CN106894507A - The connecting joint structure and construction method of girder steel and column - Google Patents

The connecting joint structure and construction method of girder steel and column Download PDF

Info

Publication number
CN106894507A
CN106894507A CN201710246499.8A CN201710246499A CN106894507A CN 106894507 A CN106894507 A CN 106894507A CN 201710246499 A CN201710246499 A CN 201710246499A CN 106894507 A CN106894507 A CN 106894507A
Authority
CN
China
Prior art keywords
girder steel
column
crab
bolt
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710246499.8A
Other languages
Chinese (zh)
Inventor
秦志平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Dingniu Municipal Construction Co ltd
Original Assignee
Suzhou Zhonghai Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhonghai Architectural Design Co Ltd filed Critical Suzhou Zhonghai Architectural Design Co Ltd
Priority to CN201710246499.8A priority Critical patent/CN106894507A/en
Publication of CN106894507A publication Critical patent/CN106894507A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2406Connection nodes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of girder steel and the connecting joint structure of column, including girder steel and the column being fixed on below girder steel, the bottom surface of the end of girder steel is plane, also include crab-bolt, channel-section steel, leveling nut and fixing nut, imbed the top of column in the lower end of crab-bolt, the upper end of column is provided with a back pouring hole, the bottom surface of the end of girder steel has channel-section steel, in the back pouring hole of the lower end insertion column of channel-section steel, the end of girder steel is held on leveling nut, fixing nut is screwed with crab-bolt and positioned at girder steel top, the distance between girder steel and column are adjusted by leveling nut, girder steel is connected with column by fixing nut;A concrete layer is poured in space between channel-section steel, girder steel and column;The stress performance of the column of girder steel of the invention and column connecting node similar to framed bent, but girder steel stress performance similar to arch, there is horizontal force, thus stress performance is slightly different with framed bent, the connecting node stress of present invention design is clear and definite, workable.

Description

The connecting joint structure and construction method of girder steel and column
Technical field
The invention belongs to building structure technology field, it is related to a kind of architectural engineering and combining structure.
Background technology
As being continuously increased for China's steel yield is perfect with continuing to develop for long strands, steel construction has been obtained rapidly Development, industry and civil buildings in applications it is more and more, newly constructed the factory buildings and large span venue at some, more also change In making the enlarging of project and adding layer to construct, there is the connection of increasing steel construction and former xoncrete structure, such as concrete The connection of the connection of post and steel column, the connection of steel column and beams of concrete, girder steel and concrete column, these connections are mostly by chemistry Crab-bolt or expansion bolt are connected.
Wherein, the connected mode of traditional girder steel and concrete column is portal-rigid frames (Fig. 1) or bent structure (Fig. 2), but Both modes, it is not ideal at aspects such as speed of application, cost, thermal-insulating waterproof effect and compressive properties;Therefore in recent years, it is long The more single storey industry workshop in tessellated region uses the structure type of reinforced concrete pile herringbone girder steel, due to this structure both not gate Formula rigid frame (Fig. 1), and unconventional bent structure (Fig. 2), on the one hand, the connecting node of existing reinforced concrete pile herringbone girder steel Processing mode be girder steel one end with it is concrete column articulated, the other end is slide hinged with post, but this kind of method is cumbersome, and construction is multiple It is miscellaneous;On the other hand, although the structure of this reinforced concrete pile herringbone girder steel takes full advantage of the compressive property and steel of concrete column The anti-bending strength of beam, but the regulation of respective standard is made in calculating and construction of the national regulation not yet to this node, does not also have Ready-made specification or the maps and census records of the border regions can be quoted directly.
The content of the invention
The present invention solves the technical problem of the connecting joint structure for providing a kind of girder steel and column, steel of the invention The stress performance of the column of beam and column connecting node similar to framed bent, but girder steel stress performance similar to arch, there is level Power, thus stress performance is slightly different with framed bent, the connecting node stress of present invention design is clearly, workable, big Applied in amount engineering, in practice it has proved that its is safe and reliable, and similar item can be used for reference, and is particularly well-suited to the girder steel of single storey industry workshop With the connecting joint structure of column.
In order to solve the above technical problems, one aspect of the present invention is:The company of a kind of girder steel and column is provided Connect node structure, including girder steel and the column that is fixed on below the girder steel, the bottom surface of the end of the girder steel is plane, and steel The end of beam has leading flank and trailing flank, also including crab-bolt, channel-section steel, leveling nut and fixing nut, the crab-bolt be provided with to Few four, the quantity of the quantity of the leveling nut and the quantity of the fixing nut all with the crab-bolt is identical, the girder steel End bottom surface have perforate corresponding with the crab-bolt;
The top of the column is imbedded in the lower end of the crab-bolt, and the upper end of each crab-bolt is screwed with a leveling spiral shell Mother, the centre position of the upper end of the column is provided with a back pouring hole, and the centre position of the bottom surface of the end of the girder steel has institute Channel-section steel is stated, the lower end of the channel-section steel is inserted in the back pouring hole of the column, and the perforate of the bottom surface of the end of the girder steel is placed on In the crab-bolt, the bottom surface of the end of the girder steel is held on the leveling nut, in the crab-bolt and positioned at the girder steel Top is screwed with the fixing nut, the distance between the girder steel and described column is adjusted by the leveling nut, by institute State fixing nut the girder steel is connected with the column;
A concrete layer is poured in space between the channel-section steel, the girder steel and the column;
The depth that the crab-bolt imbeds in the column is 20-30 times of the crab-bolt diameter;The crab-bolt it is a diameter of 24mm, the height of the channel-section steel is 100mm, length is 100mm and width is 48mm, and the wall thickness of the channel-section steel is 10mm, described The depth of back pouring hole is 90mm, length is 140mm and width is 90mm, the upper surface of the column and the end of the girder steel The vertical range of bottom surface is 50mm.
Further say, also including purlin, the purlin is fixed between the girder steel and roof color steel.
Further say, the perforate of the girder steel is the slotted hole of Φ 25.5mm × 50mm.
Further say, the concrete layer is C40 microdilatancy fine-stone concretes.
Further say, the crab-bolt is provided with four.
Further say, the column is armored concrete concrete post, the girder steel behaviour font girder steel.
Present invention also offers a kind of described girder steel and the construction method of the connecting joint structure of column, according to following steps Suddenly carry out:
S1. pouring reinforcement concrete concrete post, while being poured after the middle part of the upper end of armored concrete concrete post reserves Hole, while pre-buried four crab-bolts, pre-hardening 2-8h;
S2. condense 7 days, the intensity of armored concrete concrete post is reached the 75% of design strength;
S3. a leveling nut is all covered in each crab-bolt, then girder steel is placed in crab-bolt, then according to design requirement by adjusting Save the position of leveling nut, and then adjust the levelness of girder steel and the distance between with column;
S4. a fixing nut is covered again in each crab-bolt, girder steel is fixed;
S5. casting concrete in the space between girder steel and column, condenses 7 days.
The beneficial effects of the invention are as follows:
The bottom surface of girder steel the firstth, of the invention offers slotted hole, mainly easy for installation, girder steel before being twisted eventually due to crab-bolt Horizontal stretch deformation is had under Gravitative Loads, this aspect can reduce the horizontal thrust of column top, and column is favourable;Separately On the one hand girder steel mid span moment and amount of deflection can be made to increase;Because this horizontal force is smaller, so this influence is also smaller, steel is designed Liang Shike solves the problems, such as amount of deflection by arch camber, and intensity surplus meets requirement;
Secondth, the horizontal force between girder steel and column is transmitted by the frictional force between girder steel and column, if the friction Power not enough, then must set shear key, because crab-bolt can not transmit horizontal force, and because steel beam bottom of the invention offers length Circular hole, can reduce column top horizontal thrust, i.e., frictional force reduces, it is not necessary to sets shear key, can just meet design requirement, applies Work is relatively easy, and the duration is relatively short, easily realizes;
3rd, channel-section steel of the invention, pour a concrete layer in the space between girder steel and column, and be microdilatancy microlith Concrete, strengthens the intensity of connecting node;
Connected mode between 4th, girder steel of the invention and column is easily real when causing using software modelings such as PKPM It is existing, each parameter can be precalculated, it is ensured that the accuracy of design and the safety and stability of engineering;
5th, the speed of application of reinforced concrete pile of the invention and herringbone steel beam connecting joint is fast, and cost is small, is incubated, prevents Preferably, application is more and more extensive at present for water effect;
6th, the bottom surface of the girder steel of connecting node of the invention has a channel-section steel, can transmit between girder steel and column Shearing, strengthens the weight capacity of girder steel and the anti-bending strength of girder steel.
The stress performance of the column of girder steel of the invention and column connecting node similar to framed bent, but girder steel stress performance Similar to arch, there is horizontal force, thus stress performance is slightly different with framed bent, beam-column connection way currently there are no ready-made Specification or the maps and census records of the border regions, the present invention design connecting node stress clearly, it is workable, applied in a large amount of engineerings, put into practice Prove that its is safe and reliable, similar item can be used for reference.
Described above is only the general introduction of technical solution of the present invention, in order to better understand technological means of the invention, And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Brief description of the drawings
Fig. 1 is one of structural representation of prior art;
Fig. 2 is one of structural representation of prior art;
Fig. 3 is overall structure diagram of the invention;
Fig. 4 is plan of the invention;
Fig. 5 is sectional side view of the invention;
Fig. 6 is the A portions enlarged drawing of Fig. 5;
Each several part mark is as follows in accompanying drawing:
Girder steel 1, channel-section steel 11, perforate 12, column 2, back pouring hole 21, crab-bolt 3, leveling nut 4, fixing nut 5, concrete layer 6th, purlin 7, wall 8 and roof color steel 9.
Specific embodiment
Specific embodiment of the invention is illustrated below by way of particular specific embodiment, those skilled in the art can be by this Content disclosed in specification understands advantages of the present invention and effect easily.The present invention can also other different modes give Implement, i.e. without departing substantially from different modifications under the scope of disclosed, being given and changed.
Embodiment:The connecting joint structure of a kind of girder steel and column, as seen in figures 3-6, including girder steel 1 and is fixed on described Column 2 below girder steel, the bottom surface of the end of the girder steel 1 is plane, and the end of girder steel 1 has leading flank and trailing flank, Also include crab-bolt 3, channel-section steel 11, leveling nut 4 and fixing nut 5, the crab-bolt 3 is provided with least four, the leveling nut 4 Quantity of the quantity of quantity and the fixing nut 5 all with the crab-bolt 3 is identical, the bottom surface of the end of the girder steel 1 have with The corresponding perforate 12 of the crab-bolt 3;
The top of the column 2 is imbedded in the lower end of the crab-bolt 3, and the upper end of each crab-bolt 3 is screwed with a tune Flush nut 4, the centre position of the upper end of the column is provided with a back pouring hole 21, the interposition of the bottom surface of the end of the girder steel 1 Put with the channel-section steel 11, the lower end of the channel-section steel 11 is inserted in the back pouring hole 21 of the column, and the end of the girder steel 1 The perforate 12 of bottom surface is placed in the crab-bolt 3, and the bottom surface of the end of the girder steel 1 is held on the leveling nut 4, the anchor The fixing nut 5 is screwed with bolt 3 and positioned at the top of the girder steel 1, the girder steel 1 and institute are adjusted by the leveling nut 4 The distance between column 2 is stated, the girder steel 1 is connected with the column 2 by the fixing nut 5;
A concrete layer 6 is poured in space between the channel-section steel 11, the girder steel 1 and the column 2;
The depth that the crab-bolt 3 imbeds in the column 2 is 20-30 times of the diameter of the crab-bolt 3;The crab-bolt 3 it is straight Footpath is 24mm, and the height of the channel-section steel 11 is 100mm, length is 100mm and width is 48mm, and the wall thickness of the channel-section steel is 10mm, the depth of the back pouring hole 21 is 90mm, length is 140mm and width is 90mm, the upper surface of the column 2 with it is described The vertical range of the bottom surface of the end of girder steel 1 is 50mm.
Also include purlin 7, the purlin 7 is fixed between the girder steel and roof color steel 9, the side of the column with Wall 8 is connected.
The perforate 12 of the girder steel 1 is the slotted hole of Φ 25.5mm × 50mm.
The concrete layer 6 is C40 microdilatancy fine-stone concretes.
The crab-bolt 3 is provided with four.
The column 2 is armored concrete concrete post, and the girder steel 1 is people's font girder steel.
A kind of described girder steel and the construction method of the connecting joint structure of column, are carried out as steps described below:
S1. pouring reinforcement concrete concrete post, while being poured after the middle part of the upper end of armored concrete concrete post reserves Hole, while pre-buried four crab-bolts, pre-hardening 2-8h;
S2. condense 7 days, the intensity of armored concrete concrete post is reached the 75% of design strength;
S3. a leveling nut is all covered in each crab-bolt, then girder steel is placed in crab-bolt, then according to design requirement by adjusting Save the position of leveling nut, and then adjust the levelness of girder steel and the distance between with column;
S4. a fixing nut is covered again in each crab-bolt, girder steel is fixed;
S5. casting concrete in the space between girder steel and column, condenses 7 days.
Operation principle of the invention and the course of work are as follows:
The bottom surface of girder steel offers slotted hole, mainly easy for installation, and girder steel is under Gravitative Loads before being twisted eventually due to crab-bolt Horizontal stretch deformation is had, this aspect can reduce the horizontal thrust of column top, and column is favourable;On the other hand steel can be made Beam mid span moment and amount of deflection increase;Because this horizontal force is smaller, so this influence is also smaller, can be by rising during design girder steel Arch solves the problems, such as amount of deflection, and intensity surplus meets requirement;
Horizontal force between girder steel and column is transmitted by the frictional force between girder steel and column, if the frictional force is not It is enough, then shear key must be set, because crab-bolt can not transmit horizontal force, and offered because of steel beam bottom of the invention oval Hole, can reduce column top horizontal thrust, i.e., frictional force reduces, it is not necessary to sets shear key, can just meet design requirement, constructs Relatively easy, the duration is relatively short, easily realizes;
A concrete layer is poured in space between channel-section steel, girder steel and column, and is microdilatancy fine-stone concrete, enhancing connection section The intensity of point;
Connected mode between girder steel and column is easily realized when causing using software modelings such as PKPM, can precalculated Each parameter, it is ensured that the accuracy of design and the safety and stability of engineering;
Reinforced concrete pile is fast with the speed of application of herringbone steel beam connecting joint, and cost is small, and insulation, waterproof effect are preferable, mesh Preceding application is more and more extensive;
The bottom surface of the girder steel of connecting node has a channel-section steel, can transmit the shearing between girder steel and column, strengthens girder steel Weight capacity and girder steel anti-bending strength.
The stress performance of the column of girder steel of the invention and column connecting node similar to framed bent, but girder steel stress performance Similar to arch, there is horizontal force, thus stress performance is slightly different with framed bent, beam-column connection way currently there are no ready-made Specification or the maps and census records of the border regions, the present invention design connecting node stress clearly, it is workable, applied in a large amount of engineerings, put into practice Prove that its is safe and reliable, similar item can be used for reference.
Embodiments of the invention are the foregoing is only, embodiments of the invention, and unprovoked is not thereby the foregoing is only This limitation the scope of the claims of the invention, the equivalent structure that every utilization description of the invention and accompanying drawing content are made, or directly or Other related technical fields are used in indirectly, are included within the scope of the present invention.

Claims (7)

1. a kind of connecting joint structure of girder steel and column, including girder steel and the column being fixed on below the girder steel, its feature It is:The bottom surface of the end of the girder steel is plane, and the end of girder steel has leading flank and trailing flank, also including crab-bolt, groove Steel, leveling nut and fixing nut, the crab-bolt are provided with least four, the quantity of the leveling nut and the fixing nut Quantity of the quantity all with the crab-bolt is identical, and the bottom surface of the end of the girder steel has perforate corresponding with the crab-bolt;
The top of the column is imbedded in the lower end of the crab-bolt, and the upper end of each crab-bolt is screwed with a leveling nut, The centre position of the upper end of the column is provided with a back pouring hole, and the centre position of the bottom surface of the end of the girder steel has the groove Steel, the lower end of the channel-section steel is inserted in the back pouring hole of the column, and the bottom surface of the end of the girder steel perforate be placed on it is described In crab-bolt, the bottom surface of the end of the girder steel is held on the leveling nut, in the crab-bolt and positioned at girder steel top The fixing nut is screwed with, the distance between the girder steel and described column is adjusted by the leveling nut, by described solid Determine nut the girder steel is connected with the column;
A concrete layer is poured in space between the channel-section steel, the girder steel and the column;
The depth that the crab-bolt imbeds in the column is 20-30 times of the crab-bolt diameter;A diameter of 24mm of the crab-bolt, The height of the channel-section steel is 100mm, length is 100mm and width is 48mm, and the wall thickness of the channel-section steel is 10mm, the back pouring hole Depth be 90mm, length be that 140mm and width are 90mm, the upper surface of the column and the bottom surface of the end of the girder steel Vertical range is 50mm.
2. the connecting joint structure of girder steel according to claim 1 and column, it is characterised in that:Also include purlin, it is described Purlin is fixed between the girder steel and roof color steel.
3. the connecting joint structure of girder steel according to claim 1 and column, it is characterised in that:The perforate of the girder steel is The slotted hole of Φ 25.5mm × 50mm.
4. the connecting joint structure of girder steel according to claim 1 and column, it is characterised in that:The concrete layer is C40 microdilatancy fine-stone concretes.
5. the connecting joint structure of girder steel according to claim 1 and column, it is characterised in that:The crab-bolt is provided with four It is individual.
6. the connecting joint structure of girder steel according to claim 1 and column, it is characterised in that:The column is mixed for reinforcing bar Solidifying soil concrete post, the girder steel behaviour font girder steel.
7. the construction method of the connecting joint structure of a kind of girder steel according to claim 1 and column, it is characterised in that:Press Carried out according to following step:
S1. pouring reinforcement concrete concrete post, while a back pouring hole is reserved in the middle part of the upper end of armored concrete concrete post, and And pre-buried four crab-bolts, pre-hardening 2-8h simultaneously;
S2. condense 7 days, the intensity of armored concrete concrete post is reached the 75% of design strength;
S3. a leveling nut is all covered in each crab-bolt, then girder steel is placed in crab-bolt, then adjusted by adjusting according to design requirement The position of flush nut, and then adjust the levelness of girder steel and the distance between with column;
S4. a fixing nut is covered again in each crab-bolt, girder steel is fixed;
S5. casting concrete in the space between girder steel and column, condenses 7 days.
CN201710246499.8A 2017-04-15 2017-04-15 The connecting joint structure and construction method of girder steel and column Pending CN106894507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710246499.8A CN106894507A (en) 2017-04-15 2017-04-15 The connecting joint structure and construction method of girder steel and column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710246499.8A CN106894507A (en) 2017-04-15 2017-04-15 The connecting joint structure and construction method of girder steel and column

Publications (1)

Publication Number Publication Date
CN106894507A true CN106894507A (en) 2017-06-27

Family

ID=59197084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710246499.8A Pending CN106894507A (en) 2017-04-15 2017-04-15 The connecting joint structure and construction method of girder steel and column

Country Status (1)

Country Link
CN (1) CN106894507A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733979A (en) * 2020-07-02 2020-10-02 苏州中材建设有限公司 Large-span steel truss structure of cement production line

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064784A (en) * 2001-08-29 2003-03-05 Toyo Constr Co Ltd Mounting structure between column-cum-pile and beam
CN202627327U (en) * 2012-05-30 2012-12-26 西北矿冶研究院 Haunching double-hinge straight arch beam
CN202755451U (en) * 2012-09-05 2013-02-27 机械工业第三设计研究院 Inclined steel structure support seat and inclined support column
CN203213303U (en) * 2013-01-22 2013-09-25 苏州工业园区设计研究院股份有限公司 Structure of joint between steel beam and concrete pillar under condition of overlong lateral row frame
CN205604550U (en) * 2016-04-28 2016-09-28 厦门天重钢结构有限公司 Steel construction eaves mouth
JP2017036653A (en) * 2015-08-07 2017-02-16 日鐵住金建材株式会社 Column-beam joining structure and method, method of designing column-beam joining structure, and program for designing column-beam joining structure
CN206646645U (en) * 2017-04-15 2017-11-17 苏州中海建筑设计有限公司 The connecting joint structure of girder steel and column

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064784A (en) * 2001-08-29 2003-03-05 Toyo Constr Co Ltd Mounting structure between column-cum-pile and beam
CN202627327U (en) * 2012-05-30 2012-12-26 西北矿冶研究院 Haunching double-hinge straight arch beam
CN202755451U (en) * 2012-09-05 2013-02-27 机械工业第三设计研究院 Inclined steel structure support seat and inclined support column
CN203213303U (en) * 2013-01-22 2013-09-25 苏州工业园区设计研究院股份有限公司 Structure of joint between steel beam and concrete pillar under condition of overlong lateral row frame
JP2017036653A (en) * 2015-08-07 2017-02-16 日鐵住金建材株式会社 Column-beam joining structure and method, method of designing column-beam joining structure, and program for designing column-beam joining structure
CN205604550U (en) * 2016-04-28 2016-09-28 厦门天重钢结构有限公司 Steel construction eaves mouth
CN206646645U (en) * 2017-04-15 2017-11-17 苏州中海建筑设计有限公司 The connecting joint structure of girder steel and column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733979A (en) * 2020-07-02 2020-10-02 苏州中材建设有限公司 Large-span steel truss structure of cement production line

Similar Documents

Publication Publication Date Title
CN107299699B (en) Assembled cavity shear wall horizontal joint Alveolus type dry type connection structure
CN207700443U (en) Exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey
CN106351333A (en) Precast concrete slab column node and connecting method thereof
CN207194006U (en) A kind of prefabricated concrete retaining wall
CN105756202A (en) Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
CN206233431U (en) A kind of assembled light gauge cold-formed steel shape composite floor
CN206903022U (en) A kind of steel bar truss floor support plate
CN106567458A (en) Assembly type steel-concrete combined beam column frame structure system
CN206769092U (en) The light steel of half assembled-foam concrete assembled wall
CN106869567A (en) A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System
CN106284656A (en) A kind of prefabricated primary and secondary beam connecting node being connected with angle steel and manufacture method
CN108775084B (en) Steel-concrete combined precast beam and precast column connecting structure and construction method
CN101597920A (en) Assembled type building construction and method thereof
CN109403509A (en) Assembled composite shear wall based on self-resetting combined end post-slurry anchor shear wall
CN110241915A (en) A kind of assembly concrete beam column L-type muscle integrated connection node and application method
CN206646645U (en) The connecting joint structure of girder steel and column
CN106894507A (en) The connecting joint structure and construction method of girder steel and column
CN108978996B (en) Outrigger added in existing brick-concrete structure and construction method thereof
CN111441513A (en) Cast-in-place concrete wall body combining truss reinforcing steel bars and steel plates and construction method
CN207003719U (en) A kind of prefabricated steel faced wall with steel bar girder
CN113279423B (en) Prefabricated column pier and post-cast strip foundation beam assembly integral construction method
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN205530324U (en) Cold-formed thin-wall section steel micro pile
CN206646649U (en) The connecting joint structure of column and girder steel
CN205153144U (en) Joint construction of shear force corner portion and slant girder steel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right

Effective date of registration: 20180201

Address after: Suzhou City, Jiangsu province 215300 Kunshan City Shipai town extension Yi Road No. 375

Applicant after: KUNSHAN DINGNIU MUNICIPAL CONSTRUCTION Co.,Ltd.

Address before: 215300 room 701-709, Xinghai garden, Yushan Town, Kunshan City, Suzhou, Jiangsu

Applicant before: SUZHOU ZHONGHAI ARCHITECT DESIGN CO.,LTD.

TA01 Transfer of patent application right
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627

RJ01 Rejection of invention patent application after publication