67281250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910380572.XA Active CN110042686B (en) 2019-05-08 2019-05-08 Tail rope head manufacturing process

Country Status (1)

Country Link
CN (1) CN110042686B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985604A (en) * 2019-11-25 2020-04-10 北京杏林伟业电梯工程有限公司 Bus alloy pouring process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314923A (en) * 2008-06-30 2008-12-03 中国第十七冶金建设有限公司 Technique for pouring hoisting cable anchorage head with alloy
CN101829764A (en) * 2010-04-17 2010-09-15 贵州钢绳股份有限公司 Molten metal casting method for cable wire end
JP5258719B2 (en) * 2008-09-19 2013-08-07 東綱橋梁株式会社 Fiber rope terminal fixing method
CN103255658A (en) * 2013-05-06 2013-08-21 巨力索具股份有限公司 Method for casting and solidifying end portion of fiber rope
US20160237615A1 (en) * 2015-02-16 2016-08-18 Tokyo Rope Mfg. Co., Ltd. End fixing structure of composite wire rod
CN208009152U (en) * 2018-01-31 2018-10-26 徐州道亨机械科技有限公司 Wire rope end steel strand breaks up pretreating tool
CN109371728A (en) * 2018-10-26 2019-02-22 江苏良友钢绳有限公司 A kind of preparation method of wear-resisting durable shaped steel wire rope

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314923A (en) * 2008-06-30 2008-12-03 中国第十七冶金建设有限公司 Technique for pouring hoisting cable anchorage head with alloy
JP5258719B2 (en) * 2008-09-19 2013-08-07 東綱橋梁株式会社 Fiber rope terminal fixing method
CN101829764A (en) * 2010-04-17 2010-09-15 贵州钢绳股份有限公司 Molten metal casting method for cable wire end
CN103255658A (en) * 2013-05-06 2013-08-21 巨力索具股份有限公司 Method for casting and solidifying end portion of fiber rope
US20160237615A1 (en) * 2015-02-16 2016-08-18 Tokyo Rope Mfg. Co., Ltd. End fixing structure of composite wire rod
CN208009152U (en) * 2018-01-31 2018-10-26 徐州道亨机械科技有限公司 Wire rope end steel strand breaks up pretreating tool
CN109371728A (en) * 2018-10-26 2019-02-22 江苏良友钢绳有限公司 A kind of preparation method of wear-resisting durable shaped steel wire rope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985604A (en) * 2019-11-25 2020-04-10 北京杏林伟业电梯工程有限公司 Bus alloy pouring process

Also Published As

Publication number Publication date
CN110042686B (en) 2021-07-30

Similar Documents

Publication Publication Date Title
CN101314923B (en) Technique for pouring hoisting cable anchorage head with alloy
CN102587279B (en) Steel strand finished stay cable and manufacturing method thereof
CN110042686A (en) A kind of tail rope head manufacture craft
CN103643121B (en) A kind of Stranded Galvanized Steel Wire for built on stilts bracing wire and production technique thereof
CN101829764A (en) Molten metal casting method for cable wire end
AT10889U2 (en) CLIMBING SECURITY SYSTEM
CN205954480U (en) Packing type epoxy steel strand wires extrusion anchor cable
KR101058400B1 (en) Wire rope and method for forming ring in the same
JP2006241652A (en) Method for processing terminal socket for wire rope
CN110985604A (en) Bus alloy pouring process
CN210001295U (en) vertical pay-off device
JP3020404B2 (en) Terminal socket processing method for linear body
CN205247987U (en) A wire protector for production pencil
CN207077497U (en) A kind of non-bending steel cable device for peeling
CN107855498B (en) Pear-shaped rope sling alloy casting method
JP3360006B2 (en) Wire rope terminal processing method
CN207145427U (en) A kind of automatic clutch drag-line
JP2007221870A (en) Protector, removing method of wire bundle
CN205134744U (en) But propelling movement formula in -band is put finished steel stranded conductor that cramps ring and is restrainted
CN111607998A (en) Method for manufacturing steel wire rope head
CN205012298U (en) Safe drawing die structure
DE440214C (en) Floating rope for fishing nets, harbor barriers, target ropes
CN110528387A (en) Magnesium Baogang silk main cable strand and its manufacturing method
CN105568411B (en) Method for improving quality of viscose fiber product
DE1560692B2 (en) PROCESS FOR THE PRODUCTION OF FLEXIBLE SEALING TAPES

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant