CN106894448A - 用于沉管隧道的最终接头结构形式 - Google Patents
用于沉管隧道的最终接头结构形式 Download PDFInfo
- Publication number
- CN106894448A CN106894448A CN201710070490.6A CN201710070490A CN106894448A CN 106894448 A CN106894448 A CN 106894448A CN 201710070490 A CN201710070490 A CN 201710070490A CN 106894448 A CN106894448 A CN 106894448A
- Authority
- CN
- China
- Prior art keywords
- sides
- long joint
- final
- adjacent long
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
- E02D29/073—Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
Abstract
用于沉管隧道的最终接头结构形式,它涉及交通运输技术领域;基础垫层上设置有两侧相邻长管节,两侧相邻长管节上均安装有千斤顶顶推系统,两侧相邻长管节内均设置有端封墙,两侧相邻长管节的两个端面设置有呈双面楔形,且两个端面设置有接触面和橡胶止水带,两侧相邻长管节的两个端面之间设置有双面楔形最终接头,双面楔形最终接头的两侧也设置有接触面和橡胶止水带;所述的两侧相邻长管节与双面楔形最终接头通过螺栓连接;所述的两侧相邻长管节的最终接头底部与基础垫层之间设置注浆。本发明沉管最终接头结构尺寸小,预制方便,施工质量容易保证;施工难度小;双面楔形,易于止水带压缩;预制构件水下对接,施工速度快。
Description
技术领域
本发明涉及交通运输技术领域,具体涉及用于沉管隧道的最终接头结构形式。
背景技术
我国幅员辽阔,海岸线长,江、河、湖泊和岛屿众多,近年来多采用对环境、景观影响小的水下隧道方式,其中相当一部分水下隧道都采用沉管法建设。
沉管法隧道最终接头是实现隧道最终贯通的重要连接结构,也是整个工程关键工序中的重点环节。以往水下隧道最终接头施工往往是采用在接头四周水下安装止水钢封板后,再在封板内部现浇接头钢筋混凝土结构,施工工艺复杂,周期较长,水下钢封板安装伴随长时间的人工水下作业。如何实现沉管法隧道最终接头的快速、方便施工,一直是隧道沉管工法探索的方向之一。
发明内容
本发明的目的在于针对现有技术的缺陷和不足,提供一种施工质量容易保证、施工难度小、施工速度快的沉管隧道最终接头的结构形式。
为实现上述目的,本发明采用的技术方案是:它包含基础垫层、千斤顶顶推系统、两侧相邻长管节、端封墙、接触面、双面楔形最终接头、螺栓、注浆、橡胶止水带;所述的基础垫层上设置有两侧相邻长管节,两侧相邻长管节上均安装有千斤顶顶推系统,两侧相邻长管节内均设置有端封墙,两侧相邻长管节的两个端面设置有呈双面楔形,且两个端面设置有接触面和橡胶止水带,两侧相邻长管节的两个端面之间设置有双面楔形最终接头,双面楔形最终接头的两侧也设置有接触面和橡胶止水带;所述的两侧相邻长管节与双面楔形最终接头通过螺栓连接;所述的两侧相邻长管节的最终接头底部与基础垫层之间设置注浆。
作为优选,所述的两侧相邻长管节与双面楔形最终接头之间还设置有橡胶板。
作为优选,所述的双面楔形最终接头的两侧面与两侧相邻长管节的两个端面配合。
作为优选,所述的双面楔形最终接头采用浮吊设备水中运输。
本发明的工作原理为:利用双面楔形最终接头的自身重力和管段顶部千斤顶顶推压接,使接触面紧贴,橡胶止水带压缩达到最终接头止水效果,通过螺栓使双面楔形最终接头与左右两侧管节永久连接。
采用上述结构后,本发明产生的有益效果为:本发明所述的用于沉管隧道的最终接头结构形式,沉管最终接头结构尺寸小,预制方便,施工质量容易保证;施工难度小;双面楔形,易于止水带压缩;预制构件水下对接,施工速度快,极大减小了人工水下操作工作量和最终结构的施工难度,有很大推广价值。
附图说明
图1是本发明的分解结构图;
图2是本发明装配结构图;
图3是本发明隧道拆除端封墙连通图;
图4是本发明管底注浆、施工附属工程图;
图5是本发明最终接头接缝大样图。
附图标记说明:
基础垫层1、千斤顶顶推系统2、两侧相邻长管节3、端封墙4、接触面5、双面楔形最终接头6、螺栓7、注浆8、橡胶止水带9、橡胶板10。
具体实施方式
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。
参看如图1——图5所示,本具体实施方式采用如下技术方案:它包含基础垫层1、千斤顶顶推系统2、两侧相邻长管节3、端封墙4、接触面5、双面楔形最终接头6、螺栓7、注浆8、橡胶止水带9;所述的基础垫层1上设置有两侧相邻长管节3,两侧相邻长管节3上均安装有千斤顶顶推系统2,两侧相邻长管节3内均设置有端封墙4,两侧相邻长管节3的两个端面设置有呈双面楔形,且两个端面设置有接触面5和橡胶止水带9,两侧相邻长管节3的两个端面之间设置有双面楔形最终接头6,双面楔形最终接头6的两侧也设置有接触面5和橡胶止水带9;所述的两侧相邻长管节3与双面楔形最终接头6通过螺栓7连接;所述的两侧相邻长管节3的最终接头底部与基础垫层1之间设置注浆8。
作为优选,所述的两侧相邻长管节3与双面楔形最终接头6之间还设置有橡胶板10。
作为优选,所述的双面楔形最终接头6的两侧面与两侧相邻长管节3的两个端面配合。
作为优选,所述的双面楔形最终接头6采用浮吊设备水中运输。
本具体实施方式的工作原理为:利用双面楔形最终接头6的自身重力和管段顶部千斤顶顶推压接,使接触面5紧贴,橡胶止水带9压缩达到最终接头止水效果,通过螺栓7使双面楔形最终接头6与左右两侧管节永久连接。
本具体实施方式操作时:
1、两侧相邻长管节3预制时,将千斤顶顶推系统2两端支座同时预制;
2、两侧相邻长管节3的端面安装橡胶止水带9,沉放双面楔形最终接头6,测定端面数据,将双面楔形最终接头6运输到位;
3、双面楔形最终接头6逐步沉放,动态调整定位精度及管节姿态,双面楔形最终接头6沉放到位;
4、利用双面楔形最终接头6的自身重力及千斤顶顶推系统的推力,将双面楔形最终接头6和两侧相邻长管节3结合面贴紧,橡胶止水带9压缩止水;
4、双面楔形最终接头6内结合腔排水,形成干施工环境;
5、用螺栓8连接双面楔形最终接头6和两侧相邻长管节3;
6、拆除端封墙4和千斤顶顶推系统2;
7、管底后注浆8;
8、回填保护,管内附属工程施工。
采用上述结构后,本具体实施方式产生的有益效果为:本具体实施方式所述的用于沉管隧道的最终接头结构形式,沉管最终接头结构尺寸小,预制方便,施工质量容易保证;施工难度小;双面楔形,易于止水带压缩;预制构件水下对接,施工速度快,极大减小了人工水下操作工作量和最终结构的施工难度,有很大推广价值。
以上显示和描述了本发明的基本原理和主要特征以及本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。
Claims (4)
1.用于沉管隧道的最终接头结构形式,其特征在于:它包含基础垫层、千斤顶顶推系统、两侧相邻长管节、端封墙、接触面、双面楔形最终接头、螺栓、注浆、橡胶止水带;所述的基础垫层上设置有两侧相邻长管节,两侧相邻长管节上均安装有千斤顶顶推系统,两侧相邻长管节内均设置有端封墙,两侧相邻长管节的两个端面设置有呈双面楔形,且两个端面设置有接触面和橡胶止水带,两侧相邻长管节的两个端面之间设置有双面楔形最终接头,双面楔形最终接头的两侧也设置有接触面和橡胶止水带;所述的两侧相邻长管节与双面楔形最终接头通过螺栓连接;所述的两侧相邻长管节的最终接头底部与基础垫层之间设置注浆。
2.根据权利要求1所述的用于沉管隧道的最终接头结构形式,其特征在于:所述的两侧相邻长管节与双面楔形最终接头之间还设置有橡胶板。
3.根据权利要求1所述的用于沉管隧道的最终接头结构形式,其特征在于:所述的双面楔形最终接头的两侧面与两侧相邻长管节的两个端面配合。
4.根据权利要求1所述的用于沉管隧道的最终接头结构形式,其特征在于:所述的双面楔形最终接头采用浮吊设备水中运输。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710070490.6A CN106894448A (zh) | 2017-02-09 | 2017-02-09 | 用于沉管隧道的最终接头结构形式 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710070490.6A CN106894448A (zh) | 2017-02-09 | 2017-02-09 | 用于沉管隧道的最终接头结构形式 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106894448A true CN106894448A (zh) | 2017-06-27 |
Family
ID=59198006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710070490.6A Pending CN106894448A (zh) | 2017-02-09 | 2017-02-09 | 用于沉管隧道的最终接头结构形式 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106894448A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524169A (zh) * | 2017-09-01 | 2017-12-29 | 中交第航务工程局有限公司 | 最终接头安装方法 |
CN107574844A (zh) * | 2017-08-31 | 2018-01-12 | 中交航局第二工程有限公司 | 一种用于沉管隧道最终接头安装的姿态测控系统及方法 |
CN108240001A (zh) * | 2018-01-29 | 2018-07-03 | 中交第航务工程局有限公司 | 沉管隧道最终接头及其对接施工方法 |
CN108560596A (zh) * | 2018-06-28 | 2018-09-21 | 中交第航务工程局有限公司 | 可逆式沉管隧道最终接头及其对接施工方法 |
CN109162729A (zh) * | 2018-10-19 | 2019-01-08 | 中铁隧道局集团有限公司 | 多开口多管节式大断面隧道及建造方法、管节连接结构及连接方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1061268A (zh) * | 1990-10-30 | 1992-05-20 | 克劳福德器材公司 | 管接头 |
JPH0579289A (ja) * | 1991-09-18 | 1993-03-30 | Penta Ocean Constr Co Ltd | 沈埋函最終接続方法 |
JP2001115471A (ja) * | 1999-10-15 | 2001-04-24 | Penta Ocean Constr Co Ltd | 沈埋トンネルの可撓性継手構造 |
CN1804375A (zh) * | 2005-01-14 | 2006-07-19 | 上海隧道工程股份有限公司 | 沉管隧道最终接头结构形式及其使用方法 |
CN106193121A (zh) * | 2016-08-30 | 2016-12-07 | 中铁隧道勘测设计院有限公司 | 一种沉管隧道管节止水装置 |
CN207436107U (zh) * | 2017-02-09 | 2018-06-01 | 中铁隧道勘测设计院有限公司 | 用于沉管隧道的最终接头结构形式 |
-
2017
- 2017-02-09 CN CN201710070490.6A patent/CN106894448A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1061268A (zh) * | 1990-10-30 | 1992-05-20 | 克劳福德器材公司 | 管接头 |
JPH0579289A (ja) * | 1991-09-18 | 1993-03-30 | Penta Ocean Constr Co Ltd | 沈埋函最終接続方法 |
JP2001115471A (ja) * | 1999-10-15 | 2001-04-24 | Penta Ocean Constr Co Ltd | 沈埋トンネルの可撓性継手構造 |
CN1804375A (zh) * | 2005-01-14 | 2006-07-19 | 上海隧道工程股份有限公司 | 沉管隧道最终接头结构形式及其使用方法 |
CN106193121A (zh) * | 2016-08-30 | 2016-12-07 | 中铁隧道勘测设计院有限公司 | 一种沉管隧道管节止水装置 |
CN207436107U (zh) * | 2017-02-09 | 2018-06-01 | 中铁隧道勘测设计院有限公司 | 用于沉管隧道的最终接头结构形式 |
Non-Patent Citations (1)
Title |
---|
林鸣等: "日本沉管隧道最终接头施工新工法", 《中国港湾建设》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107574844A (zh) * | 2017-08-31 | 2018-01-12 | 中交航局第二工程有限公司 | 一种用于沉管隧道最终接头安装的姿态测控系统及方法 |
CN107524169A (zh) * | 2017-09-01 | 2017-12-29 | 中交第航务工程局有限公司 | 最终接头安装方法 |
CN108240001A (zh) * | 2018-01-29 | 2018-07-03 | 中交第航务工程局有限公司 | 沉管隧道最终接头及其对接施工方法 |
CN108240001B (zh) * | 2018-01-29 | 2024-02-02 | 中交第一航务工程局有限公司 | 沉管隧道最终接头及其对接施工方法 |
CN108560596A (zh) * | 2018-06-28 | 2018-09-21 | 中交第航务工程局有限公司 | 可逆式沉管隧道最终接头及其对接施工方法 |
CN108560596B (zh) * | 2018-06-28 | 2024-02-02 | 中交第一航务工程局有限公司 | 可逆式沉管隧道最终接头及其对接施工方法 |
CN109162729A (zh) * | 2018-10-19 | 2019-01-08 | 中铁隧道局集团有限公司 | 多开口多管节式大断面隧道及建造方法、管节连接结构及连接方法 |
CN109162729B (zh) * | 2018-10-19 | 2023-12-12 | 中铁隧道局集团有限公司 | 多开口多管节式大断面隧道及建造方法、管节连接结构及连接方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106894449A (zh) | 一种沉管隧道最终接头的结构形式 | |
CN106894448A (zh) | 用于沉管隧道的最终接头结构形式 | |
JP6533842B2 (ja) | 沈埋トンネルの最終接続部として用いられる継手 | |
CN103981898B (zh) | 一种整体明挖节点逆作的地下工程施工方法 | |
CN105041337B (zh) | 一种地下盾构隧道衬砌管片的接缝拼接结构及防水方法 | |
CN101956388B (zh) | 一种灌浆固定海洋平台立管的新型卡子装置及其固定方法 | |
CN106050263A (zh) | 一种盾构隧道管片结构及其连接结构 | |
CN111931372A (zh) | 一种考虑多因素的饱和土小曲率盾构施工引起土体变形预测方法 | |
CN207538837U (zh) | 一体化沉管管节 | |
CN103924581B (zh) | 预制钢管混凝土组合结构地下连续墙及其施工方法 | |
CN205776157U (zh) | 装配式地下连续墙 | |
CN108914968B (zh) | 一种具有防水接头的综合管廊及其安装方法 | |
CN207436107U (zh) | 用于沉管隧道的最终接头结构形式 | |
CN103343577B (zh) | 可拆式对接螺杆的剪力墙止水方法 | |
CN207160082U (zh) | 一种沉管隧道最终接头的结构形式 | |
CN202769112U (zh) | 钢承口钢筋混凝土管道双密封止水接口 | |
CN205908277U (zh) | 一种用于隧道混凝土二衬脱空注浆用封孔器装置 | |
CN107447747A (zh) | 一种预制地下连续墙及其施工方法 | |
CN208039313U (zh) | 一种沉管隧道用最终接头 | |
CN201599504U (zh) | 一种f型钢筋混凝土管道双密封防水接口 | |
Akimoto et al. | Immersed tunnels in Japan: Recent technological trends | |
CN107975153A (zh) | 一种顶板变形缝处理结构 | |
CN110130667A (zh) | 一种楼面预埋管道成品保护的方法 | |
CN109519622A (zh) | 一种承插式钢顶管接头 | |
CN215483149U (zh) | 地铁主体结构中侧墙与隧洞的防水结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190214 Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88. Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd. Address before: No. 1 Hebei street, Hongqiao District, Tianjin City, Tianjin Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd. Applicant before: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170627 |
|
WD01 | Invention patent application deemed withdrawn after publication |