CN106894385A - A kind of armoured type lightweight dock structure and its construction method - Google Patents

A kind of armoured type lightweight dock structure and its construction method Download PDF

Info

Publication number
CN106894385A
CN106894385A CN201710237005.XA CN201710237005A CN106894385A CN 106894385 A CN106894385 A CN 106894385A CN 201710237005 A CN201710237005 A CN 201710237005A CN 106894385 A CN106894385 A CN 106894385A
Authority
CN
China
Prior art keywords
filler
front wall
foam
poured
lightweight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710237005.XA
Other languages
Chinese (zh)
Inventor
吴昊
岑文杰
姜伟
陈定勋
刘剑锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Guangdong Branch Of Construction Supervision Consulting Co Ltd
Original Assignee
Guangzhou Guangdong Branch Of Construction Supervision Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Guangdong Branch Of Construction Supervision Consulting Co Ltd filed Critical Guangzhou Guangdong Branch Of Construction Supervision Consulting Co Ltd
Priority to CN201710237005.XA priority Critical patent/CN106894385A/en
Publication of CN106894385A publication Critical patent/CN106894385A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a kind of armoured type lightweight dock structure, including front wall, ground, breastwork, anchor pole, filler, relieving slab and Wharf Surface;Described filler is Foam lightweight soil, and it includes ground floor filler and second layer filler;The ground floor filler is poured in ground top to front wall top;, in front wall top, described anchor pole one end is affixed with the front wall top and is layed on the ground floor filler for the breast wall pouring;The second layer filler is poured in ground floor filler top to breastwork top;The off-load version and Wharf Surface are poured in second layer filler top, and are together wrapped in outside described filler with the front wall and breastwork.The armoured type lightweight dock structure has the rational in infrastructure, construction period short, Foam lightweight soil packed bulk density is small, bearing capacity is high, good integrity the features such as.The invention also discloses the construction method of above-mentioned armoured type lightweight dock structure.

Description

A kind of armoured type lightweight dock structure and its construction method
Technical field
The present invention relates to the design of harbour civil engineering structure and construction field, more particularly to a kind of armoured type lightweight harbour Structure and its construction method.
Background technology
China builds up sheet-pile wharf 40 or so before the sixties in last century, and the overwhelming majority is reinforced concrete structure, small Part is steel plate pilework, the total bulkhead wall of harbour 5958m long.Structural shape is drawing anchor formula sheet-pile wharf, and sheet-pile wharf is thousand Middle-size and small-size harbour below tonne.Built by this stage, China's plate Picket wharf begins to take shape, and is achieved in terms of construction rich Rich experience.
The seventies in last century is built 39 sheet-pile wharfs again, wherein 31 is reinforced concrete structure, 8 is steel sheet pile Structure, bulkhead wall 6754m long.Because sheet pile section resistance moment is smaller, it is impossible to very big moment of flexure is born, so as to limit sheet-pile wharf Develop to maximization, deep water direction.Sheet-pile wharf 47 is built up the eighties in last century and the nineties, wherein 21 mixed for reinforcing bar Concrete board pilework, 16 is steel plate pilework, and 10 is diaphram wall sheet-pile structure, dock wall overall length 15793m.Ground The development of continuous wall technology down so that sheet-pile wharf has striden forward major step, the thickness of sheet pile wall can in more than 1m, then, The single anchor sheet-pile wharf for 3.5 tons having been built up in Jingdang Port in 1989.
Nearly ten years, China's sheet-pile wharf construction technique obtains new progress again, mainly in sheet-pile wharf maximization, deeply Aquation aspect achieves breakthrough achievement, and the blind type that released one after another (half blind type, full blind type), discharging type (are integrally unloaded Lotus formula, separate discharging type) etc. new structure type so that sheet-pile wharf is developed into by the situation for mainly building middle-size and small-size harbour and built If large quantities of 10 ton deepwater wharfs
Compared with China, external situation but differs widely, for example Europe and Japan, and harbour is most of to use steel sheet pile knot Structure.They think that sheet-pile structure is cheaper than other structures pattern and it is simple to construct, and European almost all of harbour all uses sheet pile Structure.China have passed through the port of building of 60 years, and current depth condition and the good port location of foundation condition are remaining seldom, Wo Menxian To be a large amount of epoch that port is built in beach, offshore shoal, fine sea bed and silt coast what is faced, can foretell, it is modern Afterwards sheep pile wharf structure China can apply it is more and more wider.
Therefore it is badly in need of the environmental condition that a kind of structure is more reasonable, and traditional sheet-pile wharf can be overcome to overcome, using model Enclose wider, the more superior sheep pile wharf structure of performance further improves the construction technology level of China's sheet-pile wharf.
Other Foam lightweight soil technology is highly developed, is widely used to the Large Constructions such as highway, bridge, high ferro Mesh, Foam lightweight soil superior performance, operating expenses is reasonable.
The content of the invention
Based on this, it is an object of the present invention to provide a kind of armoured type lightweight dock structure, is returned in the prior art with overcoming Lateral pressure that filler is born from great, harbour front wall is big, it is serious etc. to be susceptible to harbour overall collapse, harbour face differential settlement Problem.
A kind of armoured type lightweight dock structure, including front wall, ground, breastwork, anchor pole, filler, relieving slab and Wharf Surface; Described filler is Foam lightweight soil, and it includes ground floor filler and second layer filler;The ground floor filler is poured in described Base top to front wall top;The breast wall pouring is in front wall top, and described anchor pole one end is affixed simultaneously with the front wall top It is layed on the ground floor filler;The second layer filler is poured in ground floor filler top to breastwork top; The off-load version and Wharf Surface are poured in second layer filler top, and are together wrapped in the front wall and breastwork described Outside filler.
Compared to prior art, the invention provides a kind of brand-new dock structure form, the armoured type lightweight dock structure Port is built suitable for beach, offshore shoal, fine sea bed and silt coast, its rational in infrastructure, construction period is short, light-weight foamed Native packed bulk density is small, bearing capacity is high, good integrity.
Further, the front wall plugs to be formed using steel sheet pile.Steel sheet pile should select the preferable steel sheet pile of water-stagnating effect, steel Sheet pile lock takes effective measures of preventing water to be conducive to subsequent construction.
Further, the ground uses Composite Foundation of Soil cement Mixing Piles.Due to cement mixing method and Foam lightweight soil Cement is used as main material, is conducive to overall arrangement of constructing, and both compatibility are good, therefore preferentially select soil cement to stir Mixing stake carries out complex ground treatment.Can also be using other method for processing foundation such as vacuum preloading, dynamic replacements.
Further, the breastwork is poured by armored concrete and formed.Pouring breastwork using armored concrete can effectively improve The intensity of breastwork, plays a good protection to filler.
Further, described filler is Foam lightweight soil, and it is by foaming agent machinery side by the foamed system of foaming machine Formula is fully foamed, and foam is uniformly mixed with cement mortar, then carries out cast-in-place construction by the pumping system of foaming machine, through certainly So maintenance is formed, and it is internal containing a large amount of sealed porositys.Foam lightweight soil belongs to air bubble-shaped light heat insulation material, prominent special Point is the foam hole that closing is formed in inside concrete, makes concrete light, and its dry volume density is generally 300-1600Kg/ M3, equivalent to 1/5~1/8 or so of portland cement concrete, can mitigate building Integral Loading and compression strength about 0.6- 25.0MPa, by the way that harbour use requirement can be met completely after Wharf Surface and relieving slab dispersive stress.Due to Foam lightweight soil Considerably lighter than other traditional fillers, while consolidation is an entirety, before Foam lightweight soil is to wharf shoulder and steel sheet pile after consolidation Wall almost without lateral pressure, greatly reduces the lateral pressure and moment of flexure of steel sheet pile, is filled under the conditions of the steel sheet pile using same size First formula Foam lightweight soil sheep pile wharf structure has bigger bearing capacity and more preferable stability.Consider in actual design construction The unit weight and compression strength index of the load inversion Foam lightweight soil of harbour, it is reasonable to reach economic indicator.
Further, the anchor pole is the threaded anchor rod for being provided with many places anchor plate.Anchor pole and anchor plate are poured in foam completely Inside light soil, anchor pole is integrally firmly anchored, the construction of traditional sheet-pile wharf anchorage can be saved, reduce the length of anchor pole.
The invention also discloses a kind of construction method of armoured type lightweight dock structure, comprise the following steps:
1) prepare before constructing:Water-retaining cofferdam is set, levelling of the land is then carried out;
2) steel sheet pile front wall is plugged, the enclosed structure of sealing is formed;
3) basement process is carried out at front wall rear;
4) excavation of foundation pit is carried out after basement process is finished, while setting gully;
5) by being poured on the ground after basement process near ground floor Foam lightweight soil to the stake top of steel sheet pile front wall;
6) at the top of steel sheet pile front wall construction reinforced bar concrete structure breastwork;
7) anchor pole and anchor plate of steel sheet pile front wall are layed in ground floor Foam lightweight soil top, anchor pole end is temporarily solid Determine anchor tight;
8) second layer Foam lightweight soil to breastwork top is poured, and anchor pole is poured inside Foam lightweight soil completely, made Anchor pole is integrally anchored;
9) relieving slab of construction reinforced bar concrete structure and Wharf Surface structure and remainder code at the top of Foam lightweight soil Head facility;
10) harbour front carries out port basin and waterway dredging.
Compared to prior art, the dress obtained using the construction method of armoured type lightweight dock structure disclosed in this invention First formula lightweight dock structure builds port suitable for beach, offshore shoal, fine sea bed and silt coast, and its is rational in infrastructure, apply Work short time limit, Foam lightweight soil packed bulk density is small, bearing capacity is high, good integrity.
Further, step 3) in complex ground treatment is carried out using cement mixing method.Due to cement mixing method and bubble Foam light soil, as main material, is conducive to overall arrangement of constructing using cement, and both compatibility are good, therefore preferentially selects Cement mixing method carries out complex ground treatment.Can also be using other method for processing foundation such as vacuum preloading, dynamic replacements.
Further, the Foam lightweight soil is mechanically fully to be sent out foaming agent by the foamed system of foaming machine Bubble, and foam is uniformly mixed with cement mortar, cast-in-place construction then is carried out by the pumping system of foaming machine, through natural curing institute Formed, it is internal containing a large amount of sealed porositys.Foam lightweight soil belongs to air bubble-shaped light heat insulation material, and outstanding feature is mixed Solidifying soil is internally formed the foam hole of closing, makes concrete light, and its dry volume density is generally 300-1600Kg/m3, quite In 1/5~1/8 or so of portland cement concrete, building Integral Loading can be mitigated and compression strength about 0.6-25.0MPa, By the way that harbour use requirement can be met completely after Wharf Surface and relieving slab dispersive stress.Because Foam lightweight soil is considerably lighter than it His traditional filler, while consolidation is an entirety, Foam lightweight soil does not almost have to wharf shoulder and steel sheet pile front wall after consolidation There is lateral pressure, greatly reduce the lateral pressure and moment of flexure of steel sheet pile, the armoured type foam under the conditions of the steel sheet pile using same size Light soil sheep pile wharf structure has bigger bearing capacity and more preferable stability.The lotus of harbour is considered in actual design construction The unit weight and compression strength index of adjustment Foam lightweight soil are carried, it is reasonable to reach economic indicator.
In order to more fully understand and implement, the invention will now be described in detail with reference to the accompanying drawings.
Brief description of the drawings
Fig. 1 is the structural representation of armoured type lightweight dock structure of the present invention
Specific embodiment
Further to illustrate the present invention to reach technological means and its technique effect that predetermined goal of the invention is taken, with Under in conjunction with the embodiments and accompanying drawing, to armoured type lightweight dock structure proposed by the present invention and its specific embodiment of construction method Illustrate, describe in detail as follows.
Fig. 1 is referred to, it is the structural representation of armoured type lightweight dock structure of the present invention.What the present invention was provided A kind of armoured type lightweight dock structure, including front wall 10, ground 20, breastwork 30, anchor pole 40, filler 50, relieving slab and harbour face Layer 60;The front wall 10 is located at the outside of the ground 20, and the breastwork 30 is poured in the top of the front wall 10, and described filler 50 is poured Build in the top of the ground 20, the one end of the anchor pole 40 is affixed with the top of the front wall 10, is embedded in inside described filler 50; The relieving slab and Wharf Surface 60 are poured in the top of described filler 50.
Specifically, described filler 50 is Foam lightweight soil, it includes ground floor filler 51 and second layer filler 52;Described One layer of filler 51 is poured in the top of the ground 20 to the top of front wall 10;The breastwork 30 is poured in the top of the front wall 10, institute State the one end of anchor pole 40 affixed with the top of the front wall 10 and be layed on the ground floor filler 51;The second layer filler 52 is poured Build in the top of the ground floor filler 51 to the top of the breastwork 30;The off-load version and Wharf Surface 60 are poured in described second The top of layer filler 52, and be together wrapped in outside described filler with the front wall 10 and breastwork 30, so as to form an armoured type New-Type Wharf structure.
Preferably, in the present embodiment, the front wall 10 plugs to be formed using steel sheet pile.Steel sheet pile should from water-stagnating effect compared with Good steel sheet pile, steel sheet pile lock takes effective measures of preventing water to be conducive to subsequent construction.The ground 20 is stirred using soil cement Mix pile composite foundation.Be conducive to construction as main material using cement due to cement mixing method 21 and Foam lightweight soil Overall arrangement, and both compatibility are good, therefore preferential selection cement mixing method carries out complex ground treatment.In other embodiment In, it would however also be possible to employ other method for processing foundation such as vacuum preloading, dynamic replacement.
Preferably, in the present embodiment, the breastwork 30 is poured by armored concrete and formed.Chest is poured using armored concrete Wall can effectively improve the intensity of breastwork, and filler is played a good protection.
Preferably, in the present embodiment, described filler 50 is Foam lightweight soil, and it is that will be sent out by the foamed system of foaming machine Infusion is mechanically fully foamed, and foam is uniformly mixed with cement mortar, is then carried out by the pumping system of foaming machine Cast-in-place construction, is formed through natural curing, and it is internal containing a large amount of sealed porositys.Foam lightweight soil belongs to air bubble-shaped lightweight guarantor Adiabator, outstanding feature is the foam hole that closing is formed in inside concrete, makes concrete light, and its dry volume density is general It is 300-1600Kg/m3, equivalent to 1/5~1/8 or so of portland cement concrete, building Integral Loading and resistance to compression can be mitigated Intensity is about 0.6-25.0MPa, by that can meet harbour use requirement completely after relieving slab and the dispersive stress of Wharf Surface 60. Because Foam lightweight soil is considerably lighter than other traditional fillers, while consolidation is an entirety, Foam lightweight soil is to harbour after consolidation Breastwork 30 and steel sheet pile front wall 10 almost without lateral pressure, greatly reduce the lateral pressure and moment of flexure of steel sheet pile, are using identical rule Armoured type Foam lightweight soil sheep pile wharf structure has bigger bearing capacity and more preferable stability under the conditions of the steel sheet pile of lattice. The unit weight and compression strength index of the load inversion Foam lightweight soil of harbour are considered in actual design construction, to reach economic indicator Rationally.
Preferably, in the present embodiment, the anchor pole 40 is the threaded anchor rod for being provided with many places anchor plate 41.Anchor pole 40 and anchor pad Plate 41 is poured inside Foam lightweight soil completely, the entirety of anchor pole 40 is firmly anchored, and can save traditional sheet-pile wharf anchorage Construction, reduces the length of anchor pole 40.
Compared to prior art, the invention provides a kind of brand-new dock structure form, the armoured type lightweight dock structure Port is built suitable for beach, offshore shoal, fine sea bed and silt coast, its rational in infrastructure, construction period is short, light-weight foamed Native packed bulk density is small, bearing capacity is high, good integrity.
The present embodiment additionally provides a kind of construction method of above-mentioned armoured type lightweight dock structure, comprises the following steps:
1) prepare before constructing:Water-retaining cofferdam is set, levelling of the land is then carried out;
2) steel sheet pile front wall 10 is plugged, the enclosed structure of sealing is formed;Steel sheet pile should select the preferable steel plate of water-stagnating effect Stake (such as AZ Series Steels sheet pile), steel sheet pile lock takes effective measures of preventing water to be conducive to subsequent construction.
3) basement process is carried out at the rear of front wall 10;Preferably, complex ground treatment is carried out using cement mixing method.By In cement mixing method and Foam lightweight soil using cement as main material, be conducive to overall arrangement of constructing, and both are simultaneous Capacitive is good, therefore preferential selection cement mixing method carries out complex ground treatment.Vacuum can also be used in other embodiments Other method for processing foundation such as precompressed, dynamic replacement;
4) excavation of foundation pit is carried out after basement process is finished, while setting gully;
5) in the stake top by pouring ground floor Foam lightweight soil 51 to steel sheet pile front wall on the ground 20 after basement process Near;
6) in the breastwork 30 of the top construction reinforced bar concrete structure of steel sheet pile front wall 10;
7) anchor pole 40 and anchor plate 41 of steel sheet pile front wall 10 are layed in the top of ground floor Foam lightweight soil 51, anchor pole 40 It is tight that anchor is fixed in end temporarily;
8) second layer Foam lightweight soil 52 to the top of breastwork 30 is poured, and anchor pole 40 is poured in Foam lightweight soil completely Portion, is anchored the entirety of anchor pole 40;
9) the relieving slab and Wharf Surface structure 60 of the top construction reinforced bar concrete structure of Foam lightweight soil 50 and its Remaining terminal facilities (such as wharf portal crane track, bollard);
10) harbour front carries out port basin and waterway dredging.
Compared to prior art, the dress obtained using the construction method of armoured type lightweight dock structure disclosed in this invention First formula lightweight dock structure builds port suitable for beach, offshore shoal, fine sea bed and silt coast, and its is rational in infrastructure, apply Work short time limit, rationally, Foam lightweight soil packed bulk density is small, bearing capacity is high, good integrity for cost.
Embodiment described above only expresses several embodiments of the invention, and its description is more specific and detailed, but simultaneously Can not therefore be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Scope.

Claims (9)

1. a kind of armoured type lightweight dock structure, it is characterised in that:Including front wall, ground, breastwork, anchor pole, filler, relieving slab and Wharf Surface;Described filler is Foam lightweight soil, and it includes ground floor filler and second layer filler;The ground floor filler is poured In ground top to front wall top;The breast wall pouring is in front wall top, described anchor pole one end and the front wall top End is affixed and is layed on the ground floor filler;The second layer filler is poured in ground floor filler top to the chest Wall top;The off-load version and Wharf Surface are poured in second layer filler top, and are together wrapped with the front wall and breastwork It is wrapped in outside described filler.
2. armoured type lightweight dock structure according to claim 1, it is characterised in that:The front wall is plugged using steel sheet pile Formed.
3. armoured type lightweight dock structure according to claim 1, it is characterised in that:The ground uses Soil-cement Pile composite foundation.
4. armoured type lightweight dock structure according to claim 1, it is characterised in that:The breastwork is poured by armored concrete Build to be formed.
5. armoured type lightweight dock structure according to claim 1, it is characterised in that:Described filler is Foam lightweight soil, It is that foaming agent is mechanically fully foamed by the foamed system of foaming machine, and foam is uniformly mixed with cement mortar, Then cast-in-place construction is carried out by the pumping system of foaming machine, is formed through natural curing, a large amount of closing gas are contained in its inside Hole.
6. armoured type lightweight dock structure according to claim 1, it is characterised in that:The anchor pole is to be provided with many places anchor pad The threaded anchor rod of plate.
7. a kind of construction method of armoured type lightweight dock structure, it is characterised in that:Comprise the following steps:
1) prepare before constructing:Water-retaining cofferdam is set, levelling of the land is then carried out;
2) steel sheet pile front wall is plugged, the enclosed structure of sealing is formed;
3) basement process is carried out at front wall rear;
4) excavation of foundation pit is carried out after basement process is finished, while setting gully;
5) by being poured on the ground after basement process near ground floor Foam lightweight soil to the stake top of steel sheet pile front wall;
6) at the top of steel sheet pile front wall construction reinforced bar concrete structure breastwork;
7) anchor pole and anchor plate of steel sheet pile front wall are layed in ground floor Foam lightweight soil top, anchor is fixed in anchor pole end temporarily Tightly;
8) second layer Foam lightweight soil to breastwork top is poured, and anchor pole is poured inside Foam lightweight soil completely, make anchor pole It is overall to be anchored;
9) relieving slab of construction reinforced bar concrete structure and Wharf Surface structure and remaining harbour set at the top of Foam lightweight soil Apply;
10) harbour front carries out port basin and waterway dredging.
8. armoured type lightweight dock structure according to claim 7, it is characterised in that:Step 3) in use Soil-cement Stake carries out complex ground treatment.
9. armoured type lightweight dock structure according to claim 7, it is characterised in that:The Foam lightweight soil is by hair The foamed system of bubble machine mechanically fully foams foaming agent, and foam is uniformly mixed with cement mortar, then by hair The pumping system of bubble machine carries out cast-in-place construction, is formed through natural curing, and it is internal containing a large amount of sealed porositys.
CN201710237005.XA 2017-04-12 2017-04-12 A kind of armoured type lightweight dock structure and its construction method Pending CN106894385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710237005.XA CN106894385A (en) 2017-04-12 2017-04-12 A kind of armoured type lightweight dock structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710237005.XA CN106894385A (en) 2017-04-12 2017-04-12 A kind of armoured type lightweight dock structure and its construction method

Publications (1)

Publication Number Publication Date
CN106894385A true CN106894385A (en) 2017-06-27

Family

ID=59196548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710237005.XA Pending CN106894385A (en) 2017-04-12 2017-04-12 A kind of armoured type lightweight dock structure and its construction method

Country Status (1)

Country Link
CN (1) CN106894385A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316232A (en) * 2018-02-09 2018-07-24 中交四航局第二工程有限公司 The surface layer structure and its construction method of gravity type quay breastwork

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1818221A (en) * 2006-03-21 2006-08-16 东南大学 Box-depositing dock light quantization
CN201172810Y (en) * 2008-03-28 2008-12-31 中交第一航务工程勘察设计院有限公司 Separate unloading type sheet pile bulkhead structure
KR20090046309A (en) * 2007-11-05 2009-05-11 한국철도기술연구원 Reinforced retaining wall and construction method thereof
CN205530114U (en) * 2016-03-28 2016-08-31 中交第三航务工程勘察设计院有限公司 To drawing formula steel pipe sheet pile wharf structure
CN206768731U (en) * 2017-04-12 2017-12-19 广州粤科工程建设监理咨询有限公司 A kind of armoured type lightweight dock structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1818221A (en) * 2006-03-21 2006-08-16 东南大学 Box-depositing dock light quantization
KR20090046309A (en) * 2007-11-05 2009-05-11 한국철도기술연구원 Reinforced retaining wall and construction method thereof
CN201172810Y (en) * 2008-03-28 2008-12-31 中交第一航务工程勘察设计院有限公司 Separate unloading type sheet pile bulkhead structure
CN205530114U (en) * 2016-03-28 2016-08-31 中交第三航务工程勘察设计院有限公司 To drawing formula steel pipe sheet pile wharf structure
CN206768731U (en) * 2017-04-12 2017-12-19 广州粤科工程建设监理咨询有限公司 A kind of armoured type lightweight dock structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316232A (en) * 2018-02-09 2018-07-24 中交四航局第二工程有限公司 The surface layer structure and its construction method of gravity type quay breastwork

Similar Documents

Publication Publication Date Title
CN100371537C (en) Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN100516384C (en) Underwater vacuum prepressing reinforcement soft base technique method
CN102926398B (en) A kind of for Salt Lake Area iron tower of power transmission line bolts of inclined column type anti-corrosion foundation construction method
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
KR20140075767A (en) Retaining wall construction using site compaction and excavation
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN108193648A (en) Plasticity panel homogeneous dam
CN102733407A (en) Two-ring grouted single pile foundation
CN109252542B (en) Tree root pile light retaining wall for road widening and construction method thereof
CN206971247U (en) A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock
CN201339186Y (en) Soft rock concrete replacement pile composite foundation
CN206768731U (en) A kind of armoured type lightweight dock structure
CN108385612A (en) A kind of construction method of the good concrete protecting face plate of stability
CN106894385A (en) A kind of armoured type lightweight dock structure and its construction method
KR100312457B1 (en) Solidified composition to strengthen weak stratum and constructing method using the same
CN106149624B (en) A kind of gravity type quay and its construction method suitable for roadbed of alluvial silt
CN208517891U (en) The novel reinforced structure of gravity type quay
CN109653223A (en) River anti-floating weighting board construction method
JP5681988B2 (en) Breakwater reinforcement method and reinforced breakwater
CN107366302B (en) A kind of construction technology of reinforced concrete retaining wall
CN206090534U (en) Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall
CN211113446U (en) Side slope protection structure capable of being constructed underwater
CN115637689A (en) Immersed tube reinforcement gravel pile construction method for reinforcing soft foundation
CN201649103U (en) Xi-type single-row multidirectional swing injected agitating reinforced combined supporting pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627

RJ01 Rejection of invention patent application after publication