CN106886164A - Monitoring system emulator - Google Patents
Monitoring system emulator Download PDFInfo
- Publication number
- CN106886164A CN106886164A CN201611129042.0A CN201611129042A CN106886164A CN 106886164 A CN106886164 A CN 106886164A CN 201611129042 A CN201611129042 A CN 201611129042A CN 106886164 A CN106886164 A CN 106886164A
- Authority
- CN
- China
- Prior art keywords
- equipment
- state
- monitoring system
- input unit
- emulator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 114
- 238000012790 confirmation Methods 0.000 abstract description 14
- 238000010276 construction Methods 0.000 description 8
- 238000004378 air conditioning Methods 0.000 description 7
- 238000005286 illumination Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000010200 validation analysis Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000018199 S phase Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000004069 differentiation Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- DOETVZCFKJCYJV-UHFFFAOYSA-N 6-(4,5-dihydro-1h-imidazol-2-yl)-2-[4-(4,5-dihydro-1h-imidazol-2-yl)phenyl]-1h-indole Chemical compound N1CCN=C1C1=CC=C(C=2NC3=CC(=CC=C3C=2)C=2NCCN=2)C=C1 DOETVZCFKJCYJV-UHFFFAOYSA-N 0.000 description 1
- 101100286286 Dictyostelium discoideum ipi gene Proteins 0.000 description 1
- 230000037007 arousal Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Monitoring system emulator, its equipment control that can be assumed in short-term interior confirmation monitoring system, it is also possible to suppress the unexpected action control of the equipment in monitoring system.Emulator (50) has:Particular state input unit, it is used to select particular state in the multiple states assumed from the facility with multiple equipment;Equipment state output section, its state for being used to export each equipment;And control unit (20), its control software according to the action that multiple equipment is controlled in monitoring system, particular state is got up with the state relation of each equipment corresponding to the particular state, by the status display of each equipment of the association in equipment state output section.
Description
Technical field
The present invention relates to monitoring system emulator (simulator of monitoring system), for example, it is related to true
The monitoring used during the action control of equipment in the facility recognized in the monitoring system monitored to facilities such as building and amusement parks
System simulator.
Background technology
In the past, as emulator, there is the emulator of the air conditioner described in patent document 1.The emulator is used to grasp sky
The operating condition of tune machine.The emulator is defeated in display part when the input condition for determining operating condition is input into from input unit
Go out the related data of the action of air conditioner corresponding with the input condition.
【Patent document 1】Japanese Unexamined Patent Publication 2006-242429 publications
The content of the invention
Problems to be solved by the invention
However, when building monitoring system is set up, preferably in the place different from its setting place such as factory building etc. in advance
The establishment of the equipment of carrying out simultaneously carries out the confirming operation of equipment, and equipment is then set at the scene, wherein, building monitoring system monitoring
The multiple equipments such as illumination, air-conditioning, automatic sprinkler, elevator.But, in duration shorter construction, sometimes can not be
Factory building etc. carries out the prior establishment of equipment, haves no alternative but carry out at the scene the establishment of building monitoring system.In this case, when
When equipment carries out unexpected action in the confirming operation at scene, it is not easy to which differentiation is that the monitoring of the action for controlling each equipment is used
Be present problem, wiring connection of such as mistake of construction still at the scene etc. and there is problem in the control software of controller, exist
Confirming operation needs the situation of long period.Also, need once to be controlled with the conjunction of software in confirming operation at the scene
The confirmation and the whether suitable confirmation for connecting up connection etc. in addition whether fitted, thus easily produce confirmation to slip, sometimes
Even if the equipment of there is also carries out unexpected action also undiscovered situation.
It is an object of the present invention to provide a kind of can carry out assumed equipment control to monitoring system interior in short term
Situation confirmed, additionally it is possible to suppress the monitoring system emulation of the unexpected action control of equipment in monitoring system
Device.
The means used to solve the problem
Monitoring system emulator of the invention is emulated to the action control of the multiple equipment in monitoring system, the monitoring
System monitors the action of the multiple equipment in the facility with the multiple equipment, and the monitoring system emulator has:It is special
Determine state input unit, it assumes to select particular state in the multiple states for producing from the facility;Equipment state output section,
The state of its output equipment;And control unit, it is according to the action that the multiple equipment is controlled in the monitoring system
Control software, the particular state is got up with the state relation of the equipment corresponding to the particular state, this is closed
The status display of the equipment of connection is in the equipment state output section.
According to the present invention, in the particular state for selecting and being input into assume to produce in facility, in the control of monitoring system
The action of the equipment being associated with the particular state with output in software.Therefore, by confirming whether exported action is false
Fixed action, and can be whether there is with software in the control of the prior confirmation monitoring systems such as the factory building beyond system setting place
Problem.Therefore, even in the establishment of monitoring system at the scene in the case of generation problem, it is also possible to determine the problem be by
Cause in construction at the scene, it is thus possible to the time required for shortening confirming operation.Further, since construction at the scene
The whether suitable confirmation of the preceding software of finishing control, thus be only controlled at the scene with software it is whether suitable confirm with
The outer confirmation for confirming such as wiring connection etc..Therefore, confirmation item at the scene is reduced, thus leakage seen in monitoring system
Equipment hypothesis outside the possibility of action control also reduce.
In addition, can also be in the present invention, also there is the monitoring system emulator sequential to select input unit, sequential choosing
Input unit is selected for chronologically continuously automatically selecting the particular state from the multiple state.
According to above-mentioned structure, the operating state for particular state, the continuous equipment for continuously generating is able to confirm that,
It is thus able to confirm to carry out a series of actions of the equipment of calendar management in sequential in monitoring system.
Alternatively, it is also possible to be, in the case of with sequential selection input unit, the monitoring system emulator also has
Have:Stop input unit, it stops the successional selection of the particular state, and selects the described specific shape under particular moment
State;F.F. input unit, particular moment described in its F.F.;And input unit is refunded, it refunds the particular moment.
According to said structure, can stop the successional selection of particular state in particular moment, it is thus possible to confirm
Whether the action of equipment under particular moment on control software is normal.Further, it is possible to fast forward or reverse particular moment, thus
The state of each equipment under the particular moment for wanting confirmation can be easily shown, under can easily verifying that the particular moment
The state of equipment.
Invention effect
In accordance with the invention it is possible to confirm in the short-term interior equipment control assumed to monitoring system, it is also possible to press down
The unexpected action control of the equipment in monitoring system processed.
Brief description of the drawings
Fig. 1 is the concept map for illustrating the establishment of general monitoring system that casual labourer's phase constructs.
Fig. 2 is the concept map of the application method for illustrating monitoring system emulator.
Fig. 3 is the block diagram of monitoring system emulator.
Fig. 4 is the schematic diagram of that shows the display image that the display part in monitoring system emulator shows.
Fig. 5 is the close-up schematic view of a part for above-mentioned display image.
Label declaration
20 control units;50 monitoring system emulators;71 sequential select input unit;74 stop input unit;75 F.F. input units;
76 refund input unit;90 monitoring systems.
Specific embodiment
Below, the implementation method that present invention will be described in detail with reference to the accompanying.Below, comprising multiple implementation methods and variation
Deng in the case of, it is assumed to be from the beginning their characteristic is appropriately combined and forms other implementation methods.
Fig. 1 is that show can be to the action of equipment in the facility to be monitored using monitoring system emulator disclosed by the invention
The summary construction diagram of the monitoring system 90 that control is emulated.First, using the structure of Fig. 1 explanation monitoring systems 90, in casual labourer
Problem points in phase construction in the establishment and the establishment of the general monitoring system 90 for carrying out.
Monitoring system 90 monitors building.Explanation supervision object is the situation of building in this embodiment, but supervision object can also
It is any facility with multiple equipment beyond amusement park or aquarium etc., or building.As shown in figure 1, monitoring system
System 90 has central monitoring computer 61, central monitoring server 62 and central monitoring controller 63.
Central monitoring computer 61 is preferably made up of personal computer and/or work station etc..Central monitoring computer
61 are connected with central monitoring server 62 and central monitoring controller 63, with central monitoring server 62 and central monitoring
The transmission and reception of signal are carried out with controller 63.Central monitoring computer 61 has what is be made up of multiple buttons and mouse etc.
Input unit, system validation person etc. can be using input units to the input signal of central monitoring controller 63.Central monitoring is calculated
Machine 61 has the display part being made up of monitor etc., the operating state of equipment 81-1~81-n in display part display building etc..
Central monitoring server 62 is connected with central monitoring controller 63, and letter is carried out with controller 63 with central monitoring
Number transmission and reception.It is mounted with to be used in the control local device of central monitoring controller 63 in central monitoring server 62
The database of the data needed during controller 80-1~80-n, the data of the needs are in and can suitably be retrieved, extracted
State.
Central monitoring controller 63 via multiple local device controller 80-1~80-n (n is random natural number, with
Under it is identical) be connected with the equipment 81-1~81-n in building.Equipment 81-1~81-n for example include air-conditioning, illumination, elevator and oneself
Dynamic sprinkler system etc..Multiple equipment determines according to each facility.It is mounted with central monitoring controller 63
Make the control software of local device controller 80-1~80-n control devices 81-1~81-n.Central monitoring controller
63 when from central 61 input condition of supervisory computer, with reference to data of the central monitoring in server 62, is locally set to each
Spare controller 80-1~80-n control signals of the output based on input condition.
In local device controller 80-1~80-n, it is mounted with according to the control from central monitoring controller 63
The control software that action of the signal to equipment 81-1~81-n is controlled.In local device controller 80-1~80-n
In the built-in control circuit being controlled by the signal from central monitoring controller 63, comprising many in the control circuit
Individual relay.When local device controller 80-1~80-n receives control signal from central monitoring controller 63, on
The switched on and off of each relay stated in control circuit is determined.Local device controller 80-1~80-n is according to passing through
The control circuit for determining the switched on and off of each relay and building carrys out control device 81-1~81-n.
In addition, illustrate in Fig. 1 each local device controller 80-1~80-n only with an equipment 81-1~81-
The state of n connections, but actually each local device controller 80-1~80-n is connected with multiple equipment.
In general casual labourer's phase constructs, monitoring system 90 builds at the scene, the action control of equipment 81-1~81-n
Whether system is also properly to confirm at the scene.Specifically, central monitoring with computer 61, central monitoring server 62 and in
Centre monitoring controller 63 is to be attached at the scene, and local device controller 80-1~80-n is also to be supervised with center at the scene
Depending on being connected with controller 63.Also, each equipment 81-1~81-n be also at the scene with corresponding local device controller 80-
1~80-n is connected, and is input into for realizing the signal of particular state by central monitoring computer 61, and confirms to set at the scene
Whether standby 81-1~81-n carries out assumed action.
In the establishment of the monitoring system 90, when in confirming operation at the scene equipment 81-1~81-n carry out it is unexpected
Action when, it is not easy to differentiation is that the central monitoring of the action for controlling each equipment 81-1~81-n is used with the control of controller 63
There is problem in software or the mistake wiring connection or the control of local device controller 80-1~80-n at scene are deposited with software
In problem, confirming operation needs the long period sometimes.
Fig. 2 is the concept map of the application method for illustrating monitoring system emulator 50.
(the hereinafter referred to as unit emulator) 50 of monitoring system emulator 50 is preferably by structures such as personal computer and/or work stations
Into.As shown in Fig. 2 emulator 50 is controlled with central monitoring with computer 61, central monitoring server 62 and central monitoring
The connection of device 63 is used.
Fig. 3 is the block diagram of emulator 50.
Emulator 50 has input unit 1, display part 5, storage part 15 and control unit 20.Input unit 1 is by multiple operating portion structures
Into.In the case where emulator 50 is personal computer, input unit 1 includes mouse and/or multiple buttons.Input unit 1 be in order to
Input assumes the particular state for occurring and sets in building.For example, can be input into the specific building of building by input unit 1
Layer makes all or part in building illuminate the state extinguished when there occurs the state of fire or the time to regulation
Deng.
Display part 5 is controlled by by control unit 20, and shows the state of each equipment 81-1~81-n in building.
In the case where emulator 50 is personal computer, display part 5 is made up of monitor etc., and storage part 15 is by hard disk and/or storage
Device etc. is constituted.Be stored with emulator software in storage part 15.As described above, in central monitoring controller 63 to locally setting
During spare controller 80-1~80-n output signals, local device controller 80-1~80-n is according to the signal control device
The action of 81-1~81-n.Emulator software makes the signal of central monitoring controller 63 and represents to be controlled by local device
The signal of the operating state of the equipment 81-1~81-n of device 80-1 processed~80-n controls is associated.
When have input particular state from input unit 1, the central monitoring controller of the signal from input unit 1 is received
63 to the output signal of emulator 50.Then, signal and table from central monitoring controller 63 are made by emulator software
Show that the signal of the operating state of each equipment 81-1~81-n for being assumed is associated, by each equipment 81-1 of the association~
The operating state of 81-n is shown in display part 5.In monitoring system 90, the central monitoring actual control device 81-1 of controller 63
The action of~81-n, and in emulator 50 it is the control for emulating central monitoring controller 63, by under the Simulation Control
The operating state of each equipment 81-1~81-n is shown in display part 5.
Fig. 4 is the figure of of the display image of the display of display part 5 for showing emulator 50.In fig. 4, specific example
Above-mentioned n is that 6, monitoring system 90 has a case that 6 local device controller 80-1~80-6, but as described above, n can be
Any natural number.
In the display image shown in Fig. 4, comprising local controller display part (hereinafter referred to as LC display parts) 70.LC shows
Portion 70 includes 6 specific local controller display part (hereinafter referred to as TLC display parts) 70-1~70-6.Say in detail below
Bright, TLC display parts 70-1~70-6 is used to be input into for making corresponding local device controller 80-1~80-6 control devices
81-1~81-6 is directed to the equipment 81-1~81-6 of the input signal for showing to cause the signal of reproduction particular state
Output state.Also, in above-mentioned display image, comprising the continuous output being made up of vertically extending belt-like zone
Display part 55.In addition, comprising sequential selection input unit 71, moment change input unit 72, time interval in above-mentioned display image
Input unit 73 is changed, is stopped input unit 74, F.F. input unit 75 and is refunded input unit 76.
Fig. 5 is the enlarged drawing of TLC display parts 70-1.The structure of TLC display parts 70-1 has and other TLC display parts 70-2
~70-6 identical structures.The structure explanation of the structure explanation reference TLC display parts 70-1 of TLC display parts 70-2~70-6, because
And omit.Reference picture 5, the multiple display parts for being shown as DIPI are input display parts, are shown as multiple display parts of DO
It is output display portion.When input display part is clicked on, management project and the current state relevant with the input display part is shown.
The state of input side is for example stated as if opening (ON) state, then input display part is lighted with the 1st color, if closing
(OFF) state is closed, then input display part is not lighted.Shown by all inputs included in TLC display parts 70-1~70-6
Portion constitutes particular state input unit.1st color preferably selects yellow, but the 1st color can also be any color beyond yellow.
System validation persons etc. click on input display part by appropriate, can be input into particular state.In TLC display parts 70-1
In, CT1~CT8 represents the slot numbering of local device controller 80-1 corresponding with TLC display parts 70-1.Each locally sets
Spare controller 80-1~80-6 has multiple slots for insertion control base board.Slot numbering is in local device controller
To the numbering of multiple slots distribution in 80-1~80-6.In the example as shown in fig. 5, according to the input of system validation person etc., card
The DI02J of the DIPI00, the DIPI03 of draw-in groove CT2 and draw-in groove CT5 of groove CT2 turns into ON states, is lighted with the 1st color.It is input into
Particular state be, for example, 1 layer and 3 layers of illumination is extinguished and make the state that 2 layers of air-conditioning stops.
When have input particular state, the state of equipment 81-1 corresponding with the particular state is shown in output display portion.
When output display portion is clicked on, management project and the current state relevant with the output display portion is shown.The example in management project
Such as include 3 layers of air-conditioning, 4 layers of illumination.The current state of outlet side for example shows as:State, then export aobvious if on
Show that portion is lighted with the 2nd color, if off state, then output display portion does not light.Wrapped by TLC display parts 70-1~70-6
The all of output display portion and continuous output display portion 55 (reference picture 4) constitution equipment State- output portion for containing.
It is preferred that being the colors different from the 1st color by the 2nd color settings, but it is also possible to be set as and the 1st color identical
Color.Also, it is preferred that the 2nd color of outlet side is by being capable of the eye-catching color structure such as the red of attention of arousal system affirmant etc.
Into.In this embodiment, the DO05H of the DO02 of draw-in groove CT5, the DOACC of draw-in groove CT5, the DO05C of draw-in groove CT8 and draw-in groove CT8 turns into
ON states, are lighted with the 2nd color.The shape that these output states for example stop with 1 layer and 3 layers of illumination extinguishing and 2 layers of air-conditioning
State correspondence.
System validation person etc. suitably selects and operates specific display part from the display part of multiple input sides, and this is specific
Display part be set to open (ON), thus, it is possible to reproduce particular state, by confirming the illuminating state in output display portion, can be true
The state of the equipment recognized under the particular state.
Referring again to Fig. 4, sequential selection input unit 71 is used to start following function:Make in the building for being managed on time
The moment that the particular state that sequence is produced is produced with the state associates, and continuously automatically enters.In building management, exist
The situation of particular state linkage, for example, in the case where A equipment is acted, B device is also carried out action.Thus, it is possible to according to
Demand, is incorporated into the schedule in specific period, and the data of the schedule are previously stored in into central monitoring server in advance
62 or central monitoring with controller 63.The data of schedule are the data for making chronologically to continuously perform particular state, for example
For:Door lock is unlocked when to 9, and lights illumination;Open air-conditioning at 9 in the morning, at night 11 when close air-conditioning
Deng.Schedule for example can also be different according to external conditions such as seasons.In the present embodiment, will make in advance chronologically continuous
The program storage of multiple schedules of particular state that execution is chronologically continuously generated central monitoring server 62 or in
Centre monitoring is with controller 63.System validation persons etc., and can be from by with mouse drag or clicking on sequential and selecting input unit 71
Specific schedule is selected and performed in multiple schedules.
Moment change input unit 72 is used to set the initial time of the particular state for chronologically continuously generating.Clicking on the moment
The moment can be shown during change input unit 72, by changing the moment, the initial time of continuous particular state can be selected.And
And, between time interval change input unit 73 is used for the time of the particular state continuously generated in simulations according to schedule setting
Every.The moment can be shown when time interval change input unit 73 is clicked on, by changing the moment, can select what is continuously generated
The time interval of particular state.
Reference picture 4, equipment 81- of the display for the particular state for chronologically continuously generating in continuous output display portion 55
The state of 1~81-6.In one example, continuous output display portion 55 shows that date, time, management project are opened in each row
Open (ON) or close (OFF) and alarm.Sequential is carried out in continuous output display portion 55 to show, new historical record is shown in the old Chinese calendar
The upside of Records of the Historian record, old historical record is sent into by side gradually downward.
With continued reference to Fig. 4, stopping input unit 74 is used to stop the automatic reproduction of continuous particular state in sequential, and selects
Select the particular state under particular moment.Also, F.F. input unit 75 be used for make particular moment F.F., refund input unit 76 for will
Particular moment refunds.System validation persons etc. can easily be selected by the way that these three input units 74,75,76 are carried out with mouse action
Select the special time for wanting display.
Referring again to Fig. 2, the central monitoring display part of computer 61 is shown and the emulator illustrated using Fig. 4 and Fig. 5
The corresponding display image of display image that 50 display part shows.The observer of monitoring system 90 can be used by means of central monitoring
The input unit of computer 61 reproduces particular state.Central monitoring is operated with computer 61 by observer, thus preferred expression
The management project of the equipment for being managed is easier to understand.Therefore, central monitoring with the display part of computer 61 show it is aobvious
In diagram picture, icon representation management project is preferably used.In the icon of management project can also include such as illumination icon and/
The icon of OR gate.
Emulator 50 according to above-mentioned implementation method, in the particular state that select and have input to assume to produce in building
When, the shape of each equipment 81-1~81-6 being associated with the particular state using the control software of monitoring system 90, output
State.Therefore, by confirming whether exported action is assumed action, thus, it is possible to set up at the scene monitoring system 90 it
The control of preceding prior confirmation monitoring system 90 whether there is problem with software.Therefore, even in the establishment of monitoring system 90
At the scene in the case of generation problem, it is also possible to determine that the problem is caused due to construction at the scene, it is thus possible to contract
Time required for short confirming operation.Also, due to before construction at the scene finishing control software it is whether suitable really
Recognize, thus be only controlled at the scene with software it is whether suitable confirm beyond confirmation, for example wiring connection etc. confirmation be
Can.Therefore, confirmation item at the scene is reduced, thus the unexpected action control of equipment seen in monitoring system of leakage can
Energy property is also reduced.
In addition, have sequential select input unit 71, its be used for automatically carry out from multiple states to particular state when
Continuously selected in sequence, it is thus possible to each equipment 81-1~81-6's that confirmation is managed in monitoring system 90 according to the time
A series of actions in sequential.
In addition, also having:Stop input unit 74, it stops continuous selection, and selects the specific shape under particular moment
State;F.F. input unit 75, it makes particular moment F.F.;And input unit 76 is refunded, it makes particular moment rewind, it is thus possible to hold
The action changed places on the control software for confirming each equipment 81-1~81-6 under particular moment.
In addition, the invention is not restricted to above-mentioned implementation method and its variation, can be remembered in following claims
Various improvement and change are carried out in the item of load and its scope of equalization.
For example, it is also possible to installed in central monitoring server 62 for by local device controller 80-1~
80-n and central monitoring controller 63 are taken into the software of the operating state data joined with time correlation of equipment 81-1~81-n.
In addition, in the above-described embodiment, there is sequential selection input unit 71 to emulator 50, stopping input unit 74, F.F. input unit
75 and refund the example of input unit 76 and be illustrated, but emulator can also select input unit with sequential, without
Stop input unit, F.F. input unit and refund the composition of input unit.In addition, emulator can also select input without sequential
Portion, stop input unit, F.F. input unit and refunding input unit.In addition, the layout, input in the display image that shows of display part are used
And quantity, the shape of output display part etc. is not limited to situation about being illustrated in above-mentioned Fig. 4 and Fig. 5, it is also possible to fitted according to specification
Work as change.
Claims (3)
1. a kind of monitoring system emulator, its action control to the multiple equipment in monitoring system is emulated, the monitoring
System monitors the action of the multiple equipment in the facility with the multiple equipment, wherein, the monitoring system emulator
Have:
Particular state input unit, it is used to assume from the facility to select particular state in the multiple states for producing;
Equipment state output section, its state for being used to export the equipment;And
Control unit, its basis is used for the control software of the action that the multiple equipment is controlled in the monitoring system, by institute
The state relation of particular state and the equipment corresponding to the particular state is stated, by the state of the equipment of the association
It is shown in the equipment state output section.
2. monitoring system emulator according to claim 1, wherein,
The monitoring system emulator also has sequential selection input unit, and sequential selection input unit is used for from the multiple state
In chronologically continuously automatically select the particular state.
3. monitoring system emulator according to claim 2, wherein,
The monitoring system emulator also has:
Stop input unit, it stops the successional selection of the particular state, and select described specific under particular moment
State;
F.F. input unit, it makes the particular moment F.F.;And
Input unit is refunded, it refunds the particular moment.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015-244261 | 2015-12-15 | ||
JP2015244261A JP6173418B2 (en) | 2015-12-15 | 2015-12-15 | Surveillance system simulator |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106886164A true CN106886164A (en) | 2017-06-23 |
CN106886164B CN106886164B (en) | 2021-05-25 |
Family
ID=59081377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611129042.0A Active CN106886164B (en) | 2015-12-15 | 2016-12-09 | Monitoring system simulator |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP6173418B2 (en) |
CN (1) | CN106886164B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107407914A (en) * | 2015-03-24 | 2017-11-28 | 三菱电机株式会社 | Plant supervisory control device |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07210238A (en) * | 1994-01-17 | 1995-08-11 | Nec Eng Ltd | Simulation device for building automation |
JPH1115515A (en) * | 1997-06-24 | 1999-01-22 | Hitachi Ltd | Simulator |
JP2000250775A (en) * | 1999-03-01 | 2000-09-14 | Omron Corp | Trouble analysis supporting device and simulation system |
JP2002297226A (en) * | 2001-03-29 | 2002-10-11 | Sumitomo Heavy Ind Ltd | Simulation device for automatic conveyance system and its method and its simulation program |
JP2005122353A (en) * | 2003-10-15 | 2005-05-12 | Toshiba Corp | Monitoring and controlling device |
CN101995840A (en) * | 2009-08-20 | 2011-03-30 | 三菱电机株式会社 | Monitoring and control apparatus |
EP2304633A2 (en) * | 2008-07-18 | 2011-04-06 | EDSA Micro Corporation | A method for predicting symmetric, automated, real-time arc flash energy within a real-time monitoring system |
CN103809459A (en) * | 2012-11-13 | 2014-05-21 | 中国广东核电集团有限公司 | Nuclear power station digital fire alarm detection simulation system, analog system and simulation method |
CN103809460A (en) * | 2012-11-14 | 2014-05-21 | 国家电网公司 | Monitoring center simulation method, device and system |
CN103926883A (en) * | 2013-01-11 | 2014-07-16 | Ckd株式会社 | Inspecting device monitoring system |
WO2014141162A1 (en) * | 2013-03-15 | 2014-09-18 | Coolit Systems, Inc. | Sensors, multiplexed communication techniques, and related systems |
CN104133378A (en) * | 2014-08-05 | 2014-11-05 | 中国民用航空总局第二研究所 | Real-time simulation platform for airport activity area monitoring guidance system |
CN102055959B (en) * | 2009-10-29 | 2015-07-22 | 株式会社日立制作所 | Central monitoring system based on a plurality of monitoring cameras and central monitoring method |
WO2015170990A1 (en) * | 2014-05-04 | 2015-11-12 | Roger Andre Eilertsen | A road traffic server |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013228314A (en) * | 2012-04-26 | 2013-11-07 | Toshiba Corp | Digital control panel test device and test method for the same |
-
2015
- 2015-12-15 JP JP2015244261A patent/JP6173418B2/en active Active
-
2016
- 2016-12-09 CN CN201611129042.0A patent/CN106886164B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07210238A (en) * | 1994-01-17 | 1995-08-11 | Nec Eng Ltd | Simulation device for building automation |
JPH1115515A (en) * | 1997-06-24 | 1999-01-22 | Hitachi Ltd | Simulator |
JP2000250775A (en) * | 1999-03-01 | 2000-09-14 | Omron Corp | Trouble analysis supporting device and simulation system |
JP2002297226A (en) * | 2001-03-29 | 2002-10-11 | Sumitomo Heavy Ind Ltd | Simulation device for automatic conveyance system and its method and its simulation program |
JP2005122353A (en) * | 2003-10-15 | 2005-05-12 | Toshiba Corp | Monitoring and controlling device |
EP2304633A2 (en) * | 2008-07-18 | 2011-04-06 | EDSA Micro Corporation | A method for predicting symmetric, automated, real-time arc flash energy within a real-time monitoring system |
CN101995840A (en) * | 2009-08-20 | 2011-03-30 | 三菱电机株式会社 | Monitoring and control apparatus |
CN102055959B (en) * | 2009-10-29 | 2015-07-22 | 株式会社日立制作所 | Central monitoring system based on a plurality of monitoring cameras and central monitoring method |
CN103809459A (en) * | 2012-11-13 | 2014-05-21 | 中国广东核电集团有限公司 | Nuclear power station digital fire alarm detection simulation system, analog system and simulation method |
CN103809460A (en) * | 2012-11-14 | 2014-05-21 | 国家电网公司 | Monitoring center simulation method, device and system |
CN103926883A (en) * | 2013-01-11 | 2014-07-16 | Ckd株式会社 | Inspecting device monitoring system |
WO2014141162A1 (en) * | 2013-03-15 | 2014-09-18 | Coolit Systems, Inc. | Sensors, multiplexed communication techniques, and related systems |
WO2015170990A1 (en) * | 2014-05-04 | 2015-11-12 | Roger Andre Eilertsen | A road traffic server |
CN104133378A (en) * | 2014-08-05 | 2014-11-05 | 中国民用航空总局第二研究所 | Real-time simulation platform for airport activity area monitoring guidance system |
Non-Patent Citations (1)
Title |
---|
秦琳琳,等: "基于物联网的温室智能监控系统设计", 《农业机械学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107407914A (en) * | 2015-03-24 | 2017-11-28 | 三菱电机株式会社 | Plant supervisory control device |
CN107407914B (en) * | 2015-03-24 | 2020-10-16 | 三菱电机株式会社 | Plant monitoring and controlling device |
Also Published As
Publication number | Publication date |
---|---|
JP2017111544A (en) | 2017-06-22 |
CN106886164B (en) | 2021-05-25 |
JP6173418B2 (en) | 2017-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5493642A (en) | Graphically constructed control and scheduling system | |
CN104486416B (en) | A kind of utilization system and method for smart home service regulation | |
CN104750063B (en) | For configuring the system and industrial safety system collocation method of industry security relay | |
CN103162374B (en) | control method and device of air conditioner system | |
CN106716269A (en) | Systems and methods for managing environmental conditions | |
CN111401829A (en) | Building intelligent park management system based on BIM technology | |
CN101484889A (en) | System and method for managing, routing, and controlling devices and inter-device connections | |
CN103809459A (en) | Nuclear power station digital fire alarm detection simulation system, analog system and simulation method | |
CN107948008A (en) | A kind of modeling method for low-voltage network monitoring system | |
CN102734894A (en) | Air-conditioning controlling system | |
CN104460611A (en) | Control system and control method of distributed storage cabinet | |
Mijović et al. | Emergency management in critical infrastructures: A complex-event-processing paradigm | |
CN106886164A (en) | Monitoring system emulator | |
CN108490906A (en) | DCS controls fired power generating unit is improved to the design method having completely from start-stop function | |
CN1979588A (en) | Plant simulator | |
CN106200435A (en) | The wisdom of wisdom platform and artificial compatible control method and system | |
CN207612125U (en) | Electric railway traction supply intelligent auxiliary system | |
US20150367227A1 (en) | Interaction of video projection and effects lighting with bowling scoring system and methods of use | |
CN104950778A (en) | Monitoring system of data center | |
CN116128212A (en) | Urban rail station operation scene arrangement method and system based on BPMN | |
Luchetta et al. | As built design, commissioning and integration of the SPIDER and NBTF central safety systems | |
CN202795797U (en) | Practical training device of intelligent and automatic fire alarm system for buildings | |
CN104932330A (en) | Security linkage platform | |
CN104820601B (en) | A kind of security protection interlock method | |
CN105093938B (en) | Building control system design and maintained equipment and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |