- CN103162374B CN103162374B CN201110416675.0A CN201110416675A CN103162374B CN 103162374 B CN103162374 B CN 103162374B CN 201110416675 A CN201110416675 A CN 201110416675A CN 103162374 B CN103162374 B CN 103162374B
- Authority
- CN
- China
- Prior art keywords
- equipment
- air
- control
- monitoring
- input
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000012544 monitoring process Methods 0.000 claims abstract description 97
- 230000001143 conditioned effect Effects 0.000 claims description 30
- 238000007791 dehumidification Methods 0.000 claims description 7
- 238000010438 heat treatment Methods 0.000 claims description 6
- 238000005057 refrigeration Methods 0.000 claims description 6
- 230000007257 malfunction Effects 0.000 claims description 5
- 230000001276 controlling effect Effects 0.000 description 16
- 230000000875 corresponding effect Effects 0.000 description 11
- 238000010586 diagram Methods 0.000 description 8
- 238000004088 simulation Methods 0.000 description 8
- 238000004364 calculation method Methods 0.000 description 5
- 206010008190 Cerebrovascular accident Diseases 0.000 description 2
- 208000006011 Stroke Diseases 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 2
- 230000003542 behavioural effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 239000012141 concentrate Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
The invention discloses a control method and a control device of an air conditioner system. The control method of the air conditioner comprises the following steps: receiving an equipment selection command input by a user, wherein the equipment selection command corresponds to first equipment and second equipment of an air conditioner system; monitoring the first equipment to obtain a monitoring result of the first equipment; judging whether a monitoring result of the first equipment meets a preset condition or not; and controlling the second equipment according to a preset command when the monitoring result of the first equipment meets a preset condition. According to the invention, during linkage control, a user can flexibly select any equipment in the air conditioner system for linkage, so that the flexibility of linkage control of the equipment is improved.
Description
Technical field
The present invention relates to air-conditioner field, in particular to a kind of control method and device of air-conditioner system.
Background technology
At present, coordinated signals scheme in air-conditioner system is: each signal selecting a checkout equipment to detect is as coordinated signals input signal, this checkout equipment only comprises temperature sensor, humidity sensor and gas concentration lwevel sensor sensor device, correspondingly, the equipment controlled also can only be one, and the signal such as detected according to humidity sensor controls humidifier and runs.
But the mode of this coordinated signals has very large restriction to input signal and controlled device, especially when air-conditioner system is used for regulating the humiture compared with large regions, time such as regulating the humiture in certain Administrative Area Zhong Duodong building, be unfavorable for the flexibility operated, centralized Control is poor.
Control the problem of very flexible for equipment linkage in air-conditioner system in correlation technique, not yet propose effective solution at present.
Summary of the invention
Main purpose of the present invention is the control method and the device that provide a kind of air-conditioner system, controls the problem of very flexible to solve equipment linkage in air-conditioner system.
To achieve these goals, according to an aspect of the present invention, a kind of control method of air-conditioner system is provided.
Control method according to air-conditioner system of the present invention comprises: the equipment choice order receiving user's input, wherein, and the first equipment of the corresponding air-conditioner system of equipment choice order and the second equipment; First equipment of monitoring is to obtain the monitoring result of the first equipment; Judge whether the monitoring result of the first equipment meets pre-conditioned; And when the monitoring result of the first equipment meets pre-conditioned, control the second equipment according to pre-set commands.
Further, first equipment of monitoring comprises with the monitoring result obtaining the first equipment: the operational factor of monitoring the first equipment, judges whether the monitoring result of the first equipment meets pre-conditioned comprising: judge that the operational factor of the first equipment is whether in preset parameter range; Or judge whether the operational factor of the first equipment equals parameter preset.
Further, first equipment of monitoring comprises with the monitoring result obtaining the first equipment: the running status of monitoring the first equipment, judges whether the monitoring result of the first equipment meets pre-conditioned comprising: judge that whether the running status of the first equipment is opening or closed condition or malfunction.
Further, control the second equipment according to pre-set commands to comprise: control the second opening of device or closedown; Second equipment that controls runs on refrigeration mode, heating mode, air supply pattern or dehumidification mode; And second equipment that controls changes operational factor.
Further, the first equipment and the second equipment include following any one or plurality of devices: temperature sensor, humidity sensor, gas concentration lwevel sensor, internal machine of air-conditioner, air conditioner external, remote controller, humidifier, dehumidifier, new blower fan, dry type end, air-valve and blower fan.
Further, the monitoring result of the first equipment meet pre-conditioned after, the method also comprises: the monitoring result showing the first equipment; And receive the equipment control command of user's input, and using equipment control command as pre-set commands.
Further, the equipment control command receiving user's input comprises: the first control command receiving user's input, and wherein, the first control command changes operational factor for controlling the second equipment; And/or receive the second control command of user's input, wherein, the second control command changes running status for controlling the second equipment.
Further, after monitoring first equipment is with the monitoring result obtaining the first equipment, the method also comprises: the condition select command receiving user's input, and wherein, condition select command is used in the multiple conditions prestored, determine that one or more condition is as pre-conditioned.
To achieve these goals, according to an aspect of the present invention, a kind of control device of air-conditioner system is provided.According to the control device of air-conditioner of the present invention for performing the control method of any one air-conditioner system provided by the invention.
To achieve these goals, according to an aspect of the present invention, a kind of control device of air-conditioner system is provided.Control device according to air-conditioner of the present invention comprises: the first receiver module, for receiving the equipment choice order of user's input, wherein, and the first equipment of the corresponding air-conditioner system of equipment choice order and the second equipment; Monitoring modular, for monitoring the first equipment to obtain the monitoring result of the first equipment; Judge module, for judging whether the monitoring result of the first equipment meets pre-conditioned; And control module, for when the monitoring result of the first equipment meets pre-conditioned, control the second equipment according to pre-set commands.
Further, monitoring modular comprises: the first monitoring submodule, and for monitoring the operational factor of the first equipment, judge module comprises: first judges submodule, for judging that the operational factor of the first equipment is whether in preset parameter range; Or second judges submodule, for judging whether the operational factor of the first equipment equals parameter preset.
Further, monitoring modular comprises: the second monitoring submodule, and for monitoring the running status of the first equipment, judge module comprises: the 3rd judges submodule, for judging that whether the running status of the first equipment is opening or closed condition or malfunction.
Further, control module comprises: first controls submodule, for controlling the second opening of device or closedown; Second controls submodule, runs on refrigeration mode, heating mode, air supply pattern or dehumidification mode for controlling the second equipment; And the 3rd controls submodule, change operational factor for controlling the second equipment.
Further, this device also comprises: display module, for showing the monitoring result of the first equipment; And second receiver module, for receiving the equipment control command of user's input, and using equipment control command as pre-set commands.
Further, the second receiver module comprises: first receives submodule, and for receiving the first control command of user's input, wherein, the first control command changes operational factor for controlling the second equipment; And/or second receives submodule, for receiving the second control command of user's input, wherein, the second control command changes running status for controlling the second equipment.
Further, this device also comprises: the 3rd receiver module, and for receiving the condition select command of user's input, wherein, condition select command is used in the multiple conditions prestored, determine that one or more condition is as pre-conditioned.
By the present invention, adopt the control method of the air-conditioner system comprised the following steps: the equipment choice order receiving user's input, wherein, the first equipment of the corresponding air-conditioner system of equipment choice order and the second equipment; First equipment of monitoring is to obtain the monitoring result of the first equipment; Judge whether the monitoring result of the first equipment meets pre-conditioned; And when the monitoring result of the first equipment meets pre-conditioned, the second equipment is controlled according to pre-set commands, solve equipment linkage in air-conditioner system and control the problem of very flexible, and then reach user the arbitrary equipment in air-conditioner system can be selected flexibly to link, improve the effect that equipment linkage controls flexibility.
Accompanying drawing explanation
The accompanying drawing forming a application's part is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the control method of air-conditioner system according to the embodiment of the present invention;
Fig. 2 is the control area schematic diagram of the air-conditioner system according to the embodiment of the present invention;
Fig. 3 is the input equipment list schematic diagram of the air-conditioner system according to the embodiment of the present invention;
Fig. 4 is the output equipment list schematic diagram of the air-conditioner system according to the embodiment of the present invention;
Fig. 5 is the air-conditioner system background task schematic diagram according to the embodiment of the present invention;
Fig. 6 is the block diagram of the control device of air-conditioner system according to the embodiment of the present invention; And
Fig. 7 is the control device workflow diagram of the air-conditioner system according to the embodiment of the present invention.
Detailed description of the invention
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
Fig. 1 is the flow chart of the control method of air-conditioner system according to a first embodiment of the present invention, this system can according to the input equipment of user's setting and Rule of judgment, by monitoring the state of input equipment, if input equipment meeting Rule of judgment, issuing control instruction and controlling output equipment.As shown in Figure 1, the method comprises following step S102 to step S110:
Step S102: the equipment choice order receiving user's input, wherein, first equipment (i.e. input equipment) of the corresponding air-conditioner system of equipment choice order and the second equipment (i.e. output equipment), first equipment and the second equipment include following any one or plurality of devices: temperature sensor, humidity sensor, gas concentration lwevel sensor, internal machine of air-conditioner, air conditioner external, remote controller, humidifier, dehumidifier, new blower fan, dry type end, air-valve and blower fan, user can under the corresponding engineering of unrestricted choice any one region as control area, as shown in Figure 2, in this region, arbitrary equipment can be selected as one group of input equipment, as shown in Figure 3, be input equipment list, also can unrestricted choice arbitrary equipment as output equipment, as shown in Figure 4, be output equipment list, and output equipment behavioral parameters and associated delay control time be set.
Step S104: the first equipment of monitoring is to obtain the monitoring result of the first equipment, when the first equipment is sensor device, the parameter that monitoring result can detect for sensor device, the humidity that the temperature-humidity sensor that such as temperature sensor detects detects and the concentration that gas concentration lwevel sensor detects; When the first equipment is humidifier, dehumidifier, new blower fan, monitoring result can be the current load condition of this equipment.
Step S106: judge whether the monitoring result of the first equipment meets pre-conditioned, wherein, the pre-conditioned conditional information that can prestore for system also can be the Rule of judgment of user's setting.
Preferably, in order to embody the flexibility of control, between step S104 and step S106, the method also comprises: the condition select command receiving user's input, wherein, condition select command is used in the multiple conditions prestored, determine that one or more condition is as pre-conditioned.
In systems in which, the following Rule of judgment that prestores is selected for user:
Open: whether input equipment is opened;
Close: whether input equipment closes;
Fault: whether input equipment breaks down;
The simulation upper limit: the preset simulation upper limit, whether the operational factor of input equipment reaches the preset simulation upper limit;
Simulation lower limit: arrange the preset simulation upper limit, whether the operational factor of input equipment reaches preset simulation lower limit, by simulating the setting of bound, whether the operational factor of the input equipment that can break is in preset parameter range;
The analogue value: the preset analogue value, whether the operational factor of input equipment is the preset analogue value.
For above-mentioned multiple condition, user is when selecting two or more conditions, the relation of each condition can be set: if arrange the logical relation of two or more Rule of judgment above-mentioned for " simultaneously ", when then Rule of judgment occurs simultaneously, just perform step S108, the i.e. output equipment of control association, as logical relation be " or ", just step S108 can be performed, i.e. the output equipment of control association when then Rule of judgment has one to occur.
Step S108: control the second equipment (i.e. output equipment) according to pre-set commands, also second equipment that namely controls performs deliberate action, some relevant actions of output equipment are then caused when the state of input equipment meets Rule of judgment, output equipment action parameter can be controllable signal all in equipment, comprising:
The running status of change equipment: start: start output equipment when condition meets; Close: when condition meets, close output equipment.
Other parameters are set: when condition meets, output equipment runs by the parameter in arranging, such as: the operational mode arranging the second equipment: freeze, heat, blow and dehumidification mode; When output equipment be new blower fan or return fan time, the air quantity of equipment is set: strong wind, little wind, apoplexy; When output equipment is filter screen: open and close; The temperature arranging air-conditioner dry type end is occurrence; Shielding remote controller authority: open and close; The temperature upper limit arranging internal machine of air-conditioner is occurrence, upper limit deviation is occurrence, lowest temperature is occurrence, lower limit deviation is occurrence.
Above-mentioned relevant action can for the action preset according to Rule of judgment, also corresponding action can be performed according to the order of user's input, preferably, the monitoring result of the first equipment meet pre-conditioned after, the method also comprises: the monitoring result showing the first equipment (i.e. input equipment), with the running status and the operational factor that enable user understand current device, thus input device controls order, the equipment control command that user inputs by control system is run as pre-set commands, wherein, the control command receiving user's input comprises: the first control command receiving user's input, wherein, first control command changes operational factor for controlling the second equipment, and/or receive the second control command of user's input, wherein, the second control command changes running status for controlling the second equipment.
In this embodiment, user can select arbitrarily input equipment and output equipment, and according to input equipment and default Rule of judgment, coordinated signals enables the co-operating of equipment.When monitoring the state situation of change of input equipment, if the input equipment state recorded under imposing a condition changes to some extent, namely send relevant control instruction (start/stop etc.) to output equipment, thus improve operating flexibility and the centralized Control of monitoring air-conditioning system.
The parameter that air-conditioner system is arranged according to user, automatic generation running background task, user can arrange the state of this task as required for coming into force or losing efficacy, to monitor air-conditioning more flexibly, more easily, as shown in Figure 5, be the task that comes into force of system generation.
Fig. 6 is the block diagram of the control device of air-conditioner system according to the embodiment of the present invention, and as shown in Figure 6, this control device comprises: the first receiver module 10, monitoring modular 20, judge module 30 and control module 40.
Wherein, first receiver module 10 is for receiving the equipment choice order of user's input, wherein, first equipment (i.e. input equipment) of the corresponding air-conditioner system of equipment choice order and the second equipment (i.e. output equipment), first equipment and the second equipment include following any one or plurality of devices: temperature sensor, humidity sensor, gas concentration lwevel sensor, internal machine of air-conditioner, air conditioner external, remote controller, humidifier, dehumidifier, new blower fan, dry type end, air-valve and blower fan, user can under the corresponding engineering of unrestricted choice any one region as control area, as shown in Figure 2, in this region, arbitrary equipment can be selected as one group of input equipment, as shown in Figure 3, be input equipment list, also can unrestricted choice arbitrary equipment as output equipment, as shown in Figure 4, be output equipment list, and output equipment behavioral parameters and associated delay control time be set.
Monitoring modular 20 is for monitoring the first equipment to obtain the monitoring result of the first equipment, when the first equipment is sensor device, the parameter that monitoring result can detect for sensor device, the humidity that the temperature-humidity sensor that such as temperature sensor detects detects and the concentration that gas concentration lwevel sensor detects; When the first equipment is humidifier, dehumidifier, new blower fan, monitoring result can be the current load condition of this equipment.
Judge module 30, for judging whether the monitoring result of the first equipment meets pre-conditioned, wherein, can comprise following any one and judge submodule:
First judges submodule, for judging whether input equipment is opened; Second judges submodule, for judging whether input equipment closes; 3rd judges submodule, for judging whether input equipment breaks down; 4th judges submodule, for judging whether the operational factor of input equipment reaches the preset simulation upper limit; 5th judges submodule, for judging whether the operational factor of input equipment reaches preset simulation lower limit; 6th judges submodule, for judging whether the operational factor of input equipment is the preset analogue value.
Preferably, this device also comprises: the 3rd receiver module, and for receiving the condition select command of user's input, wherein, condition select command is used in the multiple conditions prestored, determine that one or more condition is as pre-conditioned.Receive the condition select command of user's input at the 3rd receiver module after, also one or more judgement submodule is namely determined, for above-mentioned multiple judgement submodule, user is when selecting two or more to judge submodule, relation between modules can be set: if arrange the logical relation of two or more judge modules above-mentioned for " simultaneously ", think when then respectively judging that submodule meets simultaneously meet pre-conditioned, as logical relation be " or ", as long as just think when then respectively judging that submodule has one to meet meet pre-conditioned.
Control module 40, for when the monitoring result of the first equipment meets pre-conditioned, controls the second equipment according to pre-set commands.Also namely: control module 40 controls the second equipment and performs deliberate action, when the monitoring result that judge module 30 obtains the first equipment meets pre-conditioned, can be changed running status or the operational factor of equipment by control module.Wherein, control module 40 comprises: first controls submodule, for controlling the second opening of device or closedown; Second controls submodule, runs on refrigeration mode, heating mode, air supply pattern or dehumidification mode for controlling the second equipment; And the 3rd controls submodule, change operational factor for controlling the second equipment.
First controls submodule when monitoring result meets entry condition, starts output equipment; When monitoring result meets closedown condition, close output equipment.
Second controls submodule when monitoring result meets corresponding mode condition, and second equipment that controls runs on refrigeration mode, heating mode, air supply pattern or dehumidification mode;
3rd controls submodule can arrange other parameters: when condition meets, output equipment runs by the parameter arranged, namely second equipment that controls changes operational factor, such as: when output equipment be new blower fan or return fan time, the air quantity of equipment is set: strong wind, little wind, apoplexy; When output equipment is filter screen: open and close; The temperature arranging air-conditioner dry type end is occurrence; Shielding remote controller authority: open and close; The temperature upper limit arranging internal machine of air-conditioner is occurrence, upper limit deviation is occurrence, lowest temperature is occurrence, lower limit deviation is occurrence.
The control device of the air-conditioner system adopting this embodiment to provide, the equipment setting command of user's input is received by receiver module, the arbitrary equipment in air-conditioner system is selected to be connected as input equipment and output equipment, monitoring modular is monitored input equipment in real time, when judge module judges that monitoring result meets default condition, control module controls correspondingly output equipment and completes linkage action.Make air-conditioner system achieve interlock between arbitrary equipment, control flexibly.
Wherein, this control device can control output equipment according to the operational factor of input equipment, preferably, monitoring modular comprises: the first monitoring submodule, for monitoring the operational factor of the first equipment, judge module comprises: first judges submodule, for judging that the operational factor of the first equipment is whether in preset parameter range; Or second judges submodule, for judging whether the operational factor of the first equipment equals parameter preset.
Wherein, this control device can also control output equipment according to the running status of input equipment, preferably, monitoring modular comprises: the second monitoring submodule, for monitoring the running status of the first equipment, judge module comprises: the 3rd judges submodule, for judging that whether the running status of the first equipment is opening or closed condition or malfunction.
In order to reach the direct control of user to output equipment running status, preferably, this control device also comprises: display module, for showing the monitoring result of the first equipment; And second receiver module, for receiving the equipment control command of user's input, and using equipment control command as pre-set commands.User obtains monitoring result, to input suitable control command to control device by display module display.
Wherein, the second receiver module comprises: first receives submodule, and for receiving the first control command of user's input, wherein, the first control command changes operational factor for controlling the second equipment; And/or second receives submodule, for receiving the second control command of user's input, wherein, the second control command changes running status for controlling the second equipment.
Fig. 7 is the control device workflow diagram of the air-conditioner system according to the embodiment of the present invention, as shown in Figure 7, user determine link input equipment and output equipment after, first monitoring modular detects the state of input equipment, judge module judges whether this state meets " Rule of judgment " and " condition types ", when meeting, control module sends control instruction to output equipment, and output equipment performs corresponding control instruction; When not meeting, continue the state of monitoring input equipment.
From above description, can find out, present invention achieves following technique effect: when controlling to link between the multiple equipment in air-conditioner system, user can select arbitrary equipment in air-conditioner system as input equipment and output equipment flexibly, and monitor input equipment or obtain monitoring result, control output equipment according to monitoring result and complete corresponding linkage action, improve flexibility and the centrality of air-conditioner system equipment linkage control.
It should be noted that, can perform in the computer system of such as one group of computer executable instructions in the step shown in the flow chart of accompanying drawing, and, although show logical order in flow charts, but in some cases, can be different from the step shown or described by order execution herein.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on network that multiple calculation element forms, alternatively, they can realize with the executable program code of calculation element, thus, they can be stored and be performed by calculation element in the storage device, or they are made into each integrated circuit modules respectively, or the multiple module in them or step are made into single integrated circuit module to realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (11)
1. a control method for air-conditioner system, is characterized in that, comprising:
Receive the equipment choice order of user's input, wherein, the first equipment of the corresponding air-conditioner system of described equipment choice order and the second equipment;
Monitor described first equipment to obtain the monitoring result of described first equipment;
Judge whether the monitoring result of described first equipment meets pre-conditioned; And
The monitoring result of described first equipment meet described pre-conditioned time, according to pre-set commands control described second equipment;
Wherein, after described first equipment of monitoring is with the monitoring result obtaining described first equipment, described method also comprises: the condition select command receiving user's input, and wherein, described condition select command is used in the multiple conditions prestored, determine that one or more condition is as described pre-conditioned;
Wherein, monitor described first equipment to comprise with the monitoring result obtaining described first equipment: the running status of monitoring described first equipment, judge whether the monitoring result of described first equipment meets pre-conditioned comprising: judge that whether the running status of described first equipment is opening or closed condition or malfunction.
2. the control method of air-conditioner system according to claim 1, is characterized in that,
Monitor described first equipment to comprise with the monitoring result obtaining described first equipment: the operational factor of monitoring described first equipment,
Judge whether the monitoring result of described first equipment meets pre-conditioned comprising: judge that the operational factor of described first equipment is whether in preset parameter range; Or judge whether the operational factor of described first equipment equals parameter preset.
3. the control method of air-conditioner system according to claim 1, is characterized in that, controls described second equipment comprise according to pre-set commands:
Control described second opening of device or closedown; And
Control described second equipment and run on refrigeration mode, heating mode, air supply pattern or dehumidification mode; And
Control described second equipment and change operational factor.
4. the control method of air-conditioner system according to claim 1, it is characterized in that, described first equipment comprises following any one or plurality of devices: temperature sensor, humidity sensor, gas concentration lwevel sensor, internal machine of air-conditioner, air conditioner external, remote controller, humidifier, dehumidifier, new blower fan, dry type end and air-valve; Described second equipment comprises following any one or plurality of devices: temperature sensor, humidity sensor, gas concentration lwevel sensor, internal machine of air-conditioner, air conditioner external, remote controller, humidifier, dehumidifier, new blower fan, dry type end, air-valve and return fan.
5. the control method of air-conditioner system according to claim 1, is characterized in that, the monitoring result of described first equipment meet described pre-conditioned after, described method also comprises:
Show the monitoring result of described first equipment; And
Receive the equipment control command of user's input, and using described equipment control command as described pre-set commands.
6. the control method of air-conditioner system according to claim 5, is characterized in that, the equipment control command receiving user's input comprises:
Receive the first control command of user's input, wherein, described first control command changes operational factor for controlling the second equipment; And/or
Receive the second control command of user's input, wherein, described second control command changes running status for controlling the second equipment.
7. a control device for air-conditioner system, is characterized in that, comprising:
First receiver module, for receiving the equipment choice order of user's input, wherein, the first equipment of the corresponding air-conditioner system of described equipment choice order and the second equipment;
Monitoring modular, for monitoring described first equipment to obtain the monitoring result of described first equipment;
Judge module, for judging whether the monitoring result of described first equipment meets pre-conditioned; And
Control module, for meet in the monitoring result of described first equipment described pre-conditioned time, according to pre-set commands control described second equipment;
Wherein, described device also comprises: the 3rd receiver module, and for receiving the condition select command of user's input, wherein, described condition select command is used in the multiple conditions prestored, determine that one or more condition is as described pre-conditioned;
Wherein, described monitoring modular comprises: the second monitoring submodule, for monitoring the running status of described first equipment, described judge module comprises: the 3rd judges submodule, for judging that whether the running status of described first equipment is opening or closed condition or malfunction.
8. the control device of air-conditioner system according to claim 7, is characterized in that,
Described monitoring modular comprises: the first monitoring submodule, for monitoring the operational factor of described first equipment,
Described judge module comprises: first judges submodule, for judging that the operational factor of described first equipment is whether in preset parameter range; Or second judges submodule, for judging whether the operational factor of described first equipment equals parameter preset.
9. the control device of air-conditioner system according to claim 7, is characterized in that, described control module comprises:
First controls submodule, for controlling described second opening of device or closedown;
Second controls submodule, runs on refrigeration mode, heating mode, air supply pattern or dehumidification mode for controlling described second equipment; And
3rd controls submodule, changes operational factor for controlling described second equipment.
10. the control device of air-conditioner system according to claim 7, is characterized in that, also comprises:
Display module, for showing the monitoring result of described first equipment; And
Second receiver module, for receiving the equipment control command of user's input, and using described equipment control command as described pre-set commands.
The control device of 11. air-conditioner systems according to claim 10, is characterized in that, described second receiver module comprises:
First receives submodule, and for receiving the first control command of user's input, wherein, described first control command changes operational factor for controlling the second equipment; And/or
Second receives submodule, and for receiving the second control command of user's input, wherein, described second control command changes running status for controlling the second equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110416675.0A CN103162374B (en) | 2011-12-12 | 2011-12-12 | control method and device of air conditioner system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110416675.0A CN103162374B (en) | 2011-12-12 | 2011-12-12 | control method and device of air conditioner system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103162374A CN103162374A (en) | 2013-06-19 |
CN103162374B true CN103162374B (en) | 2016-03-30 |
Family
ID=48585687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110416675.0A Active CN103162374B (en) | 2011-12-12 | 2011-12-12 | control method and device of air conditioner system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103162374B (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103383130B (en) * | 2013-07-31 | 2016-02-24 | 南京泰通科技有限公司 | A kind of intelligent fresh air air-conditioning coordinated signals management method |
CN103673211A (en) * | 2013-11-19 | 2014-03-26 | 四川长虹电器股份有限公司 | Air conditioning control method and air conditioner |
CN104729010B (en) * | 2013-12-24 | 2018-09-18 | 珠海格力电器股份有限公司 | control method, device and system of air conditioner |
CN103884079B (en) * | 2014-03-25 | 2016-10-05 | 四川长虹电器股份有限公司 | A kind of air-conditioning work mode switching method and a kind of air-conditioning |
CN104977905A (en) * | 2014-04-10 | 2015-10-14 | 海信(山东)空调有限公司 | System control method, device and system based on BACnet protocol |
CN104460328B (en) * | 2014-10-29 | 2019-05-10 | 小米科技有限责任公司 | Smart machine control method and device based on set scene mode |
US10057077B2 (en) | 2014-10-29 | 2018-08-21 | Xiaomi Inc. | Method and server for controlling smart devices based on predefined scenario mode |
CN105045112A (en) * | 2015-05-29 | 2015-11-11 | 四川长虹电器股份有限公司 | Smart home control method based on indoor human body information detection |
CN106016515B (en) * | 2016-05-18 | 2018-12-07 | 珠海格力电器股份有限公司 | Control method, device and system of dehumidifying device |
CN106292329A (en) * | 2016-10-20 | 2017-01-04 | 乐视控股(北京)有限公司 | Intelligent home furnishing control method, device, system and a kind of electronic equipment |
CN108253579A (en) * | 2017-12-21 | 2018-07-06 | 珠海格力电器股份有限公司 | Air conditioner control method and system |
CN108679783B (en) * | 2018-03-06 | 2019-10-08 | 珠海格力电器股份有限公司 | Control method and device of air conditioning system |
CN109947003B (en) * | 2019-03-29 | 2023-09-19 | 联想(北京)有限公司 | Control method and control equipment |
CN114076387B (en) * | 2020-08-14 | 2023-06-09 | 海信空调有限公司 | Air conditioner and fresh air quantity control method thereof |
CN112161393A (en) * | 2020-08-28 | 2021-01-01 | 珠海格力电器股份有限公司 | Method and device for customizing functions of household appliance, electronic equipment and storage medium |
CN114599097A (en) * | 2022-02-24 | 2022-06-07 | 深圳市海洋王照明工程有限公司 | Control method and device of terminal equipment, centralized controller and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007155229A (en) * | 2005-12-06 | 2007-06-21 | Sanden Corp | Vapor compression type refrigerating cycle |
CN101012954A (en) * | 2007-02-12 | 2007-08-08 | 广州金关节能科技发展有限公司 | Air-conditioning cold flow self-adaptive energy-saving control system |
CN101017021A (en) * | 2007-02-14 | 2007-08-15 | 广州金关节能科技发展有限公司 | Intelligent cluster control system of central air-conditioning |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101440984B (en) * | 2008-12-16 | 2010-06-09 | 中山大学 | Airflow regulating method of communication base station air conditioner unit |
-
2011
- 2011-12-12 CN CN201110416675.0A patent/CN103162374B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007155229A (en) * | 2005-12-06 | 2007-06-21 | Sanden Corp | Vapor compression type refrigerating cycle |
CN101012954A (en) * | 2007-02-12 | 2007-08-08 | 广州金关节能科技发展有限公司 | Air-conditioning cold flow self-adaptive energy-saving control system |
CN101017021A (en) * | 2007-02-14 | 2007-08-15 | 广州金关节能科技发展有限公司 | Intelligent cluster control system of central air-conditioning |
Also Published As
Publication number | Publication date |
---|---|
CN103162374A (en) | 2013-06-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103162374B (en) | control method and device of air conditioner system | |
CN105091097B (en) | Air handling system | |
KR100565486B1 (en) | Air conditioner's central controlling system and its operating method | |
CN104956154B (en) | Air handling system | |
US20060287774A1 (en) | Multi-air conditioner central control system | |
CN106302059A (en) | A kind of long-range control method for Smart Home and device | |
CN102734894B (en) | Air-conditioning controlling system | |
US6895308B2 (en) | Controller for devices in a control network | |
CN105259957A (en) | Control method and controller capable of controlling household equipment in linkage mode | |
WO2014115318A1 (en) | Air-conditioning control system | |
CN107204904A (en) | The control method of smart home, Centralized Controller, intelligent domestic system | |
CN110260461B (en) | Method and device for accurately detecting state of communication line in multi-split air conditioning system | |
Rafeeq et al. | Remote supervision and control of air conditioning systems in different modes | |
CN106970600A (en) | Situation location sense answers contextual model control device | |
KR200427916Y1 (en) | Building Management Control System which uses Direct Digital Controller of two wire DC Power Line Communication and Key Pad | |
WO2016060836A1 (en) | System and method for monitoring and controlling heating, ventilating, and air conditioning equipment | |
KR20010017425A (en) | Apparatus and method for controlling home appliances | |
CN103148558B (en) | Temperature and humidity control system | |
CN110260453A (en) | Humidify matching process, device and the computer readable storage medium of pipeline | |
CN108679783B (en) | Control method and device of air conditioning system | |
US10274228B2 (en) | Packaged HVAC unit with secondary system capability | |
JP4832536B2 (en) | Equipment controller | |
CN106123244B (en) | drainage control method and device of air conditioning system | |
KR20150043879A (en) | Air conditioner and method | |
CN220872902U (en) | Intelligent controller of wind cabinet and wind cabinet system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |